Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Celsius Resources Limited Capital/Financing Update 2012

Jan 24, 2012

10450_rns_2012-01-24_512f36cd-9f3f-4806-900a-643c3905837d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [252 x 95] intentionally omitted <==

MEDIA RELEASE/ASX ANNOUNCEMENT

25 January 2012

UPDATE ON COAL ACQUISITION - ENCOURAGING RESULTS FROM SURFACE SAMPLING AT KYRGYZSTAN COAL PROJECTS

1. Receipt of Assay Results

View Resources Limited (ASX:VRE) ( View or the Company ) is pleased to advise that assay results have been received from coal samples taken at the Kyrgyzstan coal projects under the supervision of the Company’s appointed independent geologist, Micromine Consulting Pty Ltd (refer to prior announcement dated 8 December 2012).

The coal analyses were by Stewart Global Group (part of the ALS Group) at their accredited laboratories in Mongolia. Some selected samples are being sent to a laboratory in Australia for analysis of coal rank properties.

The results are set out in table 1 attached to this announcement and have confirmed the presence of relatively high energy thermal coal at both the Bel-Alma and Sary-Mogol projects in Kyrgyzstan. 12 out of the 14 samples returned calorific values above 5,500 Kcal/kg on an “as received” basis, including 4 samples above 7,000 kcal/kg and a maximum value of 7,284kcal/kg . 11 out of 14 samples contained less than 15% ash (including 5 samples with less than 5% ash).

It should be noted that these are surface samples of weathered coal and further exploration drilling and coal sampling, especially of fresh coal, is required to determine the representative characteristics of the coal seams at each Project.

The Company is now able to confirm satisfaction with its technical due diligence on the projects.

2. Timetable

The timetable for completion of the acquisition of the coal projects has been slightly varied as per below:

Event Date
General Meeting of shareholders to approve Transaction 30 January 2012
Lodge Prospectus with ASIC 30 January 2012
Offer under Prospectus opens 30 January 2012
Offer under Prospectus closes 3 February 2012
Coal acquisition completes 4 February 2012

AUTHORISED BY:

Ranko Matic

Non-Executive Director and Company Secretary

P: + 61 8 9226 4500 F: + 61 8 9226 4300

Level 1, 12 Kings Park Road WEST PERTH, WA 6005

Competent Person’s Statement

The information in this announcement that relates to exploration results relating to the Kyrgyzstan coal projects is based on information compiled by Graeme Hewitt of Micromine Pty Ltd who is a Fellow of the Australasian Institute of Mining and Metallurgy. Graeme Hewitt has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Graeme Hewitt consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Table 1. Coal Assays from Bel-Alma Project (BA01 – BA10) and Sary-Mogol Project (CM01 – CM03)

SAMPLE NO. AS RECEIVED BASIS AS RECEIVED BASIS AS RECEIVED BASIS AS RECEIVED BASIS AS RECEIVED BASIS AIR DRIED BASIS AIR DRIED BASIS AIR DRIED BASIS AIR DRIED BASIS AIR DRIED BASIS DRY BASIS DRY BASIS DRY BASIS DRY BASIS DRY BASIS DAF
True
Relative
Density
(TRD)
Free
Swelling
Index
(FSI)
Total
Moisture
(TM)
Ash
(CPAA)

Volatile
Matter
(CPAV)
Fixed
Carbon
Total
Sulphur
(TS)
Calorific
Value
(CV)

Analytical
Moisture
(CPAM)
Ash
(CPAA)
Volatile
Matter
(CPAV)
Fixed
Carbon
Total
Sulphur
(TS)
Calorific
Value
(CV)

Ash
(CPAA)
Volatile
Matter
(CPAV)
Fixed
Carbon
Total
Sulphur
(TS)
Calorific
Value
(CV)

Calorific
Value
(CV)
mode-
dynamic
mode-
dynamic
mode-
dynamic
mode-
dynamic
% cal/g % cal/g % cal/g cal/g
BA01 2.89 5.13 28.52 63.46 0.46 6649 2.80 5.13 28.55 63.52 0.46 6655 5.28 29.37 65.35 0.47 6847 7228 1.48 0.0
BA02 3.64 23.36 23.12 49.88 0.35 5240 2.22 23.71 23.46 50.61 0.36 5318 24.24 23.99 51.76 0.36 5438 7178 1.63 0.0
BA03 3.12 6.46 28.31 62.10 0.58 6674 2.33 6.51 28.55 62.61 0.59 6728 6.67 29.23 64.10 0.60 6889 7381 1.46 0.0
BA04 3.28 3.12 29.06 64.54 0.68 7075 2.20 3.16 29.38 65.26 0.69 7154 3.23 30.05 66.73 0.70 7315 7560 1.41 0.0
BA05 3.81 3.61 27.83 64.76 0.59 6942 2.18 3.67 28.30 65.86 0.60 7060 3.75 28.93 67.32 0.61 7217 7498 1.43 0.0
BA06 2.68 2.50 28.05 66.77 0.56 7171 2.04 2.52 28.23 67.21 0.57 7218 2.57 28.82 68.61 0.58 7369 7563 1.43 0.0
BA07 1.77 1.95 28.92 67.36 0.69 7284 2.17 1.94 28.80 67.08 0.68 7254 1.99 29.44 68.57 0.70 7415 7565 1.41 0.0
BA08 2.29 3.63 29.99 64.08 0.80 7060 2.23 3.64 30.01 64.13 0.80 7065 3.72 30.69 65.59 0.82 7226 7505 1.43 0.0
BA09 2.38 5.14 30.80 61.67 0.92 6872 2.42 5.14 30.79 61.65 0.92 6869 5.27 31.56 63.18 0.94 7040 7431 1.43 0.0
BA10 3.98 6.59 29.21 60.22 0.88 6625 2.31 6.70 29.72 61.26 0.89 6740 6.86 30.42 62.72 0.92 6900 7408 1.45 0.0
CM01 5.30 16.58 29.98 48.14 0.61 5710 2.66 17.04 30.81 49.48 0.62 5868 17.51 31.65 50.83 0.64 6029 7309 1.53 0.0
CM02 8.70 9.61 32.49 49.20 0.46 6086 3.38 10.17 34.38 52.06 0.49 6440 10.53 35.59 53.88 0.50 6665 7450 1.45 0.0
CM02/1 6.57 8.09 34.06 51.27 0.50 6356 3.44 8.37 35.20 52.99 0.52 6568 8.66 36.46 54.88 0.54 6803 7448 1.43 0.0
CM03 8.11 32.43 27.00 32.46 0.35 4336 2.34 34.47 28.70 34.50 0.37 4608 35.29 29.38 35.33 0.38 4719 7292 1.65 0.0