Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

STELLAR RESOURCES LIMITED Capital/Financing Update 2025

Feb 10, 2025

65860_rns_2025-02-10_64e2eee0-4fa3-4323-84af-2bb1ec584873.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Outstanding Wide High-Grade Intersection at Queen Hill Deposit, Heemskirk

23.3m @ 2.20% Sn Zone Intersected Below Indicated Resource

HIGHLIGHTS:

  • At Queen Hill, drillhole ZQ173, has intersected a wide high-grade zone of mineralisation downhole returning:

o 23.3m[†] @ 2.20% Sn from 295.7m including;

  • 4.2m[‡] @ 3.76% Sn from 303.6m and

  • 3.9m @ 3.45% Sn from 312.1m.

  • ZQ173 is located approximately 95m below and just south of ZQ170, reported on 5 December 2024[1] , which returned:

o 17.0m @ 1.79% Sn from 203.8m including;

  • 7.9m @ 2.74% Sn from 206m.

  • Drillhole ZQ173 targeted a zone of Inferred mineralisation for conversion to Indicated material with the resulting intersection being wider than the existing resource model.

  • The drillhole also returned multiple tin zones further downhole in the lower Queen Hill horizon including 3.5m @ 0.75% Sn from 356m, 4.0m @ 0.81% Sn from 379m and 9.7m @ 0.78% Sn from 386m indicating the fertile nature of the Heemskirk Tin system.

  • Significantly, Down Hole Electromagnetic (DHEM) surveying of hole ZQ173 indicates the presence of a conductive body along strike and to the south of the intersection on the lower Queen Hill horizon.

  • Mineralisation remains open down dip and plunge and once further results from the DHEM are received, deeper drilling will further test for extensions to this wide zone of mineralisation.

  • A total of 12 holes for 5,923 metres have been completed to date of the planned 24 hole ~9,500m drill program, as part of the Prefeasibility Study ( PFS ) underway.

1 SRZ ASX Announcement 5 December 2024 – Queen Hill Delivers Wide High-Grade Tin at Heemskirk

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

1

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Stellar’s Managing Director Mr Simon Taylor commented:

“It’s very encouraging to see another hole at Queen Hill deliver a wider and higher-grade intersection than the existing resource model as we look to convert further resources to the Indicated category. The zone has delivered an outstanding grade at over 2% tin and remains open at depth.

“Drilling continues with three rigs operating and we are now starting to model the first results from down hole electromagnetic surveys to help guide further drilling as we look to bolster the resource to be updated as part of the Prefeasibility Study.

“With the highly encouraging Ore Sorting results[2] recently released coupled with the encouraging resource drilling success, we see great opportunities to be able to increase the potential metal production from Heemskirk to well above that outlined in our Scoping Study.

“Stellar aims to be a 3,000 to 3,500 tpa tin producer over the first 6 to 10 years of production. The PFS studies are working towards this by improving upon the base case scoping study of 1,900 tpa over a 12 year mine life.”

==> picture [506 x 171] intentionally omitted <==

Figure 1 : Diamond drill core from Severn hole ZQ173 from approximately 303.6m – 307.7m with a grade of approximately 3.76% Sn. Core shows broad massive pyrite with associated massive sphalerite-galena zone, interpreted to be replacing dolomite protolith.

2 SRZ ASX Announcement 28th January 2025 – Ore Sorting Demonstrates Excellent Results at Heemskirk

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

2

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Stellar Resources Limited (ASX: SRZ, “Stellar” or the “Company”) is pleased to report further drilling results from the Queen Hill and Severn deposits at its Heemskirk Tin Project (“ Heemskirk” ) in Western Tasmania. The program comprises a 24-hole (~9,500m) diamond drilling campaign focused on infill and extensions to the 2023 Mineral Resource Estimate (MRE)[3] . This release reports assay results from three holes drilled at Queen Hill (ZQ173, ZQ173W, ZQ171) and one hole from Severn (ZS164A).

To date, Stellar has completed 12 holes for a total of 5,923 metres. The Company has three rigs operating at present and will report further assays as they come to hand. Refer to Figure 2,Figure 3 and Figure 4 for drillhole cross sections and locations and Table 1Table 2 for significant intersections and drill hole location data.

Queen Hill Infill - Holes ZQ173, ZQ173W and ZQ171

At Queen Hill, drillhole ZQ173 targeted the southern end of the Mineral Resource model below the Indicated Resource and was designed to target a zone of Inferred mineralisation directly below the mineralisation reported in ZQ170 in December[1] .

The hole was highly successful returning multiple zones of wide high-grade mineralisation downhole located within the central mineralised horizon at Queen Hill (Figure 2), including:

  • 23.3m† @ 2.20% Sn from 295.7m including;

  • 4.2m[‡] @ 3.76%Sn from 303.6m and

  • 3.9m @ 3.45% Sn from 312.1m.

This zone is interpreted as a continuation of the mineralisation reported in drillhole ZQ170 (from 203.8m), however the alteration overprinting has a stronger silica, clay, sericite with a dominant pyrite sulphide alteration of a possible basalt rather than the altered sedimentary package surrounding.

Importantly this intersection is located within an Inferred region of the Mineral Resource and should allow for the conversion of mineralisation to the Indicated category and its inclusion in the currently ongoing PFS.

Equipment failure in ZQ173 at 402m prevented reaching the targeted depth and hole ZQ173W was wedged from 360m down hole to its completion at 431m depth.

3 SRZ ASX Announcement 4 September 2023 – Heemskirk Tin Project MRE Update

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

3

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Both holes intersected the lower Queen Hill mineralised horizon and returned values including:

  • 4m @ 0.81% Sn from 379m,

  • 9.7m @ 0.78% Sn from 386m, and

  • 10.6m @ 0.61% Sn from 378m and

  • 2m @ 1.25% Sn from 385m

Significantly, DHEM surveying of hole ZQ173 indicates the presence of a conductive body (2,600S, 70m length and 104m depth extent) along strike and to the south of the intersection on the lower horizon as shown in Figure 4. Further survey work will be undertaken during February and a follow up hole subsequently planned as required.

Hole ZQ171 is located on the northern end of Queen hill and returned a narrow intersection of 1m @ 0.8% from 279m depth. This shows that, though currently narrowed, the system continues to the north.

==> picture [481 x 353] intentionally omitted <==

Figure 2: Drill Hole Cross Section A-A’ (Located on Figure 4), new drill holes ZQ173 and ZQ173W, Indicated and Inferred resource blocks from the 2023 MRE[3] and location of the DHEM conductor/target.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

4

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

==> picture [482 x 454] intentionally omitted <==

Figure 3: Queen Hill Long Section looking west showing location of holes ZQ173, ZQ173W, ZQ171 and the Sept 2023 Severn Mineral Resource as projected total of the multiple mineralised resource zones and drillhole pierce points coloured by Sn% * Thickness (historic holes & SRZ holes shown). GDA Z55

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

5

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

==> picture [495 x 302] intentionally omitted <==

Figure 4 : Drill hole location plan, location of cross section A-A’ for Queen Hill holes ZQ173, ZQ173W, ZQ171 (Figure 2Figure 3) and ZS164A, highlighted in red. Blue box indicates section line and width of sectional view.

Severn – Hole 164A

Drill hole ZS164A was the second attempt to complete this hole and intersected the three mineralised zones at Severn giving further support for conversion of the Inferred mineralisation in this area to the Indicated category. Results included 2.5m @ 1.26% Sn from 378.5m, 0.7m @ 0.62% Sn from 428.3m, 3m @ 0.69% Sn from 433m and 1m @ 1.17% Sn from 463m.

Drilling at Severn has been hampered due to bad ground impacting drilling effectiveness on the northern extensions of the body with a number of holes having been lost before completion. Alternative drilling methods and techniques are continuing to be trialled by the Company.

Drilling focus has been put on Queen Hill with two rigs to provide metallurgical material from the early years of the anticipated mining schedule. Once planned drilling at Queen Hill is completed, more resources will be allocated to Severn. It is anticipated that improved drilling approaches will be in place by this time.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

6

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Table 1 – Summary of Significant Intercepts

Hole
Number
From To Width Sn % Cu %
ZQ173
including
including
295.7 319 **23.3† ** 2.20 0.01
303.6 307.8 4.2‡ 3.76 0.00
312.1 316 3.9 3.45 0.00
356 359.5 3.5 0.75 0.01
379 383 4 0.81 0.02
386 395.7 9.7 0.78 0.04
401 402 1 1.05 0.00
ZQ173W 378 388.6 10.6 0.61 0.00
385 387 2 1.25 0.03
ZQ171 279 280 1 0.80 0.03
ZS164A 378.5 381 2.5 1.26 0.06
428.3 429 0.7 0.62 0.09
433 437 3 0.69 0.02
463 464 1 1.17 0.06

NB: †) This width includes 2.5m of core loss and ‡) includes 0.9m of core loss. The grade of widths with noted core loss are calculated on the weighted (length) x (Sn grade) of recovered core, with the lost core ascribed no value or weighting in the average.

Calculated using a 0.40% Sn lower cut off and no more than 2 metres of internal dilution. Drillhole ZQ173 intersected mineralization at ~ 65 degrees to the modelled dip of the ore body. Hence the true widths are ~55% of the reported interval widths.

Further Work Programs and Drilling Progress

Drilling to date has completed 12 of the planned 24 holes with three rigs currently operating. A total of 5,923 metres has been drilled, inclusive of three abandoned holes.

The drilling program is designed to advance Heemskirk to development ready status by providing key technical inputs for the Prefeasibility Study, while also aiming for mineral resource expansion by providing a DHEM platform to support further exploration drilling.

The PFS is progressing well and on track for delivery in 2H 2025.

Table 2 - Drill hole location data

Hole
Number
Easting Northing RL Depth Azimuth Dip
ZQ171 360971 5362076 253 312 306 -60
ZQ173 360880 5361900 282 402 287 -72
ZQ173W 360880 5361900 282 431 284 -72
ZS164A 361470 5361799 177 480 292 -53

Notes: All coordinates in Map Grid of Australia, Zone 55 (MGA Z55), Rounding errors may exist in length calculations

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

7

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

– ENDS –

This announcement is authorised for release to the market by the Board of Directors of Stellar Resources Limited.

For further details please contact: For broker and media enquiries: Simon Taylor Jason Mack Managing Director & CEO Communications Advisor Stellar Resources Limited White Noise Communications T: +61 409 367 460 T: +61 400 643 799 E: [email protected] E: [email protected]

Competent Persons Statement

The information in this announcement that relates to exploration results is based on and fairly represents, information and supporting documentation compiled by Mr. Andrew Boyd who is an Executive Director and shareholder of the Company. Mr. Boyd is a Member of the Australian Institute of Geologists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Boyd has reviewed the contents of this news release and consents to the inclusion in this announcement of exploration results in the form and context in which they appear.

Compliance Statement

This announcement contains information relating to Exploration Results extracted from ASX market announcements reported previously in accordance with the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ("2012 JORC Code") and published on the ASX platform on 5 December 2024 and 28 January 2025. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements.

Forward Looking Statements

This report may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Stellar Resources Limited’s planned activities and other statements that are not historical facts. When used in this report, the words such as “could”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar expressions are forward-looking statements. In addition, summaries of Exploration Results and estimates of Mineral Resources and Ore Reserves could also be forward-looking statements. Although Stellar Resources Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given that actual results will be consistent with these forward-looking statements. The entity confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning this announcement continue to apply and have not materially changed. Nothing in this report should be construed as either an offer to sell or a solicitation to buy or sell Stellar Resources Limited securities.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

8

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

About Stellar Resources:

Stellar Resources ( ASX:SRZ ) is focused on developing its world class Heemskirk Tin Project located in the mining friendly jurisdiction of Zeehan, Western Tasmania. The Company has defined a substantial high-grade resource totalling 7.48Mt at 1.04% Sn, containing 77.87kt of tin[*] . This ranks the Heemskirk Project as the highest-grade undeveloped tin resource in Australia and third globally.

The focus for the Company is to complete exploration and resource drilling at the Heemskirk Project to further grow the resource and increase its confidence by upgrading of its resource classifications. Currently, a large proportion of the resource is classified in the Indicated category totalling 3.52Mt at 1.05% Sn for 37kt of contained tin and with 3.96Mt at 1.03%Sn for 41kt of contained tin the Inferred category.

Stellar also made a major discovery at its North Scamander Project in September 2023, with a maiden exploration drillhole intersecting a significant new high-grade silver, tin, zinc, lead and Indium polymetallic discovery. The Company has also delineated multiple down hole conductors via DHEM and FLEM surveys, providing high priority follow up targets.

==> picture [341 x 348] intentionally omitted <==

Stellar Resources Heemskirk Tin Project Location

The Company confirms that it is not aware of any new information or data that materially affects the information included within the original announcement and that all material assumptions and technical parameters underpinning the MRE quoted in the release continue to apply and have not materially changed.

  • – SRZ ASX Announcement 4 September 2023 Heemskirk Tin Project MRE Update.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961

Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

9

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

JORC Code, 2012 Edition – Table 1

Section 1: Sampling Techniques and Data (criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary
Sampling
techniques
• Nature and Quality of sampling (e.g. cut channels,
random chips or specific specialized industry
standard measurement tools appropriate to the
minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments
etc.).
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1m samples
from which 3kg was pulverized to produce 30g
charge for fire assay’). In other cases, more
explanation may be required, such as where
there is coarse gold that has inherent sampling
problems. Unusual commodities or sampling
types (e.g. submarine nodules) may warrant
disclosure of detailed information.

The Zeehan Tin deposit has been delineated entirely by
diamond drilling. Numerous drilling campaigns were
completed between 1960 and 1992 by Placer, Gippsland,
Minops, CRAE and Aberfoyle. Post 2010, diamond drilling
was completed by Stellar with diamond core of nominally
NQ or HQ diameter.

Logged sulphide and siderite altered zones were selected
for geochemical analysis.

Approximately 1m samples of 2-3kg were taken from
diamond saw cut drill core whilst respecting geological
boundaries.
Drilling
Techniques
• Drill type (e.g. core, reverse circulation, open hole
hammer, rotary air blast, auger, bangka, sonic
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face
sampling bit or other type, where core is oriented
and if so by what method, etc.)

All drill sampling by standard wireline diamond drilling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximize sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material

Core logging captured drilled recoveries and core loss.

Recoveries generally excellent (95-100%) through
mineralized sections.

No bias based on recovery has been identified.

In ZQ173 reported in this release 0.9m of core was lost
within the reported intersection and documented
immediately below the results table.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.

Geological logging has been carried out on all holes by
experienced geologists and technical staff.

Holes logged for lithology, weathering, alteration,
structural orientations, Geotech, RQD, magnetic
susceptibility and mineralisation verified with an Olympus
DPO 2000 pXRF.

Photographed dryand wetprior to cutting.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

10

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Criteria JORC Code Explanation Commentary
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel etc.)
photography.
• The total length and percentage of the relevant
intersections logged.

Logs loaded into excel spreadsheets and uploaded into an
SQL database.

Standard lithology codes used for all drillholes.
Sub-
Sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub
sampling stages to maximize representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the insitu material collected,
including for instance results of field
duplicate/second half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled

Half core split by diamond saw over 0.3 – 1.0m sample
intervals while respecting geological contacts. Most
sample intervals are 1.0m.

Assay sample weights between 1 and 4kg are considered
appropriate with respect to any coarse tin that may be
present.

Half core has specific gravity undertaken using the
Archimedes method by the laboratory before it is coarse
crushed and then pulverized to 85% passing 75um.
Quality of
assay data
and
laboratory
tests

The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibration factors
applied and their derivation etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have
been established.

Sn, Fe and S analyses were conducted at ALS Laboratories
using:

a fused disc XRF technique (ALS Method XRF15B). Fused
disc XRF is considered a total technique, as it extracts and
measures the whole of the element contained within the
sample.

Aqua regia acid digestion and multi element analysis using
Induced coupled plasma mass spectrometry (ALS Method
ICP41a) for Sn, Li, Ag, Ba, Ca, Cr, Ga, La, Mo, P, Sb, Th, U, Zn,
Al, Cu, Mg, Na, Pb, Sc, Ti, V, As, Bi, Co, Fe, K, Mn, Ni, Sr, Tl,
W. Where required, overlimit ore grade base metals
analysis is undertaken by Aqua regia acid digestion and
multi element analysis using Induced coupled plasma mass
spectrometry (ME-OG46). Where required, Pb that is
overlimit for OG46Pb analysis, is analysed by a fused disc
XRF technique (XRF15d).

Certified reference material (CRM) are inserted
approximately every 20 samples using custom made CRM
material by OREAS with grades of ~ 0.3, 0.7 and 1.5% Sn

Course blanks and fine blank OREAS 22e are also inserted
after mineralised zones.

Duplicate samples are requested approximately every 20
samples for the lab to repeat the sample.
Verification
of sampling
and assaying
• The verification of significant intersections by
either independent or alternative company
personnel
• The use of twinned holes.

Significant intersections were reviewed by company
personnel.

Eight twinned holes have been included in previous drilling
program with six holes demonstrating moderate to high Sn

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

11

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Criteria JORC Code Explanation Commentary
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
grade variability between 20% and 50%. Two holes
demonstrate extreme grade and or geological variability.

Data is collected by qualified geologists and experienced
field assistants and entered into excel spreadsheets. Data
is imported into and SQL database. Data is regularly
backed up and archival copies of the database stored on
the cloud and hard drives.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and downhole surveys) trenches,
mine workings and other locations used in
mineral resource estimation
• Specification of grid system used
• Quality and accuracy of topographic control.

Drill holes are sighted and initially recorded by hand held
GPS (+/- 5m accuracy), with final locations picked up by a
licensed surveyor on a 3 monthly basis. The holes reported
in this release are located by handheld (non-RTK) GPS

All Post 2010 drill collars surveyed by licensed surveyor
using differential GPS, including those included in this
announcement.

Pre 2010 drill collars surveyed by licensed surveyor with
the exception of 13 early drill holes located to within 1m
by local grid tape and compass for Queen Hill deposit.

Down hole surveys by downhole camera or Tropari. 2017
holes by Deviflex. For the 2021/2022 holes a digital
magnetic survey tool used up to hole ZQ146. From hole
Z1S43W onwards, a Devigyro survey tool and a
DeviAlligner tool has been used.

The Digital Terrain Model has been generated from lands
department 10m contours and adjusted with surveyed drill
collar and controlpoints.
Data Spacing
and
distribution
• Data spacing for reporting Exploration Results
• Whether data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied

Drill hole spacing for this phase of exploration drilling is
approximately 50m.

It is anticipated that this will be suitable for an Indicated
classification of resource, based on existing geo-statistics
but will need to be assessed by the CP undertaking the
estimation.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling
orientation and the orientation of key mineralised
structures is considered to have introduced a
sampling bias, this should be assessed and
reported if material.

The majority of drill holes have been drilled local grid east
west sub-perpendicular to the steeply east dipping
mineralisation in the Severn and Queen Hill Deposits.

Drillhole ZQ173 intersected at approximately 65oto the
currently modelled dip of the ore body. Hence the (true)
downhole interval lengths are ~55% of the interval widths
in this announcement.

Drill hole orientation is not considered to have introduced
any material sampling bias.
Sample
Security
• The measures taken to ensure sample security.
Post 2010 chain of custody is managed by Stellar from the
drill site to ALS laboratories in Burnie.

All samples, bagged in pre-numbered calico bags and
delivered in labelled poly-weave bags.

Pre 2010 sample securityis not documented.
Audits or
Reviews
• The results of any audits or reviews of sampling
techniques and data.

No audits or reviews of sampling data and techniques have
been completed.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

12

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Section 2: Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section)

Criteria JORC Code Explanation Commentary
Mineral
tenement and
land tenure
status


Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.

The security of tenure held at the time of
reporting along with known impediments to
obtaining a license to operate the area

ML2023P/M, RL5/1997 and EL13/2018 hosting the
Heemskirk Tin Project in Western Tasmania are 100%
owned by Stellar Resources Ltd.
Exploration
done by other
parties

Acknowledgement and appraisal of exploration
by other parties.

Early mining activity commenced in the 1880’s with the
production of Ag-Pb sulphides and Cu-Sn sulphides from
fissure loads.

Modern exploration commenced by Placer in the mid
1960’s with the Queen Hill deposit discovered by
Gippsland in 1971.

The Aberfoyle-Gippsland JV explored the tenements until
1992 with the delineation of the Queen Hill, Severn and
Montana deposits.
Geology
Deposit type, geological setting and style of
mineralization.

The Heemskirk Tin Deposits are granite related tin-
sulphide-siderite vein and replacement style deposits
hosted in the Oonah Formation and Crimson Creek
Formation sediments and volcanics. Numerous Pb-Zn-Ag
fissure lodes are associated with the periphery of the
mineralizing system. Mineralisation is essentially
stratabound controlled by northeast plunging fold
structures associated with northwest trending faults. Tin
is believed to be sourced from a granite intrusion located
over 1km from surface below the deposit.
Drill hole
information

A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
-
easting and northing of the drill hole
collar
-
elevation or RL (Reduced Level - elevation
above sea level in metres) of the drill hole
collar
-
dip and azimuth of the hole
-
downhole length and interception depth
-
hole length

If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case

See the body of this report for tabulated drill hole collar
details and mineralised results.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

13

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Data
aggregation
methods

In reporting of Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually material
and should be stated.

Where aggregate intercepts include short
lengths of high grade results and longer lengths
of low grade results, the procedure used for
aggregation should be stated and some
examples of such aggregations should be
shown in detail

The assumptions used for any reporting of
metal equivalent values should be clearly
stated.

Exploration assay results are downhole length weighted
averages for Sn%, Cu%.

High grade intercepts may have been selected from some
longer low-grade length weighted downhole average
intercepts and presented as length-weighted average
inclusions.

No metal equivalents have been used.
Relationship
between
mineralisation
widths and
intercept
lengths


These relationships are particularly important
in the reporting of Exploration Results.

If the geometry of the mineralization with
respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the downhole
lengths are reported, there should be a clear
statement to this effect (e.g. down hole length,
true width not known)

Drillhole ZQ173 intersected at approximately 465oto the
currently modelled dip of the ore body. Hence the (true)
downhole interval length is ~55% of the interval widths in
this announcement.

Mineralisation is thought to be of a stockwork style with
vein angles within mineralised zones variable.
Diagrams
Appropriate maps and sections (with scales)
and tabulated intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan
view of drill collar locations and appropriate
sectional views.

See body of the announcement for relevant plan and
sectional views.
Balanced
reporting

Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/ or widths should be practiced to
avoid misleading reporting of Exploration
Results

In general, mineralised zones above a Sn cut off of 0.4%
and greater than 3.0m length or shorter intervals with a
significant grade are included in the tables and figures
associated with this report, however in some cases higher
cut off grades have been used for selection of significant
intervals.
Other
substantive
exploration
data

Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey result; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.

Metallurgical test work completed by ALS/BRL laboratories
and supervised by Worley-Parsons over a number of
different campaigns on drill core samples.

Deposits have been zoned mineralogically and
metallurgically

Cassiterite is the dominant tin-bearing mineral occurring
as free grains and in complex mineral composites.

Grain sizes vary according to ore type, with Severn having
the coarsest and Upper Queen Hill having the finest.

Cassiterite liberation generally commences at a grind of
130 microns and is largely complete at 20 microns.

Based on the work undertaken by ALS metallurgy, Stellar
anticipates that concentratesgradingapproximately48%

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

14

==> picture [612 x 88] intentionally omitted <==

----- Start of picture text -----

ASX Announcement | ASX: SRZ
11 February 2025
----- End of picture text -----

Criteria JORC Code Explanation Commentary
tin at an overall tin recovery of 73% will be obtained from
the Zeehan Tin ores.

Bulk densities determined on mineralised intercepts using
the Archimedes method.
Further work
The nature and scale of planned further work
(e.g. test for lateral extensions or depth
extensions or large scale step out drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.

Prefeasibility level metallurgical and mining studies are
occurring in conjunction with the current drilling.

Environmental baseline studies are underway to support
the application of a Notice of Intent with the
Environmental Protection Authority of Tasmania.

The mineral deposits remain open down dip and down
plunge and will be explored as access becomes available
with mine development.

Stellar Resources Limited | ASX: SRZ | ABN: 96 108 758 961 Level 5, 56 Pitt Street, Sydney NSW 2000, Australia T: +61 2 8823 3179 | E: [email protected] stellarresources.com.au @SRZ_Tin

15