Vale S.A. — Regulatory Filings 2011
Jul 29, 2011
30050_ffr_2011-07-29_8260195b-534f-44b1-b469-1be99fe5d906.zip
Regulatory Filings
Open in viewerOpens in your device viewer
PAGEBREAK
Table of Contents
United States Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16 of the Securities Exchange Act of 1934
For the month of July 2011
Vale S.A.
Avenida Graça Aranha, No. 26 20030-900 Rio de Janeiro, RJ, Brazil (Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If Yes is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82- .)
Folio /Folio
PAGEBREAK
TOC
TABLE OF CONTENTS
| Press Release |
|---|
| Signature Page |
/TOC
Table of Contents
link1 "Press Release"
Vale 2Q11 Production Report
GETTING STRONGER
Rio de Janeiro, July 28, 2011 Vale S.A. (Vale) operations had a solid performance in 2Q11, overcoming the effects of the adverse weather conditions faced in 1Q11.
Despite the production increases, there is still room for growth and ultimately to expand our exposure to the expansionary cycle. The growth potential stems from the solution to problems faced in 2Q11 in the production of iron ore, coal, nickel and copper, as well as from the progress in the ramp up of several new operations.
Iron ore production in 2Q11 reached 80.3 Mt, being the best performance ever for a second quarter. In the first half of 2011, we produced 146.5 1 Mt, 47% of the targeted output for 2011. The second half of the year is seasonally stronger, with the production curve accelerating and reaching its peak in the 3Q.
Pellet production kept setting new records, achieving 13.1 Mt, which is the highest level for a second quarter. Output totaled 25.6 Mt in 1H11, another all-time high figure, surpassing by 2.5 Mt the previous record in 1H10.
Although the production of base metals in 2Q11 was affected by the shutdown of furnace #2 of Sudburys Copper Cliff smelter, we were able to minimize expected losses through improved performance of furnace #1. Realized nickel output loss was 2,800 t less than previously estimated.
Following our strategy of focusing on organic growth, four projects were ramping up in 2Q11: (i) VNC, in New Caledonia, produced 2,000 t of nickel hydroxide cake; (ii) Onça Puma, in Brazil, saw line #1 commissioned and started its ramp up process, delivering 1,080 t of nickel in ferronickel; (iii) Tres Valles, in Chile, reached an output of 2,200 t of copper cathodes in 2Q11 and (iv) the first pellet plant of Oman produced 336,000 t.
| Production — 000 metric tons | 1H10 | 1H11 | % Change |
|---|---|---|---|
| Iron ore a | 144,919 | 151,797 | 4.7 % |
| Pellets a | 23,145 | 25,656 | 10.8 % |
| Manganese ore | 891 | 1,117 | 25.4 % |
| Ferroalloy | 223 | 227 | 1.9 % |
| Coal | 3,276 | 2,727 | -16.7 % |
| Nickel | 69 | 115 | 65.6 % |
| Copper | 73 | 132 | 80.0 % |
| Potash | 338 | 279 | -17.5 % |
| Phosphate Rock | 2,061 | 3,601 | 74.7 % |
a Including Samarcos attributable production.
1 Vales US GAAP production It does not include Samarco.
Folio 1 /Folio
PAGEBREAK
Table of Contents
BULK MATERIALS
Iron ore
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| IRON ORE | 75,860 | 71,540 | 80,257 | 144,919 | 151,797 | 12.2 % | 5.8 % | 4.7 % |
| Southeastern System | 30,036 | 28,694 | 30,528 | 55,355 | 59,222 | 6.4 % | 1.6 % | 7.0 % |
| Itabira | 10,139 | 9,081 | 10,499 | 18,046 | 19,581 | 15.6 % | 3.6 % | 8.5 % |
| Mariana | 9,750 | 9,374 | 9,861 | 18,005 | 19,234 | 5.2 % | 1.1 % | 6.8 % |
| Minas Centrais | 10,148 | 10,239 | 10,168 | 19,304 | 20,407 | -0.7 % | 0.2 % | 5.7 % |
| Midwestern System | 1,012 | 914 | 1,417 | 1,852 | 2,331 | 55.0 % | 39.9 % | 25.9 % |
| Corumbá | 652 | 609 | 1,028 | 1,204 | 1,637 | 68.8 % | 57.6 % | 35.9 % |
| Urucum | 360 | 305 | 389 | 647 | 694 | 27.4 % | 8.0 % | 7.2 % |
| Southern System | 19,808 | 16,779 | 19,496 | 36,232 | 36,275 | 16.2 % | -1.6 % | 0.1 % |
| Minas Itabiritos | 7,833 | 7,177 | 7,691 | 14,306 | 14,868 | 7.2 % | -1.8 % | 3.9 % |
| Vargem Grande | 5,821 | 4,459 | 5,784 | 11,000 | 10,242 | 29.7 % | -0.6 % | -6.9 % |
| Paraopebas | 6,154 | 5,144 | 6,021 | 10,926 | 11,165 | 17.0 % | -2.2 % | 2.2 % |
| Northern System | 22,296 | 22,651 | 26,019 | 46,167 | 48,670 | 14.9 % | 16.7 % | 5.4 % |
| Carajás | 22,296 | 22,651 | 26,019 | 46,167 | 48,670 | 14.9 % | 16.7 % | 5.4 % |
| Samarco 1 | 2,707 | 2,501 | 2,798 | 5,313 | 5,300 | 11.9 % | 3.4 % | -0.3 % |
1 Vales attributable production of 50%.
Our iron ore production rose to 80.3Mt in 2Q11, which was the best performance for a second quarter. Output increased 12.2% on a quarterly basis, with across-the-board gains in all systems, Northern, Southeastern, Southern and Midwestern, as well as at Samarco. The end of the rainy season in the Southeastern, Southern and Midwestern Systems helped the recovery.
Production at the Carajás mining site reached 26 Mt in 2Q11, increasing 14.9% over 1Q11 and 16.7% over 2Q10. It could have been even better, but it was negatively affected by the extended rainy season which spilled over into April and May. The strong rainfall this year contributed also to reduce the pace of shipments as the resulting higher degrees of moisture of ores caused a slowdown in the discharging process of trains at the Ponta da Madeira maritime terminal.
In addition, there was a problem with a car dumper, which suffered corrective maintenance during the quarter slowing shipments and production.
The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais mining sites, had a good performance, with a production of 30.5 Mt, showing an increase of 6.4% over 1Q11.
The Southern System Minas Itabirito, Vargem Grande and Paraopeba produced 19.5 Mt, 16.2% higher than the previous quarter.
The Midwestern System, Urucum and Corumbá mining sites, produced 1.4 Mt in 2Q11. Production rose 55.0% on a quarter-on-quarter basis and 39.9% on a year-on-year basis. This strong increase was due to the ramp-up of a new processing plant in Corumbá, which started in February.
Folio 2 /Folio
PAGEBREAK
Table of Contents
Pellets
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| PELLETS | 12,653 | 12,516 | 13,140 | 23,145 | 25,656 | 5.0 % | 3.8 % | 10.8 % |
| Tubarão I and II | 1,497 | 1,336 | 1,440 | 2,813 | 2,776 | 7.8 % | -3.8 % | -1.3 % |
| Fábrica | 1,057 | 947 | 992 | 1,735 | 1,939 | 4.8 % | -6.1 % | 11.7 % |
| São Luís | 1,440 | 1,337 | 1,349 | 1,735 | 2,686 | 1.0 % | -6.3 % | 54.8 % |
| Vargem Grande | 1,441 | 1,276 | 1,321 | 2,688 | 2,597 | 3.6 % | -8.3 % | -3.4 % |
| Nibrasco | 2,074 | 2,408 | 2,291 | 4,070 | 4,699 | -4.8 % | 10.5 % | 15.5 % |
| Kobrasco | 1,198 | 1,222 | 1,001 | 2,384 | 2,224 | -18.1 % | -16.4 % | -6.7 % |
| Hispanobras 1 | 457 | 542 | 544 | 896 | 1,086 | 0.3 % | 18.9 % | 21.2 % |
| Itabrasco | 972 | 1,020 | 1,135 | 1,803 | 2,155 | 11.2 % | 16.8 % | 19.5 % |
| Samarco 2 | 2,519 | 2,428 | 2,731 | 5,023 | 5,159 | 12.5 % | 8.4 % | 2.7 % |
| Oman | 0 | 0 | 336 | 0 | 336 | n.m. | n.m. | n.m. |
| 1 | Vales attributable production capacity of 50.89%. |
|---|---|
| 2 | Vales attributable production capacity of 50%. |
In 2Q11, pellet production was 13.1 Mt, the highest quarterly level achieved in a second quarter. It increased 5% over 1Q11 and 3.8% over 2Q10. In addition, our strong pace of production resulted in a new record for a first half-year, reaching 25.6 Mt.
Itabrasco production rose 11.2% over 1Q11, recovering from the scheduled stoppage for maintenance in March.
In 2Q11, the output of Tubarão I and II increased 7.8%, reflecting operational improvements after repairs in the mill which took place in the previous quarter.
Fábrica output was 4.8% higher than 1Q11 and 6.1% lower than 2Q10, impacted by the scheduled stoppages for maintenance on the conveyor belt in April.
Vargem Grande and São Luís had a slight increase of 3.6% and 1.0% on quarter-on-quarter basis, 6.3% and 8.3% lower than 2Q10, respectively, reflecting a decrease in pellet feed availability in 2Q11.
Nibrasco production was 4.8% down from 1Q11, as a result of operational issues in the plant, which caused some maintenance stoppages.
Kobrasco output was 18.1% lower than 1Q11, due to the scheduled stoppage for maintenance, which affected most of the production in June.
The attributable production of the three pellet plants of the 50%-owned Samarco JV, was 2.731 Mt in 2Q11, 12.5% higher than 1Q11, reflecting good operational performance after maintenances in 1Q11.
The Oman operations, in the industrial site of Sohar, in Oman, are ramping up. It has two pellet plants, each with capacity to produce 4.5 Mtpy, thus adding 9.0 Mtpy to our total capacity. The two plants will produce direct reduction pellets. Omans first plant started operating in April and produced 336,000 t in 2Q11.
Folio 3 /Folio
PAGEBREAK
Table of Contents
Manganese ore and ferroalloys
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| MANGANESE ORE | 494 | 498 | 619 | 891 | 1,117 | 24.2 % | 25.3 % | 25.4 % |
| Azul | 431 | 417 | 486 | 787 | 902 | 16.6 % | 12.7 % | 14.6 % |
| Urucum | 48 | 52 | 82 | 89 | 134 | 56.2 % | 70.3 % | 51.4 % |
| Other mines | 15 | 29 | 51 | 15 | 81 | 74.8 % | 242.3 % | 438.0 % |
| FERROALLOYS | 113 | 113 | 114 | 223 | 227 | 0.3 % | 0.4 % | 1.9 % |
| Brazil | 51 | 52 | 52 | 102 | 104 | 1.3 % | 2.0 % | 1.9 % |
| Dunkerque | 36 | 37 | 37 | 67 | 74 | -1.3 % | 0.5 % | 9.5 % |
| Mo I Rana | 26 | 25 | 25 | 54 | 50 | 0.5 % | -2.9 % | -7.4 % |
In 2Q11, manganese ore production increased 24.2% on a quarter-on-quarter basis, reaching 619,000 t against 498,000 t in 1Q11.
The production of Azul our largest manganese mine was 16.6% higher than 1Q11, showing an improvement in operational performance, overcoming the rainy weather, which affected our operation in the Northern System in 2Q11.
Urucum had a stronger performance, rising 56.2% over 1Q11, due to improved productivity reflecting the arrival of two new trucks and one loader used to transport mine output to the beneficiation plant, which started to operate at the end of 1Q11.
Morro da Mina production, allocated in other mines, had a sharp increase of 74.8% over 1Q11. It is operating at full capacity, due to higher demand.
In 2Q11, ferroalloy production was in line with 1Q11 and 2Q10 performance.
Production in 2Q11 was comprised of 49,100 t of ferrosilicon manganese alloys (FeSiMn), 59,900 t of high-carbon manganese alloys (FeMnHc) and 4,900 t of medium-carbon manganese alloys (FeMnMC).
Folio 4 /Folio
PAGEBREAK
Table of Contents
Coal
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| METALLURGICAL COAL | 755 | 488 | 518 | 1,471 | 1,007 | 6.2 % | -31.3 % | -31.6 % |
| Integra Coal | 245 | 186 | 30 | 572 | 216 | -84.0 % | -87.8 % | -62.3 % |
| Broadlea | 70 | 0 | 0 | 101 | 0 | n.m. | n.m. | n.m. |
| Carborough Downs | 277 | 231 | 368 | 560 | 599 | 59.1 % | 32.6 % | 6.9 % |
| Others | 162 | 71 | 121 | 237 | 192 | 69.4 % | -25.6 % | -19.0 % |
| THERMAL COAL | 1,104 | 933 | 787 | 1,805 | 1,720 | -15.7 % | -28.7 % | -4.7 % |
| El Hatillo | 809 | 835 | 698 | 1,331 | 1,533 | -16.4 % | -13.7 % | 15.2 % |
| Integra Coal | 65 | 71 | 25 | 122 | 96 | -64.3 % | -61.5 % | -21.8 % |
| Broadlea 1 | 118 | 0 | 0 | 165 | 0 | n.m. | n.m. | n.m. |
| Others | 111 | 28 | 63 | 186 | 91 | 129.9 % | -43.2 % | -51.1 % |
1 Broadlea Coal was placed in care and maintenance in December 2009. The washing of the ROM stockpiles was finalized in June 2010.
In 2Q11, Vales coal production reached 1.3 Mt decreasing 8.2% on a quarter-on-quarter basis, primarily due to a fall in thermal coal output. We produced a total of 518,000 t of metallurgical coal and 787,000 t of thermal coal. Moatize, our Mozambican coal project, is expected to start ramping up by the end of 3Q11.
Production of metallurgical and thermal coal at Integra Coal was 30,000 t and 25,000 t, respectively, in 2Q10. The metallurgical coal output was negatively impacted by the start of a longwall move during 2Q11. Thermal coal production at Integra Coal was negatively impacted by pre-stripping of overburden waste in preparation for developing a new mining pit.
Production at Carborough Downs was 368,000 t versus 231,000 t in the previous quarter, recovering from the geotechnical problems faced in 1Q11.
Coal production in other mines reached 121,000 t of metallurgical coal and 63,000 t of thermal coal, recovering from the flooding early this year. By the end of 2Q11 most of the dewatering activity and mud removal was finalized.
El Hatillo, our Colombian thermal coal mine located in the Cesar Department, reached 698,000 t, decreasing 16.4% from 1Q11. This is primarily due to a pit development to ramp up production to 4.5 Mtpy, which caused a transitory increase in the strip ratio in 2Q11. Additionally, due to logistics constraints caused by the railroad accident in April, our nominal capacity was temporarily reduced from 4.5 to 4.0 Mtpy in 2011.
Folio 5 /Folio
PAGEBREAK
Table of Contents
BASE METALS
Nickel
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| NICKEL | 37 | 59 | 56 | 69 | 115 | -4.4 % | 53.1 % | 65.6 % |
| Sudbury | 8 | 14 | 10 | 8 | 25 | -27.8 % | 34.7 % | 207.6 % |
| Thompson | 8 | 8 | 7 | 17 | 15 | -17.9 % | -19.8 % | -11.7 % |
| Voisey Bay | 4 | 16 | 15 | 7 | 32 | -3.3 % | 336.6 % | 341.6 % |
| Sorowako | 17 | 18 | 19 | 37 | 37 | 7.3 % | 11.8 % | -1.3 % |
| VNC | 0 | 0 | 2 | 0 | 2 | 402.1 % | n.m. | n.m. |
| Onça Puma | 0 | 0 | 1 | 0 | 1 | 260.0 % | n.m. | n.m. |
| Others* | 0 | 2 | 2 | 0 | 4 | -15.1 % | 567.5 % | 710.7 % |
- External feed purchased from third parties and processed into finished nickel in our operations
Total finished nickel production was 56,200 t in 2Q11, 2,600 t lower than the previous quarter, reflecting the problem in furnace #2 at the Copper Cliff smelter in Sudbury. Additionally, due to the furnace stoppage, we decided to reschedule planned maintenance for both the Sudbury and Voiseys Bay operations from 3Q11 into 2Q11
Finished nickel production from Sudbury in 2Q11 was 10,300 t, down 4,000 t from 1Q11, mostly due to the problem in furnace #2.
Production at Thompson in 2Q11 was 6,700 t, down 1,500 t from 1Q11 and down 1,700 t from 2Q10, due to a shortfall in sourced feed. The high quality feed from Voiseys Bay is normally blended at Thompson. However, it was redirected to the Sudbury operations in order to maximize the production of high grade products, which lessened the negative impact of the shutdown of furnace #2 on finished nickel output.
Originally, the estimated production loss was 15,000 t. However, as a result of our efforts furnace #1 of the Copper Cliff smelter was able to deliver a better than expected output, thus cutting the predicted loss by 2,800 t.
Nickel in matte production from the Indonesian operations at Sorowako was 18,600 t in 2Q11, up 2,100 t from 1Q11. In that quarter, production was negatively impacted by an earthquake at the Island of Sulawesi, where our operations are located.
Vale New Caledonia (VNC) produced 2,000 t of nickel hydroxide cake, a nickel and cobalt intermediate product resulting from the High Pressure Acid Leaching (HPAL) process.
Onça Puma line #1 was successfully commissioned and the first ferronickel was produced in March 2011. Line #2 is currently at the commissioning stage.
Folio 6 /Folio
PAGEBREAK
Table of Contents
Copper
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| COPPER | 40 | 70 | 63 | 74 | 133 | -10.0 % | 57.4 % | 80.0 % |
| Sossego | 29 | 23 | 23 | 55 | 46 | 0.8 % | -20.5 % | -17.1 % |
| Sudbury | 3 | 25 | 22 | 6 | 47 | -13.7 % | 637.3 % | 689.4 % |
| Thompson | 0 | 1 | 0 | 0 | 1 | -51.7 % | n.m. | n.m. |
| Voiseys Bay | 5 | 13 | 11 | 7 | 25 | -13.3 % | 129.0 % | 271.0 % |
| Tres Valles | 0 | 1 | 2 | 0 | 3 | 139.0 % | n.m. | n.m. |
| Others | 3 | 7 | 4 | 5 | 11 | -41.5 % | 49.4 % | 105.4 % |
Vales copper production was 62,800 t in 2Q11, decreasing 10% on a quarter-on-quarter basis.
Production of copper in concentrates from the Sossego mine at Carajás was in line with the previous quarter and 20.5% lower than 2Q10 due to the lower grade of copper received by the processing plant during 2Q11.
Output from our Canadian operations reached 37,700 t in 2Q11, down 8,500 t from 1Q11, mainly due to the furnace failure. Sudbury was operating with only one furnace, and both Sudbury and Voiseys Bay brought forward planned maintenance stoppage from 3Q11 to 2Q11.
In 2Q11 we bought copper ore from small mines equivalent to 4,200 t of copper metal, 40% less than the amount acquired in 1Q11 due to the issues with the furnace at the Sudbury operations.
Operations at Tres Valles, in the Coquimbo region of Chile, continued to ramp-up producing 2,200 t of copper cathodes in 2Q11. Tres Valles has an annual capacity of 18,500 t of copper cathodes and is currently at a processing rate of 50%.
Folio 7 /Folio
PAGEBREAK
Table of Contents
Nickel by-products
| 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | 2Q11/1Q11 | 2Q11/2Q10 | 1H11/1H10 | |
|---|---|---|---|---|---|---|---|---|
| COBALT (metric tons) | 179 | 580 | 640 | 308 | 1,221 | 10.3 % | 258.1 % | 296.1 % |
| Sudbury | 6 | 41 | 57 | 6 | 98 | 39.5 % | 879.3 % | 1,581.2 % |
| Thompson | 73 | 51 | 41 | 125 | 92 | -19.8 % | -43.5 % | -26.1 % |
| Voisey Bay | 98 | 427 | 410 | 175 | 838 | -4.1 % | 317.0 % | 378.3 % |
| VNC | 0 | 22 | 114 | 0 | 136 | 407.3 % | n.m. | n.m. |
| Others | 2 | 38 | 18 | 2 | 56 | -52.7 % | 902.7 % | 2,403.4 % |
| PLATINUM (000 oz troy) | 5 | 57 | 51 | 7 | 108 | -11.5 % | 822.9 % | 1,524.8 % |
| Sudbury | 5 | 57 | 51 | 7 | 108 | -11.5 % | 822.9 % | 1,524.8 % |
| PALLADIUM (000 oz troy) | 15 | 72 | 72 | 18 | 144 | -0.9 % | 393.8 % | 704.6 % |
| Sudbury | 15 | 72 | 72 | 18 | 144 | -0.9 % | 393.8 % | 704.6 % |
| GOLD (000 oz troy) | 6 | 30 | 95 | 10 | 125 | 215.5 % | 1,588.4 % | 1,145.3 % |
| Sudbury | 6 | 30 | 95 | 10 | 125 | 215.5 % | 1,588.4 % | 1,145.3 % |
| SILVER (000 oz troy) | 718 | 595 | 686 | 855 | 1,281 | 15.2 % | -4.5 % | 49.8 % |
| Sudbury | 718 | 595 | 686 | 855 | 1.281 | 15.2 % | -4.5 % | 49.8 % |
Cobalt production in 2Q11 amounted to 640,000 t, rising 10.3% from 1Q11, primarily due to increased output of cobalt-in-nickel-hydroxide-cake, which was sold from New Caledonia.
Production of platinum and palladium in 2Q11 was 123,000 troy ounces, 7,000 troy ounces lower than in 1Q11, because Sudbury was operating with only one furnace, meaning lower shipments of PGM cake from Sudbury to the Acton refinery, in the United Kingdom.
Folio 8 /Folio
PAGEBREAK
Table of Contents
FERTILIZER NUTRIENTS
Potash
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| POTASH | 180 | 134 | 145 | 338 | 279 | 7.9 % | -19 .6 % | -17.5 % |
| Taquari-Vassouras | 180 | 134 | 145 | 338 | 279 | 7.9 % | -19.6 % | -17.5 % |
Production of potash was 145,000 t in 2Q11, an increase of 7.9% on a quarter-on-quarter basis and a decrease of 19.6% year-on-year. The geological conditions of the mine affected performance, reflecting the lower average grade of the feed received by the plant.
Folio 9 /Folio
PAGEBREAK
Table of Contents
Phosphates
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| Phosphate Rock | 1,107 | 1,743 | 1,858 | 2,061 | 3,601 | 6.6 % | 67.9 % | 74.7 % |
| Vale Fertilizantes | 1,107 | 1,148 | 1,272 | 2,061 | 2,420 | 10.8 % | 15.0 % | 17.4 % |
| Bayóvar | 0 | 595 | 586 | 0 | 1,180 | -1.6 % | n.m. | n.m. |
| MAP Monoammonium phosphate | 185 | 210 | 131 | 424 | 341 | -37.6 % | -29.1 % | -19.7 % |
| Vale Fertilizantes | 185 | 210 | 131 | 424 | 341 | -37.6 % | -29.1 % | -19.7 % |
| TSP Triple superphosphate | 197 | 233 | 175 | 397 | 408 | -24.9 % | -11.0 % | 2.7 % |
| Vale Fertilizantes | 197 | 233 | 175 | 397 | 408 | -24.9 % | -11.0 % | 2.7 % |
| SSP -Single superphosphate | 525 | 545 | 666 | 966 | 1,212 | 22.2 % | 27.0 % | 25.5 % |
| Vale Fertilizantes | 525 | 523 | 583 | 966 | 1,107 | 11.4 % | 11.1 % | 14.6 % |
| Vale Cubatão | 0 | 22 | 83 | 0 | 105 | 277.5 % | n.m. | n.m. |
| DCP Dicalcium Phosphate | 137 | 151 | 158 | 246 | 309 | 5.1 % | 15.5 % | 25.6 % |
| Vale Fertilizantes | 137 | 151 | 158 | 246 | 309 | 5.1 % | 15.5 % | 25.6 % |
In February 2001, Vale Fosfatados was incorporated into Vale Fertilizantes. The following assets are now part of Vale Fertilizantes: two phosphate rock mines, Araxá, in the state of Minas Gerais, and Cajati, in the state of São Paulo, Brazil. Alongside the mining operations, the assets also comprise four processing plants for the production of phosphates fertilizers located at: (a) Araxá, state of Minas Gerais; (b) Cajati, state of São Paulo; (c) Cubatão, state of São Paulo; (d) Guará, state of São Paulo.
In 2Q11, the total production of phosphate rock, which is used to feed the output of phosphate nutrients, was 6.6% higher than in 1Q11.
Bayóvar, our Peruvian phosphate rock mine, is in a ramp up process. Its production in 2Q11 was slightly lower than in 1Q11, due to the lower average grade of the feed received by the plant.
The total output of Vale Fertilizantes increased 2.4% on a quarter-on-quarter basis recovering from the rainy season that affected last quarters performance.
The production of MAP (monoammonium phosphate) was 131,000 t, down 37.6% quarter-on-quarter, as a consequence of corrective maintenance stoppage at the sulfuric acid plant. The stoppage affects the production of phosphoric acid, and therefore decreases the production of MAP and TSP (triple superphosphate).
TSP production decreased 24.9% compared to 1Q11, due to the lack of phosphoric acid. The problem with the sulfuric acid plant was solved in the 2Q11.
In 2Q11, the production of SSP (single superphosphate) was 22.2% higher than 1Q11, showing production recovery after the maintenance stoppages. Vale Cubatão was acquired from Mosaic in March 2011, and it had its first full quarter of production in 2Q11, reaching 83.000 t.
DCP (dicalcium phosphate) production increased 5.1% from last quarter due to higher demand.
Folio 10 /Folio
PAGEBREAK
Table of Contents
Nitrogen
| 000 metric tons | 2Q10 | 1Q11 | 2Q11 | 1H10 | 1H11 | % Change — 2Q11/1Q11 | % Change — 2Q11/2Q10 | % Change — 1H11/1H10 |
|---|---|---|---|---|---|---|---|---|
| Ammonia | 112 | 157 | 167 | 260 | 325 | 6.3 % | 48.9 % | 24.8 % |
| Vale Fertilizantes | 112 | 157 | 167 | 260 | 325 | 6.3 % | 48.9 % | 24.8 % |
| Urea | 144 | 159 | 175 | 288 | 335 | 9.9 % | 21.7 % | 16.2 % |
| Vale Fertilizantes | 144 | 159 | 175 | 288 | 335 | 9.9 % | 21.7 % | 16.2 % |
| Nitric Acid | 103 | 107 | 121 | 215 | 228 | 12.2 % | 16.9 % | 6.3 % |
| Vale Fertilizantes | 103 | 107 | 121 | 215 | 228 | 12.2 % | 16.9 % | 6.3 % |
| Ammonium Nitrate | 105 | 103 | 114 | 216 | 217 | 10.9 % | 8.4 % | 0.1 % |
| Vale Fertilizantes | 105 | 103 | 114 | 216 | 217 | 10.9 % | 8.4 % | 0.1 % |
In 2Q11, ammonia and urea production increased by 6.3% and 9.9%, respectively, when compared to 1Q11, recovering after the non-scheduled stoppage for maintenance at the ammonia plant in the previous quarter.
The output of nitric acid and ammonium nitrate was 12.2% and 10.9% higher than the previous quarter also due to the maintenance stoppage in 1Q11.
For further information. please contact: +55-21-3814-4540 Roberto Castello Branco: [email protected] Viktor Moszkowicz: [email protected] Carla Albano Miller: [email protected] Andrea Gutman: [email protected] Christian Perlingiere: [email protected] Fernando Frey: [email protected] Marcio Loures Penna: [email protected] Samantha Pons: [email protected] Thomaz Freire: [email protected]
This press release may include statements that present Vales expectations about future events or results. All statements, when based upon expectations about the future and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will prove correct. These risks and uncertainties include factors related to the following: (a) the countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital markets; (d) the mining and metals prices and their dependence on global industrial production, which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To obtain further information on factors that may lead to results different from those forecast by Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de Valores Mobiliários (CVM), the French Autorité des Marchés Financiers (AMF), and The Stock Exchange of Hong Kong Limited, and in particular the factors discussed under Forward-Looking Statements and Risk Factors in Vales annual report on Form 20-F.
Folio 11 /Folio
PAGEBREAK
Table of Contents
link1 "Signature Page"
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Vale S.A. | ||
|---|---|---|
| (Registrant) | ||
| Date: July 28, 2011 | By: | /s/ Roberto Castello Branco Roberto Castello Branco |
| Director of Investor Relations |