Table of Contents

*United States*

*Securities and Exchange Commission*

*Washington, D.C. 20549*

*FORM 6-K*

*Report of Foreign Private Issuer*

*Pursuant to Rule 13a-16 or 15d-16*

*of the*

*Securities Exchange Act of 1934*

*For the month of*

*July 2016*

*Vale S.A.*

*Avenida das Américas, No. 700 — Bloco 8, Sala 218 22640-100 Rio de Janeiro, RJ, Brazil*

(Address of principal executive office)

(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)

(Check One) Form 20-F x Form 40-F o

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))

(Check One) Yes o No x

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))

(Check One) Yes o No x

(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)

(Check One) Yes o No x

(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82- .)

SEQ.=1,FOLIO='',FILE='C:\JMS\109488\16-14363-8\task8027082\14363-8-ba.htm',USER='109488',CD='Jul 21 17:42 2016'

Table of Contents

Table of Contents:

Press Release
Signature Page 23

2

SEQ.=1,FOLIO='2',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bc.htm',USER='107536',CD='Jul 21 18:05 2016'

Table of Contents

*VALE PRODUCTION IN 2Q16*

3

SEQ.=1,FOLIO='3',FILE='C:\JMS\109500\16-14363-8\task8027130\14363-8-be.htm',USER='109500',CD='Jul 21 18:09 2016'

Table of Contents

www.vale.com

[email protected]

Tel.: (55 21) 3485-3900

*Investor Relations Department*

André Figueiredo

Carla Albano Miller

Fernando Mascarenhas

Andrea Gutman

Bruno Siqueira

Claudia Rodrigues

Denise Caruncho

Mariano Szachtman

Renata Capanema

BM&F BOVESPA: VALE3, VALE5

NYSE: VALE, VALE.P

EURONEXT PARIS: VALE3, VALE5

LATIBEX: XVALO, XVALP

This press release may include statements that present Vale’s expectations about future events or results. All statements, when based upon expectations about the future and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will prove correct. These risks and uncertainties include factors related to the following: (a) the countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital markets; (d) the mining and metals prices and their dependence on global industrial production, which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To obtain further information on factors that may lead to results different from those forecast by Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de ValoresMobiliários (CVM), the French Autorité des Marchés Financiers (AMF), and The Stock Exchange of Hong Kong Limited, and in particular the factors discussed under “Forward-Looking Statements” and “Risk Factors” in Vale’s annual report on Form 20-F.

4

SEQ.=1,FOLIO='4',FILE='C:\JMS\109500\16-14363-8\task8027130\14363-8-be.htm',USER='109500',CD='Jul 21 18:09 2016'

Table of Contents

Production highlights

Rio de Janeiro, July 21, 2016 — Vale S.A. (Vale) reached 86.8 Mt of iron ore production(1) in the second quarter of 2016 (2Q16), 9.3 Mt higher than in 1Q16, mainly due to the good performance of the Northern System.

Carajás achieved a production record for a second quarter of 36.5 Mt in 2Q16, representing an increase of 4.9 Mt (or 15.5%) in relation to 2Q15, mainly due to the increase in the overall equipment efficiency of the truck fleet and the ramp-up of the N4WS and N5S extension pits.

Pellet production, excluding Samarco’s attributable production, reached 10.0 Mt in 2Q16, 12.4% and 17.9% lower than in 1Q16 and 2Q15, respectively, mainly as a result of (i) the halt of the Fábrica pelletizing plant, due to delays in obtaining environmental permits for the expansion of adjacent mines; and (ii) the scheduled maintenance stoppages at the Tubarão plants in 2Q16. Tubarão 8 production achieved the monthly record of 637 kt in May.

Global Recovery (GR), measured by final production output divided by the total tons extracted, reached 39% in 2013, 41% in 2014 and 46% in 2015. On a quarter-on-quarter basis, GR increased from 45.4% in 2Q15 to 46.1% in 2Q16(2).

Nickel production reached a record for a second quarter of 78,500 t in 2Q16, representing an increase of 11,400 t in relation to 2Q15, mainly due to the stronger operational performance from PTVI and the ongoing ramp-ups of Long Harbour and Vale New Caledonia (VNC).

Copper production reached a record for a second quarter of 107,400 t in 2Q16, representing an increase of 2,500 t in relation to 2Q15, mainly due to the better operational performance at Sudbury and the successful ramp-up of Salobo.

Gold production reached a record for a second quarter of 109,000 oz in 2Q16.

Coal production totaled 1.5 Mt in 2Q16, 9.5% and 25.2% lower than in 1Q16 and 2Q15, respectively, mainly due to the lower production at Carborough Downs as a result of geological instability issues in 2Q16.

(1) Excluding Samarco’s attributable production and including iron ore acquired from third parties

(2) Due to external factors, such as seasonal weather conditions, the comparison should always be made on a year-on-year basis.

5

SEQ.=1,FOLIO='5',FILE='C:\JMS\109500\16-14363-8\task8027130\14363-8-be.htm',USER='109500',CD='Jul 21 18:09 2016'

Table of Contents

In June, the total mine movement in Mozambique reached a new monthly record of 12.7 Mt due to higher equipment productivity and the development of new mining areas which will feed the Moatize II coal handling and preparation plant. Commissioning of the Moatize II plant is almost concluded and its start-up is expected by early August. The ramp-up of Moatize II will enable the increase in production and the reduction in costs in the next quarters.

*Production summary*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
Iron ore(1) 86,823 77,544 89,311 164,367 166,729 12.0 % -2.8 % -1.4 %
Pellets(1) 10,049 11,478 12,237 21,527 23,625 -12.4 % -17.9 % -8.9 %
Manganese Ore 553 596 554 1,149 1,146 -7.3 % -0.2 % 0.3 %
Coal 1,505 1,663 2,012 3,168 3,707 -9.5 % -25.2 % -14.5 %
Nickel 78.5 73.5 67.1 152.0 136.3 6.8 % 17.0 % 11.5 %
Copper(2) 107.4 111.9 104.9 219.2 212.0 -4.0 % 2.4 % 3.4 %
Cobalt 1,312 1,400 1,122 2,711 2,092 -6.3 % 16.9 % 29.7 %
Gold (000’ oz troy) 109 118 100 227 203 -7.6 % 9.0 % 12.2 %
Potash 101 111 111 211 219 -9.1 % -9.8 % -3.8 %
Phosphate rock 1,805 1,615 2,114 3,420 4,106 11.8 % -14.6 % -16.7 %

(1) Excluding Samarco’s attributable production and including third party purchases.

(2) Including Lubambe’s attributable production.

6

SEQ.=1,FOLIO='6',FILE='C:\JMS\109500\16-14363-8\task8027130\14363-8-be.htm',USER='109500',CD='Jul 21 18:09 2016'

Table of Contents

Iron Ore

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
Northern System 36,493 32,385 31,609 68,878 59,130 12.7 % 15.5 % 16.5 %
Carajás 36,493 32,385 31,609 68,878 59,130 12.7 % 15.5 % 16.5 %
Southeastern System 25,166 22,544 29,123 47,710 55,041 11.6 % -13.6 % -13.3 %
Itabira 8,491 7,512 9,428 16,003 16,751 13.0 % -9.9 % -4.5 %
Minas Centrais 10,008 9,987 10,006 19,995 18,925 0.2 % 0.0 % 5.7 %
Mariana 6,667 5,045 9,689 11,712 19,365 32.1 % -31.2 % -39.5 %
Southern System 24,575 22,033 27,299 46,608 49,941 11.5 % -10.0 % -6.7 %
Paraopeba 7,007 5,630 8,422 12,637 14,956 24.5 % -16.8 % -15.5 %
Vargem Grande 7,362 7,323 7,330 14,685 13,218 0.5 % 0.4 % 11.1 %
Minas Itabirito 10,206 9,080 11,547 19,286 21,768 12.4 % -11.6 % -11.4 %
Midwestern System 589 582 1,281 1,172 2,616 1.2 % -54.0 % -55.2 %
Corumbá 552 253 891 805 1,784 117.6 % -38.1 % -54.9 %
Urucum 38 329 390 367 832 -88.5 % -90.3 % -55.9 %
IRON ORE 86,823 77,544 89,312 164,367 166,729 12.0 % -2.8 % -1.4 %

*Production summary*

Vale’s iron ore production(3) was 86.8 Mt in 2Q16, 9.3 Mt higher than in 1Q16, due to weather-related seasonality and better productivity in the Northern System, and was 2.5 Mt

lower than in 2Q15 mainly due to: (i) the strategic decision to marginally reduce production from lower-margin operations and other actions; (ii) the stoppage of run of mine supply to Samarco.

Based on the same criterion of margin optimization, production in 1H16 and forecast projection for the remainder of 2016 adjusted to seasonality indicate an annual production in the lower end of the 340-350Mt guidance range for 2016.

Iron ore and pellets shipments from Brazil and Argentina reached 77.2 Mt in 2Q16, 5.6 Mt and 2.6 Mt higher than in 1Q16 and 2Q15 respectively, with the ongoing elimination of logistics bottlenecks. Inventories were moved from the mines to the Distribution Centers (DCs) abroad

(3) Including third party purchases and excluding Samarco’s attributable production

7

SEQ.=1,FOLIO='7',FILE='C:\JMS\109500\16-14363-8\task8027130\14363-8-be.htm',USER='109500',CD='Jul 21 18:09 2016'

Table of Contents

for offshore blending and additional commercial flexibility. Iron ore inventories at the mines and Brazilian ports decreased 4 Mt in 2Q16 vs. 2Q15, while inventories in China and Malaysia increased 2 Mt in the period. This is consistent with our target to reduce overall inventories by the end of 2016 and simultaneously achieve a downstream shift of products’ inventories along the supply chain.

These supply chain optimization efforts will continue in 2017, with important inventory reductions in the Southern System resulting in lower production volumes for Vale than the range of 380-400Mt announced at the 2015 Vale Day.

Aligned with Vale’s strategy of margin optimization, the Fe content decreased slightly from 64.3% in 1Q16 to 63.6% in 2Q16 due the change of some beneficiation plants from wet to dry processing in the Southeastern system in order to reduce the need to use tailing dams and to take the opportunity of lower demerit discounts for higher silica products.

*Northern system*

Carajás achieved a new production record for a second quarter of 36.5 Mt in 2Q16, 12.7% and 15.5% higher than in 1Q16 and 2Q15, respectively. The increase vs. 1Q16 is mostly due to the lower impact from rainfall and better overall equipment efficiency. The increase vs. 2Q15 was mainly due to the above-mentioned productivity gains and the ramp-up of the N4WS mine and N5S extension pits, which more than offset the impact of the higher precipitation in 2Q16 vs. 2Q15.

*Southeastern system*

The Southeastern System, which encompasses the Itabira, Minas Centrais and Mariana mining hubs, produced 25.2 Mt in 2Q16, 2.6 Mt higher than in 1Q16 and 4.0 Mt lower than in 2Q15, mainly due to the stoppage of supply of run of mine to Samarco (2.9 Mt).

*Southern system*

The Southern System, composed of the Paraopeba, Vargem Grande and Minas Itabirito mining hubs, produced 24.6 Mt in 2Q16, 11.5% higher than in 1Q16 and 10.0% lower than in 2Q15, due to the decision to reduce production from lower margin operations.

*Midwestern system*

The Midwestern System, composed of the Urucum and the Corumbá mines, produced 0.6 Mt in 2Q16, in line with 1Q16 and 0.7 Mt lower than in 2Q15, as a result of Vale’s strategy to optimize margins.

8

SEQ.=1,FOLIO='8',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bg.htm',USER='107536',CD='Jul 21 18:02 2016'

Table of Contents

Pellets

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
Southeastern System 6,657 7,221 7,199 13,878 14,320 -7.8 % -7.5 % -3.2 %
Itabrasco (Tubarão 3) 1,119 1,100 1,135 2,219 2,260 1.8 % -1.4 % -1.8 %
Hispanobras (Tubarão 4) 1,088 1,128 1,135 2,215 2,188 -3.5 % -4.2 % 1.3 %
Nibrasco (Tubarão 5 and 6) 1,715 2,159 2,228 3,873 4,469 -20.6 % -23.0 % -13.3 %
Kobrasco (Tubarão 7) 969 1,088 1,088 2,058 2,176 -11.0 % -10.9 % -5.5 %
Tubarão 8 1,767 1,746 1,613 3,513 3,227 1.2 % 9.5 % 8.8 %
Southern System 1,544 2,330 2,619 3,874 4,991 -33.8 % -41.1 % -22.4 %
Fábrica — 861 951 861 1,806 n.m. n.m. -52.3 %
Vargem Grande 1,544 1,469 1,667 3,012 3,184 5.1 % -7.4 % -5.4 %
Oman 1,848 1,927 2,419 3,776 4,314 -4.1 % -23.6 % -12.5 %
TOTAL PELLETS 10,049 11,478 12,237 21,527 23,625 -12.4 % -17.9 % -8.9 %
Samarco (1) — — 3,645 — 14,285 n.m. n.m. n.m.

(1) Vale’s attributable production capacity of 50%.

*Production overview*

Pellet production, excluding Samarco’s attributable production, totaled 10.0 Mt in 2Q16, 12.4% and 17.9% lower than in 1Q16 and 2Q15, respectively, mainly as a result of: (i) the halt of the Fábrica pelletizing plant, due to delays in obtaining environmental permits for the expansion of adjacent mines; and (ii) the scheduled maintenance stoppages at the Tubarão plants in 2Q16.

Vale is currently studying the reopening of its pelletizing plants of Tubarão 1 and 2 in order to offset a supply shortage resulting from the stoppage of Samarco.

*Southeastern system*

Production at the Tubarão pellet plants — Tubarão 3, 4, 5, 6, 7 and 8 — reached 6.7 Mt in 2Q16, 7.8% and 7.5% lower than in 1Q16 and 2Q15, respectively, mainly due to the scheduled maintenance stoppages in 2Q16. Tubarão 8 production achieved the monthly record of 637 kt in May.

9

SEQ.=1,FOLIO='9',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bg.htm',USER='107536',CD='Jul 21 18:02 2016'

Table of Contents

*Southern system*

Production at the Fábrica pellet plant was suspended on March 28 th due to delays in obtaining environmental permits for the expansion of adjacent mines. On July 2 nd the environmental permits were granted and operations resumed, with production forecast to achieve nominal capacity by August.

Production at the Vargem Grande pellet plant totaled 1.5 Mt, 5.1% and 7.4% lower than in 1Q16 and 2Q15, respectively, mainly as a result of a lower availability of pellet feed.

*Oman operations*

Production at the Oman pellet plant reached 1.8 Mt in 2Q16, 4.5% and 23.9% lower than in 1Q16 and 2Q15, respectively, due to the scheduled cold maintenance shutdown in one of the lines from May to June.

*Samarco*

Samarco’s operations were suspended as a result of the failure of the Fundão tailings dam on November 5th, 2015. Samarco plans to resume operations by 2017, although timing is uncertain.

10

SEQ.=1,FOLIO='10',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bg.htm',USER='107536',CD='Jul 21 18:02 2016'

Table of Contents

*Manganese ore and ferroalloys*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
MANGANESE ORE 553 596 554 1,149 1,146 -7.3 % -0.2 % 0.3 %
Azul 397 434 346 831 753 -8.6 % 14.6 % 10.3 %
Urucum 156 162 208 318 392 -3.9 % -25.0 % -18.9 %
FERROALLOYS 29 25 31 53 58 15.3 % -8.0 % -8.4 %
Brazil 29 25 31 53 58 15.3 % -8.0 % -8.4 %

*Production overview*

Manganese ore production decreased by 7.3% in 2Q16 vs.1Q16 and was in line with 2Q15.

The Barbacena plant resumed production in February with the lower spot energy prices, while the Ouro Preto ferroalloy plant in Minas Gerais remains closed as market demand still does not justify the resumption of the operation.

*Manganese ore production*

Production at the Azul manganese mine reached 397,000 t in 2Q16, 8.6% lower than in 1Q16 as a result of lower physical availability in the plant, and 14.7% higher than in 2Q15 due to the availability of higher grade ore.

Production at the Urucum mine reached 156,000 t in 2Q16, 3.9% and 25.0% lower than in 1Q16 and 2Q15, respectively, as a result of lower availability of operation mining faces.

*Ferroalloy production*

Ferroalloy production in 2Q16 was 28,630 t, 15.3% higher than in 1Q16, due to the reopening of the Barbacena plant in February, driven by lower energy prices, and 8.0% lower than in 2Q15 due to lower efficiency at the Simões Filho plant.

Production was comprised of 20,090 t of ferrosilicon manganese alloys (FeSiMn), 6,640 t of high-carbon manganese alloys (FeMnHC) and 1,900 t of medium-carbon manganese alloys (FeMnMC).

11

SEQ.=1,FOLIO='11',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bg.htm',USER='107536',CD='Jul 21 18:02 2016'

Table of Contents

Nickel

*Finished production by source*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
Canada 43.1 40.5 43.0 83.6 81.5 6.3 % 0.2 % 2.5 %
Sudbury 18.9 19.5 11.7 38.4 23.1 -3.1 % 61.5 % 66.2 %
Thompson 8.1 6.2 7.0 14.3 12.8 30.6 % 15.7 % 12.3 %
Voisey’s Bay 11.3 10.9 15.2 22.2 28.6 3.7 % -25.7 % -22.5 %
Feed from third parties(1) 4.8 3.9 9.1 8.7 17.1 24.8 % -47.4 % -49.3 %
Indonesia 20.7 17.8 13.4 38.5 31.4 16.3 % 54.5 % 22.6 %
New Caledonia(2) 8.4 9.7 4.8 18.0 11.3 -13.4 % 75.0 % 59.3 %
Brazil 6.4 5.6 5.9 11.9 12.0 14.3 % 8.5 % -0.9 %
TOTAL NICKEL 78.5 73.5 67.1 152.0 136.3 6.8 % 17.0 % 11.5 %

(1) External feed purchased from third parties and processed into finished nickel in our operations.

(2) Production at VNC reached 8.400 t in 2Q16, whereas production of finished nickel from VNC also totaled 8.400 t in 2Q16, despite the differences stemming from the required processing time into finished nickel.

*Production overview*

Production of nickel reached a record for a second quarter of 78,500 t in 2Q16, being 6.8% higher than in 1Q16, mainly due to strong performances in Thompson, Indonesia (PTVI) and Onça Puma. Production was 17.0% higher than in 2Q15.

*Canadian operations*

Production from the Sudbury mine reached 18,900 t in 2Q16, in line with 1Q16 production and 61.5% higher than in 2Q15 as a result of an electrical fire in the matte processing plant in 2Q15.

Production from the Thompson mine reached 8,100 t in 2Q16, 30.6% higher than in 1Q16 and 15.7% higher than in 2Q15. The use of Thompson sourced ore was prioritized due to the severe winter weather conditions, which delayed shipments from Voisey’s Bay concentrates to the Thompson refinery. Thompson operations have a previously scheduled maintenance shutdown for three weeks in August, and during this period annual preventive work will be carried out in the smelter, refinery and utilities.

12

SEQ.=1,FOLIO='12',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bg.htm',USER='107536',CD='Jul 21 18:02 2016'

Table of Contents

Production from the Voisey’s Bay mine reached 11,300 t in 2Q16, 3.7% higher than in 1Q16. Production in 2Q16 was 25.7% lower than in 2Q15 as Voisey’s Bay sourced ore was negatively affected by winter weather conditions and logistics constraints in 2016, with on-site build-up of inventories for consumption in the following quarters.

Production at the Long Harbour processing plant reached 3,800 t in 2Q16, 72.5% higher than in 1Q16 and 154.8% higher than in 2Q15. Long Harbour product quality has exceeded the industry-wide accepted ASTM B39-79 refined Ni grade.

*Indonesian operation (PTVI)*

Production of finished nickel from PTVI reached 20,700 t in 2Q16, 16.3% and 54.5% higher than in 1Q16 and in 2Q15, respectively, mainly as a result of the scheduled maintenance in 2Q15 and in 1Q16.

*New Caledonia operation (VNC)*

Production of finished products from VNC reached a record level for a second quarter of 8,400 t in 2Q16, 13.4% lower and 75.0% higher than in 1Q16 and 2Q15, respectively. Production from VNC sourced ore was impacted by the termination of SUMIC’s off take since the share of VNC’s production, previously booked as sales volume for SUMIC, will now be further processed at Vale’s Dalian refinery. Production from VNC sourced ore decreased in 2Q16 due to the lag effect of further processing and should increase in the following quarters. Production of NiO and NHC at VNC reached 8,400 t in 2Q16. NiO represented 79.8% and NHC 20.2% of VNC’s 2Q16 site production. New Caledonia operations are undergoing their annual maintenance shutdown for three weeks in July. During this period a portion of the slurry pipeline will be replaced and annual descaling of pipes will be completed.

*Brazilian operation (Onça Puma)*

Production from the Onça Puma operation reached a record level for a second quarter of 6,400 t in 2Q16, 14.3% and 8.5% higher than in 1Q16 and in 2Q15, respectively. Production was positively impacted by improvements in calcine handling and additional kiln capacity.

13

SEQ.=1,FOLIO='13',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bi.htm',USER='107536',CD='Jul 21 18:03 2016'

Table of Contents

Copper

*Finished production by source*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
BRAZIL 64.4 63.4 67.0 127.8 129.4 1.6 % -3.9 % -1.3 %
Sossego 23.6 22.3 29.0 46.0 56.2 5.8 % -18.6 % -18.1 %
Salobo 40.7 41.1 38.0 81.8 73.3 -1.0 % 7.1 % 11.6 %
CANADA 41.2 46.5 35.1 87.7 77.3 -11.4 % 17.4 % 13.4 %
Sudbury 28.9 30.9 22.4 59.8 47.7 -6.5 % 29.0 % 25.1 %
Thompson 0.8 0.6 0.7 1.4 0.8 33.3 % 14.3 % 74.4 %
Voisey’s Bay 7.3 7.8 5.9 15.1 13.4 -6.4 % 23.7 % 13.0 %
Feed from third parties 4.3 7.1 6.1 11.4 15.4 -39.4 % -29.5 % -25.6 %
TOTAL EX-LUBAMBE 105.6 109.9 102.1 215.5 206.7 -3.9 % 3.4 % 4.2 %
Lubambe(1) 1.7 2.0 2.7 3.8 5.3 -15.0 % -37.0 % -29.3 %
TOTAL COPPER 107.4 111.9 104.9 219.2 212.0 -4.0 % 2.4 % 3.4 %

(1) Attributable production.

*Production overview*

Production of copper(4) was a record for a second quarter with 105,600 t in 2Q16, 3.9% lower than in 1Q16, mainly due to less feed from third parties and 3.4% higher than in 2Q15 mainly due to higher production from Sudbury and Salobo’s ramp-up.

*Brazilian operations*

Production of copper in concentrate at Sossego totaled 23,600 t in 2Q16, 5.8% higher than in 1Q16 and 18.6% lower than in 2Q15, mainly as a result of lower ore grade.

Production of copper in concentrate at Salobo totaled a record for a second quarter of 40,700 t in 2Q16, in line with 1Q16 and 7.1% higher than in 2Q15. Salobo achieved a monthly production record of 14,600 t of copper in concentrates in May, with overall production in 2Q16 negatively impacted by planned maintenance works in June. Production is expected to reach its full production capacity on a monthly basis during 2H16.

(4) Excluding Lubambe attributable production

14

SEQ.=1,FOLIO='14',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bi.htm',USER='107536',CD='Jul 21 18:03 2016'

Table of Contents

*Canadian operations*

Production of copper from Sudbury reached 28,900 t in 2Q16, 6.5% lower than in 1Q16 due to a special campaign for recycling low copper grade slag and 29.0% higher than in 2Q15, mainly due to a fire in matte processing in May 2015.

Production of copper from Voisey’s Bay reached 7,300 t in 2Q16, 6.4% lower than in 1Q16, as less Voisey’s Bay copper concentrate was delivered to Sudbury. Production was 23.7% higher than in 2Q15 due to annual preventive maintenance carried out at Voisey’s Bay in 2Q15.

*African operation (Lubambe)*

Lubambe delivered 4,300 t of copper in concentrate on a 100% basis (attributable production of 1,700 t).

15

SEQ.=1,FOLIO='15',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bi.htm',USER='107536',CD='Jul 21 18:03 2016'

Table of Contents

Nickel and copper by-products

*Finished production by source*

2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
COBALT (metric tons) 1,312 1,400 1,122 2,711 2,091 -6.3 % 16.9 % 29.6 %
Sudbury 225 173 97 398 309 30.1 % 132.0 % 29.0 %
Thompson 171 182 146 353 188 -6.0 % 17.1 % 88.4 %
Voisey’s Bay 194 145 367 339 495 33.8 % -47.1 % -31.6 %
VNC 682 849 441 1,531 1,000 -19.7 % 54.6 % 53.1 %
Others 40 50 70 90 100 -20.0 % -42.9 % -10.2 %
PLATINUM (000’ oz troy) 49 46 46 96 88 6.5 % 6.5 % 8.9 %
Sudbury 49 46 46 96 88 6.5 % 6.5 % 8.9 %
PALLADIUM (000’ oz troy) 95 100 109 195 206 -5.0 % -12.8 % -5.5 %
Sudbury 95 100 109 195 206 -5.0 % -12.8 % -5.5 %
GOLD (000’ oz troy) 109 118 100 227 203 -7.6 % 9.0 % 12.2 %
Sudbury 22 23 23 45 50 -4.3 % -4.3 % -9.3 %
Sossego 16 19 22 35 43 -15.8 % -27.3 % -17.8 %
Salobo 71 76 56 147 110 -6.6 % 26.8 % 33.7 %
SILVER (000’ oz troy) 554 516 255 1,070 736 7.4 % 117.3 % 45.3 %
Sudbury 554 516 255 1,070 736 7.4 % 117.3 % 45.3 %

*Cobalt*

Cobalt production totaled 1,312 t in 2Q16, 6.3% lower than in 1Q16 and 16.9% higher than in 2Q15, respectively, driven by higher production from Sudbury and New Caledonia sources.

Cobalt production from Ontario increased to 225 t in 2Q16 from the 173 t in 1Q16 and 97 t in 2Q15. Cobalt production from Voisey’s Bay totaled 194 t in 2Q16, up 33.8% from 1Q16. VNC cobalt production reached 682 t in 2Q16 as VNC continues the ramp-up of its production.

*Platinum and palladium*

Platinum production was 49,000 oz and palladium production was 95,000 oz, 6.5% higher than in 1Q16 and 5.0% lower than in 1Q16, respectively.

16

SEQ.=1,FOLIO='16',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bi.htm',USER='107536',CD='Jul 21 18:03 2016'

Table of Contents

*Gold*

Gold production in 2Q16 reached a record for a second quarter of 109,000 oz.

17

SEQ.=1,FOLIO='17',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bi.htm',USER='107536',CD='Jul 21 18:03 2016'

Table of Contents

Coal

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
METALLURGICAL COAL 1,062 1,366 1,628 2,428 2,896 -22.3 % -34.8 % -16.2 %
Moatize 808 603 886 1,411 1,613 34.0 % -8.8 % -12.5 %
Carborough Downs 254 763 742 1,017 1,283 -66.7 % -65.8 % -20.7 %
THERMAL COAL 443 297 384 740 811 49.2 % 15.4 % -8.7 %
Moatize 443 297 384 740 811 49.2 % 15.4 % -8.7 %
TOTAL COAL 1,505 1,663 2,012 3,168 3,707 -9.5 % -25.2 % -14.5 %

*Production overview*

Coal production totaled 1.5 Mt in 2Q16, 9.5% and 25.2% lower than in 1Q16 and 2Q15, respectively, mainly due to the lower production at Carborough Downs which faced geological instability issues in 2Q16.

*Australian operations*

Carborough Downs faced operational challenges in 2Q16, resulting in a production of 254,000 t, 66.7% and 65.8% lower than in 1Q16 and 2Q15, respectively. Carborough Downs experienced recent roof fall events with the start-up of operations after the longwall move in May 2016. Underground mining has been stopped as roof consolidation and overall recovery works are underway. This stoppage in production has impacted the ability to meet various sales contracts obligations and thus resulted in a declaration of force majeure on July 8 th , 2016.

*Moatize operations*

Production at Moatize was 1,251,000 t in 2Q16, with an increase in both metallurgical and thermal coal production vs. 1Q16. Production recovered after the maintenance stoppage and waste removal, which impacted production in 1Q16.

18

SEQ.=1,FOLIO='18',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bk.htm',USER='107536',CD='Jul 21 18:04 2016'

Table of Contents

Production of metallurgical coal was 34.0% higher than in 1Q16 but 8.8% lower than in 2Q15. Production of thermal coal was 49.2% and 15.4% higher than in 1Q16 and 2Q15, respectively.

In June, the total mine movement reached a new monthly record of 12.7 Mt due to higher equipment productivity and the development of new mining areas which will feed the Moatize II coal handling and preparation plant. Commissioning of the Moatize II plant is almost concluded and its start-up is expected by early August. The ramp-up of Moatize II will enable the increase in production and the reduction in costs in the next quarters.

The ramp-up of the Nacala Logistics Corridor continued as planned, with 1.655 Mt being transported on the railway in 2Q16 against 761 kt in 1Q16. Nineteen shipments (1.567 Mt) were completed in 2Q16 compared to thirteen shipments (982 kt) in 1Q16.

Force majeure was declared at the Sena-Beira railway, which has been interrupted since June 8 th due to incidents on the railway.

19

SEQ.=1,FOLIO='19',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bk.htm',USER='107536',CD='Jul 21 18:04 2016'

Table of Contents

Fertilizer Nutrients

*Potash*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
POTASH 101 111 111 211 219 -9.1 % -9.8 % -3.8 %
Taquari-Vassouras 101 111 111 211 219 -9.1 % -9.8 % -3.8 %

*Phosphates*

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
PHOSPHATE ROCK 1,805 1,615 2,114 3,420 4,106 11.8 % -14.6 % -16.7 %
Brazil 969 702 1,102 1,671 2,203 38.1 % -12.1 % -24.2 %
Bayóvar 836 913 1,012 1,750 1,904 -8.5 % -17.4 % -8.1 %
MAP(1) 235 258 287 493 578 -9.1 % -18.2 % -14.8 %
TSP(2) 246 213 240 459 471 15.2 % 2.5 % -2.5 %
SSP(3) 454 326 470 780 934 39.4 % -3.4 % -16.5 %
DCP(4) 114 122 84 236 222 -7.0 % 35.1 % 6.6 %

(1) Monoammonium phosphate

(2) Triple superphosphate

(3) Single superphosphate

(4) Dicalcium phosphate

*Potash*

Potash production totaled 101,000 t in 2Q16, 9.1% and 9.8% lower than in 1Q16 and 2Q15 respectively. The decline was due to an unscheduled maintenance stoppage at the Taquari-Vassouras beneficiation plant and the mining of a lower grade of ore.

*Phosphate Rock*

Production of phosphate rock was 1.8 Mt in 2Q16, 11.8% higher than in 1Q16 due to higher production in Brazil, which was partially offset by lower production in Peru (Bayóvar). Production was 14.6% lower than in 2Q15 due to a decline in production in the Brazilian and Peruvian (Bayóvar) operations.

20

SEQ.=1,FOLIO='20',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bk.htm',USER='107536',CD='Jul 21 18:04 2016'

Table of Contents

Production in Brazil was 969,000 t in 2Q16, 38.1% higher than in 1Q16, due to the resumption of the Araxá plant after the scheduled maintenance stoppage in 1Q16 and higher production at the Tapira plant despite an unscheduled maintenance stoppage in 2Q16. Production was 12.1% lower than in 2Q15 due to unscheduled maintenance stoppages at the Catalão, Tapira and Cajati plants in 2Q16 and the stoppage of the Patos de Minas plant since July 2015. After the unscheduled maintenance stoppages, all of the above mentioned plants resumed operations.

Production at Bayóvar was 836,000 t in 2Q16, 8.5% and 17.4% lower than in 1Q16 and 2Q15, respectively, due to an unscheduled maintenance stoppage at the concentration plant.

*MAP*

Production of MAP (monoammonium phosphate) totaled 235,000 t in 2Q16, 9.1% and 18.2% lower than in 1Q16 and 2Q15 respectively. The decline resulted from a scheduled maintenance stoppage in June 2016 at the Cubatão plant, which has already resumed production, and the prioritization of TSP production in the Uberaba plant due to market conditions.

*TSP*

Production of TSP (triple superphosphate) totaled 246,000 t in 2Q16, 15.2% and 2.5% higher than in 1Q16 and 2Q15, respectively. The increase was the result of better productivity at the Uberaba plant and the prioritization of phosphoric acid use for TSP production, rather than for MAP, due to market conditions.

*SSP*

Production of SSP (single superphosphate) totaled 454,000 t in 2Q16, 39.4% higher than in 1Q16 due to the resumption of operations at the Araxá, Cubatão and Catalão plants after scheduled maintenance stoppages in 1Q16. Production was 3.4% lower than in 2Q15 due to operational adjustments in Cubatão and unscheduled maintenance stoppages in Araxá.

*DCP*

DCP (dicalcium phosphate) production totaled 114,000 t in 2Q16, 7.0% lower than in 1Q16, as the Uberaba plant underwent production adjustments. Production was 35.1% higher than in 2Q15, due to a scheduled maintenance stoppage at the Cajati plant in 2Q15.

21

SEQ.=1,FOLIO='21',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bk.htm',USER='107536',CD='Jul 21 18:04 2016'

Table of Contents

Nitrogen

000’ metric tons 2Q16 1Q16 2Q15 1H16 1H15 % change — 2Q16/1Q16 2Q16/2Q15 1H16/1H15
AMMONIA 40 26 46 66 90 53.0 % -13.5 % -26.3 %
NITRIC ACID 115 120 118 235 231 -3.6 % -2.1 % 1.5 %
AMMONIUM NITRATE 128 135 122 263 242 -5.5 % 4.6 % 9.0 %

*Ammonia production*

Ammonia production totaled 40,000 t in 2Q16, 53.0% higher than in 1Q16 due unscheduled maintenance stoppages in that quarter, but 13.5% lower than in 2Q15 due to corrective stoppages at the Cubatão plant in 2Q16. This plant remains under corrective maintenance.

*Nitric acid and ammonium nitrate production*

Nitric acid production totaled 115,000 t in 2Q16, 3.6% and 2.1% lower than in 1Q16 and 2Q15, respectively, due to unscheduled maintenance stoppages at the Cubatão plants.

Ammonium nitrate production totaled 128,000 t in 2Q16, 5.5% lower than in 1Q16 due to lower availability of diluted nitric acid and 4.6% higher than in 2Q15, due to a scheduled maintenance stoppage at the Cubatão unit in April 2015.

22

SEQ.=1,FOLIO='22',FILE='C:\JMS\107536\16-14363-8\task8027119\14363-8-bk.htm',USER='107536',CD='Jul 21 18:04 2016'

Table of Contents

*Signatures*

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

(Registrant)
By: /s/ Rogerio Nogueira
Date: July 21, 2016 Director of Investor Relations