FY22 AGM Presentation

STRICTLY CONFIDENTIAL | NOT FOR DISTRIBUTION

==> picture [168 x 506] intentionally omitted <==

Managing Director’s Address

FY22 Annual General Meeting

16 November 2022

2

FY22 AGM MD Presentation

Strong operating performance, setting LGI up for growth

Increased and optimised biogas flows, driving record financial performance

LOST TIME INJURY

1 LTI

in 57,600 hours

REVENUE EBITDA m m $25.5 $11.8  70%  81%

NPAT m $4.8  173%

worked

==> picture [960 x 32] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

Strong operating performance, setting LGI up for growth

Increased and optimised biogas flows, driving record financial performance

BIOGAS EXTRACTION

100m

  • 15%

NEW VERTICAL WELLS 150 + across our major sites

RENEWABLE ENERGY ACCUs ACQUIRED / GENERATION CREATED MWh 87,516 402,2258.2%23%

==> picture [960 x 32] intentionally omitted <==

----- Start of picture text -----

4
----- End of picture text -----

==> picture [179 x 540] intentionally omitted <==

– Hawkesbury New 12-year agreement

  • Partnership with Hawkesbury City Council since 2015 has reduced CO2e emissions by 94,070 tonnes

  • New 12-year agreement to operate and expand biogas collection system

  • Project registered with Clean Energy Regulator to produce ACCUs for a further 12 years as an upgrade project

5

==> picture [447 x 255] intentionally omitted <==

– Bunya Our first battery storage installation

  • Purchased Tesla Megapack for our first battery storage installation, at Bunya

  • Deploying hybrid battery systems increases our ability to dispatch power at peak periods to optimise the price we receive

  • Adding battery storage and optimising our hybrid peaking power stations achieves a significantly higher average price per unit of gas than continuous 24/7 energy export

  • Progressing our proprietary Dynamic Asset Control System which automates the process of generating power at the optimal point in the demand cycle

6

==> picture [457 x 253] intentionally omitted <==

– Mugga Lane AEMO registration

  • In 2020, LGI completed 4.2MW biogas to energy plant. Gas field works and innovative plant design have doubled biogas recovery and energy production

  • 15-year contract with two five-year options, for carbon abatement and renewable power generation

==> picture [457 x 223] intentionally omitted <==

  • June 2022 – LGI achieved AEMO registration as a non-scheduled registered generator, allowing LGI to settle weekly with AEMO in the wholesale market

  • Registration shows that LGI systems and governance meet AEMO requirements and establishes a working relationship for future generation registrations

7

Toowoomba

==> picture [626 x 220] intentionally omitted <==

  • Our eighth renewable power station

  • Commissioning expected by end 2022

  • Capturing biogas from Toowoomba Regional Council landfill, as a reliable, renewable fuel source to supply power directly to Council’s major wastewater treatment facility

  • 20-year contract which gives LGI beneficial use rights over the biogas we recover

Thank You

Together we can engineer a, zero carbon future.

FY22 Annual General Meeting

16 November 2022

==> picture [434 x 492] intentionally omitted <==

9

FY22 AGM MD Presentation