ANNUAL GENERAL MEETING 2019

Presentation 26 November 2019 ASX: SRZ

www.stellarresources.com.au

ANNUAL GENERAL MEETING 2019 AGENDA

  • Board Restructuring
  • Achievements in 2019
    • St Dizier Scoping Study Completed (January 2019)
    • Updated Heemskirk Mineral Resource Estimate (May 2019)
    • Heemskirk Scoping Study Completed (October 2019)
  • Substantial Exploration Upside
    • Heemskirk could become another Renison
    • Mt Razorback exploration target
    • EDGI drilling program to explore Montana Flats EL
  • Outlook for 2020
  • The Investment Proposition

BOARD OF DIRECTORS EXPERIENCED AND MULTI - DISCIPLINARY WITH STRONG GLOBAL CONNECTIONS

PHIL HARMAN, NON - EXECUTIVE CHAIRMAN GEOPHYSICIST

Over 30 years experience in BHP Billiton minerals exploration Past and present Director of several ASX listed companies

PETER BLIGHT, MANAGING DIRECTOR GEOLOGIST

30 years experience in exploration, mining and finance sectors Previously worked for UBS, UC Rusal and Rio Tinto

GARY FIETZ , NON - EXECUTIVE DIRECTOR TECHNCIAL CONSULTANT

Geologist with 30 years technical and commercial experience in exploration, project development and mining. Experienced Director of ASX and foreign listed companies

THOMAS WHITING, NON - EXECUTIVE DIRECTOR GEOPHYSICIST

Former manager of BHP Billiton exploration Chairman of Deep Exploration Technologies Cooperative Research Centre

MELANIE LEYDIN , COMPANY SECRETARY CHARTERED ACCOUNTANT

Over 2 5 years experience as an accountant and 15 years as a company secretary . Leydin Freyer provides accounting and company secretarial services for a number of ASX listed companies.

ENVIABLE PROJECT LOCATION

WEST COAST TASMANIA – AUSTRALIA'S LARGEST AND MOST PRODUCTIVE TIN FIELD

  • Stellar owned (100%) tin properties:
    • Heemskirk Project (Queen Hill, Severn, Montana and Oonah deposits)
    • Razorback and St Dizier Satellite deposits
    • Large Exploration Licence package
  • 5 underground metal mines, 3 currently operating, within 30km – significant sunk capital in associated infrastructure
  • Port of Burnie, 150km to the north, services all west coast mines and will provide access to world markets
  • Renewable power and water nearby
  • Competitive market for services, mining & processing inputs and labour

BEST PORTFOLIO OF TIN ASSETS IN AUSTRALIA

ST DIZIER SCOPING STUDY COMPLETED - JANUARY '19*

  • 409,179t @ 0.90% Sn In-pit diluted Indicated Mineral Resource
  • 4.7:1 average strip ratio after application of 10% mining dilution and 95% mining recovery factors
  • A$3.3m mining capital costs for drainage diversion, pit development and construction of a waste stockpile. In addition, A$0.5m mine closure capital cost
  • A$26/t ore contractor operated unit mining cost, inclusive of waste removal, estimated by Polberro
  • A$5/t trucking cost to the processing plant at Heemskirk (20km)
  • The accuracy of the mining operating cost and capital cost estimates was ±35%

Long Projection St Dizier Tin Deposit

* SRZ Announcement, 22 January 2019, 'St Dizier Tin Mining Lease Granted and Scoping Study Results' – Please refer to the Cautionary and Disclosure Statements contained within the announcement

HEEMSKIRK MINERAL RESOURCE UPDATE (MAY '19)*

Classification Deposit Total Sn Contained Cassiterite Cu Pb Zn
mt % Sn t % of total Sn % % %
Indicated Upper Queen Hill 0.32 1.0 3,230 87 0.2 2.1 1.0
Lower Queen Hill 0.65 1.4 9,230 97 0.0 0.1 0.1
Severn 1.15 1.0 11,500 99 0.1 0.0 0.1
Total Indicated 2.12 1.1 23,960 97 0.1 0.4 0.2
Inferred Upper Queen Hill 0.11 1.6 1,760 94 0.2 1.9 0.7
Lower Queen Hill 0.36 1.4 5,040 97 0.0 0.2 0.0
Severn 2.74 0.9 24,660 99 0.0 0.0 0.0
Montana 0.68 1.5 10,200 96 0.1 0.7 1.4
Oonah 0.59 0.9 5,310 36 0.8 0.1 0.1
Total Inferred 4.48 1.0 46,970 90 0.1 0.2 0.3
Total Indicated + Inferred 6.60 1.1 70,930 92 0.1 0.3 0.3

6.6Mt @ 1.1% Sn total resource reported to JORC 2012 at 0.6% Sn cut-off grade

  • Highest grade undeveloped tin resource in Australia & 2nd Highest Globally
  • 1.15Mt Maiden Indicated Resource at Severn and 64% increase in Total Indicated Resource vs 2016 estimate – Increased Resource Confidence Underpins Scoping Study
  • All deposits have higher grade zones & amenable to mining at higher cut-off grades
  • All deposits open at depth

* SRZ Announcement, 16 May 2019, 'Updated Heemskirk Resource Increases Indicated Category and Confidence in the Project' – Please refer to the Cautionary and Disclosure Statements contained within the announcement

COMPETITIVE GRADE/TONNAGE POSITION

Project Benchmarking Assumptions

Project Company Country Project Total Total Total Measured Indicated Inferred Source / Company Annouoncemnt Date
Stage Resource Resource Resource Resource Resource Resource
Tonnes Grade Contained in Total in Total in Total
(Mt) (%) Tin
(kt)
Bisie Alphamin DRC Production 5.1 4.50 231 9% 81% 10% 23 August 2016 (TSXV)
Syrymbet JSC Tin One Kazakhstan PFS 123.3 0.40 489 48% 0% 52% JSC Tin One & ITI websites (2018)
Rentails MetalsX Australia DFS 23.9 0.44 105 100% 0% 0% 24 May 2019 (ASX)
Renison MetalsX Australia Production 17.5 1.50 263 10% 78% 13% 25 May 2019 (ASX)200µ
San Raphael Minsur Peru Production 11.2 1.99 222 0% 100% 0% May 2018 Minsur presentation (unclassified)
San Raphael B2 Tails Minsur Peru PFS 7.6 1.05 80 100% 0% 0% May 2018 Minsur presentation (unclassified)
Heemskirk Stellar Australia Scoping 6.6 1.07 71 0% 34% 66% 16 May 2019 (ASX)
South Crofty Strongbow UK PFS 2.4 1.84 44 0% 68% 32% SBW website - 2016 Lower Mine Resource
Achmmach Kasbah Morocco DFS 14.9 0.85 127 13% 87% 0% 16 July 2018 DFS (ASX)
Mt Lindsay Venture Australia DFS 45.1 0.20 81 22% 40% 40% VMS website (excludes Tungsten credits)
Cleveland Elementos Australia Scoping 7.5 0.75 56 0% 83% 17% 31 July 2019, June 2019 Qrly Report (ASX)
Mt Garnet Consolidated Australia PFS 12.1 0.39 48 22% 60% 19% CSD website (excludes Fe and Fl credits)
Oropresa Elementos Spain PFS 12.5 0.54 68 5% 70% 24% 31 July 2019, June 2019 Qrly Report (ASX)
East Kemptville Avalon Canada PFS 37.2 0.15 55 2% 62% 36% AVL website (excludes Indium credits)
Gottesberg Anglo Saxony Germany Exploration 42.1 0.27 113 0% 25% 75% Tin Intn. website - 8 October 2012 resource
Tellehauser Anglo Saxony Germany Exploration 22.0 0.46 102 0% 29% 71% Anglo Saxony Mining presentation 2015
Taronga AusTin Australia PFS 36.3 0.16 58 0% 79% 21% ANW presentation - May 2019

HEEMSKIRK TIN SCOPING STUDY (October '19)*

  • ~350,000tpa underground mine, processing plant, tailings storage and surface infrastructure
  • Mining of Queen Hill and then Severn (2 of the 4 Heemskirk deposits) for first 10 years
  • Open pit mining of St Dizier satellite deposit and trucking to Heemskirk processing plant included in year 11 of the project
  • Tin concentrate trucked to Port of Burnie (150km via sealed road) for export to Asian smelters
  • Tailings pumped to tailings storage facility via 6.7km slurry pipeline

Conceptual Heemskirk Mine Design Showing Stopes based on Indicated Mineral Resource (Grey) and Inferred Mineral Resource (Brown)

* SRZ Announcement, 27 October 2019, 'Heemskirk Tin Scoping Study Confirms Attractive Economics' – Please refer to the Cautionary and Disclosure Statements contained within the announcement

ATTRACTIVE SCOPING STUDY ECONOMICS

  • Low All-In Sustaining Cost of ~US$13,100/t of tin generating ~34% operating margin based on US$20,000/t tin price assumption
  • Pre-tax NPV10% of ~A$83m
  • Post-tax NPV10% of ~A$71m from A$24m of tax shielding
  • IRR of ~ 45%
  • Payback of ~A$57m pre-production capital within 3 years
  • Ratio of pre-tax NPV to Pre-production capital of 1.5
  • Cost estimates and valuations have an accuracy of ±35%
Unit Total LOM
Ore Production (Mt) 3,695,386
Sn Grade (LOM Ave) (%) 0.94
Tin Recovery (LOM Ave) (%) 69.4
Tin Producted (Tonnes) 24,000
Mine Life (Yrs) 11
Tin Price (US$/t) 20,000
Exhange rate USD:AUD 0.70
Tin Price (A$/t) 200µ28,571
Gross Revenue (A$M) 691
Total Operating Costs (AISC) (A$M) 454
Total Operating Costs (AISC) (US$/t Tin) 13,100
Operating Cash Flow (A$M) 237
Operating Margin (%) 34%
Capital Cost (A$M) 57
Net Cash Flow (Pre-Tax) (A$M) 180
Pre-Tax NPV10% (A$M) 83
Post-Tax NPV10% (A$M) 71
IRR (Pre-Tax) (%) 45
Payback Period (Yrs) 3.0
Pre-Tax NPV / Capex 1.5

Heemskirk Scoping Study Base Case - Key Outcomes

HEEMSKIRK COULD BECOME THE NEXT RENISON

  • Renison, Australia's oldest, largest & highest-grade tin mine is located 18km to the NE of Heemskirk
  • Heemskirk and Renison share the same ore genesis and geology
  • Heemskirk deposits drilled to a depth of 500m – all deposits open at depth to granite source rocks 1km from surface (see long projection)
  • Successful underground exploration increased Renison mine life to 50 years with at least another 15 years to go – highlights significant opportunity for underground drilling to expand Heemskirk resources
  • The Heemskirk deposits total 71kt of contained tin or just 20% of the tin found at Renison to date

Renison long projection with overlay of Heemskirk deposits

13 RAZORBACK EXPLORATION POTENTIAL

  • Open pit operated from 1975-1978 producing 158 tonnes tin
  • 57 historical holes drilled between 1958 and 1982
  • Encouraging results from 2018 trench and face samples
  • Exploration target of 180,000t to 220,000t @ 0.8% to 1.0% Sn*1 to a depth of 100m below the pit floor estimated by Resource and Exploration Geology in July'19*2
  • Metallurgical testing of tailings demonstrates potential for 15% increase in historical recovery
  • Validation of historical data with the aim of defining an Inferred Resource for Razorback Mine is planned
  • Highly prospective exploration potential along Razorback & Grand Prize faults within EL11/2017. >6km strike length along strike from Renison

Razorback Open Pit and Tailings Dam Sampling

*1 It should be noted that this Exploration Target estimate is conceptual in nature. There has been insufficient exploration to define a Mineral Resource in this volume and it is uncertain if further exploration will result in the determination of a Mineral Resource

*2 SRZ Announcement 16 July 2019

MONTANA FLATS EXPLORATION UPSIDE

  • EL13/2018 adds 3 km of strike length along the northwest trending, tin-mineralising Oonah and Montana Faults
  • All tin deposits and major silver mines lie along or between the Oonah and Montana Faults
  • Silver miners of the 1900s largely ignored tin mineralisation
  • Exploration potential under Zeehan Western and other silver mines is untested
  • Stellar awarded $95,000 Exploration Drilling Grant Initiative Program from Tasmanian Government in May 2019 – to be applied to drilling 3 holes:
    • 1 hole planned to target tin mineralisation underneath the historically mined Zeehan Western base metal mine
    • 2 holes planned to target extension of tin mineralisation below the Oonah tin resource

2020/21 WORK PLAN AND BUDGET

FOCUS ON HEEMSKIRK PFS

  • Drilling ~17 holes (6,800m) to increase Queen Hill and Severn Indicated Resource to ~3.3Mt and to support a Probable Reserve)
  • Metallurgical testwork to focus on improving Queen Hill recovery
  • Geotechnical drilling and determination of underground water flows and quality
  • Stage 2 environmental and mining impact studies for DPEMP
  • Mining and Processing cost studies and PFS report
  • Time frame is 12 to 18 months for PFS

TEST EXPLORATION UPSIDE

Exploration drilling supported by EDGI funding – still to be budgeted

Pre Feasibility Study (18 months) (A$)
Drilling - Heemskirk Probable Reserve 1,700,000
Site Overhead and Geology Costs 450,000
Metallurgical Testwork 300,000
Geotechnical, Hydrological holes and testing 200,000
Environmental baseline surveys 150,000
PFS Costs 450,000
Corporate Overhead Costs 900,000
Total PFS Cost 4,150,000

TIN PRICE EXPECTED TO RECOVER IN 2020

  • "Shanghai Metals Markets (SMM) expect tin prices to rebound above US$20,000/t by the end of 2019 as tight ore availability and maintenance-caused production cuts at China's largest tin producer, Yunnan Tin, will lead to a sharp supply decline" according to SMM's senior tin analyst presenting at the 2019 China Tin Summit on 6 Nov 2019
  • "China's refined tin production has reduced by ~6% ytd in 2019" (SMM)
  • "Significant reductions in China's imports of tin ore and Chinese mine accidents have also contributed to the current tight tin supply in China" (ITA)
  • "China domestic ore production is expected to fall by ~5,000 tonnes (~6% YoY), helping to keep tin prices in the US$ 20,000 - 20,500/tonne range in 2020, while demand is likely to increase as the US and China head towards a partial unwinding of trade tariffs" (SMM)

  • ~15% of the worlds tin production is currently operating at a loss according to the International Tin Association (ITA) 2019 cost curve above
  • The 90th percentile price of US$17,400/t shown on the ITA 2019 cost curve should form a base against further weakening of the tin price
  • If current weak tin prices continue a number of mines are expected to close, further tightening supply

THE INVESTMENT PROPOSITION

Low cost investment – market capitalization significantly undervalues Stellar's tin assets

Heemskirk Scoping Study completed in October '19 demonstrates the project has attractive and robust economics

Potential for early production from Razorback and St Dizier satellite deposit

Significant exploration potential – both laterally and at depth in all Heemskirk deposits and within large Exploration Licence package

Opportunity to invest in the next Rension Tin

Tin is emerging as an energy metal – second generation battery raw material demand to drive opportunities for tin and higher tin prices

DISCLAIMER

FORWARD LOOKING STATEMENT S

This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to statements concerning Stellar Resources Limited's planned activities and other statements that are not historical facts. When used is this report, words such as "could", "plan", "estimate", "expert", "expect", "intend", "may", "potential", "should", and similar expressions are forward-looking statements. In addition, summaries of Exploration Results and estimates of Mineral Resources and Ore Reserves could also be forward-looking statements. Although Stellar Resources Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward–looking statements. The entity confirms that it is not aware of any new information or data that materially affects the information included in this report and that all material assumptions and technical parameters underpinning this announcement continue to apply and have not materially changed. Nothing in this report should be construed as either an offer to sell or a solicitation to buy or sell Stellar Resources Limited securities.

COMPETENT PERSONS STATEMENT - RESOURCES

The information in this report that relates to Mineral Resources was prepared in accordance with the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code) by Tim Callaghan of Resource and Exploration Geology. Tim Callaghan is a Member of The Australasian Institute of Mining and Metallurgy ("AusIMM"), has a minimum of five years' experience in the estimation, assessment and evaluation of Mineral Resources of this style and is the Competent Person as defined in the JORC Code. This report accurately summarises and fairly reports his estimations and he has consented to the resource report in the form and context in which it appears.

COMPETENT PERSONS STATEMENT - EXPLORATION

The drill and exploration results reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr. R.K. Hazeldene who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Hazeldene has sufficient experience relevant to the style of mineralisation and type of deposits being considered to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Hazeldene consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears.