A Western Australian Gold and Base Metals Explorer Investor Presentation
Westar Resources Ltd ACN 635 895 082 (the Company) is the issuer of this presentation. The issue of this presentation is intended only for the person or entity to which it has been transmitted.
Not a disclosure document
This presentation is not a disclosure document for the purposes of Chapter 6D of the Corporations Act 2001 (Cth) (Corporations Act) and does not purport to include the information required of such a disclosure document. It has not been lodged with or approved by any regulatory authority, such as the Australian Securities and Investments Commission (ASIC) or the Australian Securities Exchange (ASX). The purpose of this presentation is to provide the recipients with summary information so they can consider participating in the capital raising proposed to be undertaken by the Company. The capital raising is offered only to persons who are professional or sophisticated investors (within the meaning of section 708(8) and section 708(11) of the Corporations Act, respectively) and are exempt from the disclosure requirements of Part 6D.2 of the Corporations Act.
Confidentiality
The presentation is provided on a strictly confidential basis and is not to be published. It is not intended for, and must not be distributed to, any person other than as transmitted by or on behalf of the Company. Any disclosure to the advisers of the recipients must be on a confidential basis, for the purpose only of assessing the presentation as adviser to the recipients. The information contained in this presentation or subsequently provided to the recipients whetherorally, electronically or in writing by or on behalf of the Company or its employees, agents, advisers and consultants is provided on the terms and conditions of this disclaimer.
Forward-looking statements
This presentation contains forward-looking statements. Those forward-looking statements reflect views held only as at the date of this presentation. Any such statement is subject to inherent risks and uncertainties. Actual events or results may differ materially from the events or results expressed or implied in any forward-looking statement, and such deviations are both normal and to be expected. Recipients must make their own assessment about the likelihood of a matter, about which a forward looking statement is made, occurring. The Company makes no representation about the likelihood of a matter, about which a forward-looking statement is made, occurring. The Company and its directors, employees, agents, advisers and consultants: give no representation or warranty to a recipient of this presentation as to the accuracy or completeness of the statements contained in this presentation or in relation to any other matter; and to the fullest extent permitted by law, disclaim responsibility for and have no liability to a recipient of this presentation for any error or omission in or for any statement in this presentation.
Reliance on presentation
A recipient of this presentation must make their own assessment of the matters contained herein and rely on their own investigations and judgment in making an investment in the Company. This presentation does not purport to contain all of the information a recipient of this presentation requires to make an informed decision whether to invest in the Company. Specifically, this presentation does not purport to contain all the information that investors and their professional advisers would reasonably require to make an informed assessment of the Company’s assets and liabilities, financial position and performance, profits, losses and prospects.
Not a recommendation or financialadvice
The information in this presentation is not a recommendation to subscribe for securities in the Company and does not constitute financial advice. Any person who intends to subscribe for securities must conduct their own investigations, assessment and analysis of the Company and its operations and prospects and must base their investment decision solely on those investigations and that assessment and analysis. Prospective investors should consult their own legal, accounting and financial advisers about an investment in the Company.
No other material authorised
The Company has not authorised any person to give any information or make any representation in connection with any proposed offer of securities. A prospective investor cannot rely upon any information or representations not contained in this presentation.
Exploration Results: The information in this presentation concerning WSR exploration results and references to historical results at WSR’s projects is contained in ASX announcements available on its website, www.westar.net.au. WSR confirms that it is not aware of any new information concerning exploration results that materially affects the information included in its ASX announcements.
For the purpose of Listing Rule 15.5, this announcement has been authorised by the board of Westar Resources Ltd.
2
LOCATION
-
All projects located in WA’s premier gold terranes and a new potential base metal district
-
Proximal to world class mines and established infrastructure
AGGRESSIVE EXPLORER
-
All projects have seen significant exploration development in 2021
-
In 2021 completed geophysics, soils sampling, mapping, aircore drilling, RC drilling, two acquisitions and a farm-in
PRIMED FOR HIGH IMPACT NEWSFLOW
-
Follow up RC Drilling at Gidgee South & Winjangoo
-
Opaline Well & Gidgee North airborne EM & plate modelling for drill targeting
-
Maiden aircore & RC Drilling at Gidgee North
TIER 1 JV PARTNER (WSR 25% free carried)
-
Ramelius farming in with WSR free-carried to decision to mine at 25%. Provides continued asset level exposure while reducing funding requirements
-
Significant drill program initiated
PEOPLE
-
Highly experienced board with proven commercial and financial expertise
-
Technically focused management team & highly experienced boots on ground field personnel
VALUE ACCRETIVE ACQUISITIONS
-
50 projects reviewed in 2021, 7 at DD level
-
Birrigrin Mining Centre & Carbine Bore
-
Geoff Well
-
Pegged Ground: South-East Bore & Murrawalla Hill
3
==> picture [960 x 171] intentionally omitted <==
----- Start of picture text -----
0 10,738 47 20 18,814 1,605
LTIs Line Km Geophysics Targets Targets Drill Metres Surface
Completed Generated Tested Completed Samples
----- End of picture text -----
SANDSTONE PROJECTS (329KM[2] )
-
Exploration success achieved at Gidgee South with further RC drilling planned at the historic Birrigin Mining Centre.
-
Airborne geophysics & soil sampling confirms base metal potential at Gidgee North with additional airborne EM to be flown Q4 CY2021.
-
Geoff Well acquisition extends WSR strike to 7 km’s with historic intercepts including 8m @ 1.12% Cu from 48m.
PILBARA PROJECTS (67KM[2] )
-
Airborne EM flown in October 2022 following on from successful ground truthing and rock-chip sampling.
-
Historical rock chip samples include 200g/t , 44.6g/t & 13.77 g/t gold.
-
Targeting large scale VMS and shear zone hosted mineralisation. Anomalous historical cobalt geochemical samples require follow up investigation.
SOUTHERN CROSS PROJECTS (63KM[2] )
-
8 km’s of strike with historic intercepts of 9m @ 98.2g/t , 24m @ 3.68g/t & 1m @ 236.3 g/t gold.
-
Ramelius Resources farm-in (ASX:RMS), with WSR 25% free carry to decision to mine.
-
RC drilling commenced at Mt Finnerty, to be followed by aircore drilling for ~ 5,900 metres of total drilling.
MOUNT MAGNET PROJECTS (302KM[2] )
-
~3,000m of RC drilling at Winjangoo has identified mineralised shear zones in highly altered and sulphidic basalt - 4 structural targets to be tested in 2022.
-
11,000m of Aircore completed at Coolaloo with anomalous multi-element geochemistry in end-of-hole.
4
Capital Structure
| Key Information | Key Information |
|---|---|
| Share Price | 0.165 |
| Shares on Issue | 50.9M |
| Market Cap | 8.4M |
| Options Unlisted | 5.0M1 |
| Cash (at 31 Sept 2021) |
2.0M |
| Debt | - |
| Enterprise Value | 6.4M |
Board of Directors
==> picture [74 x 74] intentionally omitted <==
Managing Director & CEO | Karl Jupp
BappSc (Hons), GradDip(Bus), MAIG, MAusIMM
A Geologist with over 20 years’ technical and leadership experience in the Australian and international mineral resources sector. Karl commenced his career in mineral exploration in Western Australia working for Normandy, Great Central Mines, and Barrick, later moving into mining and leadership roles and eventually consulting. He has co-authored several technical papers and is experienced in Feasibility Studies, JORC Mineral Resource delineation and management of Ore Reserve conversion.
Non-Executive Chairman | Simon Eley
==> picture [75 x 75] intentionally omitted <==
B.Laws (LLB), B.Arts
Simon has extensive experience in the identification and commercialisation of mineral resource projects and was the founding director of Egan Street Resources Ltd, having led the acquisition of the Rothsay Gold Project in 2011. Egan Street was taken over by Silver Lake Resources in early 2020 for an implied value of approximately A$79m. Simon was an Executive Director of Aragon Resources Ltd and led the team that secured the Central Murchison Gold Project which eventually led to a $76m takeover by Westgold Resources Limited in 2011.
As at 25 October, 2021
Ownership Board, management & 30.2% founders[2]
==> picture [75 x 75] intentionally omitted <==
Non-Executive Director | Nathan Cammerman
BSC (HONS) GEOLOGY, MIWM, MBus (Intl)
Geologist by initial training, Nathan’s senior executive and board experience includes project generation, evaluation and acquisition, JV negotiation, financing, permitting and approvals, feasibility study management, offtake and government relations. Strong track record in shareholder wealth creation. Co-founded several private exploration companies which have progressed from green fields concepts to near term production propositions.
5
1 Issue of 5.0 million options exercisable at $0.25 to Board & Management expiring 3 years from the date of issue
2 Founders escrowed for a 2 year period from listing on the ASX (17 December, 2020)
Sandstone Projects
==> picture [421 x 208] intentionally omitted <==
6
OVERVIEW
The Projects lie within the Gum Creek Greenstone Belt (GCGB) of the Youanmi Terrane, which forms a lensoidal, broadly sinusoidal belt measuring some 100km in length and 24km in width.
Total area owned/under JV is 329 km[2] .
At Gidgee North multiple AEM geophysical conductors have been recently identified (SkyTEM).
Potentially a new and significant base metal terrane , with similar analogies to Horizon Gold’s “Altair” Cu-Zn Prospect, located in the same stratigraphy and less than 1km from the Geoff Well JV Project boundary.
Horizon Gold have 620km[2] of tenure in the GCGB under exploration and development.
Current resource at Gum Creek of 18.6Mt @ 2.3g/t Au for 1.3 million ounces of gold. > 1 million ounces have been historically extracted from the GCGB since 1985.
Limited modern exploration and drilling along the margins of the Gum Creek greenstone belt within Westar tenements, in particular along strike from historical mines and workings located in the Gidgee South Project area.
==> picture [474 x 392] intentionally omitted <==
7
7
GIDGEE NORTH PROJECT
6 conductors at Gidgee North have been identified from open file SkyTEM data, with only 50% of the leases surveyed.
Westar believes several of these conductors are along strike continuation of the nearby Horizon Gold stratabound Cu-Zn “ Altair Prospect ”.
Numerous significant intercepts have been reported at Altair including up to 44m @ 1.2% Cu from 56m and 20m @ 1.1% Cu from 64m .
Following the recent farm-in at Geoff Well, Westar now holds approximately 7km of strike length of the interpreted VMS mineralised stratigraphic horizon hosting Altair. This ‘event horizon’ extends from Altair, through the “ Vela Prospect ” at Geoff Well, past mapped gossans and onto Westar’s 100% owned tenure at Gidgee North.
The east-west trending stratigraphic “F anomaly”, folded “C anomaly” and “D anomaly” are considered to be within this same stratigraphic horizon.
==> picture [450 x 395] intentionally omitted <==
8
8
GIDGEE NORTH PROJECT – GEOFF WELL
Approximately 900 metres from Altair at the Geoff Well Project, is the Vela Prospect. Originally discovered by Pancontinental Mining a single line of 12 RAB holes (665m) was drilled in 1994. There is no deep drilling at Geoff Well or Gidgee North. Vela is hosted within the same stratigraphic unit and geophysical conductor as Altair and is interpreted to represent a potential near surface expression of similar style of mineralisation. Westar is of the opinion the Vela prospect presents a highly prospective VMS (Cu-Zn) target. The limited drilling resulted in a number of anomalous Cu and Zn intercepts within the oxide zone, including the extremely encouraging 8m @ 1.12% Cu from 48m.
Similar trend of Zn depletion in regolith as seen at Altair.
Zn (and Ag) at EOH is a good indicator of Zn in fresh-rock due to Zn nearly always depleting near surface.
==> picture [546 x 342] intentionally omitted <==
Significant Cu-Zn intersections at the “Vela” Prospect
9
9
GIDGEE NORTH PROJECT – Southern Tenement Area
Appx 11km of strike in the southern tenement area with no AEM geophysics and prospective lithologies within the ‘event horizon’ stratigraphy.
Due to be flown using the NRG XCITE[TM] system in mid-late Q4 CY2021.
A 2022 Westar soil sampling returned max Cu, Zn and Ba of 259ppm, 360ppm and 1,600ppm respectively.
GIDGEE NORTH PROJECT – Northern Tenement Area
Newly granted “ South-East Bore ” tenement, which is contiguous to the north of the Gidgee North Project and applied for based on potential “Algoma-type BIF’s” and historical Cu-Zn anomalies, which could be proximal to VMS mineralisation.
GIDGEE NORTH PROJECT – Gold Targets
8 gold targets identified from integrated data analysis and remain to be investigated and drill tested, including broad geochemical anomalies defined by auger sampling at Bonza Bore, Fairy Well and Breakaway Bore.
10 10
GIDGEE SOUTH PROJECT
Maiden drill program confirms gold mineralisation at the ‘Tassie’ prospect: o 3m @ 3.29g/t Au from 35m (GSRC0005); o 3m @ 3.41g/t Au from 55m (GSRC0047); and o Quartz vein lode beneath “Hawthorne” workings assays up to 6.27g/t Au . The historical Birrigrin Mining Centre contains over 30 shafts and produced gold at up to 196.23 g/t Au in the early 1900’s from shallow quartz hosted lodes, generally <30m depth (appx groundwater table). Results of the Deep Ground Penetrating RADAR program at the historic Birrigrin Mining Centre received and indicate sub-surface quartz veining and alteration zones. Multiple historical workings remain to be drill tested at depth and along strike. No drilling or modern exploration on the eastern granite-greenstone contact or BIF units due to alluvial cover. Significant intersection at the “Tassies” Prospect
==> picture [241 x 196] intentionally omitted <==
Rock chip samples at the Carbine Bore prospect of up to 3.61 g/t Au.
11
11
Next Steps (H1 2022 CY) – Gidgee North
Extensional and infill soil sampling, rock-chip sampling and ground truthing of initial targets completed Q4 CY2021.
AEM (airborne electromagnetic) survey (NRG Xcite) over high priority target areas in the southern portion of the lease, including the Geoff Well Project.
Generation of plate models to assist in targeting ahead of heritage surveys, clearing and maiden drilling programs across multiple targets planned for H1 CY2022.
Next Steps (H1 2022 CY) – Gidgee South
Integrate DGPR data for target refinement at the Birrigrin Mining Centre around the substantial historical workings and shafts.
“Fingerprinting” of gold-hosting veins with multi-element geochem and applying this knowledge surface exploration for vectoring on additional, hidden, gold-hosting veins.
Field mapping at the Carbine Bore Prospects and assessing the gold potential of the eastern side of the greenstone-granite contact on to refine drill targets.
==> picture [343 x 409] intentionally omitted <==
12
12
Mount Magnet Projects
==> picture [421 x 208] intentionally omitted <==
13
WINJANGOO & COOLALOO PROJECTS (224KM[2] )
-
The Mt Magnet district has produced approximately 6 Million ounces of gold.
-
Huge potential for deeper systems as typified by Ramelius Resources, operators of the Mt Magnet Gold Mine.
-
Geology is the north-south striking Meekatharra-Mt Magnet greenstone belt of the Western Australian Murchison Province.
-
Westgold Resources have recommissioned the Cue (Tuckabiana) Gold Mine, approximately 30km NE of Winjangoo in the northern arm of the greenstone belt.
==> picture [349 x 421] intentionally omitted <==
14
14
WINJANGOO PROJECT
Significant intersections (>0.1 g/t Au) include:
-
1m at 0.25g/t Au from 52-53m in WJRC0006&
-
1m at 0.22g/t Au from 53-54m, in WJRC0006
-
4m @ 0.14 g/t Au from 24 metres in WJRC0036
Prospect Scale : Gold mineralisation, sheared and altered sulphidic basalts with abundant quartz veining and granite –greenstone contacts.
Project scale : Right rocks, right structures (‘traps’) to be further investigated for potential follow up RC drilling.
==> picture [340 x 128] intentionally omitted <==
RC drill chips with altered and sulphidic basalts – WJRC0038
==> picture [281 x 339] intentionally omitted <==
Winjangoo South – lithologies with RC drilling and significant intersections
==> picture [279 x 339] intentionally omitted <==
Winjangoo South Potential structural traps and target areas for follow up investigations
15
15
COOLALOO PROJECT
Completed a maiden AC drilling program in 2021, with 373 holes for 11,038m of drilling.
The drill program was designed to penetrate regolith to basement and provide a first pass geological and geochemical assessment of high priority drill targets.
End of hole (EOH) multi-element results used for vectors to mineralisation in depleted regolith and indicate multiple anomalous areas.
CHI = 100(Bi-1) + 2(PB-10) + 2.2(Zn-30)[1] CHI3 = Cu + 3(Pb) + 5(Zn) + 3(As) + 5(Sb) + 10(Bi+Cd)+ 30(Mo) + 100(Ag)[2] CHI6 = As + 3.56(Sb) + 10(Bi) + 3(Mo) + 30(Ag) + 10(W) + 3.5(Se)[3]
Independent technical review (ITR) is in progress and has identified additional areas of interest, however, these will compete with other priority targets as part of Westar’s rigorous deployment of capital to the best available targets in the total portfolio.
Preliminary results of the ITR note anomalous uranium in DMIRS datasets, interpreted to be attributalble in abundant surface calcrete and may present a farm-out opportunity.
==> picture [462 x 333] intentionally omitted <==
Coolaloo drilling anomalies in basement geochemistry
16
16
Southern Cross Projects
==> picture [421 x 208] intentionally omitted <==
17
RAMELIUS RESOURCES FARM-IN / JOINT VENTURE
Within 36 months Ramelius Resources (ASX RMS) to spend $2M on Westar Project areas (Mt Finnerty and Parker Dome) to initiate a 75%/25% JV.
Once JV is initiated, Westar will hold a free carried 25% interest until a Decision to Mine. 5,900 metre drill program commenced 12[th] October 2021.
MT FINNERTY & PARKER DOME PROJECTS (63km[2] )
The Southern Cross Greenstone Belt hosts over 150 known gold deposits and has produced over 15+ Million ounces of gold.
Projects are proximal to infrastructure/utilities and operating processing plants with excess capacity.
Highly active region with Ramelius Resources (ASX: RMS) commencing mining at the Marda Project (100km West of Mt Finnerty) and developing the Tampia Project.
==> picture [307 x 383] intentionally omitted <==
18
18
==> picture [294 x 414] intentionally omitted <==
==> picture [574 x 227] intentionally omitted <==
Oblique long section of the Mt Finnerty and Mt Finnerty NE Prospect with historical RAB/RC drilling, significant intercepts and interpreted zones of gold mineralisation
MT FINNERTY PROJECT The Mt Finnerty Project has several prospects over 3km of known mineralisation along 8km of greenstone strike. Westar has extracted and remodelled historical data including assays of: 9m @ 98.2 g/t Au (MF023); 24m @ 3.68 g/t Au (MF038); 1m @ 263.3 g/t Au (MFRC029) and 12m @ 23.3 g/t Au (PGRB1001) 3,400 metres of RC drilling and 2,500 metres of regional AC drilling has commenced.
19
~~19~~
PARKER DOME PROJECT
3 separate gold anomoloies with shallow drilling (<12m) including 3.62g/t, 1g/t and 0.86g/t Au.
Large areas of the project are essentially unexplored, including several structural targets identified by previous explorers.
Potential analogies to the 1.4Moz “Golden Cities”, where mineralising fluids propagate along structures from greenstone terrains into granite batholiths.
Zenith Minerals (ASX: ZNC) “Split Rocks Project” adjoins Parker Dome. Significant intersections include:
Dulcie Far North: 4m @ 10.2 g/t Au (eoh), incl 2m @ 19.8 g/t Au (eoh) Scott’s Grey: 12m @ 1.7 g/t Au (eoh) incl. 1m @ 7.1 g/t Au and 5m @2.1 g/t Au Dulcie North : 32m @ 9.4g/t Au, incl 9m @ 31.4 g/tAu
RMS have indicated drilling planned for H1 2022.
==> picture [303 x 379] intentionally omitted <==
Historical soil and drilling anomalism
20
20
Pilbara Projects
==> picture [421 x 206] intentionally omitted <==
21
OPALINE WELL PROJECT
67km[2] landholding 40km west of Nullagine in the Pilbara Craton.
Historical rock chip samples in the Project area include 20.5g/t , 44.6 g/ t & 200g/t Au as well as 0.25-1.15% Cu , 0.14-1.85% Zn , 79-155g/t Ag & 0.19-0.41g/t Au.
Calidus Resources Ltd is developing the 1.25Moz Warrawoona Gold Project, approximately 70km north, in similar geological stratigraphy.[1]
The Opaline Well Project adjoins Geatland Gold’s “Panorama Project” of which Geatland Gold states “… known gold mineralisation and potentially the largest coherent cobalt-in streams anomaly in Western Australia ”.[1]
Field reconnaissance by Westar in 2021 identified several gossans and returned a rock chip sample that assayed 508ppm Cu , 343ppm Pb , 1,080ppm Zn (OWR019).
Westar completed a 375 line-km airborne EM survey in October 2021 to fast-track VMS mineralisation style target generation, with data now being processed to identify potential conductors.
Historical cobalt anomalism remains untested.
1 https://greatlandgold.com/panorama /
==> picture [337 x 399] intentionally omitted <==
22
Westar Resources Exploration Timeline
23
Strong news flow from parallel exploration programs across 100% owned and JV projects
| H2 CY2022 H1 CY2022 |
H2 CY2022 H1 CY2022 |
H2 CY2022 H1 CY2022 |
|
|---|---|---|---|
| Q4 Q1 Q2 |
|||
| Sandstone(100% Owned) | |||
| Gidgee North Project | |||
| AEM &plate models,soil sampling& reconnaissance | |||
| DrillingPrep,RC Drilling | ~ 10,000m RC | ||
| Gidgee South Project | |||
| Geochemistry& DGPR data integration | |||
| RC Drilling- BMC & Carbine Bore | ~ 2,500m | ||
| Mt Magnet(100% Owned) | |||
| Winjangoo Project | |||
| Geophysics & target refinement | |||
| RC drilling | ~ 2,000 m | ||
| Coolaloo Project | |||
| Refine &ground truth targets(incl calcretes) | |||
| Southern Cross(Joint Venture) | |||
| Mt Finnerty Project | |||
| RC & Aircore Drilling | (As indicated by RMS) | ||
| Parker Dome Project | |||
| Aircore Drilling | (As indicated by RMS) | ||
| Nullagine(100% Owned) | |||
| Opaline Well Project | |||
| AEM, plate models,interpretations & field work | |||
24
==> picture [325 x 187] intentionally omitted <==
==> picture [323 x 202] intentionally omitted <==
We are driven by discoveries. Succeed swift or fail fast. Use evidence-based decisions at established stage-gates for progressing projects. Spend money as though it were your own. Live the strategy and our processes. ESG is genuinely important. Respect our environment. Respect our stakeholders.
==> picture [298 x 397] intentionally omitted <==
25
Karl Jupp