WESTAR RESOURCES LIMITED Capital/Financing Update 2025

Mar 19, 2025

66085_rns_2025-03-19_d1a1e6d2-9620-4ed5-b7e3-19e201016fc8.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX:WSR

20 March 2025

==> picture [596 x 126] intentionally omitted <==

----- Start of picture text -----

ASX ANNOUNCEMENT
----- End of picture text -----

Mindoolah Gold Mining Centre RC Drilling Results

HIGHLIGHTS

==> picture [14 x 13] intentionally omitted <==

==> picture [14 x 12] intentionally omitted <==

  • RC Drilling successfully tested high priority gold targets around existing open pits and old workings

  • Drill assay results include:

  • 1m @ 6.1g/t Au from 10m (25MDRC003)

  • 6m @ 0.9g/t Au from 41m (25MDRC002)

==> picture [14 x 13] intentionally omitted <==

==> picture [14 x 13] intentionally omitted <==

  • Westar elects not to exercise the Option Agreement to acquire the Mindoolah Project

  • Mageye Prospect (Gidgee North Project):

  • RC drilling completed, targeting a distinct geophysical anomaly

  • Drill assay results on track for early April

Westar Resources Limited (ASX: WSR ) ( Westar or the Company ) announces the receipt of assay results from the recent RC drilling program at the Mindoolah Gold Mining Centre, approximately 70km northwest of Cue in the Murchison region WA.

The gold intercepts returned from drilling are not significant and the Company is satisfied that it has tested the potential of the Mindoolah Gold Mining Centre and determined that there is limited potential for a commercially viable gold deposit being present.

Westar has therefore decided to not extend or exercise its option to acquire 100% of the Project under the terms of the Option Agreement with the Owner.

Westar Executive Director and CEO Jason Boladeras commented:

“Despite having some hallmarks of being a project with brownfields upside potential, unfortunately the drill results did not support this. Interpretation indicates the best targets are now adequately tested and no further expenditure is warranted. This decision is consistent with our ongoing commitment to maximise value opportunities for our shareholders by allocating resources to projects with the potential to host a profitable mine. We now look forward to the Mageye drill assay results early April. At the same time, we continue to actively review advanced gold / copper projects in mining-friendly and safe jurisdictions for acquisition.”

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

Mindoolah Project

Geology and Previous Work

The project is centred on the Mindoolah Gold Mining Centre, an historic goldfield about 70km northwest of Cue, in WA’s Murchison region. The centre comprises a series of shafts from the early 1900s, and several open pits mined in the 1980s (Figure 1). The depth and along-strike potential of the mineralised quartz-vein system was never tested.

==> picture [493 x 403] intentionally omitted <==

Figure 1 . Mindoolah Mining Centre showing old pits, recent drill holes, and interpreted structures.

No information could be found on the open pit mining operations. Further, data from shallow drilling in the 1980s is very unreliable: for example, a map of drill collars cannot reliably be matched with collar locations in the field, not all intervals in the historic holes were assayed, and the assay techniques were not documented adequately[1] . For these reasons, the drilling data from the 1980s has not been used.

Westar previously reported gold and silver results of up to 40.2g/t Au and 280g/t Ag from a program

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

of detailed field mapping and rock-chip sampling across the Mindoolah Gold Mining Centre[2,3] . Of the 145 rock-chip samples, 32 yielded assays of >1g/t Au[2] . The results were obtained predominantly from quartz veins within the open pits and from veins at surface away from the pits. These results, and the geological mapping, provided the basis for the recently completed 10-hole RC drilling program.

Five main open pits were mined at the centre, with the mineralised trends orientated in four different directions (Figure 1). Westar mapping suggests that the structure with the largest displacement was probably the northeast-trending fault that hosts the Mindoolah Main Reef; the interpreted offset of units in the pit indicates an apparent sinistral strike-slip sense of movement. Other likely sinistral strike-slip faults are evident in the Pride of Mindoolah pit and cutting through the Excelsior pit. The gold-bearing reef in the Bertrams pit is probably a reverse fault. The overall distribution of faults resembles contractional trailing horsetail splays off at least two northeasttrending master faults which extend for more than 3km to the southwest of the mining centre.

Westar RC Drilling

The drilling program completed in February 2025 (Figure 1) was designed to test the main goldbearing structures and to do so about 100m down-dip of the reefs in the pits. Two holes were also drilled along strike from the pits to clarify if there was more upside along strike. The program would determine whether the structures had sufficient scale to support a profitable mining operation.

In the northern area of the Mining Centre, holes 25MDRC001 and 25MDRC002 were drilled downdip of mineralised structures in and to the southwest of Bertram’s open pit (Figure 2). Hole 25MDRC001 failed to intersect any significant mineralisation. Hole 25MDRC002, despite lacking quartz veins, contained several, narrow and mostly low-grade intercepts.

Two holes were drilled into the Excelsior quartz reef (Figure 2) to provide some clarification about the dip of the structure (which from feedback on mining in the 1980s had suggested was shallow west dipping), and the potential for stacked veins. Hole 25MDRC003 intersected multiple quartz veins beneath the Excelsior pit, but these veins were narrow and mostly low grade.

Two holes were originally planned for the Mindoolah Main Reef but, following thicker-thananticipated quartz veins in the first two holes (25MDRC005 and 25MDRC006), it was decided to add a third (25MDRC010) to the south of the workings. However, despite the abundance of quartz veins, there was little, or no grade associated with the holes.

Holes 25MDRC004 and 25MDRC007 drilled down-dip of the Pride of Mindoolah quartz reef failed to intersect any significant mineralization.

Refer to Appendix 1 for drill hole details and intercepts, and JORC Table 1 Sections 1 and 2 for supporting information.

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

==> picture [444 x 333] intentionally omitted <==

==> picture [445 x 261] intentionally omitted <==

Figure 2 . Sections through the Bertram’s pit (top) and the Excelsior pit (bottom) showing interpreted mineralised structures defined by Westar RC drilling. Refer to Figure 1 for plan view location of the Sections.

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

Mindoolah Project Option Agreement Ends

Given a lack of significant gold results returned from the best drill targets, it is evident that the Mindoolah Gold Mining Centre is unlikely to support a commercially viable gold mine that would suit Westar. The Company has therefore elected not to exercise the Option to acquire the Mindoolah Project as per the terms and conditions of the Option Agreement with the Vendor. The project will be returned in good standing and Westar thanks the owner for the opportunity and their support.

Exploration funds will instead be preserved to direct towards projects with greater potential to host a mine. Westar continues to evaluate new advanced projects in mining-friendly and safe jurisdictions both nationally and internationally, that can add significant value to shareholders, with a focus predominantly on gold and copper.

Mageye Prospect RC Drilling

RC drilling at the Mageye Prospect, Gidgee North Project (southeast of Meekatharra WA) has been completed. A total of 2 holes for 439m were drilled, targeting a distinct ‘bullseye’ geophysical feature at depth, defined by both historic open-file aeromagnetic (Figure 3) and gravity survey data[4,5,6] .

Drill assay results are expected in early April 2025 and Westar looks forward to updating the market once received.

References in this Release

This announcement contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables where applicable) of exploration results and additional information referred to in this announcement can be found in the following announcements lodged on the ASX:

  1. YY Baldé, R., 1985 Geological Report on Mindoolah, M20/6, Murchison Mineral Field, Western Australia; DEMIRS Statutory Report A15699

  2. 24 October 2024 40.2g/t gold and 280g/t silver rock chip assays - Mindoolah

  3. 20 September 2024 Mindoolah Gold Mining Centre Field Program Completed

  4. 16 July 2024 Compelling Gold Drill Target Uncovered at Gidgee North (Updated)

  5. 03 April 2023 Maiden Aircore Drilling Program Completed at Gidgee North Project

  6. 30 May 2022 Gidgee North Exploration Update

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

==> picture [362 x 447] intentionally omitted <==

Figure 3. Airborne magnetic image (TMI, RTP) showing magnetic high at the Mageye Prospect, and previous WSR drilling.[4,5,6]

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT ASX: WSR

==> picture [136 x 40] intentionally omitted <==

About Westar Resources Ltd

Westar Resources is a Perth-based Resource company focused on creating value for shareholders and the communities we live and work in, through the discovery, acquisition and development of high-quality gold and copper focused projects in supportive jurisdictions. Westar’s projects are strategically located in the highly prospective Murchison and Yilgarn regions of WA; near Cue, Southern Cross and Sandstone.

For the purpose of Listing Rule 15.5, this announcement has been authorised by the board of Westar Resources Ltd.

ENQUIRIES

Jason Boladeras , Executive Director and CEO | [email protected] | Ph: (08) 6556 6000

The information in this announcement that relates to Exploration Results is based on, and fairly represents, information compiled by Steve Sheppard, a Competent Person who is a Registered Member of the Australian Institute of Geoscientists (AIG; Member ID 5290). Steve is a full-time employee of Westar Resources Ltd and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the 2012 edition of the JORC Code. Steve consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

ASX ANNOUNCEMENT

ASX: WSR

==> picture [136 x 40] intentionally omitted <==

The information that has been extracted from prior announcements referred to in this release, are available to view on https://westar.net.au/. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of exploration results, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.’

Forward-Looking Statements

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Westar Resources Limited’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking statements. Although Westar Resources Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

Appendix 1 – Mindoolah RC Drill hole details and intercepts

Hole ID Easting Northing RL Azimuth Dip EOH Depth
From
(m)
Depth
To (m)
Au
(ppm)
Intercept
25MDRC001 547693 7019237 510 210 -56 54 Nil
25MDRC002 547734 7019321 512 208 -61 159 41 47 0.92 6.00m @ 0.92
25MDRC002 58 59 1.29 1.00m @ 1.29
25MDRC002 88 89 1.38 1.00m @ 1.38
25MDRC002 107 108 1.05 1.00m @ 1.05
25MDRC003 547811 7018834 503 81 -60 160 10 11 6.08 1.00m @ 6.08
25MDRC003 71 72 0.93 1.00m @ 0.93
25MDRC003 113 115 1.05 2.00m @ 1.05
25MDRC003 128 130 1.26 2.00m @ 1.26
25MDRC003 135 136 1.18 1.00m @ 1.18
25MDRC003 143 147 0.51 4.00m @ 0.51
25MDRC004 547412 7018543 511 177 -56 118 96 97 0.51 1.00m @ 0.51
25MDRC005 547322 7018959 509 123 -55 130 Nil
25MDRC006 547259 7018852 509 120 -56 136 117 118 0.6 1.00m @ 0.60
25MDRC007 547280 7018548 512 177 -56 118 Nil
25MDRC008 547793 7018690 510 77 -60 88 Nil
25MDRC009 547759 7018941 509 77 -61 109 22 23 0.56 1.00m @ 0.56
25MDRC009 87 88 0.97 1.00m @ 0.97
25MDRC010 547222 7018705 514 124 -56 94 47 48 0.61 1.00m @ 0.61

Westar Resources Limited | ACN 635 895 082 | ABN 66 635 895 082 Level 1, 19 Ord St, West Perth, WA 6005 | PO Box 814 West Perth, WA 6872 +61 08 6556 6000 | [email protected] | www.westar.net.au

Mindoolah Project – RC Drilling JORC Code, 2012 Edition – Table 1 report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity
and
the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold
that
has
inherent
sampling
problems.
Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Reverse circulation samples were collected using a Schramm T450
Reverse Circulation drill rig operated by Strike Drilling. All RC drilling was
undertaken with a 5-inch hammer. All RC holes were sampled for their
entire length at 1m intervals. Well-defined metre marks were present on
the rig pull-down chains and maintained during operation.
Dust suppression was used throughout the program to minimize the loss
of fines. Sufficient air was available to ensure that >99% of samples were
kept dry, even below the water table, and that material was evacuated
from the hole rapidly.
For each metre, primary and duplicate samples (each representing about
1/8 of each interval) were collected from the two chutes on an Ox cyclone.
The gates on the chutes were adjusted to achieve sample weights of
approximately 2–3kg. The relative weights of the primary and duplicate
samples were monitored using a set of scales at the rig; when the
difference was more than 20%, the cyclone was adjusted, and weights
monitored until parity was achieved.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Reverse circulation samples were collected using a Schramm T450
Reverse Circulation drill rig operated by Strike Drilling. All RC drilling was
undertaken with a 5-inch hammer.
The cyclone on the rig was cleaned at the end of each rod with
compressed air. If the cyclone had material stuck to the walls, it was
scraped out before being cleaned with compressed air. Drilling did not
resume until the cyclone was clean.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
_representative nature of the samples. _
Dust suppression was used to maximise recovery and sufficient air was
available to keep >99% of samples dry which avoided fines being washed
away.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
The bulk samples from some intervals in several holes were selected to
be weighed, along with the primary and duplicate samples, to assess total
sample recovery. This is done by comparing the collected weights with
those theoretically contained within a cylinder of the diameter
corresponding to the hammer. This does require estimates to be made of
bulk density, which are not always reliable in weathered and transitional
rock in which the amount of void space can be highly variable. The
measurements suggest recoveries of >90% for most weighed intervals
and were used to benchmark recoveries from intervals that were not
weighed. A small minority of samples had estimated recoveries of 20–
50%, but these were within barren intervals away from the veins of
interest.
No relationship appears to exist between estimated recovery and grade.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.
For every 1m interval drilled, the main rock types, alteration mineralogy
and intensity, vein types and abundances, and sulfide abundances were
logged. The detail of logging is sufficient to support any future Mineral
Resource Estimations. Rock chips from every metre in chip trays were
photographed on site.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
Samples submitted for PhotonAssay™ at Intertek Minerals at Maddington
(NATA accredited for compliance with ISO/IEC17025)
were oven dried and crushed to a nominal top size of 2mm, (samples >3kg
were riffle split first). The samples were fed into a Smart Orbis
crusher/linear splitter, and a 500g aliquot for assay was produced. The
aliquot to be assayed was put into a plastic jar for determination of gold by
PhotonAssay™.
This analytical technique was chosen because (1) it uses a much larger
sample mass than for traditional fire assay, enhancing the likelihood of a
more representative sample for gold and (2) it involves less sample
preparation. The larger sample mass is particularly useful for mineralized
systems that are likely to contain coarse or nuggety gold. The CP visited
Intertek
and
viewed
the
sample
preparation
procedures
for
PhotonAssay™before the drilling program.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
PhotonAssay™ is considered a total technique as it does not involve
dissolving the sample. The technique involves using a high-energy X-ray
source that irradiates the sample, and which induces short-lived changes
in the structure of any gold nuclei present. As the gold nuclei return to their
ground state, they emit a characteristic gamma-ray signature, the intensity
of which is directly proportional to the concentration of gold.
The laboratory inserted standards at the rate of approximately 1 in 20 and
blanks at about 1 in 40. About 5% of the samples were subjected to repeat
analysis.
Verification
of sampling
and assaying
The
verification
of
significant
intersections
by
either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Geological logs of significant intercepts were verified by the Exploration
Manager.
No twinned holes were drilled.
Geological data was logged into OCRIS Mobile on a Toughbook computer
at the drill rig for transfer into the drill hole database. DataShed is used as
the database storage and management software and incorporated
numerous data validation and integrity checks using a series of predefined
relationships. All original planned data was retained in DataShed for
validation purposes.
Adjustments made to the assay data were limited to the replacement of
below-detection results with a negative value.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Drill hole collar locations were captured using a handheld Garmin GPS
with a nominal horizontal accuracy of ±5m. This is not sufficient to support
a Mineral Resource Estimate but is suitable for presenting exploration
results. RLs were estimated using STRM 1-arc second data with an
estimated vertical accuracy across Australia of ±16m. The RLs for the
holes were all within a few metres of each other, consistent with the flat
topography, and are suitable for reporting early-stage exploration results.
Downhole azimuths (relative to magnetic north) and dips were measured
using an AXIS Champ north-seeking gyro. The manufacturer’s stated
accuracy is ±0.75° for the azimuth and ±0.15° for the dip.
The grid system used is MGA94 Zone 50. All coordinates in this release
refer to this grid system.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
See Appendix 1 and Figures in the release for hole positions and spacings.
The data spacing and distribution of holes is not sufficient for Mineral
Resource estimations. The drilling has been primarily carried out to
provide sufficient information as to whether to proceed further with the
project.
No sample compositing has been applied.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
All holes were drilled perpendicular to the strike of the main gold-bearing
structures at Mindoolah. The dips on the holes were designed to intercept
the quartz reefs at as high an angle as possible which was projected to be
between 55° and 90°. The drill orientations should not have introduced any
significant sampling bias.
Sample
security
The measures taken to ensure sample security. Samples were taken from the rig and placed into bulker bags at the field
accommodation under the supervision of the CP. The bulker bags were
loaded onto a flat-bed truck operated by the local station owner under the
supervision of the CP. The bags were then taken to the TOLL depot in
Cue and transported to Intertek in Maddington overnight.
Audits or
reviews
The results of any audits or reviews of sampling techniques and
data.
No independent audits or reviews of the sampling techniques and data
were undertaken.

Mindoolah Project – RC Drilling JORC Code, 2012 Edition – Table 1 report Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
The Mindoolah Project comprises granted leases E20/985, P20/2444 &
P20/2445 located approximately70km northwest of Cue in Western
and land
tenure status
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
Australia, within the Shire of Cue.
Westar Resources Ltd, through its 100% owned subsidiary, Lithos Energy
Pty Ltd holds an option agreement over the tenure, as previously
announced to the ASX. Details are in WSR ASX Announcement, 24
November 2022, “Secures Mindoolah Lithium & Gold Project and divests
Gidgee” and 26 April 2023, “Executes Option Agreement at Mindoolah
Lithium-Gold Project.”
The Yamatji Marlpa Aboriginal Corporation is the native title representative
body to the native title holders over the area covering E20/985, P20/2444,
& P20/2445
Exploration
done by
other parties
Acknowledgment and appraisal of exploration by other parties. The most significant exploration has been conducted by Placer
Exploration, Battle Mountain Gold and Ridolfo Mining. The work done by
Placer Exploration consisted predominantly of stream sediment sampling.
Anomalous results were obtained in the vicinity of Tate’s bore but were
dismissed as being of minor significance. Battle Mountain Gold conducted
extensive rock chip sampling over the Mardoonganna Hills and completed
a percussion drilling program to test the anomalous results. The results
were of low value and the project was relinquished. Ridolfo Mining
excavated several pits at the old Mindoolah Mining Centre and drilled a
series of short percussion and diamond drill holes. A small quantity of ore
was treated at a facility located at Poona. The results of the mining are not
available and data from the drilling is unreliable.
Geology Deposit type, geological setting and style of mineralisation. The project is in the Murchison Province, to the northwest of the Weld
Range. This range consists of basaltic lavas, extensive intruded dolerites
and banded iron formations. These banded iron formations are the current
focus for iron ore mining. At the Mindoolah Mining Centre the dominant
feature is the Mindoolah Granite. This granite consists of leucocratic -
adamellite types and contains numerous small gold workings. The
tenement geology includes a sequence of felsic volcanic rock, mafic
volcanic rock, BIF, and granite, with lenses and dykes of pegmatite, aplite
and quartz–feldspar porphyry.
Drill hole
Information
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level– elevation above sea level
Refer to Appendix 1 for the details of the drill holes.
in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
In
reporting
Exploration
Results,
weighting
averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
No data aggregation methods or metal equivalents have been applied to
these exploration results. A cut-off grade of 0.5g/t Au was used. No top
cut was applied because the highest individual assay for a metre was
6.08g/t Au.
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
The mineralized quartz veins and reefs are oriented between about 55 and
90° to the drill holes, so that in many instances the true width of the
intercepts will be slightly less than the downhole widths. All reported
lengths are downhole lengths.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Suitable summary plans and sections have been included in the body of
the report.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
All significant intercepts are reported as are holes lacking mineralisation.
The criteria used for significant intercepts are a 0.5g/t Au cut-off, a
minimum downhole length of 1m, with a maximum internal waste of 2m.
Where no significant intercepts are present in a hole, this has been noted
in the table of drill holes.
Other
substantive
exploration
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
All meaningful and material data are included in the body of the
announcement.
data samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating
substances.
Further work The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
_areas, provided this information is not commercially sensitive. _
No further work is planned.