Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Iren Environmental & Social Information 2017

Oct 11, 2017

4243_rns_2017-10-11_64487404-97f4-465d-8869-e01b55f65e56.pdf

Environmental & Social Information

Open in viewer

Opens in your device viewer

Eligible Green Category Eligible Category Details of KPI sminimun level KPI UM
Energy efficiency Cogeneration Plant Cogeneration facilities harvesting waste energy from
heat or gas sources for the generation of electrical
energy.
PES Primary Energy Saving Indicator per operating year [%] %
Renewable energy share in percent on total %
Thermal energy recovered from waste to DH network in MWh per operating year MWh
Net produced electricity from renewable non-fossil sources per operating year (kWh) kWh
Avoided CO2 emissions from fossil sources per operating year (t) t
Energy distribution &
management
Projects and assets critical to the distribution and
transmission of electrical energy for renewable sources
or the transmission of captured heat.
Primary energy saving per operating year [MWh] MWh
Avoided CO2
emissions from fossil sources per operating year [t]
t
Electrical energy produced from renewable non-fossil sources per operating year [MWhe] MWh
Thermal energy produced from renewable non-fossil sources per operating year [MWht] MWh
Distributed thermal energy per operating year [MWh] MWh
Waste Management
Efficiency & Recycling
Waste Management Efficiency
& Recycling
Projects to increase sorted waste by 10% or more and
decrease unsorted waste by 10% or more of gross waste
handled.
Total sorted waste collection (t) t
Total of non sorted waste disposed (t) t
Number of bins for sorted waste N
Volumes of bins for sorted waste (m3
)
mc
Door to door collection system (n) N
Sorted waste collection hubs (n) N
Volumes of waste collected in the collection hubs (t) t
Renewable energy Energy Network Development Projects and assets critical to the distribution and
transmission of electrical energy for renewable sources
or the transmission of captured heat.
Primary energy saving per operating year [MWh] MWh
Avoided CO2 emissions from fossil sources per operating year [t] t
Distributed thermal energy per operating year [MWh] MWh
Mini Hydro Projects and assets associated with the generation of
electrical energy though hydropower projects with
under 10MW capacity.
Electrical energy produced from renewable non-fossil sources per operating year [MWhe] MWh
Avoided CO2 emissions from fossil sources per operating year [t] t
Net produced electricity from renewable non-fossil sources per operating year (kWh) kWh
Solar Projects and assets associated with the generation of
electrical energy through Solar PV equipment.
Net produced electricity from renewable non-fossil sources per operating year (kWh) kWh
Avoided CO2 emissions from fossil sources per operating year (t) t
Waste Water Treatment Waste Water Treatment
upgrades
Capacity improvements to wastewater treatment Treated population equivalent (potential) (n) N
facilities to handle loads 30% higher than baseline Analytic parameters (Abb % BOD, Abb % COD, Abb % SST, Abb % Ntot, Abb % Ptot) %
performance. Volumes of water destined to irrigation re-usage / Volumes of total treated water %
Waste Water Plant Upgrades Capacity improvements to wastewater treatment Treated population equivalent (potential) (n) N
facilities to handle loads 30% higher than baseline
performance.
Analytic parameters (Abb % BOD, Abb % COD, Abb % SST, Abb % Ntot, Abb % Ptot) %