Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Vale S.A. Regulatory Filings 2012

Jul 19, 2012

30050_ffr_2012-07-19_5bb2b098-fd3f-49d6-b107-48ce304f9121.zip

Regulatory Filings

Open in viewer

Opens in your device viewer

Table of Contents

*United States Securities and Exchange Commission*

*Washington, D.C. 20549*

*FORM 6-K*

*Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16 of the Securities Exchange Act of 1934*

*For the month of*

*July 2012*

*Vale S.A.*

*Avenida Graça Aranha, No. 26 20030-900 Rio de Janeiro, RJ, Brazil*

(Address of principal executive office)

(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)

(Check One) Form 20-F x Form 40-F o

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))

(Check One) Yes o No x

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))

(Check One) Yes o No x

(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)

(Check One) Yes o No x

(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82- .)

SEQ.=1,FOLIO='',FILE='C:\JMS\106752\12-16120-3\task5438829\16120-3-ba.htm',USER='106752',CD='Jul 19 03:08 2012'

Table of Contents

Table of Contents:

Press Release

Signature Page

SEQ.=1,FOLIO='',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bc.htm',USER='105835',CD='Jul 19 03:45 2012'

Table of Contents

2Q12 Production Report

THE FIVE-BILLION TON MARK

Rio de Janeiro, July 18, 2012- Vale S.A. (Vale) celebrated its 70th anniversary on June 1, 2012. Simultaneously, we crossed the extraordinary mark of five billion metric tons of iron ore production accumulated since the company’s incorporation(1). The volume of iron ore produced by Vale during these seven decades is sufficient to feed more than two years of global crude steel output at the current pace of 1.5 billion metric tons per annum.

This is a major achievement stemming from a combination of hard work, technological innovation and a generous endowment of natural resources dedicated to suppling the best iron ore in the world to the global steel industry. Metals are the backbone of the modern economy, and Vale as a global mining leader will continue to play an important role in supporting the economic development of nations.

In this context, on June 27, 2012, we obtained the preliminary environmental license (LP) to develop the Carajás S11D (S11D) iron ore project. Located in the Southern Range of Carajás, state of Pará, Brazil, S11D has a nominal capacity to deliver 90 million metric tons per year, with an average ferrous content of 66.48% and low concentration of impurities.

S11D is the largest project not only in Vale’s history but also in the entire iron ore industry, being our major lever for production growth and maintenance of Vale’s undisputed leadership in the global market in terms of volume, mining costs and quality.

Iron ore output reached 80.5 Mt in 2Q12, a record for a second quarter, thus recovering from the poor performance of the previous quarter, which was caused by adverse weather conditions². Production increased 15.1% against 1Q12 and 0.4% against 2Q11.

The ramp up of new operations, including Moatize, Oman and Bayóvar, was instrumental for achieving all-time high figures for metallurgical coal, 1.3 Mt, pellets, 14.3 Mt, and phosphate rock production, 2.0 Mt.

Production

000’ metric tons 1Q12 2Q12 % change
Iron ore(a) 69,994 80,542 15.1%
Pellets(b) 12,692 14,256 12.3%
Manganese 484 584 20.6%
Coal(c) 2,350 2,467 5.0%
Nickel 63 61 -3.6%
Copper 73 70 -4.4%
Potash 118 129 8.9%
Phosphate rock 1,826 2,017 10.4%
(a) Including Samarco’s attributable production.
(b) Including Samarco’s and Hispanobras’ attributable production.
(c) Including El Hatillo’s production.
(1) Iron ore production accumulated from June 1, 1942 to June 1, 2012, totaled 5,007,783,000 metric tons.
(2) Mt = million metric tons, t = metric tons

1

SEQ.=1,FOLIO='1',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-be.htm',USER='105835',CD='Jul 19 03:47 2012'

Table of Contents

BULK MATERIALS

· *Iron ore***

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
IRON ORE 80,257 69,994 80,542 151,797 150,536 15.1 % 0.4 % -0.8 %
Northern System 26,019 21,711 27,362 48,670 49,073 26.0 % 5.2 % 0.8 %
Carajás 26,019 21,711 27,362 48,670 49,073 26.0 % 5.2 % 0.8 %
Southeastern System 30,528 26,759 28,296 59,222 55,054 5.7 % -7.3 % -7.0 %
Itabira 10,499 8,154 9,184 19,581 17,338 12.6 % -12.5 % -11.5 %
Mariana 9,861 9,340 9,080 19,234 18,420 -2.8 % -7.9 % -4.2 %
Minas Centrais 10,168 9,265 10,032 20,407 19,297 8.3 % -1.3 % -5.4 %
Southern System 19,496 17,667 20,743 36,275 38,409 17.4 % 6.4 % 5.9 %
Minas Itabirito 7,691 7,345 7,993 14,868 15,338 8.8 % 3.9 % 3.2 %
Vargem Grande 5,784 4,800 5,950 10,242 10,750 24.0 % 2.9 % 5.0 %
Paraopeba 6,021 5,521 6,800 11,165 12,321 23.2 % 12.9 % 10.4 %
Midwestern System 1,417 1,302 1,366 2,331 2,668 4.9 % -3.6 % 14.5 %
Corumbá 1,028 975 915 1,637 1,890 -6.2 % -11.0 % 15.5 %
Urucum 389 327 451 694 778 38.1 % 16.0 % 12.1 %
Samarco¹ 2,798 2,556 2,775 5,300 5,331 8.6 % -0.8 % 0.6 %

(1) Vale’s attributable production capacity of 50%.

In 2Q12 iron ore production was 80.5 Mt, reaching a new record for a second quarter.

Output increased 15.1% on a quarterly basis, with across-the-board gains in all systems, Northern, Southeastern, Southern and Midwestern, as well as Samarco. The end of the rainy season helped the recovery.

Production at the Carajás mining site reached 27.4 Mt in 2Q12, which was the best performance for a second quarter, 26.0% higher than the previous quarter and 5.2% above 2Q11. The increase reflected better weather conditions in 2Q12. The level of rainfall in the Northern System was 50% less in 2Q12 than in 2Q11.

The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais mining sites, produced 28.3 Mt, 5.7% higher than 1Q12 and 7.3% lower than 2Q11, due to the impoverishment of Itabira and Minas Centrais (Gongo Soco mine) resources.

The Southern System — Minas Itabirito, Vargem Grande and Paraopeba — produced 20.7 Mt, the best performance for a second quarter since 2Q08 reflecting operational improvements in crushing at Vargem Grande and screening at Minas Itabirito. The output was 17.4% and 6.4% higher than 1Q12 and 2Q11, respectively. Minas Itabirito produced 8.0 Mt in 2Q12, also a new record for a second quarter.

The Midwestern System, Urucum and Corumbá mining sites, produced 1.4 Mt in 2Q12. Production rose 4.9% on a quarter-over-quarter basis and decreased 3.6% on a year-over-year basis. Corumbá’s output was 6.2% lower than 1Q12 due to scheduled maintenance stoppage. Urucum’s production rose by 38.1%, when compared to 1Q12, reflecting the ramp-up process of a new processing plant, which started in February.

2

SEQ.=1,FOLIO='2',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-be.htm',USER='105835',CD='Jul 19 03:47 2012'

Table of Contents

· **Pellets****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
PELLETS 13,140 12,692 14,256 25,656 26,949 12.3 % 8.5 % 5.0 %
Tubarão I and II 1,440 1,062 1,530 2,776 2,592 44.1 % 6.3 % -6.6 %
Fábrica 992 907 956 1,939 1,863 5.4 % -3.6 % -3.9 %
São Luís 1,349 962 1,373 2,686 2,334 42.7 % 1.7 % -13.1 %
Vargem Grande 1,321 823 1,383 2,597 2,206 68.2 % 4.7 % -15.0 %
Oman 336 1,415 1,593 336 3,008 12.6 % 374.8 % 796.5 %
Nibrasco 2,291 2,257 1,977 4,699 4,234 -12.4 % -13.7 % -9.9 %
Kobrasco 1,001 1,139 1,258 2,224 2,397 10.5 % 25.6 % 7.8 %
Hispanobras(1) 544 540 565 1,086 1,105 4.7 % 4.0 % 1.8 %
Itabrasco 1,135 1,019 1,020 2,155 2,039 0.1 % -10.1 % -5.4 %
Samarco(2) 2,731 2,570 2,599 5,159 5,169 1.2 % -4.8 % 0.2 %

(1) Vale’s attributable production capacity of 50.89%.

(2) Vale’s attributable production capacity of 50%.

Pellet production reached 14.3 Mt in 2Q12, an increase of 12.3% compared to the previous quarter and 8.5% higher than 2Q11, being a new historical record. The ramp-up of the Oman plants was the main reason for the good year-over-year performance.

Oman operations delivered 1.6 Mt of direct reduction pellets in 2Q12, 12.6% higher than previous quarter.

In 2Q12, the output of the Tubarão I & II plants reached 1.5 Mt, an increase of 44.1% over 1Q12, reflecting the resumption of operation after a maintenance stoppage in 1Q12.

The production of Fábrica was 5.4% higher than 1Q12, but 3.6% lower than 2Q11, still reflecting shortage in pellet feed availability.

Vargem Grande production had an increase of 68.2% on a quarter-over-quarter basis and 4.7% on a yearly basis, recovering from the operational problems faced in mills #1 and #2 in 1Q12.

The output of São Luís was 1.4 Mt in 2Q12, an increase of 42.7% compared to the previous quarter and 1.7% higher than the same quarter of last year, showing recovery in demand.

In 2Q12, Nibrasco had a decrease of 12.4% over 1Q12 and 13.7% over 2Q11, due to the maintenance stoppage in the quarter.

Kobrasco production was 10.5% and 25.6% above 1Q12 and 2Q11, respectively, reflecting a greater supply of pellet feed in 2Q12 and the recovery from last year’s maintenance stoppage.

The attributable production of the three pellet plants of the 50%-owned Samarco JV was in line with the previous quarter, but 4.8% lower than 2Q11 due to a maintenance stoppage.

3

SEQ.=1,FOLIO='3',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-be.htm',USER='105835',CD='Jul 19 03:47 2012'

Table of Contents

*Manganese ore* and ferroalloys***

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
MANGANESE ORE 619 484 584 1,117 1,068 20.6 % -5.6 % -4.4 %
Azul 486 379 463 902 843 22.2 % -4.6 % -6.6 %
Urucum 82 67 81 134 148 22.1 % -0.7 % 10.2 %
Other mines 51 38 39 81 78 3.0 % -23.3 % -3.8 %
FERROALLOYS 114 106 109 227 215 2.7 % -4.2 % -5.3 %
Brazil 52 50 46 104 96 -6.7 % -11.6 % -7.8 %
Dunkerque 37 30 35 74 64 17.1 % -4.9 % -12.4 %
Mo I Rana 25 27 28 50 55 4.3 % 12.2 % 10.1 %

In 2Q12, manganese ore production increased 20.6% on a quarterly basis, reaching 584,000 t versus 484,000 t in 1Q12.

Output of the Carajás manganese mine Azul was the main contributor to the improved output, producing 463,000 t in 2Q12, due to the end of the rainy season in Brazil. The 4.6% reduction in output compared to 2Q11 was related to low physical availability of the plant in 2Q12.

Urucum also had a stronger performance, 22.1% higher than 1Q12, reaching 81,000 t in 2Q12, reflecting operational improvements in the equipments in the underground mine.

Production of manganese ore at Morro da Mina, part of the “other mines”, improved only 3% quarter-over-quarter due to the worsening of the stripping ratio. Waste removal is being intensified during 2012 in order to return production to normal levels.

Ferroalloy 2Q12 production was slightly higher than 1Q12, but below 2Q11, due to lower Brazilian output related to the stoppage for maintenance during the quarter. Production in 2Q12 was comprised of 59,800 t of ferrosilicon manganese alloys (FeSiMn), 43,400 t of high-carbon manganese alloys (FeMnHc) and 5,900 t of medium-carbon manganese alloys (FeMnMC).

Production from operations at Dunkerque in France recovered illustrating improved demand for FeMnHC compared to 1Q12. Furthermore, production from the Norwegian operations of Mo I Rana continued to rise because of better operational efficiency, increasing 4.3% against 1Q12 and 12.2% year-over-year.

We signed this month an agreement to sell the Dunkerque and Mo I Rana operations as part of the optimization of our asset portfolio.

4

SEQ.=1,FOLIO='4',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bg.htm',USER='105835',CD='Jul 19 03:48 2012'

Table of Contents

· *Coal***

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
METALLURGICAL COAL 518 1,127 1,277 1,007 2,403 13.3 % 146.3 % 138.8 %
Moatize 0 501 728 0 1,229 45.2 % n.m. n.m.
Carborough Downs 368 325 82 599 407 -74.8 % -77.8 % -32.1 %
Integra Coal 30 124 266 216 390 115.0 % 793.5 % 80.9 %
Others 121 177 201 192 378 13.6 % 66.3 % 96.6 %
THERMAL COAL 787 1,223 1,190 1,720 2,414 -2.7 % 51.3 % 40.3 %
Moatize 0 193 390 0 583 101.7 % n.m. n.m.
El Hatillo 698 848 571 1,533 1,419 -32.7 % -18.2 % -7.5 %
Integra Coal 25 81 121 96 202 50.5 % 381.9 % 110.9 %
Others 63 102 108 91 210 6.5 % 70.9 % 130.8 %

Coal production in 2Q12 was 2.5 Mt, compared to 2.4 Mt in 1Q12. We achieved an all time high quarterly figure for metallurgical coal production, 1.277 Mt, which represented an increase of 13.3% over 1Q12. The output of thermal coal, excluding El Hatillo, showed an improvement of 65%. In both cases the ramp-up of Moatize was the main contributor.

The ramp-up of Moatize, the first phase of the Moatize coal project, in Tete, Mozambique, is moving ahead as planned, with 728,000 t of hard coking coal and 390,000 t of thermal coal produced in 2Q12. Output composition is converging to the planned mining split of 80% metallurgical coal and 20% thermal.

Moatize, a long life low cost world-class asset, will reshape our coal business, providing the scale, cost structure and quality - Chipanga prime HCC - required to become an important source of shareholder value creation.

In 2Q12, production of metallurgical and thermal coal at Integra Coal, in Australia, was 266,000 t and 121,000 t, respectively. Metallurgical coal production improved after geological issues were solved in 1Q12 and also due to the end of the rainy season in New South Wales, which contributed to the quarterly increase in thermal coal production.

As previously stated, production at Carborough Downs was impacted by the stoppage of operations after the detection of abnormal levels of carbon monoxide in the mine. Production amounted to 82,000 t of metallurgical coal. At this point, we have begun recovery activities in order to allow for longwall mining to restart. We estimate that mining should be normalized during 3Q12. Meanwhile, we are monitoring very closely in real time the gas levels in the mine.

Coal production in other mines reached 201,000 t of metallurgical coal and 108,000 t of thermal coal, recovering from the above average rainfall in 1Q12.

On June 25, 2012, we concluded the sale of the coal assets in Colombia, including El Hatillo, as part of the effort to optimize the asset portfolio.

5

SEQ.=1,FOLIO='5',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bg.htm',USER='105835',CD='Jul 19 03:48 2012'

Table of Contents

BASE METALS

· **Nickel****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
Nickel 56 63 61 115 124 -3.6 % 8.4 % 7.9 %
Sudbury 10 23 17 25 40 -22.6 % 69.1 % 62.5 %
Thompson 7 6 7 15 13 12.6 % 1.0 % -14.0 %
Voisey’s Bay 15 14 15 32 29 1.9 % -5.2 % -7.7 %
Sorowako 19 12 17 37 29 36.3 % -11.6 % -20.6 %
VNC 2 2 2 2 4 -17.5 % -5.9 % 73.7 %
Onça Puma 1 4 2 1 6 -56.3 % 62.0 % 316.7 %
Others(1) 2 2 2 4 3 -1.3 % -2.0 % -9.3 %

(1) External feed purchased from third parties and processed into finished nickel in our operations

Total finished nickel production was 60,900 t in 2Q12, 3.6% below the previous quarter, but 8.4% above 2Q11. The longer than expected temporary suspension for safety assessment of mining operations in Sudbury negatively impacted finished nickel production in 2Q12.

Finished nickel production from Sudbury was 17,400 t, 22.6% below 1Q12. We decided to anticipate scheduled maintenance stoppages from 3Q12 to 2Q12, due to lower availability of feeds after the inventory drawdown in 1Q12.

The output of Thompson in 2Q12 was 12.6% higher than 1Q12, reflecting better operational performance. Production was in line with the same period of last year.

Production at Voisey’s Bay was slightly above 1Q12, but was still impacted by the maintenance stoppage in Sudbury, where part of the feed is processed.

Finished nickel production sourced from Sorowako, Indonesia, increased by 36.3% on a quarterly basis, reflecting the ramp-up after the operational issues faced due to the metal cut-out in 4Q11.

VNC, our nickel operation in New Caledonia, is expected to resume operations in 4Q12. In May 2012, we stopped operations due to an incident in the acid plant. An independent investigation concluded that a technical defect caused a water leak inside the plant, which diluted the acid and caused some corrosion.

The issues with the acid plant have not related to the HPAL (high pressure acid leaching) technology, whose feasibility proven by the production of 1,100 t of nickel oxide in 1Q12. The acid plant only supplies an input to the HPAL process. Currently, we are planning the repairs to the acid plant and all the equipment is expected to be operational by year-end.

The solvent extraction circuit (all 21 columns) will be commissioned and ready to operate by the fourth quarter. As a result, from 4Q12 onwards VNC will produce nickel hydroxide cake, cobalt and nickel oxide, but no output is expected to be delivered in 3Q12.

Onca Puma stopped operating by the end of 2Q12 due to the run-out of furnace #1 on May 28 and furnace #2 on June 22. We are still assessing the extent of the repairs needed and the period of time required to perform them. Initial indications suggest that is likely that both furnaces will be out of operation during the next few months.

6

SEQ.=1,FOLIO='6',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bg.htm',USER='105835',CD='Jul 19 03:48 2012'

Table of Contents

· **Copper****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
COPPER 63 73 70 133 143 -4.4 % 11.0 % 7.4 %
Sossego 23 25 28 46 53 11.5 % 22.7 % 16.8 %
Sudbury 22 24 22 47 46 -7.2 % 0.4 % -3.4 %
Thompson 0 1 1 1 2 -28.4 % 242.0 % 166.8 %
Voisey’s Bay 11 11 8 25 19 -31.6 % -31.6 % -21.8 %
Tres Valles 2 4 3 3 7 -2.5 % 58.3 % 126.1 %
Others 4 8 8 11 15 -4.9 % 80.2 % 36.5 %

Copper production in 2Q12 was 69,700 t, decreasing 4.4% quarter-over-quarter, mainly due to issues with our Canadian operations.

The output of Sudbury was impacted by the longer than expected temporary suspension for safety assessment of mining operations during 1Q12 and the anticipation of scheduled maintenance stoppage from 3Q12 to 2Q12.

Production of copper in concentrates from the Sossego mine at Carajás was 11.5% and 22.7% above 1Q12 and 2Q11, respectively, due to the improved grade of copper received by the processing plant.

Operations at Tres Valles, in Chile, continued to ramp-up to nominal capacity, reaching 3,500 t of copper cathodes in 2Q12. The output was slightly below 1Q12, due to the lower grade of the ore processed by the plant.

Tres Valles is a small operation but it is relevant as it is our first experience with an SX-EW operation after the start-up of our first copper sulphide greenfield project, Sossego, in 2004.

7

SEQ.=1,FOLIO='7',FILE='C:\JMS\106630\12-16120-3\task5438834\16120-3-bi.htm',USER='106630',CD='Jul 19 03:17 2012'

Table of Contents

· **Nickel by-products****

2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
COBALT (metric tons) 640 592 693 1,221 1,285 17.0 % 8.2 % 5.3 %
Sudbury 57 206 166 98 372 -19.2 % 190.8 % 279.2 %
Thompson 41 22 22 92 44 0.7 % -46.1 % -52.2 %
Voisey Bay 410 310 316 838 626 1.9 % -22.9 % -25.3 %
VNC 114 40 177 136 217 343.0 % 55.7 % 59.4 %
Others 18 14 11 56 25 -21.4 % -39.0 % -55.5 %
PLATINUM (000’ oz troy) 51 38 39 108 77 2.8 % -22.7 % -28.4 %
Sudbury 51 38 39 108 77 2.8 % -22.7 % -28.4 %
PALLADIUM (000’ oz troy) 72 59 66 144 125 11.9 % -8.0 % -13.3 %
Sudbury 72 59 66 144 125 11.9 % -8.0 % -13.3 %
GOLD (000’ oz troy) 95 19 18 125 37 -5.8 % -81.2 % -70.5 %
Sudbury 95 19 18 125 37 -5.8 % -81.2 % -70.5 %
SILVER (000’ oz troy) 686 595 567 1,281 1,162 -4.7 % -17.3 % -9.3 %
Sudbury 686 595 567 1,281 1,162 -4.7 % -17.3 % -9.3 %

Cobalt production reached 693 t, 17% higher than 1Q12 and 8.2% above 2Q11.

Sudbury cobalt production in 2Q12 amounted to 166 t, down 40 t from 1Q12, mostly due to a longer than expected temporary suspension for safety assessment of mining operations.

Output from VNC, at 177 t in 2Q12, reflected production before stoppage, which occurred on May 10, when we declared force majeure after an incident in the acid plant. We expect no cobalt production in 3Q12.

In 2Q12, production of platinum and palladium was 105,000 troy ounces, 8,000 troy ounces higher than 1Q12.

8

SEQ.=1,FOLIO='8',FILE='C:\JMS\106630\12-16120-3\task5438834\16120-3-bi.htm',USER='106630',CD='Jul 19 03:17 2012'

Table of Contents

FERTILIZER NUTRIENTS

· **Potash****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
POTASH 145 118 129 279 247 8.9 % -11.2 % -11.6 %
Taquari-Vassouras 145 118 129 279 247 8.9 % -11.2 % -11.6 %

· *Phosphates***

2Q11 1Q12 2Q12 1H11 1H12 % Change 2Q12/1Q12 % Change 2Q12/2Q11 % Change 1H12/1H11
PHOSPHATE ROCK 1,858 1,826 2,017 3,601 3,843 10.4 % 8.5 % 6.7 %
Brazil 1,272 1,112 1,237 2,420 2,349 11.2 % -2.8 % -2.9 %
Bayóvar 586 714 779 1,180 1,493 9.2 % 33.1 % 26.5 %
MAP(1) 131 311 286 341 597 -8.3 % 118.3 % 75.3 %
TSP(2) 175 241 213 408 454 -11.5 % 21.6 % 11.1 %
SSP(3) 666 484 507 1,212 991 4.7 % -23.9 % -18.2 %
DCP(4) 158 144 136 315 280 -5.5 % -14.1 % -11.1 %

(1) Monoammonium phosphate

(2) Triple superphosphate

(3) Single superphosphate

(4) Dicalcium phosphate

As our sales are primarily destined to the Brazilian market, where the demand for nutrients is more concentrated in the second half of the year, our production tends to be weaker in the first half.

Production of potash was 129,000 t in 2Q12, increasing 8.9% quarter-over-quarter and decreasing 11.2% year-over-year. The output increase reflected the improvement in infrastructure, the acquisition of equipment and the results of maintenance work in Taquari-Vassouras.

In 2Q12, total production of phosphate rock, which is used to feed the output of phosphate nutrients, achieved a record high figure, reflecting the ramp-up of Bayóvar. Total production of phosphate rock in 2Q12 was 10.4% higher than 1Q12. Output from Brazilian operations increased 11.2% on a quarterly basis, recovering from the maintenance stoppages and the rainy season in Brazil. Additionally, production from Bayóvar, which is ramping up, increased 9.2% over 1Q12.

The production of MAP (monoammonium phosphate) amounted to 286,000 t, down 8.3% on a quarter-over-quarter basis, due to the annual maintenance stoppage at Uberaba, which happened in June.

TSP (Triple superphosphate) production was 11.5% lower than 1Q12, also showing the effects of the maintenance work at Uberaba.

In 2Q12, the production of SSP (single superphosphate) was 4.7% higher than 1Q12, recovering from the maintenance stoppages in the Guará and Catalão units which took place in February 2012.

9

SEQ.=1,FOLIO='9',FILE='C:\JMS\106630\12-16120-3\task5438834\16120-3-bi.htm',USER='106630',CD='Jul 19 03:17 2012'

Table of Contents

DCP (dicalcium phosphate) production decreased 5.5% compared to 1Q12, showing production adjustments due to weaker demand.

· *Nitrogen***

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
AMMONIA 167 132 101 325 233 -23.4 % -39.5 % -28.1 %
UREA 175 107 143 335 250 32.8 % -18.5 % -25.2 %
NITRIC ACID 121 118 120 228 238 1.5 % -0.6 % 4.4 %
AMMONIUM NITRATE 114 119 124 217 242 4.2 % 8.5 % 11.8 %

In 2Q12, ammonia production was 23.4% lower when compared to 1Q12, as a result of low availability of steam from the Araucária refinery. Urea production increased 32.8% when compared to 1Q12, recovering from a scheduled stoppage for maintenance, which took place in 1Q12.

The output of nitric acid and ammonium nitrate was 1.5% and 4.2%, respectively, higher than last quarter.

10

SEQ.=1,FOLIO='10',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bk.htm',USER='105835',CD='Jul 19 03:50 2012'

Table of Contents

BULK MATERIALS

**Iron ore****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
IRON ORE 80,257 69,994 80,542 151,797 150,536 15.1 % 0.4 % -0.8 %
Northern System 26,019 21,711 27,362 48,670 49,073 26.0 % 5.2 % 0.8 %
Carajás 26,019 21,711 27,362 48,670 49,073 26.0 % 5.2 % 0.8 %
Southeastern System 30,528 26,759 28,296 59,222 55,054 5.7 % -7.3 % -7.0 %
Itabira 10,499 8,154 9,184 19,581 17,338 12.6 % -12.5 % -11.5 %
Mariana 9,861 9,340 9,080 19,234 18,420 -2.8 % -7.9 % -4.2 %
Minas Centrais 10,168 9,265 10,032 20,407 19,297 8.3 % -1.3 % -5.4 %
Southern System 19,496 17,667 20,743 36,275 38,409 17.4 % 6.4 % 5.9 %
Minas Itabirito 7,691 7,345 7,993 14,868 15,338 8.8 % 3.9 % 3.2 %
Vargem Grande 5,784 4,800 5,950 10,242 10,750 24.0 % 2.9 % 5.0 %
Paraopeba 6,021 5,521 6,800 11,165 12,321 23.2 % 12.9 % 10.4 %
Midwestern System 1,417 1,302 1,366 2,331 2,668 4.9 % -3.6 % 14.5 %
Corumbá 1,028 975 915 1,637 1,890 -6.2 % -11.0 % 15.5 %
Urucum 389 327 451 694 778 38.1 % 16.0 % 12.1 %
Samarco(1) 2,798 2,556 2,775 5,300 5,331 8.6 % -0.8 % 0.6 %

(1) Vale’s attributable production capacity of 50%.

**Pellets****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
PELLETS 13,140 12,692 14,256 25,656 26,949 12.3 % 8.5 % 5.0 %
Tubarão I and II 1,440 1,062 1,530 2,776 2,592 44.1 % 6.3 % -6.6 %
Fábrica 992 907 956 1,939 1,863 5.4 % -3.6 % -3.9 %
São Luís 1,349 962 1,373 2,686 2,334 42.7 % 1.7 % -13.1 %
Vargem Grande 1,321 823 1,383 2,597 2,206 68.2 % 4.7 % -15.0 %
Oman 336 1,415 1,593 336 3,008 12.6 % 374.8 % 796.5 %
Nibrasco 2,291 2,257 1,977 4,699 4,234 -12.4 % -13.7 % -9.9 %
Kobrasco 1,001 1,139 1,258 2,224 2,397 10.5 % 25.6 % 7.8 %
Hispanobras(1) 544 540 565 1,086 1,105 4.7 % 4.0 % 1.8 %
Itabrasco 1,135 1,019 1,020 2,155 2,039 0.1 % -10.1 % -5.4 %
Samarco(2) 2,731 2,570 2,599 5,159 5,169 1.2 % -4.8 % 0.2 %

(1) Vale’s attributable production capacity of 50.89%.

(2) Vale’s attributable production capacity of 50%.

**Manganese ore and ferroalloys****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
MANGANESE ORE 619 484 584 1,117 1,068 20.6 % -5.6 % -4.4 %
Azul 486 379 463 902 843 22.2 % -4.6 % -6.6 %
Urucum 82 67 81 134 148 22.1 % -0.7 % 10.2 %
Other mines 51 38 39 81 78 3.0 % -23.3 % -3.8 %
FERROALLOYS 114 106 109 227 215 2.7 % -4.2 % -5.3 %
Brazil 52 50 46 104 96 -6.7 % -11.6 % -7.8 %
Dunkerque 37 30 35 74 64 17.1 % -4.9 % -12.4 %
Mo I Rana 25 27 28 50 55 4.3 % 12.2 % 10.1 %

11

SEQ.=1,FOLIO='11',FILE='C:\JMS\105835\12-16120-3\task5438979\16120-3-bk.htm',USER='105835',CD='Jul 19 03:50 2012'

Table of Contents

**Coal****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
METALLURGICAL COAL 518 1,127 1,277 1,007 2,403 13.3 % 146.3 % 138.8 %
Moatize 0 501 728 0 1,229 45.2 % n.m. n.m.
Carborough Downs 368 325 82 599 407 -74.8 % -77.8 % -32.1 %
Integra Coal 30 124 266 216 390 115.0 % 793.5 % 80.9 %
Others 121 177 201 192 378 13.6 % 66.3 % 96.6 %
THERMAL COAL 787 1,223 1,190 1,720 2,414 -2.7 % 51.3 % 40.3 %
Moatize 0 193 390 0 583 101.7 % n.m. n.m.
El Hatillo 698 848 571 1,533 1,419 -32.7 % -18.2 % -7.5 %
Integra Coal 25 81 121 96 202 50.5 % 381.9 % 110.9 %
Others 63 102 108 91 210 6.5 % 70.9 % 130.8 %

BASE METALS

**Nickel****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
NICKEL 56 63 61 115 124 -3.6 % 8.4 % 7.9 %
Sudbury 10 23 17 25 40 -22.6 % 69.1 % 62.5 %
Thompson 7 6 7 15 13 12.6 % 1.0 % -14.0 %
Voisey’s Bay 15 14 15 32 29 1.9 % -5.2 % -7.7 %
Sorowako 19 12 17 37 29 36.3 % -11.6 % -20.6 %
VNC 2 2 2 2 4 -17.5 % -5.9 % 73.7 %
Onça Puma 1 4 2 1 6 -56.3 % 62.0 % 316.7 %
Others(1) 2 2 2 4 3 -1.3 % -2.0 % -9.3 %

(1) External feed purchased from third parties and processed into finished nickel in our operations

**Copper****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
COPPER 63 73 70 133 143 -4.4 % 11.0 % 7.4 %
Sossego 23 25 28 46 53 11.5 % 22.7 % 16.8 %
Sudbury 22 24 22 47 46 -7.2 % 0.4 % -3.4 %
Thompson 0 1 1 1 2 -28.4 % 242.0 % 166.8 %
Voisey’s Bay 11 11 8 25 19 -31.6 % -31.6 % -21.8 %
Tres Valles 2 4 3 3 7 -2.5 % 58.3 % 126.1 %
Others 4 8 8 11 15 -4.9 % 80.2 % 36.5 %

12

SEQ.=1,FOLIO='12',FILE='C:\JMS\105577\12-16120-3\task5438903\16120-3-bm.htm',USER='105577',CD='Jul 19 03:23 2012'

Table of Contents

**Nickel by-products****

2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
COBALT (metric tons) 640 592 693 1,221 1,285 17.0 % 8.2 % 5.3 %
Sudbury 57 206 166 98 372 -19.2 % 190.8 % 279.2 %
Thompson 41 22 22 92 44 0.7 % -46.1 % -52.2 %
Voisey Bay 410 310 316 838 626 1.9 % -22.9 % -25.3 %
VNC 114 40 177 136 217 343.0 % 55.7 % 59.4 %
Others 18 14 11 56 25 -21.4 % -39.0 % -55.5 %
PLATINUM (000’ oz troy) 51 38 39 108 77 2.8 % -22.7 % -28.4 %
Sudbury 51 38 39 108 77 2.8 % -22.7 % -28.4 %
PALLADIUM (000’ oz troy) 72 59 66 144 125 11.9 % -8.0 % -13.3 %
Sudbury 72 59 66 144 125 11.9 % -8.0 % -13.3 %
GOLD (000’ oz troy) 95 19 18 125 37 -5.8 % -81.2 % -70.5 %
Sudbury 95 19 18 125 37 -5.8 % -81.2 % -70.5 %
SILVER (000’ oz troy) 686 595 567 1,281 1,162 -4.7 % -17.3 % -9.3 %
Sudbury 686 595 567 1,281 1,162 -4.7 % -17.3 % -9.3 %

FERTILIZER NUTRIENTS

**Potash****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
POTASH 145 118 129 279 247 8.9 % -11.2 % -11.6 %
Taquari-Vassouras 145 118 129 279 247 8.9 % -11.2 % -11.6 %

**Phosphates****

2Q11 1Q12 2Q12 1H11 1H12 % Change 2Q12/1Q12 % Change 2Q12/2Q11 % Change 1H12/1H11
PHOSPHATE ROCK 1,858 1,826 2,017 3,601 3,843 10.4 % 8.5 % 6.7 %
Brazil 1,272 1,112 1,237 2,420 2,349 11.2 % -2.8 % -2.9 %
Bayóvar 586 714 779 1,180 1,493 9.2 % 33.1 % 26.5 %
MAP(1) 131 311 286 341 597 -8.3 % 118.3 % 75.3 %
TSP(2) 175 241 213 408 454 -11.5 % 21.6 % 11.1 %
SSP(3) 666 484 507 1,212 991 4.7 % -23.9 % -18.2 %
DCP(4) 158 144 136 315 280 -5.5 % -14.1 % -11.1 %

(1) Monoammonium phosphate

(2) Triple superphosphate

(3) Single superphosphate

(4) Dicalcium phosphate

**Nitrogen****

000’ metric tons 2Q11 1Q12 2Q12 1H11 1H12 % change 2Q12/1Q12 % change 2Q12/2Q11 % change 1H12/1H11
AMMONIA 167 132 101 325 233 -23.4 % -39.5 % -28.1 %
UREA 175 107 143 335 250 32.8 % -18.5 % -25.2 %
NITRIC ACID 121 118 120 228 238 1.5 % -0.6 % 4.4 %
AMMONIUM NITRATE 114 119 124 217 242 4.2 % 8.5 % 11.8 %

13

SEQ.=1,FOLIO='13',FILE='C:\JMS\105577\12-16120-3\task5438903\16120-3-bm.htm',USER='105577',CD='Jul 19 03:23 2012'

Table of Contents

*For further information. please contact:*

+55-21-3814-4540

Roberto Castello Branco: [email protected]

Viktor Moszkowicz: [email protected]

Carla Albano Miller: [email protected]

Andrea Gutman: [email protected]

Christian Perlingiere: [email protected]

Marcio Loures Penna: [email protected]

Rafael Rondinelli: [email protected]

Samantha Pons: [email protected]

This press release may include statements that present Vale’s expectations about future events or results. All statements, when based upon expectations about the future and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will prove correct. These risks and uncertainties include factors related to the following: (a) the countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital markets; (d) the mining and metals prices and their dependence on global industrial production, which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To obtain further information on factors that may lead to results different from those forecast by Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de Valores Mobiliários (CVM), the French Autorité des Marchés Financiers (AMF), and The Stock Exchange of Hong Kong Limited, and in particular the factors discussed under “Forward-Looking Statements” and “Risk Factors” in Vale’s annual report on Form 20-F.

14

SEQ.=1,FOLIO='14',FILE='C:\JMS\105577\12-16120-3\task5438903\16120-3-bm.htm',USER='105577',CD='Jul 19 03:23 2012'

Table of Contents

*Signatures*

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

(Registrant)
By: /s/ Roberto Castello Branco
Date: July 18, 2012 Roberto Castello Branco
Director of Investor Relations

15

SEQ.=1,FOLIO='15',FILE='C:\JMS\105835\12-16120-3\task5438999\16120-3-jc.htm',USER='105835',CD='Jul 19 04:00 2012'