ASX: MRC 12 March 2020

MAIDEN JORC RESOURCE ESTIMATION FOR THE SKALAND

GRAPHITE PROJECT

  • Indicated and Inferred 1.78 Million tonnes at 22% Total Graphitic Carbon (“TGC”) for 397Kt of contained graphite.

  • Highest grade resource for any operating graphite mine in the world.

  • Initial estimate based on previous data with mineralisation open up and down dip with potential to mine from existing development.

  • Drilling to commence next quarter to target new mineralised zones, delineate a JORC Code (2012) compliant Measured Resource and subsequent Ore Reserve estimate after the drilling campaign.

Mineral Commodities Ltd (“MRC” or “the Company”) is pleased to announce the maiden JORC resource at the Skaland Graphite Project for the underground Trælen Graphite Mine located on the island of Senja, Norway.

The Mineral Resource has been prepared in accordance with the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, (“JORC Code (2012)”) and is estimated at 1.78 Million tonnes at 22% TGC in the category of indicated and inferred for 397Kt of contained graphite using a 10% cut-off .

Table1-Total Mineral Resources for the Trælen Graphite Deposit (10% cut-off grade)

Total Graphitic Tonnes Contained
Classification Tonnes Kt
Carbon(TGC) Graphite Kt
Indicated 409 26% 106
Inferred 1,376 21% 291
Total1 1,785 22% 397
  1. Mineral Resource estimated at a 10% TGC cut-off

Executive Chairman Mark Caruso said, “ After completing the acquisition of Skaland in October, 2019 we’ve moved quickly to implement the requisite mine planning and scheduling necessary to deliver on our near term goals of optimising concentrate production before increasing output. We’re very pleased to release this maiden JORC resource at Skaland, the highest grade resource for any operating graphite mine in the world, which not only becomes the foundation of our plans to build on our existing graphite concentrate business but also underwrites our strategy to become Europe’s first vertically integrated producer of natural graphite anode material.”

T: +61 8 6253 1100 PO Box 235

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 1

WELSHPOOL DC WA 6986

12 March 2020

ASX: MRC ASX: MRC

==> picture [93 x 25] intentionally omitted <==

The mineral resource quoted at various cut-off grades (COG) as presented below (Table 2) demonstrates the high grade nature of the deposit, with nearly 75% of the total contained tonnes reporting at 25% TGC at a 20% cut off.


eporting at 25% TGC at a 20% cut off.

eporting at 25% TGC at a 20% cut off.

eporting at 25% TGC at a 20% cut off.

eporting at 25% TGC at a 20% cut off.
Table 21 : Resource Table at Various Cut off Grades
Classification Cut Off Tonnes TGC (%) Contained Total
Graphitic Carbon
(Tonnes)
TOTAL 20 1,172,627 25% 296,338
17.5 1,486,175 24% 355,781
15 1,587,387 23% 372,300
12.5 1,693,059 23% 386,851
10 1,784,796 22% 397,175
7.5 1,895,965 21% 406,839
5 1,943,603 21% 409,812

1-Refer to JORC table 1 for full table

Background

The Skaland Graphite Operation is located in northern Norway on the island of Senja, with Tromsø the nearest major town, with a population of around 65,000, some 70km to the northeast (see Figure 1).

Graphite was first discovered in the area in 1870 and production started in 1917. Skaland is understood to be the largest flake graphite producer in Europe and is presently the world’s highest-grade operating flake graphite mine. Skaland Graphite AS formerly extracted graphite ore from the Skaland mine which is located directly alongside the existing processing and port infrastructure, but since 2007 ore to the plant has been sourced from the nearby Trælen Mine.

Since the acquisition of Skaland Graphite AS on 4 October 2019, MRC has undertaken a reevaluation of the mineral resources in the Trælen Graphite Mine by re-logging, re-sampling, and re-assaying of drilling core to build a 3D block model of the deposit. No previous JORC Resource estimation has been undertaken for the Skaland or Trælen deposits. Wardell Armstrong International (“WAI”) as an independent consultant has completed an audit of the Mineral Resource Estimate of the Trælen deposit, prepared by MRC in accordance with the guidelines of the JORC Code (2012).

T: +61 8 6253 1100

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 2

PO Box 235 WELSHPOOL DC WA 6986

12 March 2020

ASX: MRC ASX: MRC

==> picture [121 x 112] intentionally omitted <==

Figure 1: Location of the Skaland and Trælen Deposits

==> picture [445 x 268] intentionally omitted <==

Geology and Mineral Resources Estimate

The Trælen deposit lies on the northern tip of the Skaland peninsula and consists of two main and related lithological units. The tectono-stratigraphically lower unit is a banded gneiss with alternating biotite rich and granitic bands (locally termed “Trælen Gneiss”) and an upper unit that consists of amphibolitic gneiss. These are heterogeneous hornblende gneisses with graphite horizons, possibly metamorphic greywacke and calciferous rocks. Both units contain granitic orthogneisses, possibly a result of partial melting of the surrounding rocks. Quartz diorites and different types of pegmatites occur as well, forming discontinuous intrusions.

The graphite found in the upper unit is assumed to be primarily syngenetic and later exposed to tectonic activity leading to its present textural, mineralogical, geochemical and geometric characteristics.

The mineralised horizon is isoclinally folded and the thickest, most continuous mineralisation occurs as lens shaped bodies oriented parallel to the main fold axis. This horizon contains the most economically interesting instances of graphite at Trælen, and can vary between centimetres and 12-14m thick. There is minor graphite found in faults and along shears. There are minor exploration targets to the south and west of the current Trælen Deposit which may represent either a further fold of the same horizon or a second mineralised horizon.

The rocks in the area have been exposed to at least three phases of folding and deformation with the last folding phase responsible at Trælen with a fold axis dipping 30 to 90 degrees towards the west–northwest. The existence of hypersthene, signs of partial melting and migmatisation, and the occurrences of course grained flaky graphite, all indicate high temperature metamorphism.

T: +61 8 6253 1100 PO Box 235 WELSHPOOL DC WA 6986

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 3

12 March 2020

ASX: MRC ASX: MRC

==> picture [121 x 112] intentionally omitted <==

The thicker, domainable zones of the graphite mineralisation are named the Boye North Shoot , Boye South Shoot (termed for their relative positions to each other),the VLF or North East Shoot and an unnamed second northeast shoot (“NE2”). The North East shoot was named as such due to occupying a location to the northeast of the mine workings, where it was identified at the 85mRL and above. A schematic plan view of the Trælen deposit is shown in Figure 2.

Figure 2- Schematic plan view of the Trælen Deposit at 0mRL - the North East and NE2 shoots migrate further east in respect to the North and South Shoots with increasing elevation

==> picture [339 x 345] intentionally omitted <==

Two types of drilling have been conducted at Trælen, diamond drillholes (both from surface and underground) and shorter rotary probe (sludge) boreholes all drilled from underground. A total of 133 holes have been drilled, 93 diamond holes and 40 probe holes. The total metres drilled is 16,540m, which comprises of 15,531m diamond drilling (average 167m, min 36m, max 435m) and 1,009m of probe drilling (average 25.2m, min 15m, max 30m). All diamond drilling has been drilled with a core diameter of 36mm, the type of drilling has only been recorded for a few holes, either BQ wireline or LTK 48 conventional.

All significant graphite bearing intersections in the diamond core have been sampled by splitting the core longitudinally, with the mineralised zone sampled every two meters except for boundaries where a longer or shorter interval was taken.

T: +61 8 6253 1100 PO Box 235 WELSHPOOL DC WA 6986

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 4

12 March 2020

ASX: MRC ASX: MRC

==> picture [93 x 25] intentionally omitted <==

All collected samples have been assayed at the on-site laboratory or sent to the ALS laboratory in Sweden (ALS Scandinavia) to complete the preparation and assaying. The 853 samples resubmitted to ALS have been analysed for both Total Carbon, using a similar method to the onsite laboratory, and Total Graphitic Carbon (TGC) by LECO furnace.

The Mineral Resource estimation involved the use of drillhole and geological mapping data to construct three dimensional wireframes to define mineralised domains. Samples were selected inside these wireframes, coded and composited. Boundaries were treated as hard with statistical and geostatistical analysis conducted on composites identified in individual domains. Grades were estimated into a geological block model representing each mineralised domain. Grade estimation was carried out by inverse distance for both TGC and flake size values by using Micromine software. The result of the flake size estimation is presented in Figure 3.

Figure 3: Flake Size Estimation, 1.01-2.00 = Fine, 2.01-3.00 = Medium, >3.01= Coarse (Looking North)

==> picture [429 x 370] intentionally omitted <==

Zones of the Trælen deposit in close proximity to mining have been drilled to 40x20m spacing, closer in places due to the nature of fan drilling, which is considered to be sufficient for classification of an Indicated Resource. Given the adjustments needed to a large portion of assays from Total Carbon to represent Graphitic Carbon, there is additional uncertainty around exact grades. For this reason, there is no classification of Measured material in the Mineral Resource, even close to existing mining, where geological and spatial confidence is high.

T: +61 8 6253 1100 PO Box 235 WELSHPOOL DC WA 6986

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 5

12 March 2020

ASX: MRC ASX: MRC

==> picture [93 x 25] intentionally omitted <==

Mining is currently being conducted by long hole open stoping in a bottom up sequence. Future mining is assumed to be long hole open stoping in a top down sequence. A crosssection of the Resource Classification on 100 Shoot is presented in Figure 4.

Figure 4: Resource Classification on 100 Shoot – the blue/green zones on the figure shows a fold where there is inferred classification on the northern limb of the fold and indicated classification on the southern limb

==> picture [486 x 335] intentionally omitted <==

----- Start of picture text -----

Mineralisation open both
up-dip and down-dip
----- End of picture text -----

A summary of the Mineral Resource statement is shown in Table 1 as defined by the JORC Code (2012).

The stated Mineral Resource estimate is not materially affected by any known environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant issues, to the best knowledge of the authors. There are no known mining, metallurgical, infrastructure, or other factors that materially affect this Mineral Resource estimate, at this time.

The Company intends to commence a drilling program in Q2-2020 to upgrade the current resource and will target delineating a JORC Code (2012) compliant Measured Resource and subsequent Ore Reserve estimate after the drilling campaign.

END

T: +61 8 6253 1100 PO Box 235 WELSHPOOL DC WA 6986

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 6

12 March 2020

ASX: MRC ASX: MRC

==> picture [121 x 112] intentionally omitted <==

Issued by Mineral Commodities Ltd ACN 008 478 653 www.mineralcommodities.com. Authorised by the Board of Mineral Commodities Ltd.

For inquiries, please contact:

INVESTORS & MEDIA CORPORATE Peter Fox Peter Torre Investor Relations and Corporate Development Company Secretary T: +61 8 6253 1100 T: +61 8 6253 1100 [email protected] [email protected]

About Mineral Commodities Ltd

Mineral Commodities Ltd (ASX: MRC) is a global mining and development company with a primary focus on the development of high-grade mineral deposits within the industrial and battery minerals sectors.

The Company is a leading producer of zircon, rutile, garnet and ilmenite concentrates through its Tormin Mineral Sands Operation, located on the Western Cape of South Africa. In October 2019, the Company completed the acquisition of Skaland Graphite AS, the owner of the world’s highest-grade operating flake graphite mine and one of the only producers in Europe. The planned development of the Munglinup Graphite Project, located in Western Australia, builds on the Skaland acquisition and is a further step toward an integrated, downstream value-adding strategy which aims to capitalise on the fastgrowing demand for sustainably manufactured lithium-ion batteries.

Competent Person Statement

The information in this Securities Exchange Announcement that relates to Mineral Resources is based on information compiled by Mr Ché Osmond, who is a Chartered Geologist (CGeol) of Geological Society of London and Fellow of the Geological Society (FGS) a Recognised Professional Organisation (RPO). Mr Osmond is Technical Director of Wardell Armstrong International (“WAI”) an independent consultant to Mineral Commodities Ltd. Mr Osmond has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“the JORC Code (2012)”). Mr Osmond consents to the inclusion in this ASX release in the form and context in which it appears.

T: +61 8 6253 1100 PO Box 235 WELSHPOOL DC WA 6986

ABN 39 008 478 653 [email protected] www.mncom.com.au

Page 7

(JORC Code, 2012 Edition – Table 1 report)

Section 1 Sampling Techniques and Data XX FEBURARY 2020

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity
and
the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report.
In cases where “industry standard” work has been done this would
be relatively simple (eg “reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay”). In other cases more explanation may
be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.

The current resource database consists of 133 holes, 93
diamond holes and 40 probe holes, representing 15,531m of
drilling and 1,245 analysed drill samples.

Probe holes have not been sampled.

Diamond drilling mineralised zones were sampled every two
metres except for boundaries where a longer or shorter interval
was taken. Unmineralised core was not sampled.

Sampling method is by manually splitting half-core sampling of
diamond drill core.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method,
_etc). _

All diamond drilling is either BQ or LTK 48 sized.

Core diameter is approximately 36mm.

No diamond drillholes are orientated.

Recent (from 2012) diamond drillholes (all drilled from
underground)have been downhole surveyed byelectronic

Page 8

Criteria JORC Code explanation Commentary
multi-shot survey tools at intervals of 3.0m (6 holes in 2012 were
surveyed on 4.0m intervals).

Probe holes, and historical diamond drillholes, have not been
downhole surveyed.
Drill
sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.

No continuous data was recorded on core recovery.

Core that has been check logged shows there is not a significant
issue with core loss, and that any material loss is not considered
significant to the estimation of mineralisation.

A sampling bias has not been determined.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.

Holes were initially geologically logged by on-site geologists
and consultants.

6 holes were check-logged in late 2019 and results were
considered to compare favourably with historical logging.

Geotechnical aspects in the form of RQD, joint type, alteration,
frequency, and water inflow were collected for 6 holes drilled in
late 2018 and 2019 only.

6 diamond drillholes completed in 2018 and 2019 have been
photographed in both dry and wet states.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representativity of samples.

Diamond core has been split longitudinally with a manual core
splitter, and half core sampled.

Duplicates have been sampled sporadically using the remaining
half of the core.

Samples are crushed to 75% passing 5mm in an onsite cone
crusher. The crushed material has then either been assayed at
the on-site laboratory or sent to the ALS laboratory in Sweden
(ALS Scandinavia)to complete thepreparation and assaying.

Page 9

Criteria JORC Code explanation Commentary
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.

ALS Sweden (“ALS”) then further prepares the sample by
weighing, drying, fine crushing the entire sample to >70%
passing 2mm, rotary splitting to 250g using a Boyd Rotary
Splitter and finally pulverising the split to >85% passing 75µm.

The sample sizes are considered appropriate for the type of
mineralisation under consideration.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.

The onsite laboratory only analyses Total Carbon (“TC”), by a
Loss-on-ignition technique, which may include non-graphitic
carbon such as from carbonate minerals. These are compared
to Graphitic Carbon for appropriateness, and a consistent
variance of 8.3% has been noted.

No certified QAQC assays were completed by the on-site
laboratory.

In 2001/2002, 15 samples were submitted to Lakefield Research
in Canada as external control samples, which reported 1.4%
lower than the on-site laboratory.

In 2019/2020, 853 samples were resubmitted to ALS to analyse
both TC to compare with the on-site lab, and TGC to compare
with the TC.

In these additional assays, standard reference material has been
inserted every 20 samples.

17 samples have been assayed for 48 rock forming elements
using HF-HNO3-HClO4 acid digestion, HCl leach, and a
combination of ICP-MS and ICP-AES. This was done on a
selection of graphite bearing and non-graphite bearing samples
to help identify general rock chemistry.

The CRM and duplicate sample results are within accepted
limits.

Page 10

Criteria JORC Code explanation Commentary Commentary Commentary Commentary Commentary Commentary
No geophysical tools or handheld instruments were utilised in
the sample analysis.
Verification
of sampling
and
assaying
The verification of significant intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.




No specific twinned holes have been drilled. However, closely
spaced drillholes were reviewed for short scale variability. TGC
values are reasonably consistent, but the integer representing
logged flake size can vary on a short scale.

Original paper logs have been provided for transcribing into
electronic format. The drillhole logs have been converted to
electronically stored formats and stored in a database provided
by Maxwell Geoservices (Webshed). This database is hosted on
an offsite server supplied by Maxwell Geoservices and managed
by their trained database staff.

Only minor core photography exists to compare to historic logs.

TC values from the onsite lab have been adjusted in line with
the graphitic carbon assays to be used in the resource by
reducing them by 8.3%.

Due to the Skaland laboratory producing TC assay values, and
the need to complete the model using TGC, some assay values
have been factored down to be representative of TGC. The
amount of the factor was determined based on the mean of 718
TGC assays compared with the same samples from the Skaland
Graphite onsite assay laboratory. Where TGC values exist, these
have been used as priority, with the remaining samples factored
down, as shown in the table below:
Univariate Statistics of Un-composited Assay Data
TGC
TC only
Total Carbon(Factored)
Graphitic C Final
Sample Count
792
488
488
1,280
Mean
16.99
25.45
23.34
19.41
Univariate Statistics of U n-compos ited Assay Data
TGC TC only Total Carbon(Factored) Graphitic C Final
Sample Count 792 488 488 1,280
Mean 16.99 25.45 23.34 19.41

Page 11

Criteria JORC Code explanation Commentary Commentary Commentary
Minimum 0.02 1.28 0.02
Maximum 44.9 52.53 52.53
Std. Dev. 10.59 9.95 10.79
Variance 112.06 98.96 116.49
C.V. 0.62 0.43 0.56
Location of
data points
Accuracy and quality of surveys used to locate drillholes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.






Accuracy of surface collar points is assumed, as the collars have
been lost. However, collar locations were picked up by company
employed surveyors at the time of drilling using DGPS.

Underground diamond drillholes have been surveyed using
routine underground surveying methods (including Leica Total
Station).

Where drillhole collars have been lost due to mining activities
prior to survey, planned collar points have been used and noted
in the database.

Downhole surveys only exist for the underground diamond
drillholes, and these have typically been surveyed every 3m.

Surface diamond drillholes have used the collar dip and
direction only, and have no downhole data to describe any
downhole movement.

Probe drilling has not been surveyed and only planned or
estimated collar points exist.

Topography and underground surveys are accurate for collar
positions.
Data
spacing and
distribution
Data spacing for reporting of exploration results.
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.


Drill spacing on the Boye North and South Shoots is 20x20m to
40x40m in the areas of the mine. Further down dip this becomes
variable due to the fanned nature of the holes.

20x20m is appropriate for the size and shape of the
mineralisation.

Through the maingraphite zones,nominal <2m samplinghas

Page 12

Criteria JORC Code explanation Commentary
been applied (minimum sample length 4cm) where appropriate
and sampled to geological boundaries elsewhere.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.

The drillhole orientation is considered appropriate with the
drillholes being drilled as close to perpendicular to the
interpreted strike of the geological units and graphite
mineralisation as possible.

Drill spacing and orientation are close to perpendicular in the
centre of the mineralised domains and becomes more oblique
as the drillholes target further up or down dip.

Drill orientation around the nose of the fold in the North Shoot
is poor and has introduced some geometry artefacts in the
domain. Sampling bias in these areas remains low.
Sample
security
The measures taken to ensure sample security.
There is little information around sample security when using
the on-site laboratory. The core and all samples are stored on
site at the Skaland processing plant and in the old workings of
the Skaland mine.

External laboratories have significant chain of command
documents due to shipping the samples internationally.
Audits or
reviews
The results of any audits or reviews of sampling techniques and
data.

No external audits or reviews of the sampling techniques and
results have been completed to date.

MRC has conducted an internal review of sampling techniques
and data, and found the following:

Sample lengths have not been constrained by a minimum
or maximum length

The use of a manual core splitter has resulted in some
inconsistences with respect to half core volumes

The use of a manual core splitter hasprecluded zones of

Page 13

Criteria JORC Code explanation Commentary
internal dilution from being sampled due to hardness

Data was primarily recorded on paper logs, then transcribed
into a database. No major transcription errors were
discovered

WAI reviewed the data as part of an overall resource estimate
review and found no fundamental errors or inconsistencies.

Page 14

Section 2 Reporting of Exploration Results

(Criteria in the preceding section apply to this section.)

Criteria Criteria JORC Code explanation JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.

According to the Norwegian Minerals Act, graphite is owned by
the landowner.

The Trælen Mine lies on cadastral numbers (property numbers)
6/1, 6/2 and 7/1. An agreement with the local landowner is in
place and covers access (6/1 and 6/2) and mining (7/1).

Skaland Graphite AS also owns three properties (10/13, 10/108
and 10/164) which cover the current process plant, an old
residence, an access road and the old Skaland Mine site. Skaland
Graphite AS also owns 10/1/28 and 10/13/5 which comprise the
wharf and hardstand area and have been leased back to the Berg
Municipality.

Skaland Graphite AS has also leased 10/1/19, 10/1/24 and
10/1/27 on which the current main office building and car park
are located.

The Skaland Graphite AS operating licence for the Trælen Mine
was renewed on 28 May 2019 for a duration of 10 years.

The Company was granted permission to increase production to
16,000t of graphite concentrate per year, and the discharge of
40,000t of tailings to sea per year. The licence issued on the 28th
June 2019 replaced the previous production licence of 24th Jan
2002 and discharge permit of 25th July 2019.

To the knowledge of WAI, all licences and permits are in good
standing with no known impediments.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. • MRC has not conducted any exploration on the Project.
• Exploration dates back to 1870 when graphite was first discovered
in the area.

Page 15

Criteria Criteria JORC Code explanation JORC Code explanation Commentary
• The Geological Survey of Norway has conducted extensive
regional-scale
exploration
including
geochemistry
and
geophysical surveys.
• Six drillholes were completed in 1985, followed by a Pre-Feasibility
Study of the Trælen deposit conducted in 1998.
• In 2001 an additional drilling program was undertaken that
comprised 15 drillholes for a total length of 2,103m. All holes
intersected high grade graphite in the Boye-vein and 5 holes also
intersected high grade graphite in the VLF-vein, which indicated a
significant addition to the 1998 estimation.
• In 2002, based on a total of 35 drillholes, two ruler shaped
mineralised bodies, or veins, were drill indicated and a Mineral
Resource evaluation completed to estimate the contained tonnes
and carbon in graphite grade.
• By 2017, a total of 101 drillholes had been completed and
comprised 40 probe holes for a total of 1,009m and 61 diamond
holes for a total of 7,506m.
Geology Deposit type, geological setting and style of mineralisation. • The Trælen deposit lies on the northern tip of the Skaland
peninsula and consists of two main and related lithological units.
The tectono-stratigraphically lower unit is a banded gneiss with
alternating biotite rich and granitic bands (locally termed “Trælen
Gneiss”) and an upper unit that consists of amphibolitic gneiss.
These are heterogeneous hornblende gneisses with graphite
horizons, possibly metamorphic greywacke and calciferous rocks.
Both units contain granitic orthogneisses, possibly a result of
partial melting of the surrounding rocks. Quartz diorites and
different types of pegmatites occur as well, forming discontinuous
intrusions.

Page 16

Criteria Criteria JORC Code explanation JORC Code explanation Commentary
• The graphite found in the upper unit is assumed to be primarily
syngenetic and later exposed to tectonic activity leading to its
present textural, mineralogical, geochemical and geometric
characteristics.
• The mineralised horizon is isoclinally folded and the thickest, most
continuous mineralisation occurs as lens shaped bodies oriented
parallel to the main fold axis. This horizon contains most
economically interesting instances of graphite at Trælen, and can
vary between centimetres and 12-14m thick. There is minor
graphite found in faults and along shears. There are minor
exploration targets to the south and west of the current Trælen
Deposit, which may represent either a further fold of the same
horizon, or a second mineralised horizon.
• The rocks in the area have been exposed to at least three phases
of folding and deformations. D1 developed the main foliation, D2
is responsible for the majority of the large scale folding structures
in the region and D3 which is the last folding phase responsible at
Trælen for the folds with a fold axis dipping 30 to 90 degrees
towards west-northwest.
Drillhole
Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all material drillholes:
o easting and northing of the drillhole collar
o elevation or RL (Reduced Level – elevation above sea level
in metres) of the drillhole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information isjustified on the basis that
• Total number of drillholes – 133 (93 diamond holes and 40 probe
holes)
• Diamond drillholes = 15,531m (average 167m, min 36m, max
435m)
• Probe drillholes = 1,009m (average 25.2m, min 15m, max 30m)
• East collar ranges – 12,389mE to 12,848mE
• North collar ranges – 1,281,260mN to 1,282,000mN
• Collar elevation ranges – 3.5mRL to 134mRL
• Azimuth ranges – The strike of the mineralised zones ranges from
290° to 85°. Drill sections are orientatedperpendicular to the

Page 17

Criteria Criteria JORC Code explanation JORC Code explanation Commentary
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
general strike of the mineralised zones.
• Dip ranges – The dip of the mineralised zones ranges from 55° to
75°. Drillholes are generally inclined to intersect perpendicular to
the mineralisation.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No individual Exploration Results are reported.
• No (high-grade) top cutting was used during the Mineral Resource
estimation process. A statistical review of the assay data is outlined
in the main body of the report.
• No metal equivalent equations were used during the Mineral
Resource estimation procedure or reporting.
• Samples were composited to 1.0m lengths during the Mineral
Resource estimation procedure to ensure a consistent level of
support during the estimation process.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting
of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
• The strike of the mineralised zones ranges from 290° to 85°. Drill
sections are orientated perpendicular to the general strike of the
mineralised zones where possible.
• The dip of the mineralised zones ranges from 55° to 75°. Drillholes
are generally inclined to intersect the mineralisation at appropriate
angles to limit sampling bias.
• Any reported mineralisation intercepts are downhole widths and
not true widths, which are unknown at this time.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
• Appropriate maps, sections and data tabulations are included in
the main body of the report.

Page 18

Criteria Criteria JORC Code explanation JORC Code explanation Commentary
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Statistics of drillhole grades used during the Mineral Resource
estimate are contained in the main body of the report.
• This report provides the total information available to date and is
considered to represent a balanced report.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating
substances.
• A substantial amount of work has been completed at the Project
by historic explorers dating back to 1870. Work has included
geophysical surveys, soil sampling, diamond and probe drilling.
• A Pre-Feasibility Study for the Trælen deposit was prepared in
1998 following the drilling of 6 drillholes in 1985.
• In 2001 and 2002 50 drillholes were completed that culminated in
a Mineral Resource evaluation completed to estimate the
contained tonnes and carbon in graphite grade.
Further work The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future
drilling areas, provided this information is not commercially
sensitive.
• Further drilling will be required in order to improve the quality of
the Mineral Resource estimation and develop detailed mine
planning as the output of the plant is increased to 16,000tpa of
concentrate (in accordance with the new permit) – a detailed drill
programme has yet to be developed.
• Relevant level plans and cross-sections are presented in the report
but until the drill programme has been developed it is not possible
to present any meaningful diagrams.

Page 19

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria Criteria Criteria JORC
Code
explanation
Commentary
Database
integrity
Measures taken to ensure that data has not been corrupted by,
for example, transcription or keying errors, between its initial
collection and its use for Mineral Resource estimation purposes.
Data validation procedures used.
• Data is stored in an offsite database hosted by Maxwell
Geoservices.
• Visual validation of results against logs and in a spatial context
have been undertaken.
• Any discrepancies or errors were either corrected or the results
rejected.
• Downhole survey was checked for significant deviation. No issues
were identified.
• Assay were checked for anomalies between geology and TC, and
TGC grade. No anomalies were identified. Drill cores with no
sample assays were inserted with zero grade.
Site visits Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
If no site visits have been undertaken indicate why this is the
case.
• No site visit by the Competent Person has been undertaken at this
stage due to the climate at the Project and time constraints.
Further, there is currently no active exploration work being
undertaken.
• MRC Senior Geologist (Daniel Ball) visited the site in late 2019 and
completed check logging of core that was available and validation
of original paper logs was undertaken.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral
Resource estimation.
The use of geology in guiding and controlling Mineral Resource
estimation.
• Confidence in the interpretation of the Trælen stratigraphy is
considered to be high given domain interpretation was
completed with a consideration for geological logging,
geochemical data and surrounding holes.
• Graphite is distinct geochemically and visually compared to the
host rocks and is defined using lithological logging, and where
loggingwas not available a total carbon value of >10% was used.

Page 20

Criteria Criteria Criteria JORC
Code
explanation
Commentary
The factors affecting continuity both of grade and geology. • Domaining fits well with previous geological investigations of the
overall architecture of the mineralisation.
• Major faulting may cause a break in domains to the east of the
main mineralised zones, but lack of data around this fault has
made it difficult to confidently interpret its affect.
• Domaining has been done manually, and as such, no major
interpretation artefacts exist.
• Wireframe solids and surfaces of the Domains act as hard
boundaries during estimation for the mineralisation.
Dimensions The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below
surface to the upper and lower limits of the Mineral Resource.
• The mineralised shoots consist of four 2-20m wide moderately
plunging shoots, folded around a moderately plunging double
anticline system
100 Shoot:
o Length: 725m
o Width: 80-160m
o Depth to surface: +330m to -250m below sea level, from 0m
to 75m inside mountain
200 Shoot:
o Length: 190m
o Width: 55m
o Depth to surface: +140m to -130m below sea level, from 10m
to 50m inside mountain
300 Shoot:
o Length: 310m
o Width: 30m
o Depth to surface:+140m to -60m below sea level, from 100m
to 130m inside mountain

Page 21

Criteria Criteria Criteria JORC
Code
explanation
Commentary
400 Shoot:
o Length: 268m
o Width: 50m
o Depth to surface: +140m to -150m below sea level, from 20m
to 100m inside mountain
Estimation
and
modelling
techniques
The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme
grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If a
computer assisted estimation method was chosen, include a
description of computer software and parameters used.
The availability of check estimates, previous estimates and/or
mine production records and whether the Mineral Resource
estimate takes appropriate account of such data.
The assumptions made regarding recovery of byproducts.
Estimation of deleterious elements or other non-grade
variables of economic significance (eg sulphur for acid mine
drainage characterisation).
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.
Any assumptions behind modelling of selective mining units.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to
control the resource estimates.
Discussion of basis for using or not using grade cutting or
_capping. _
• Inverse Distance Weighting method was used for the estimation,
as not enough data was available for robust variography.
• 1m composites were used for the estimation.
• No top-cuts were applied as outlier analysis indicated any high
assay values were part of a normal distribution, and as such were
not outliers.
• Parent block size was 8mx4mx2m, with sub-blocking down to a
quarter of this to reflect domain boundaries closely. Estimate was
into parent blocks only. Block size was based around the
dimensions of the ore body, and drillhole spacing that was
between 5m and 50m.
• Domain boundaries were treated as hard during estimation.
• Anisotropic search distances were used, with directions of major
and semi major axes based on domain wireframe orientations.
• No top cuts were applied, based on visual review of all data and
statistical analysis of the data lying within the domains.
• Micromine software was used.
• No check estimates or previous comparable estimates are
available; mining data is available for reconciliation from the last
5 years of mining, which was used as a validation.
• No byproducts are present.
• No deleterious elements have been estimated.

Page 22

Criteria Criteria Criteria JORC
Code
explanation
Commentary
The process of validation, the checking process used, the
comparison of model data to drillhole data and use of
reconciliation data if available.
• Estimate was visually checked against raw assays.
• Discretisation of 2x2x2.
• Maximum search distance of 55m.
• Maximum composite points per block – 15.
• Minimum points per block – 3.
• No quadrant or octant searching was used.
• Validation of the final resource has been carried out in a number
of ways, including:
− Visual validation - comparing block model estimated grade
against drillhole by section.
− Statistical validation - comparing statistically by domain,
wireframe and block model grades versus sample and
composite grades.
− Swath plots - graphical display of the grade distribution to
compare the grade within these bands of the composite
samples and the block estimated grades.
− Reconciliation - compare the estimated Mineral Resource
inside the north and south stope outlines against production
records.
• All modes of validation have produced acceptable results.
• This is considered to be the maiden JORC resource estimate for
the Trælen deposit.
Moisture Whether the tonnages are estimated on a dry basis or with
natural moisture and the method of determination of the
moisture content.
• All tonnes and grades are on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters
applied.
• The current reported resource was declared at a cut-off grade of
10% as the industry standard median grade for commercial

Page 23

Criteria

JORC Code Commentary explanation graphite mine development is considered to be approximately 9- 10% TGC.

graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9- graphite mine development is considered to be approximately 9-
10% TGC.
• This grade represents an approximate economic cut-off and
allows correlation of the mineralisation between sections.
The mineral resource quoted at various cut-off grades (COG) is
presented in the table below.
Resource Table at Various Cut off Grades
Contained Total
Classification Cut
Off
Tonnes TGC (%) Graphitic Carbon
(Tonnes)
20 367,573 27% 99,007
17.5 385,878 27% 102,486
15 401,059 26% 104,951
Indicated 12.5
10
7.5
407,883
408,783
408,862
26%
26%
26%
105,921
106,027
106,034
5 408,947 26% 106,039
2.5 408,947 26% 106,039
0 408,947 26% 106,039
20 805,055 25% 197,331
17.5 1,100,297 23% 253,295
15 1,186,328 23% 267,348
Inferred 12.5
10
7.5
1,285,176
1,376,013
1,487,103
22%
21%
20%
280,930
291,148
300,806
5 1,534,657 20% 303,772
2.5 1,559,893 20% 304,813
0 1,564,764 19% 304,902

Page 24

Criteria Criteria Criteria JORC
Code
explanation
JORC
Code
explanation
JORC
Code
explanation
Commentary Commentary
TOTAL 20 1,172,627 25% 296,338
17.5 1,486,175 24% 355,781
15 1,587,387 23% 372,300
12.5 1,693,059 23% 386,851
10 1,784,796 22% 397,175
7.5 1,895,965 21% 406,839
5 1,943,603 21% 409,812
2.5 1,968,839 21% 410,852
0 1,973,711 21% 410,941
Mining
factors or
assumptions
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential mining methods, but
the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not
always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining
assumptions made.


Mining is currently being conducted by long hole open stoping in
a bottom up sequence.
Future mining is assumed to be long hole open stoping in a top
down sequence.
It is assumed due to geotechnical considerations no mining may
take place within 10m of the mountainside.
Metallurgical
factors or
assumptions
The
basis
for
assumptions
or
predictions
regarding
metallurgical amenability. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous. Where this is
the case, this should be reported with an explanation of the
basis of the metallurgical assumptions made.

Metallurgical factors have been taken from the current processing
plant.
Any changes that MRC undertake have not been quantified or
assumed to change the product specifications.

Page 25

Criteria Criteria Criteria Criteria JORC
Code
explanation
Commentary
Environmenta
l factors or
assumptions
Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider the potential environmental
impacts of the mining and processing operation. While at this
stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential
environmental impacts should be reported. Where these
aspects have not been considered, this should be reported with
an explanation of the environmental assumptions made.
• WAI understands that all necessary environmental permits
required to operate the mine and process plant are in place.
• Any changes that MRC undertake have not been quantified or
assumed to change the product specifications.
Bulk density Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or
dry, the frequency of the measurements, the nature, size and
representativeness of the samples.
The bulk density for bulk material must have been measured
by methods that adequately account for void spaces (vugs,
porosity, etc), moisture and differences between rock and
alteration zones within the deposit.
Discuss assumptions for bulk density estimates used in the
evaluationprocess of the different materials.
• A bulk density of 2.72 has been measured from 12 samples,
weighed dry then wet to determine the density (Archimedes
principle).
• No wax coating was used to seal the sample.
• Visual inspection of the core indicates little loss of material due to
vugs or other void spaces.
• No spatially relevant density estimate was made.
• It should be noted that historically a density value of 2.6 has been
used but there is no supporting data for this value.
Classification The basis for the classification of the Mineral Resources into
varying confidence categories.
Whether appropriate account has been taken of all relevant
factors (ie relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology
and metal values, quality, quantity and distribution of the
_data). _
• The Mineral Resources have been classified as the Indicated and
Inferred Categories, in accordance with the 2012 Australasian
Code for Reporting of Mineral Resources and Ore Reserves (JORC
Code).
• A range of criteria has been considered in determining this
classification including:

Page 26

Criteria Criteria Criteria JORC
Code
explanation
Commentary
Whether the result appropriately reflects the Competent
Person’s view of the deposit.

Geological continuity

Data quality

Drillhole spacing

Modelling techniques

Estimation properties including search strategy, number of
informing data, average distance of data from blocks and
estimation output from the interpolation
• No Measured Mineral Resources were classified.
• Indicated resources are typically supported by a drillhole spacing
of between 20mx20m and up to 40mx40m.
• Inferred resources for drillhole spacing in excess of 40mx40m.
• Drillhole spacing greater than 100mx100m is considered to be
unclassified.
• Where geological complexity is greater, around folds etc., Inferred
classification has been used.
• Where typically material may be classified as Measured, such as
near current mining fronts, due to the lack of geological data from
mining (ie face maps and assays) and the adjusting of total carbon
assays to represent total graphitic carbon, these areas have been
classified as Indicated only.
• The results of the validation of the block model shows acceptable
correlation of the input data to the estimated grades.
• The Mineral Resource Classification reflects the views of the
Competent Person.
Audits or
reviews
The results of any audits or reviews of Mineral Resource
estimates.
• WAI is not aware of any audits or reviews of this or any previous
Mineral Resource Estimates.
• This is considered to be a maiden Mineral Resource Estimate

Page 27

Criteria Criteria Criteria JORC
Code
explanation
Commentary
under the guidelines of the JORC Code (2012).
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an
approach or procedure deemed appropriate by the
Competent Person. For example, the application of statistical
or geostatistical procedures to quantify the relative accuracy
of the resource within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion
of the factors that could affect the relative accuracy and
confidence of the estimate.
The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions
made and the procedures used.
These statements of relative accuracy and confidence of the
estimate should be compared with production data, where
available.
• Calculated accuracy and confidence in the Mineral Resource
Estimate are not explicitly stated.
• However, relative accuracy is reflected in the Resource
classification, based on statistical analysis, and comparing the
output of the results from the interpolation techniques with the
mean statistical grades lying within the individual domains.
• The Indicated and Inferred Mineral Resource Estimates are
considered to represent a local estimate as there is reasonable
confidence in the location of mineralisation.
• The Trælen deposit has been mined continuously for the past 12
years and during this time, the high-grade nature of the
mineralisation has been proven.
• While no previous comparable estimation has been conducted,
the results of this estimation compare well with non-scientific
approximations of the deposit.
• Globally the estimation is considered reasonable, while lack of
data in general will lead to short scale variability and local
estimation accuracy may be low.
• Production data from the mine has not been well documented,
but where it is available, grade estimations from this estimate
reconcile well with production data.

Page 28