ASX and Media Release

20 February 2012

4.4 BILLION TONNE MAIDEN RESOURCE AT McCALLS HMS PROJECT

KEY POINTS

  • Maiden Inferred Mineral Resource of 4.4 billion tonnes (Bt) @ 1.2% heavy mineral

  • Mineral assemblage comprises 43 million tonnes (Mt) of high-TiO2 ilmenite and 3.5Mt of zircon

  • Potential for consistent, long-term supply of chloride-grade ilmenite to the pigment industry

  • Scoping study commenced, further drilling planned for Q2 2012

Successful mineral sands explorer, Sheffield Resources (“Sheffield”) (ASX:SFX) today announced a maiden Inferred Resource of 4.4Bt @ 1.2% HM for 53Mt of contained HM (Table 1) at its McCalls heavy mineral sand (HMS) project, 110km north of Perth near Gingin in Western Australia.

Managing Director, Bruce McQuitty said the mineral resource had far exceeded expectations in terms of size and the contained tonnages of zircon and ilmenite.

“The key feature of the deposit is that it contains over 40 million tonnes of chloride grade ilmenite. As such it ranks as one of the largest accumulations of chloride grade ilmenite in the world.”

“We regard McCalls as a strategic asset with potential to deliver a consistent long term supply of feedstock for chloride route or synthetic rutile processing,” he said .

“This sizable maiden Resource at McCalls, together with our large-scale zircon-rich Dampier project and a growing (HMS) resource base at Eneabba, firmly positions Sheffield as a fastemerging and significant Australian mineral sands company.”

Table 1: McCalls Project Mineral Resource[1] at a 0.9% HM cutoff.

Mineral Assemblage2
Domain
Resource
Category
Material
(Mt)*
Bulk
Density
HM
%
Slimes
%3
Osize
%
Insitu
HM
(Mt)*
Zircon
%
Rutile
%
Leuc.
%
Ilmenite
%
McCalls
Inferred
4,431
2.3
1.2
26.5
1.4
53 6.6
2.0
4.9
80.8
Total
All
4,431
2.3
1.2
26.5
1.4
53 6.6
2.0
4.9
80.8
Table 2: McCalls Deposit contained Valuable HM (VHM) (0.9% HM cutoff).
Resource
Category
Zircon
(kt)
Rutile
(kt)

Leuc.
(kt)
Ilmenite
(kt)

Total VHM
(kt)*
Inferred
3,491
1,063
2,576
42,911
50,041

1 The contained HM tonnages shown in Table 2 are sourced from Table 1

*Tonnes have been rounded to reflect the relative uncertainty of the estimate.[1] This estimate is classified and reported in a manner compliant with the JORC code and guidelines (JORC, 2004.[2] The Mineral Assemblage is represented as the percentage of the Heavy Mineral (HM) component of the deposit, as determined by QEMSCAN. TiO2 minerals defined according to the following ranges: Rutile >95% TiO2; Leucoxene 85-95% TiO2; Ilmenite <55-85% TiO2. McCalls is reported below a 35% Slimes upper cutoff.

  • 2 -

==> picture [438 x 253] intentionally omitted <==

----- Start of picture text -----

McCalls
(Sheffield)
Eneabba
(Sheffield)
----- End of picture text -----

Figure 1: Comparison of Sheffield’s mineral resources against those of peer companies (resources

data sourced by Sheffield from recent ASX releases)

McCalls now ranks alongside some of the world‟s largest mineral sands deposits in terms of contained heavy mineral (Figure 1).

Ilmenite dominates the heavy mineral assemblage at 80.8% , as determined by QEMSCAN average particle chemistry, along with a significant zircon component of 6.6% . Additional rutile (2%) and leucoxene (4.9%) bring the valuable heavy mineral component to 94.3% .

Ilmenite characterisation studies conducted on a single sample composited from Sheffield‟s drilling produced concentrates containing between 60% and 66% TiO2, indicating potential suitability for chloride-route or synthetic rutile processing (see ASX release 27 October 2011). The work also demonstrated the heavy mineral has properties well suited to conventional mineral processing methods.

Chloride Ilmenite Market Outlook

Market research leaders TZMI forecast a significant long term supply deficit from 2013 out to 2020 due to a combination of rising demand and depletion of existing resources (Figure 2). McCalls therefore has the potential to contribute significantly into this predicted gap in global supply.

==> picture [389 x 191] intentionally omitted <==

Figure 2: Global supply/demand outlook for chloride ilmenite: 2006-2020 (© TZMI 2012, not to be reproduced without permission)

  • 3 -

The McCalls deposit is well located with respect to existing infrastructure. A railway line located 10km to the east of the project connects McCalls to the Fremantle and Kwinana ports approximately 160km to the south; and to Geraldton port 345km to the north. This railway also links to Iluka Resources Ltd‟s Narngulu synthetic rutile plant near Geraldton and passes within 1km of Tiwest‟s Chandala synthetic rutile plant at Muchea, 75km to the south of McCalls (Figure 3).

==> picture [339 x 328] intentionally omitted <==

Figure 3: Location of McCalls project

The McCalls mineral resource follows Sheffield‟s recent announcement of a $10 million placement to institutional and sophisticated investors which will underpin the Company‟s exploration programmes for 2012 and beyond.

Whilst the majority of these funds will be used to progress the Dampier Zircon project and the advanced Eneabba project, the Company will undertake further drilling, mineral assemblage and scoping work at McCalls. This work will focus on better understanding the distribution of the high value minerals zircon and rutile and definition of higher-grade zones.

About the McCalls Deposit

The deposit is within three granted exploration licences held 100% by Sheffield: E70/3967, E70/3929 and E70/3930.

This maiden estimate is based on new drilling by Sheffield (see ASX release 20 September 2011) and historic drilling by BHP. The deposit covers an area of 14km x 13km, with an average thickness of 28m (although it extends in places to over 90m), and is open at depth. Overburden thickness ranges from 0m to 27m, with an average of 6m.

  • 4 -

Grade throughout the deposit displays a degree of stratification (Figure 5), and this feature together with the consistent grainsize, rounding and sorting throughout; suggests a stacked dunal or estuarine origin to the deposit.

Previous holes were drilled to preset depth with most ending in mineralisation. Therefore, significant potential still exists at McCalls to increase the tonnage and grade of the deposit by drilling to greater depths along existing sections (Figure 5).

The McCalls resource is reported at 0.9% HM cutoff. At higher cutoff grades, despite the associated decrease in tonnage (Figure 6), significant and coherent zones of higher grade material remain.

Figure 4: McCalls Resource Plan

==> picture [487 x 186] intentionally omitted <==

----- Start of picture text -----

Domain outline
Figure 5: McCalls resource section, looking west
----- End of picture text -----

==> picture [401 x 224] intentionally omitted <==

Figure 6: McCalls resource grade-tonnage curves (<35% slimes cutoff)

  • 5 -

==> picture [394 x 269] intentionally omitted <==

Figure 7: Isometric view of the block model below topography, looking NE

ENDS

For further information please contact:

Bruce McQuitty Managing Director Tel: 0409 929 121 [email protected] Website: www.sheffieldresources.com.au

Media: Annette Ellis Purple Communications Tel: 08 6314 6300 [email protected]

COMPETENT PERSONS’ STATEMENT

1The information in this announcement that relates to resource estimation is based on information compiled under the guidance of John Vann. Mr Vann is a Principal of Quantitative Group and acts as a consultant to the Company. Mr Vann is a Fellow of the Australasian Institute of Mining and Metallurgy and a Fellow of the Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the „Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“JORC Code”)‟. Mr Vann consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

2The information in this announcement that relates to reporting of resource and exploration results is based on information compiled under the guidance of Mark Teakle. Mr Teakle is a consultant to the Company. Mr Teakle is a Member of the Australasian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the „Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“JORC Code”)‟. Mr Teakle consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

FORWARD LOOKING STATEMENTS

Some statements in this announcement regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forwardlooking statements include, but are not limited to, statements concerning the Company‟s exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as “expected”, “planned”, “target”, “scheduled”, “intends”, “potential”, “prospective” and similar expressions.

  • 6 -

ABOUT SHEFFIELD RESOURCES

Sheffield Resources Limited ( Sheffield ) is a rapidly emerging heavy mineral sands (HMS) company with significant additional iron and talc assets.

ASX Code – SFX Market Cap @ 34cps - $20.0m
Issued shares* – 58.8m Cash - $2.3 (at 31/12/2011)
* Pre placement shares being issued as announced 10 February 2012

The Company has over 6,000km[2] of highly prospective tenure, all situated within the state of Western Australia.

HEAVY MINERAL SANDS

The Dampier project, located near Derby in WA‟s Kimberley region has the potential to become Sheffield‟s flagship HMS project. It contains a large zircon-rich HMS deposit formerly explored by Rio Tinto.

Sheffield‟s Eneabba Project contains six advanced exploration prospects: West Mine North, Ellengail, Yandanooka, Durack, Drummond Crossing and Irwin which are located near Eneabba. The Project is close to existing mineral sands operations and to a network of highways and railway lines connecting to the Geraldton and Fremantle/Kwinana ports. Sheffield‟s strategy is, subject to exploration success, to develop multiple HMS deposits capable of supporting a flexible mobile mining plant.

Sheffield is also evaluating the large McCalls chloride ilmenite project, located near Gingin.

IRON

Sheffield‟s iron strategy is to target hematite mineralisation adjacent to infrastructure in the world class Pilbara iron province and build up consolidated tenement holdings over time. To date, high grade iron mineralisation has been identified on three of the Company‟s tenements.

TALC

Sheffield has 1,152km[2] of tenure over the 175km-long Moora Talc Belt which represents a dominant ground position over a region that has, for the last 50 years, been exclusively controlled by major mining companies.

The Moora Talc Belt includes the large Three Springs mine which is owned by Imerys subsidiary Luzenac Australia Pty Ltd. Three Springs is renowned for producing high purity talc and is a relatively simple “dig-and-deliver” operation.

Sheffield‟s large tenement holding contains numerous talc occurrences and has the potential to become a strategic talc asset. Sheffield therefore represents a unique opportunity for investors to gain exposure to one of the few high-grade talc explorers in the world.

  • 7 -

Sheffield Resources’ contained Valuable HM (VHM) Resource inventory (0.9% HM cutoff).

Deposit Resource
Category
Zircon
(kt)
Rutile
(kt)

Leuc.
(kt)
Ilmenite
(kt)

Total VHM
(kt)*
West Mine North
West Mine North
Yandanooka
Yandanooka
Ellengail
McCalls
Measured
18
33
42
200
293
Indicated
71
87
46
506
709
Indicated
201
117
168
1,072
1,558
Inferred
12
8.5
15
73
108
Inferred
92
90
20
658
860
Inferred
3,491
1,063
2,576
42,911
50,041
Total
Total
Total
Measured
18
33
42
200
293
Indicated
272
204
214
1,577
2,268
Inferred
3,595
1,162
2,611
43,641
51,009
All
3,885
1,399
2,867
45,418
53,570
Total
  • Tonnes have been rounded to reflect the relative uncertainty of the estimate.

1 The contained HM tonnages shown in the Table above are sourced from the Tables “Sheffield Resources‟ Eneabba Project Mineral Resource[1] Inventory…” and "Sheffield Resources' McCalls Project Mineral Resource[1] …" (below).

Sheffield Resources’ Eneabba Project Mineral Resource[1] Inventory, at a 0.9% HM cutoff.

Mineral Assemblage2
Deposit
Resource
Category
Material
(Mt)*
Bulk
Density
HM
%
Slimes
%3
Osize
%
Insitu
HM
(Mt)*
Zircon
%
Rutile
%
Leuc.
%
Ilmenite
%
West Mine North
Measured
6.47
2.0
5.6
14.8
1.2
0.36 4.9
9.1
11.6
54.9
West Mine North
Indicated
36.11
1.9
2.3
13.1
2.8
0.84 8.4
10.3
5.4
60.0
West Mine North
All
42.58
1.9
2.8
13.4
2.5
1.21 7.9
10.1
6.4
59.2
Yandanooka
Indicated
61.00
2.0
2.8
14.7
9.4
1.72 11.7
6.8
9.8
62.3
Yandanooka
Inferred
10.75
1.9
1.1
12.9
9.0
0.12 10.1
7.0
12.5
59.8
Yandanooka
All
71.75
2.0
2.6
14.4
9.3
1.84 11.5
6.9
10.2
61.9
Ellengail
Inferred
46.45
2.0
2.2
15.6
2.1
1.04 8.9
8.7
1.9
63.5
Ellengail
All
46.45
2.0
2.2
15.6
2.1
1.04 8.9
8.7
1.9
63.5
Total
Measured
6.47
2.0
5.6
14.8
1.2
0.36 4.9
9.1
11.6
54.9
Total
Indicated
97.13
2.0
2.6
14.1
6.9
2.56 10.5
8.1
8.2
61.5
Total
Inferred
57.21
2.0
2.0
15.1
3.4
1.16 9.1
8.4
3.9
62.8
Total
All
160.81
2.0
2.5
14.5
5.4
4.08 9.8
8.2
6.8
61.7

Sheffield Resources’ McCalls Project Mineral Resource[1] at a 0.9% HM cutoff.

Mineral Assemblage2
Domain
Resource
Category
Material
(Mt)*
Bulk
Density
HM
%
Slimes
%3
Osize
%
Insitu
HM
(Mt)*
Zircon
%
Rutile
%
Leuc.
%
Ilmenite
%
McCalls
Inferred
4,431
2.3
1.2
26.5
1.4
53 6.6
2.0
4.9
80.8
Total
All
4,431
2.3
1.2
26.5
1.4
53 6.6
2.0
4.9
80.8

*Tonnes have been rounded to reflect the relative uncertainty of the estimate.

1 This estimate is classified and reported in a manner compliant with the JORC code and guidelines (JORC, 2004). Further details on the Mineral Resource at each deposit can be found in this document and on the ASX Announcements page of the Company’s website.[2] The Mineral Assemblage is represented as the percentage of the Heavy Mineral (HM) component of the deposit, as determined by QEMSCAN. TiO2 minerals defined according to the following ranges: Rutile >95% TiO2; Leucoxene 85-95% TiO2; Ilmenite <55-85% TiO2.[3] West Mine North and McCalls are reported below a 35% Slimes upper cutoff.

ANNEXURE 1 – TECHNICAL DETAILS

BHP explored the McCalls region from 1989 to 1995, completing 304 aircore drill holes totalling 8,409.5m on an approximate 800m x 400m spaced grid over the central portion of the deposit and wider in peripheral areas. BHP‟s drilling outlined mineralisation over an area of 30km[2] extending from near-surface to the depth limit of their drill holes (typically 30-57m).

In 2011, following the grant of E70/3967, Sheffield completed 30 holes totalling 1,714m. The majority of these holes (25) were drilled at 200m spacing on a single north-south section, and drilled to a typical depth of 50-60m, with one hole drilled to over 90m depth. All but two of Sheffield‟s holes ended in mineralisation.

Resources were estimated from the results of 278 vertical aircore drill holes on an approximate drilling pattern of 400m x 800m to 1km x 1km. The resource drill hole database comprises 304 holes (91%) drilled by the previous explorer BHP; and 30 new holes (9%) drilled by Sheffield. The historic drill hole database was obtained from open file reports, and includes holes drilled both inside and outside Sheffield‟s current tenement holding. Drill holes located outside Sheffield‟s current tenement holding were used in the estimation process, however the reported Mineral Resources are wholly within Sheffield‟s tenure.

Of the total resource drill hole database, 91% of holes (BHP) were recorded as planned (unsurveyed) AMG coordinates, with the remaining 9% of the holes (Sheffield) surveyed by RTKGPS. To account for topographic changes between sections, all drillhole RL (height) data was projected to a digital elevation model (DEM) generated from spot data supplied by Landgate (accuracy +/1.5m) and discretised to 25m x 25m. This DEM was subsequently used in the resource estimation process in order to represent a consistent land surface between drill holes.

Heavy Mineral, Slimes and Oversize determinations were by Heavy Liquid Separation techniques. Holes drilled by Sheffield (23% of the samples database) used -45µm and 1mm screen sizes, with static separation in TBE (SG 2.96), identical to those drilled by BHP (77% of the samples database).

Resource domains were based on a combination of grade and geological factors driven by deposit continuity.

Bulk Density was determined using an industry-standard formula which assumes density and proportionately accounts for the grain size and mineral component of the material.

The mineral assemblage of the resource was determined from results of QEMSCAN analysis by Bureau-Veritas in Queensland of four Heavy Mineral Concentrate (HMC) composite samples collected from Sheffield drill holes.

At McCalls, the QEMSCAN process used observed mass and chemistry to classify particles according to their average chemistry, and then report mineral abundance by % mass. For the TiO2 minerals specific breakpoints are used to distinguish between rutile (>95% TiO2), leucoxene (85-95% TiO2) and ilmenite (<55-85% TiO2). These breakpoints are chosen to reflect mineral assemblage data defined by previous workers, and provide a consistent base for comparison between Mineral Resources.

Details of the estimation methodology are contained in Annexure 2.

  • 9 -

ANNEXURE 2 – ESTIMATION METHODOLOGY

==> picture [124 x 85] intentionally omitted <==

==> picture [108 x 89] intentionally omitted <==

Sheffield Resources Ltd 14 Prowse Street West Perth WA 6005

Attention: Mr Bruce McQuitty

15 February 2012

Dear Sir,

Re: McCalls Mineral Sands Deposit Resource Estimate

The mineral resource estimate of the McCalls Mineral Sands deposit as of the 15[th] of February 2012 is presented in the attached table (Table 1).

The estimate was prepared by Mr Trent Strickland under the supervision and technical review of Mr John Vann. Trent Strickland is a full time employee of Quantitative Group (QG) and a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). John Vann is a Director and Principal Consultant of QG and a Fellow of both the AusIMM and the Australian Institute of Geoscientists (AIG). Mr Vann has over 25 years experience in the minerals industry, including 18 as a consultant geologist and geostatistician, and 10 years as Director of QG. Mr. Vann has sufficient experience to satisfy the requirements to act as the competent person for this estimate as defined in the 2004 Edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves. Mr Vann consents to the inclusion in this report of the McCalls Mineral Sands resource estimate.

Yours faithfully,

John Vann Principal Consultant / Director

  • 10 -

==> picture [124 x 85] intentionally omitted <==

==> picture [108 x 89] intentionally omitted <==

Technical Notes on Mineral Resource Estimation

A 0.7% heavy mineral (HM) grade domain, with slime contents less than 35%, was defined to model the mineralisation. HM grade was used along with specific geological considerations to define the domain wireframe. The robustness of this domain was assessed by QG using a variety of measures including statistical and geostatistical analysis and by critically examining the geological interpretation. The domain is considered geologically robust in the context of the resource classification applied to the estimate.

A ‘rock wireframe’ was constructed to define areas where the hardness of the material was of potential concern for mining. Due to the possible influence of such areas on the reliability of the heavy mineral assay, all intervals intersecting the wireframe were excluded from estimation. These areas were also flagged in the model and excluded from the resource tabulation. This has a potentially conservative impact on the reported tonnages.

Estimation of HM %, oversize % and slime % was by Ordinary Kriging (OK) and the search (or ‘neighbourhood’) employed was optimised using Quantitative Kriging Neighbourhood Analysis (QKNA). Density was assigned globally to the estimated domain.

The mineral assemblage results from two Heavy Mineral Concentrate (HMC) composites from within the upper part of the domain and two from within the lower part of the domain were separately averaged and assigned to the respective areas to represent the heavy mineral assemblage within the deposit.

The estimate was validated by QG as follows:

  • A visual checking of the interpolation results in both plan and section;

  • Global input vs. output statistics were compared, including clustered and declustered composites; and

  • Semi-local input vs. output statistics using moving window averages.

The estimate was considered to be robust on the basis of the above checks.

The tonnes and grades of the McCalls estimate are reported above a 0.9 HM% cut off, with an upper slime cut off of 35%.

Classification of the McCalls estimate takes into account all aspects of the integrity of the estimate, including: data quality, geological interpretation, domaining approach, data distribution and density, spatial continuity and estimation confidence. The entire McCalls Mineral Resource above a 0.9 HM% cut off is classified as Inferred.

The following table summarises the Mineral Resource estimate at a cut off of 0.9 HM%, with an upper slime cut off of 35%.

  • 11 -

==> picture [124 x 85] intentionally omitted <==

==> picture [108 x 89] intentionally omitted <==

McCalls
Domain
Inferred
Mineral
Resource
Category
4,431
Material
Million
Tonnes
2.3
Bulk Density
1.2
HM %
26.5
Slimes %
1.4
Osize %
53
In-situ HM
Million
Tonnes
Domain Mineral
Resource
Category
In-situ HM
Million
Tonnes
Mineral Assemblage (% of HM Tonnes)
Zircon Rutile Leucoxene Ilmenite Total VHM
McCalls Inferred 53 6.6 2.0 4.9 80.8 94.3
*Tonnes hav e been rounded to reflect the relativ e uncertainity of the estimate.
1The Mineral Assemblage is represented as the percentage of the Heav y Mineral (HM) component of the deposit, as determined by
QEMSCAN. TiO2minerals defined according to the following ranges: Rutile >95% TiO2; Leucoxene 85-95% TiO2; Ilmenite <55-85% TiO2.

Table 1. McCalls resource estimate at a 0.9 HM% cut off, with an upper slime cut off of 35%.

==> picture [520 x 380] intentionally omitted <==