MINERAL COMMODITIES LTD Investor Presentation 2018

Aug 30, 2018

65371_rns_2018-08-30_951994dc-f2f6-4cac-a933-0239979c2675.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [140 x 56] intentionally omitted <==

==> picture [720 x 245] intentionally omitted <==

MINERAL COMMODITIES LTD 2018 HALF YEAR RESULTS PRESENTATION ASX: MRC | www.mineralcommodities.com

DISCLAIMER AND COMPETENT PERSON STATEMENT

This document has been prepared by Mineral Commodities Ltd (MRC or the Company) and comprises written materials / slides for a presentation concerning MRC. This is not a prospectus, disclosure document or offering document.

This document is for information purposes only and does not constitute or form part of any offer or invitation to acquire, sell or otherwise dispose of, or issue, or any solicitation of any offer to sell or otherwise dispose of, purchase or subscribe for, any securities, nor does it constitute investment advice, nor shall it or any part of it nor the fact of its distribution form the basis of, or be relied on in connection with, any contract or investment decision.

Certain statements in this presentation are forward looking statements. You can identify these statements by the fact that they use words such as “anticipate”, “estimate”, “expect”, “project”, “intend”, “plan”, “believe”, “target”, “may”, “assume” and words of similar import. These forward looking statements speak only as at the date of this presentation. These statements are based on current expectations and beliefs and, by their nature, are subject to a number of known and unknown risks and uncertainties that could cause the actual results, performances and achievements to differ materially from any expected future results, performance or achievements expressed or implied by such forward looking statements. No representation, warranty or assurance (express or implied) is given or made by MRC that the forward looking statements contained in this presentation are accurate, complete, reliable or adequate or that they will be achieved or prove to be correct. Except for any statutory liability which cannot be excluded, each of MRC, its related companies and the respective officers, employees and advisers expressly disclaim any responsibility for the accuracy or completeness of the forward looking statements and exclude all liability whatsoever (including negligence) for any director in direct loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from.

Subject to any continuing obligation under applicable law or any relevant listing rules of the ASX, MRC disclaims any obligation or undertaking to disseminate any updates or revisions to any forward looking statements in these materials to reflect any change in expectations in relation to any forward looking statements or any change in events, conditions or circumstances on which any statement is based. Nothing in these materials shall under any circumstances create an implication that there has been no change in the affairs of MRC since the date of this presentation.

The information in this presentation which relates to Exploration Results, Mineral Resources or Ore Reserves for Tormin is based on information compiled by Mr Adriaan du Toit, who is a Member of the AusIMM and was previously an independent consultant to the Company. Mr du Toit is the Director and Principal Geologist of AEMCO Pty Ltd and has over 26 years’ exploration and mining experience in a variety of mineral deposits and styles. Mr du Toit has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code (2012). The information from Mr du Toit was prepared under the JORC Code (2012). Mr du Toit consents to inclusion in the report of the matters based on this information in the form and context in which it appears.

2

==> picture [88 x 35] intentionally omitted <==

H1 2018 HIGHLIGHTS

Operational

  • Safety performance maintained – Total Recordable Injury Frequency Rate reduced to zero with no Lost Time Injuries recorded since April 2017

  • Record PBC/TSP and GSP/SCP processing plants throughput (1,062,697t and 483,667t respectively), availability (+94%) and valuable mineral recoveries

  • Final concentrate gross production at record levels – 352,492 tonnes

  • S102 Application submitted for potential 10 year LOM extension

  • Prospecting Right Environmental Authorisation issued

Financial

  • Total Revenue of US$28.5 million

  • EBITDA of US$4.8 million and NPAT of US$1.2 million

  • Cash balance of US$10.2 million

  • Debt decreased to US$3.0 million

  • Trade and Other Receivables increased to US$9.5 million

  • Record 55% increase pricing for zircon/rutile concentrate

  • Final concentrate stockpile inventory to deliver future revenue of circa US$65 million and circa US$25 million in future net cash generation (pre-tax)

  • Interim dividend of 0.6 Australian cent per share (partially franked)

3

4
Iran MRK PJSC
100% Corporate Entity
Gold/Copper
Cobalt/Nickel
Zinc
Potash/Lithium
MRC Graphite Pty Ltd
51% Ownership of Munglinup
Graphite Project
Graphitic Products
Transworld Energy & Minerals
Resources (SA) (Pty) Ltd (RSA)
56% Ownership of Xolobeni Mineral
Sands Project
Rich Ilmenite
Mineral Sands Resources
(Pty) Ltd (RSA)
50% Ownership of Tormin Mineral Sands Mine
Zircon/Rutile
Ilmenite
Garnet
Projects
Location
Resource
Interest
Status
MSR Tormin
South Africa
Mineral Sands Mine
50%
Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni
South Africa
Mineral Sands Project
56%
Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup
Australia
Graphite
51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration
Australia
Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100%
Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran
Iran
Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine
PROJECT LOCATIONS
MRC Exploration
Australia Pty Ltd
100% Corporate Entity
Copper/Gold
Channel Iron Ore
Hard Rock Lithium, Vanadium
4
Iran MRK PJSC
100% Corporate Entity
Gold/Copper
Cobalt/Nickel
Zinc
Potash/Lithium
MRC Graphite Pty Ltd
51% Ownership of Munglinup
Graphite Project
Graphitic Products
Transworld Energy & Minerals
Resources (SA) (Pty) Ltd (RSA)
56% Ownership of Xolobeni Mineral
Sands Project
Rich Ilmenite
Mineral Sands Resources
(Pty) Ltd (RSA)
50% Ownership of Tormin Mineral Sands Mine
Zircon/Rutile
Ilmenite
Garnet
Projects
Location
Resource
Interest
Status
MSR Tormin
South Africa
Mineral Sands Mine
50%
Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni
South Africa
Mineral Sands Project
56%
Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup
Australia
Graphite
51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration
Australia
Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100%
Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran
Iran
Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine
PROJECT LOCATIONS
MRC Exploration
Australia Pty Ltd
100% Corporate Entity
Copper/Gold
Channel Iron Ore
Hard Rock Lithium, Vanadium
4
Iran MRK PJSC
100% Corporate Entity
Gold/Copper
Cobalt/Nickel
Zinc
Potash/Lithium
MRC Graphite Pty Ltd
51% Ownership of Munglinup
Graphite Project
Graphitic Products
Transworld Energy & Minerals
Resources (SA) (Pty) Ltd (RSA)
56% Ownership of Xolobeni Mineral
Sands Project
Rich Ilmenite
Mineral Sands Resources
(Pty) Ltd (RSA)
50% Ownership of Tormin Mineral Sands Mine
Zircon/Rutile
Ilmenite
Garnet
Projects
Location
Resource
Interest
Status
MSR Tormin
South Africa
Mineral Sands Mine
50%
Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni
South Africa
Mineral Sands Project
56%
Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup
Australia
Graphite
51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration
Australia
Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100%
Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran
Iran
Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine
PROJECT LOCATIONS
MRC Exploration
Australia Pty Ltd
100% Corporate Entity
Copper/Gold
Channel Iron Ore
Hard Rock Lithium, Vanadium
4
Iran MRK PJSC
100% Corporate Entity
Gold/Copper
Cobalt/Nickel
Zinc
Potash/Lithium
MRC Graphite Pty Ltd
51% Ownership of Munglinup
Graphite Project
Graphitic Products
Transworld Energy & Minerals
Resources (SA) (Pty) Ltd (RSA)
56% Ownership of Xolobeni Mineral
Sands Project
Rich Ilmenite
Mineral Sands Resources
(Pty) Ltd (RSA)
50% Ownership of Tormin Mineral Sands Mine
Zircon/Rutile
Ilmenite
Garnet
Projects
Location
Resource
Interest
Status
MSR Tormin
South Africa
Mineral Sands Mine
50%
Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni
South Africa
Mineral Sands Project
56%
Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup
Australia
Graphite
51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration
Australia
Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100%
Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran
Iran
Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine
PROJECT LOCATIONS
MRC Exploration
Australia Pty Ltd
100% Corporate Entity
Copper/Gold
Channel Iron Ore
Hard Rock Lithium, Vanadium
4
Iran MRK PJSC
100% Corporate Entity
Gold/Copper
Cobalt/Nickel
Zinc
Potash/Lithium
MRC Graphite Pty Ltd
51% Ownership of Munglinup
Graphite Project
Graphitic Products
Transworld Energy & Minerals
Resources (SA) (Pty) Ltd (RSA)
56% Ownership of Xolobeni Mineral
Sands Project
Rich Ilmenite
Mineral Sands Resources
(Pty) Ltd (RSA)
50% Ownership of Tormin Mineral Sands Mine
Zircon/Rutile
Ilmenite
Garnet
Projects
Location
Resource
Interest
Status
MSR Tormin
South Africa
Mineral Sands Mine
50%
Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni
South Africa
Mineral Sands Project
56%
Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup
Australia
Graphite
51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration
Australia
Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100%
Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran
Iran
Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine
PROJECT LOCATIONS
MRC Exploration
Australia Pty Ltd
100% Corporate Entity
Copper/Gold
Channel Iron Ore
Hard Rock Lithium, Vanadium
Projects Location Resource Interest Status
MSR Tormin South Africa Mineral Sands Mine 50% Commenced operation October 2013, potential extension to mine life
identified
TEM Xolobeni South Africa Mineral Sands Project 56% Rich ilmenite mineral sands deposit on the Eastern Cape of South Africa
Munglinup Australia Graphite 51% (earn-in to
90%)
Feasibility study in progress, planned production Q4 2019
WA Exploration Australia Gold, Copper, Lithium, Channel
Iron Ore, Vanadium
100% Drill program completed at Doolgunna on high grade gold target, results
pending. Secondary drilling program to commence
Iran Iran Gold, Copper, Potash, Lithium,
Cobalt, Nickel, Zinc
100% of
corporate entity
Reviewed in excess of 36 mining projects. Four project investments to date
including operating gold mine

4

==> picture [88 x 35] intentionally omitted <==

SOUTH AFRICA | TORMIN MINERAL SANDS OPERATION

TORMIN MINERAL SANDS OPERATION

  • Continued strong safety record with with TRIFR of zero and 1 LTI since commencement of operations

● Resource: Original 2.7Mt at 49.7% THM Mined 6.6Mt at 27.6% THM Current Inferred 1.8Mt at 15.9% THM[(1)]

  • Identified potential 10+ years life of mine extension

  • Logistics/Power Optimisation via rail and Eskom grid connection

  • ● Prospecting permitting Environmental Authorisations granted

  • S102 expansion permitting continuing with expected resolution in 2019

  • Permitting continuing with expected resolution in 2019

  • New South African Government leadership pro mining development

  • (1) Refer to ASX release of 28 February 2018

5

==> picture [88 x 35] intentionally omitted <==

SOUTH AFRICA | TORMIN OPERATION | SAFETY

==> picture [323 x 216] intentionally omitted <==

The Company continued its outstanding safety performance, with only one Lost Time Injury (“LTI”) being a sprained ankle in April 2017, for in excess of 2.4 million man hours worked since Tormin Operations commenced.

Health and Safety Data
Man-hours worked since last LTI 730,206
Total LTI’s since Tormin mining commenced 1

Total Reportable Injury Frequency Rate (TRIFR per million man hours)

==> picture [315 x 169] intentionally omitted <==

6

==> picture [88 x 35] intentionally omitted <==

H1 2018 TORMIN OPERATION | PRODUCTION

352,492t

207,386t

H1 2018 Gross Production Summary

H1 2018 Net Production Summary

==> picture [322 x 129] intentionally omitted <==

==> picture [323 x 128] intentionally omitted <==

H1 2017 H1 2018
Garnet Concentrate 145,888 275,115
Ilmenite Concentrate 139,424 67,563
Zircon/ Rutile Concentrate 11,674 9,814
Total 296,986 352,492
H1 2017 H1 2018
Garnet Concentrate 92,453 130,009
Ilmenite Concentrate 63,409 67,563
Zircon/ Rutile Concentrate 11,674 9,814
Total 167,536 207,386

7

==> picture [88 x 35] intentionally omitted <==

H1 2018 TORMIN OPERATION | SALES AND STOCKPILE

146,990t

818,036t

H1 2018 Sales Summary

H1 2018 Stockpile Summary

==> picture [322 x 128] intentionally omitted <==

H1 2017 H1 2018
Garnet Concentrate 81,536 81,330
Ilmenite Concentrate 172,098 55,000
Zircon/ Rutile Concentrate 13,044 10,660
Total 266,678 146,990
  • (1) Total tonnes = Tormin, Koekenaap, Saldanha Bay, in transit or held on behalf of third party under offtake agreement.

==> picture [324 x 107] intentionally omitted <==

H1 2017 H1 2018
ROM 102,257 70,475
HMC 4,441 13,954
Garnet
Concentrate(1)
620,722 664,233
Ilmenite Concentrate 67,285 68,450
Zircon/ Rutile Concentrate 544 924
Total 795,249 818,036

8

==> picture [88 x 35] intentionally omitted <==

H1 2018 REVENUE AND PROFITABILITY

US$28.5m

US$4.8m H1 2018 EBITDA

H1 2018 Revenue

==> picture [208 x 121] intentionally omitted <==

==> picture [208 x 120] intentionally omitted <==

==> picture [439 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018 H1 2017 H1 2018
31.6 28.5 10.1 4.8
REVENUE (US$m) EBITDA (US$m)
----- End of picture text -----

US$1.2m

H1 2018 NPAT

==> picture [208 x 121] intentionally omitted <==

==> picture [208 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
5.4 1.2
NPAT (US$m)
----- End of picture text -----

9

==> picture [88 x 35] intentionally omitted <==

H1 2018 CASHFLOWS AND CASH POSITION

US$2.7m

US$5.4m H1 2018 Cashflow from Operations

H1 2018 Investment Expenditure

==> picture [208 x 120] intentionally omitted <==

==> picture [208 x 120] intentionally omitted <==

==> picture [439 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018 H1 2017 H1 2018
11.3 5.4 1.5 2.7
Cashflow from Operations (US$m) Investment Expenditure (US$m)
----- End of picture text -----

US$10.2m

H1 2018 Cash Balance

==> picture [209 x 121] intentionally omitted <==

==> picture [208 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
6.9 10.2
Cash Balance (US$m)
----- End of picture text -----

10

==> picture [88 x 35] intentionally omitted <==

H1 2018 FINANCIAL POSITION

US$3.0m

US$14.3m

H1 2018 Net Working H1 2018 Borrowings Capital

==> picture [208 x 120] intentionally omitted <==

==> picture [208 x 120] intentionally omitted <==

==> picture [439 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018 H1 2017 H1 2018
13.3 14.3 5.5 3.0
Net Working Capital (US$m) Borrowings (US$m)
----- End of picture text -----

US$42.4m

H1 2018 Net Assets

==> picture [208 x 120] intentionally omitted <==

==> picture [208 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
40.5 42.4
Net Assets (US$m)
----- End of picture text -----

11

==> picture [88 x 35] intentionally omitted <==

H1 2018 SHAREHOLDER RATIOS

A$ 0.60cent H1 2018 Dividend per

US$ 0.27cent

H1 2018 Earnings per Share

Share

==> picture [208 x 120] intentionally omitted <==

==> picture [210 x 116] intentionally omitted <==

==> picture [210 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
1.32 0.27
Earnings Per Share (US$ cents)
----- End of picture text -----

==> picture [208 x 99] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
0.50 0.60
Dividend Per Share (A$ cents)
----- End of picture text -----

US$ 10.14cents H1 2018 Net Assets per Share

==> picture [208 x 120] intentionally omitted <==

==> picture [208 x 51] intentionally omitted <==

----- Start of picture text -----

H1 2017 H1 2018
10.01 10.14
----- End of picture text -----

==> picture [208 x 38] intentionally omitted <==

----- Start of picture text -----

Net Assets Per Share (US$ cents)
----- End of picture text -----

12

==> picture [88 x 35] intentionally omitted <==

For further information please contact:

Phil Retter | Manager – Investor Relations & Corporate Affairs Mineral Commodities Ltd

T: +61 8 6253 1100 | D: +61 8 6253 1152 | M +61 407 440 882 E: [email protected]

13