AI assistant
LGI LIMITED — AGM Information 2022
Nov 15, 2022
65230_rns_2022-11-15_3593d18d-84d8-49a4-ac68-7d6221ec1c66.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [214 x 121] intentionally omitted <==
==> picture [154 x 439] intentionally omitted <==
1
FY22 AGM Presentation
STRICTLY CONFIDENTIAL | NOT FOR DISTRIBUTION
==> picture [168 x 506] intentionally omitted <==
Managing Director’s Address
FY22 Annual General Meeting
16 November 2022
2
FY22 AGM MD Presentation
Strong operating performance, setting LGI up for growth
Increased and optimised biogas flows, driving record financial performance
LOST TIME INJURY
1 LTI
in 57,600 hours
REVENUE EBITDA m m $25.5 $11.8 70% 81%
NPAT m $4.8 173%
worked
==> picture [960 x 32] intentionally omitted <==
----- Start of picture text -----
3
----- End of picture text -----
Strong operating performance, setting LGI up for growth
Increased and optimised biogas flows, driving record financial performance
BIOGAS EXTRACTION
100m M³
- 15%
NEW VERTICAL WELLS 150 + across our major sites
RENEWABLE ENERGY ACCUs ACQUIRED / GENERATION CREATED MWh 87,516 402,225 8.2% 23%
==> picture [960 x 32] intentionally omitted <==
----- Start of picture text -----
4
----- End of picture text -----
==> picture [179 x 540] intentionally omitted <==
– Hawkesbury New 12-year agreement
-
Partnership with Hawkesbury City Council since 2015 has reduced CO2e emissions by 94,070 tonnes
-
New 12-year agreement to operate and expand biogas collection system
-
Project registered with Clean Energy Regulator to produce ACCUs for a further 12 years as an upgrade project
5
==> picture [447 x 255] intentionally omitted <==
– Bunya Our first battery storage installation
-
Purchased Tesla Megapack for our first battery storage installation, at Bunya
-
Deploying hybrid battery systems increases our ability to dispatch power at peak periods to optimise the price we receive
-
Adding battery storage and optimising our hybrid peaking power stations achieves a significantly higher average price per unit of gas than continuous 24/7 energy export
-
Progressing our proprietary Dynamic Asset Control System which automates the process of generating power at the optimal point in the demand cycle
6
==> picture [457 x 253] intentionally omitted <==
– Mugga Lane AEMO registration
-
In 2020, LGI completed 4.2MW biogas to energy plant. Gas field works and innovative plant design have doubled biogas recovery and energy production
-
15-year contract with two five-year options, for carbon abatement and renewable power generation
==> picture [457 x 223] intentionally omitted <==
-
June 2022 – LGI achieved AEMO registration as a non-scheduled registered generator, allowing LGI to settle weekly with AEMO in the wholesale market
-
Registration shows that LGI systems and governance meet AEMO requirements and establishes a working relationship for future generation registrations
7
Toowoomba
==> picture [626 x 220] intentionally omitted <==
-
Our eighth renewable power station
-
Commissioning expected by end 2022
-
Capturing biogas from Toowoomba Regional Council landfill, as a reliable, renewable fuel source to supply power directly to Council’s major wastewater treatment facility
-
20-year contract which gives LGI beneficial use rights over the biogas we recover
Thank You
Together we can engineer a, zero carbon future.
FY22 Annual General Meeting
16 November 2022
==> picture [434 x 492] intentionally omitted <==
9
FY22 AGM MD Presentation