Celsius Resources Limited — Investor Presentation 2012
Aug 23, 2012
10450_rns_2012-08-23_c41ae418-9265-423e-aa82-ce4791fae7a7.pdf
Investor Presentation
Open in viewerOpens in your device viewer
View Resources Ltd to be renamed
COKING & THERMAL COAL PROJECTS
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
The information contained in this presentation (“Presentation”) has been prepared by View Resources Ltd (to be renamed Celsius Coal Ltd) (“Company” or “Celsius”) and is being communicated for general background informational purposes only. The information contained in this Presentation is subject to updating, completion, revision, verification and further amendment. Neither the Company, nor its shareholders, directors, officers, agents, employees, or advisors give, has given or has authority to give, any representations or warranties (express or implied) as to, or in relation to, the accuracy, reliability or completeness of the information in this Presentation, or any revision thereof, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed.
Information contained in this Presentation is the property of the Company. It is made available strictly for the purposes referred to above. Neither the communication of this Presentation nor any part of its contents is to be taken as any form of commitment on the part of the Company to proceed with any transaction. This Presentation does not constitute, or form part of, any offer or invitation to sell or issue, or any solicitation of any offer to subscribe for or purchase any securities in the Company, nor shall it, or the fact of its communication, form the basis of, or be relied upon in connection with, or act as any inducement to enter into, any contract or commitment whatsoever with respect to such securities This Presentation is not to be communicated to any other person or used for any other purpose and any other person who receives communication of this Presentation should not rely or act upon it. In furnishing this Presentation, the Company does not undertake or agree to any obligation to provide the attendee with access to any additional information or to update this Presentation or to correct any inaccuracies in, or omissions from, this Presentation that may become apparent either during, or at any time after this Presentation.
2
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [655 x 369] intentionally omitted <==
3
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [352 x 430] intentionally omitted <==
4
==> picture [191 x 96] intentionally omitted <==
Corporate
==> picture [720 x 15] intentionally omitted <==
-
Established highly experienced Board and Management.
-
Peter O’Malley -- Non-Executive Chairman
-
Grant Thomas – Managing Director
-
Bill Oliver – Non-Executive Director
-
Management active in country since March 2012.
-
• Bishkek office established April 2012.
-
Local Directors and industry professionals
-
Stock Code: ASX:VRE
-
Share Price: $0.024
-
52 Weekly Range: $0.01 – $0.032
-
Market Capitalization: $37M (based on Kokkia transaction completing)
-
Corporate Advisors: CPS Securities/ Kenosis Capital.
5
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
• Non-Executive Chairman – Peter O’Malley BA (Politics), Juris Doctor (Law)
Peter O’Malley is the Chief Executive Officer and Founding Partner of Kenosis Capital Partners, a global merchant banking and advisory firm focused on the natural resources sector. Prior to founding Kenosis Capital Partners, Mr. O’Malley was Head of the Asia-Pacific Natural Resources investment banking practice at Deutsche Bank and more recently at HSBC. Prior to joining Deutsche Bank and HSBC, Mr. O’Malley was a senior energy and natural resources banker at Credit Suisse First Boston based in New York and Johannesburg.
During more than 21 years in investment banking, Mr. O’Malley led the origination and execution of major mergers and acquisitions, equity and debt capital markets, and structured finance transactions in the metals and mining and oil and gas and sectors.
• Managing Director - Grant Thomas BSc (Hons), MAusIMM
Mr. Grant Thomas is a highly experienced geologist who is a Competent Person for the purposes of the JORC Code in coal and gold (together with other commodities). He has previously management roles with Rio Tinto, Hamersley Iron and was previously the Managing Director of Tianshan Goldfields Ltd, as well as Exploration Manager for Southern Gold Limited (ASX listed entities) and Director of Mojo Minerals Limited.
More recently, Mr Thomas has consulted for AsiaMin Consulting Limited (HK) primarily as a Competent Person and Valuer to various international and Chinese coal companies listing on the Hong Kong Stock Exchange. In this role, Mr Thomas completed Technical and Valuer reports, including JORC conversions, for several coal projects in Inner Mongolia and Xinjiang provinces China and Tajikistan.
• Non-Executive Director – Bill Oliver BSc (Hons), GDipAppFin (FINSA), MAIG, MAusIMM
Mr Oliver was appointed to the position of director on 23 December 2010. Mr Oliver has 14 years’ experience in the international resources industry working for both major and junior companies. He has managed exploration and resources definition projects across a range of commodities for Harmony Gold, Rio Tinto, Iberian Resources, Bellamel Mining and BC Iron. He is currently Non Executive Director of Signature Metals.
6
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [652 x 207] intentionally omitted <==
----- Start of picture text -----
Shares Options
Existing 1,031,953,670 170,000,000
Vendor Shares 500,000,000 0
Total 1,531,953,670 170,000,000
----- End of picture text -----*
Top 20 Shareholders hold 48% of the company currently.
-
Up to an additional 900 million Performance Shares may be issued to the vendors of the Uzgen Basin projects, subject to meeting significant JORC resource milestones.
-
** These Options have an exercise price of $0.01 each and an expiry date of 31 March 2014 . A further 80 million Options ($0.02 exercise price) to be issued to the Directors (subject to shareholder approval) and 50 million Options ($0.02 exercise price ) to be issued to Kenosis Capital (subject to shareholder approval).
7
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [668 x 348] intentionally omitted <==
8
==> picture [191 x 96] intentionally omitted <==
THE HOT NEW ADDRESS FOR COAL
==> picture [720 x 15] intentionally omitted <==
==> picture [18 x 18] intentionally omitted <==
Geology: Celsius has secured high quality thermal and coking coal deposits in Kyrgyzstan (principally the Uzgen Basin), with other potential acquisitions under consideration. During the time of the Soviet Union, Kyrgyzstan was designated as the main supplier of raw materials to the rest of the republics.
==> picture [18 x 18] intentionally omitted <==
Size: An Exploration Target[1] of 501 to 700 Mt has been defined for the Uzgen Basin Projects based on historical exploration' (principally Soviet era mapping, trenching and ~30,000m drilling). Upside potential via exploration.
==> picture [18 x 18] intentionally omitted <==
Focus: Immediate drilling of Tuyuk-Kargasha, Kokkia and Min Teke to resource status in accordance with JORC code. Estimate initial resources by early 2013.
==> picture [18 x 18] intentionally omitted <==
Coal Quality: Initial coal quality analysis shows Celsius has premium hard coking coal. If subsequent laboratory test work confirms these results Celsius can be regarded as ‘best in class’ for coal quality
==> picture [18 x 18] intentionally omitted <==
Mining: Immediate mine start-up with Min Teke and Sary Mogol. Potentially significant open cut and underground mining at all projects – multiple sites.
==> picture [18 x 18] intentionally omitted <==
Infrastructure/Markets: The Kyrgyzstan coal projects are in close proximity to the proposed Trans-Asia Railway, China and other potential end users, as well as located in a country with strong and growing domestic demand.
1 Note that the potential quantity and grade of this Exploration Target is conceptual in nature and there has been insufficient exploration to define a Mineral Resource. This Exploration Target is detailed at the end of presentation.
9
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
Celsius and selected peers – total coal resource
==> picture [680 x 223] intentionally omitted <==
----- Start of picture text -----
2,500
Kyrgyzstan
1,000
Australia
1,881
750 China
Mongolia
500
853
786
733
700
250 497
292
252
197
141
0
Guidford MMC SouthGobi¹ Hidili Celsius² Xanadu Aspire UP MEC
Million tonnes
----- End of picture text -----
Source: Company reports
Notes:
1. Includes attributable ownership of Aspire Mines¹
2. Based on the high end of the exploration target that has been generated for the Uzgen Basin coal projects of 501 – 700 million tonnes (further details of which are set out on slide 19). The potential quantity and quality of the coal presented as an Exploration Target are conceptual in nature. It should be noted that there has been insufficient exploration to define a Mineral Resource which complies with the JORC code, and it is uncertain if further exploration will result in the determination of a Mineral Resource.
10
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
Celsius and selected peers – distance to China
==> picture [534 x 269] intentionally omitted <==
----- Start of picture text -----
1,600
•
1,571
access well before Mongolia
•
460
311
285
260
60 45
Logistically Possible
----- End of picture text -----
==> picture [170 x 10] intentionally omitted <==
----- Start of picture text -----
Logistic story for Celsius is enhanced by:
----- End of picture text -----
• Trans-Asia railway - Kyrgyz likely to have Chinese gage direct rail access well before Mongolia • Central Asia market Potential - Coking coal demand in Kazakhstan
Source: Company reports, Management’s estimates
Notes:
1. Based on transportation distance for Uzgen Basin coking coal
11
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
Drilling has commenced onsite with a total of 3 rigs to be drilling at Tuyuk-Kargasha. 2 rigs to commence drilling at Min Teke, then to move to Kokkia (5 core drilling rigs in total). Minimum 5,000 metres to be drilled.
-
Rate of drilling has been excellent.
-
All work in country uses local contractors, and field staff are sourced from the region.
-
Celsius will train its technical staff in drilling and sampling procedures to industry “best practices” (i.e. JORC code).
-
Snowden to conduct QA/QC of all drilling procedures
==> picture [292 x 389] intentionally omitted <==
12
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
- The first drillhole DD12TK001 successfully intersected twelve (12) coal seams for a total coal thickness of approximately 7 metres.
==> picture [334 x 189] intentionally omitted <==
-
Two major seams intersected each approximately 2.0 - 2.5 metres thick.
-
Coal intersected is hard, black coal (based on visual inspection) and will be immediately sent for analysis at internationally accredited laboratory
-
Lithologies intersected in DD12TK001 closely match the information recorded from the historical hole that DD12TK001 was designed to twin. Notably thicker coal seams were intersected in View’s drillhole (for a similar total thickness of coal).
-
DD12TK001 is the first drillhole in a confirmatory drill program to test the Company’s Exploration Targets and, with further success, will enable delineation of JORC Resources.
-
Downhole geophysical crews are also on site and will complete a full suite of downhole logs for each hole to enable correlation between drillholes.
13
==> picture [191 x 96] intentionally omitted <==
==> picture [584 x 420] intentionally omitted <==
----- Start of picture text -----
Kargasha Prospect
Outcropping
Coal
A
DD12TK001
Tuyuk
Prospect Interpreted Cross Section of the
Tuyuk-Kargasha License
B
----- End of picture text -----
14
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
| Prospect | Exploration Target (millions of tonnes of coal) |
Moisture (%) |
Ash (%) |
Sulphur (%) |
Calorific Value (kcal/kg) |
|---|---|---|---|---|---|
| Kargasha | 115 - 140 | 0.9 - 6.0 | 3.0 - 10.0 | 0.4 - 0.9 | 7700 - 8700 |
| Tuyuk | 267 - 335 | ||||
| Kokkia | 114 – 198 | 0.7 - 5.0 | 5.0 - 15.0 | 0.4 - 0.9 | 7800 - 8500 |
| Min-Teke | 5 – 27 | 3.0 - 10.0 | 10.0 - 25.0 | 0.4 - 0.9 | 6200 - 7700 |
| Total | 501 - 700 |
It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this announcement relating to Exploration Targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) and Reserve(s) have not been used in this context in this announcement. The potential quantity of coal presented in this announcement as Exploration Targets are conceptual in nature. It should be noted that there has been insufficient exploration to define a Mineral Resource which complies with the JORC code, and it is uncertain if further exploration will result in the determination of a Mineral Resource. View Resources intends to carry out an exploration programme to systematically test the Exploration Targets for each of the Prospects, which are detailed in the above table.
15
16
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [590 x 422] intentionally omitted <==
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
Management: Highly experienced and qualified Board and Management in place. Industry professionals who have been “on the ground” in country.
-
First Mover: Celsius has secured a significant foot hold in highly prospective areas known to have extensive coal deposits (principally the Uzgen Basin), with other potential acquisitions under consideration.
-
Cheap Entry: With a market capitalisation of circa $40m on completion of the recent acquisition, the current share price represents a very cheap entry into a portfolio of large tonnage, world class thermal and coking coal projects which have been drilled previously (~30,000m completed).
-
Right Location: The Kyrgyzstan coal projects are in close proximity to the proposed Trans-Asia Railway, China and other potential end users, as well as located in a country with strong and growing domestic demand. The Tuyuk-Kargasha tenement is 70km from the rail station Kyzyl-Kiya, and 70km from Osh, one of the largest cities in Kyrgyzstan.
-
Further Opportunities: Multiple quality additional projects available. The Company has built strong relationships with local partners and contractors.
17
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
Significant Exploration Upside:
-
Tuyuk-Kargasha and Kokkia projects have significant potential for coking and thermal coal based on Soviet era exploration (quality exploration and evaluation).
-
An Exploration Target[1] of 501 to 700 Mt has been defined based on historical exploration (principally Soviet era mapping, trenching and drilling (~ 30,000m)).
-
Bel Alma and Min Teke projects have had limited past exploration and offer significant upside through drilling. The Exploration Target[1 ] defined for Bel Alma is between 20 and 51 million tonnes of coal.
-
Utilization of modern drilling and exploration techniques (previous exploration focussed on surface coal and trenching).
-
Immediate Mining:
-
Min Teke development/mining licence and outcropping thermal coal.
-
Sary Mogol development/mining licence and significant historical stockpiles of coal which could be exploited. Sampling indicates high energy thermal coal.
1 Note It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this announcement relating to Exploration Targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) and Reserve(s) have not been used in this context in this presentation. The potential quantity and quality of the coal presented in this presentation as Exploration Targets are conceptual in nature. It should be noted that there has been insufficient exploration to define a Mineral Resource which complies with the JORC code, and it is uncertain if further exploration will result in the determination of a Mineral Resource. View Resources is currently carrying out an exploration program to systematically test the Exploration Targets for each of the Prospects, which are detailed in the above table
18
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
Prove Up Immediately commence drilling to test Exploration Targets at TuyukKargasha, Kokkia, Min Teke and Bel Alma.
Production Teke and Bel Alma. Undertake a small capital program to Delineation of resources begin open pit mining to JORC standard. at Min Teke and Sary Mogol.
Pipeline First mover advantage.
Management has been active in country since first acquisition. Local directors.
Working closely with in country partners to secure additional quality coal assets.
Infrastructure planned near to current assets.
19
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [448 x 380] intentionally omitted <==
• Acquiring 80% interest in three tenements covering a total area of 9,763Ha in the northern Uzgen Coal Basin
• Most coal beds are hosted by the Tuyuk formation, which outcrops throughout the three tenements.
Exploration Prospect Target[1] (Mt coal) Kargasha 115 – 140 Tuyuk 267 – 335 Kokkia 114 – 198 Min-Teke 5 – 27 Total 501 - 700
1 Note that the potential quantity and grade of this Exploration Target is conceptual in nature and there has been insufficient exploration to define a Mineral Resource. This Exploration Target is detailed at the end of presentation.
20
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [688 x 128] intentionally omitted <==
-
Schematic cross section through the Tuyuk-Kargasha and Min Teke Prospects showing interpreted geology and the structure of the Tuyuk Formation.
-
Note the shallow dip of the beds as well as small scale folding resulting in the coal remaining relatively close to the surface.
-
The Uzgen Coal Basin has not undergone significant deformation unlike other coal basins in Kyrgyzstan.
21
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [374 x 280] intentionally omitted <==
Soviet Era Drillhole Collar and Diamond Core
==> picture [310 x 232] intentionally omitted <==
Road Construction to Min Teke
Prospect
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
Exploration on Tuyuk-Kargasha tenement was predominantly completed in Soviet era 1941-1946. Based on these exploration results a non-JORC standard coal resource was estimated.
-
A total of 60 cored drill holes were completed for 29,920m along with approximately 15,000m of trenching and adits.
-
The Tuyuk Project has 9 main coal seams for a combined total of 8.3m.
-
The Kargasha Project has 14 main coal seams for a combined total of 15.3m.
-
Historical reports state that individual coal seams can reach a thickness of 8.7m .
-
Kashirin, Ibraimov and Karabalaev (1975) state that coal from Tuyuk-Kargasha is bituminous coking coal (metallurgical and semi-industrial scale testing).
23
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
==> picture [201 x 151] intentionally omitted <==
Soviet Era Drill Core and Adit
==> picture [301 x 226] intentionally omitted <==
Small Scale Mining Operation on Tenement Boundary
24
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
China and Kyrgyzstan have agreed to commence a feasibility study for the construction of the Trans - Asia Railway.
-
This railway will link China – Kyrgyzstan – Uzbekistan.
-
The railway is anticipated to be completed within 3 years from commencement of construction.
-
The railway will connect to the Nanjing line at Kashgar and from there, to the rest of China.
-
The Kokkia Project lies within 6 kilometres of the proposed railway.
in the equity market will be the
Mongolia Energy Corp, Aspire Mines, Xanadu and Guildford Coal and to a lesser extent, the China on-shore coking coal plays (Shougang Fushan, Hidili and UP Energy.
25
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
-
Tuyuk-Kargasha and Kokkia Projects – Carry out systematic exploration, drilling and sampling programs with the aim of testing the Company’s Exploration Target and, if successful, delineating resources complying with the JORC Code. Trenching has been completed at Tuyuk-Kargasha.
-
Min Teke and Sary Mogol Projects - Commence open pit coal mining and production. Complete drilling programs with the aim of defining a resource complying with the JORC Code.
-
Identify markets for anticipated thermal coal sales (e.g. Sary Mogol) – including domestic, China, Tajikistan, Uzbekistan and other adjacent countries.
-
Acquire additional coal projects in Kyrgyzstan and potentially adjacent/nearby countries.
-
Liaise with national and regional government agencies and other stakeholders to ensure all activities comply with relevant regulations.
26
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
Celsius Coal Limited
Registered Office: Level 1, 12 Kings Park Road, WEST PERTH, WA, AUSTRALIA, 6005 Telephone: +61 8 9226 4500 Facsimile: +61 8 9226 4300 Website: www.celsiuscoal.com.au Email: [email protected]
27
==> picture [191 x 96] intentionally omitted <==
==> picture [720 x 15] intentionally omitted <==
The information in this Presentation that relates to exploration results and Exploration Targets relating to the Kyrgyzstan Projects is based on information compiled by Grant Thomas who is Managing Director of Celsius Resources and a Member of the Australasian Institute of Mining and Metallurgy.
Mr Thomas has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Thomas consents to the inclusion in this Presentation of the matters based on his information in the form and context in which it appears.
Exploration Targets
It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this announcement relating to Exploration Targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) and Reserve(s) have not been used in this context in this announcement. The potential quantity of coal presented in this announcement as Exploration Targets are conceptual in nature. It should be noted that there has been insufficient exploration to define a Mineral Resource which complies with the JORC code, and it is uncertain if further exploration will result in the determination of a Mineral Resource. Celsius Resources intends to carry out an exploration programme to systematically test the Exploration Targets for each of the Prospects.
28
==> picture [191 x 96] intentionally omitted <==
Appendix 1
==> picture [720 x 15] intentionally omitted <==
-
For the first time, on 10 October 2010, Kyrgyzstan held free and fair parliamentary elections.
-
Kyrgyz citizens voted in a referendum in June 2011 in favour of the introduction of a parliamentary democracy and constitutional changes, including curbing presidential powers.
-
The country is now the first parliamentary democracy in Central Asia, a region dominated by authoritarian leaders.
==> picture [322 x 186] intentionally omitted <==
-
Almazbek Atambaev was elected President and commenced his new role on 1 January 2012.
-
Improved Mining Law– removal of provisions that would have allowed government free-carried interest in projects prior to passing the new law
"The most important thing today is stability because without stability Kyrgyzstan has no future"
- Constitutional protection for foreign investment
29
==> picture [191 x 96] intentionally omitted <==
Appendix 2
==> picture [720 x 15] intentionally omitted <==
-
Kyrgyzstan consumes in excess of 1.5mpta of thermal coal, but the domestic output is only in the order of 500ktpa.
-
Consequently, there is a significant domestic market for quality thermal coal.
-
Tajikistan and Uzbekistan are both importers of thermal coal and are in close proximity to the Tuyuk-Kargasha, Kokkia, Min Teke, Bel Alma and Sary Mogol projects.
And then there is China...
==> picture [458 x 213] intentionally omitted <==
30
==> picture [191 x 96] intentionally omitted <==
Appendix 3
==> picture [720 x 15] intentionally omitted <==
1 Xinjiang will grow fast
-
China Central Government has explicit goal to bring investment to Xinjiang
-
RMB2,100 billion investments planned between now and 2020
-
Includes establishment of Special Economic Zone at Kashi (Kashgar) by 2015 to become a manufacturing centre for export to Central Asia and Russia
-
2015 Xinjiang development goals include: 60% urbanization; additional 170,000 kilometres of roads; 8,200 kilometres of railway expansion; and 22 new airports
2 Xinjiang has been mandated to have its own steel industry, with capacity for export
-
China has identified Central Asia as a steel export market (only Kazakhstan produces in the region currently)
-
Xinjiang is forecast to triple steel production to 35 million tonnes per year by 2015, including 10 million tonnes per year of high-margin special steel
-
Azarga Management has identified 10 new projects and expansions in Xinjiang by companies such as Shangang, Baicheng, Xin Yu, Shougang, Baiyi and JISCO – 15 million tonnes of this new capacity is in the Kashi, Akesu and Kuche regions close to the Kyrgyz-China border
3 Coking coal is absent from Xinjiang’s own resource base
-
Xinjiang is rich in coal resources but less than 2% is classified as coking coal
-
Any coking coal Xinjiang has is semi-soft coking coal (eg, similar to that of UP Energy’s)
-
Xinjiang is forecast to import 30 million tonnes of coking coal from other countries and provinces of China by 2015 (ie, roughly half the size of South Korea’s total coking coal imports)
31
==> picture [191 x 96] intentionally omitted <==
Appendix 4
==> picture [720 x 15] intentionally omitted <==
==> picture [278 x 199] intentionally omitted <==
- In 2009, China became the world’s largest energy consumer, surpassing the United States.
• China's coal consumption is forecast to rise 28 percent between 2009 and 2015 to 2.67 billion tonnes a year, according to published government figures.
- For China’s own electric generation
==> picture [278 x 194] intentionally omitted <==
program, it is building coal-fired generators and currently producing 80 percent of its electricity from coal-fired generation.
- China’s coal-fired capacity is already about 80 percent higher than that of the United States and by 2035, it is expected to be more than 200 percent greater.
32