ASX AND MEDIA RELEASE 11 March 2026

==> picture [93 x 61] intentionally omitted <==

==> picture [501 x 10] intentionally omitted <==

THUNDERBIRD OPERATIONS & SALES UPDATE

==> picture [501 x 10] intentionally omitted <==

Sheffield Resources Limited (“Sheffield” or “the Company”) (ASX: SFX) Sheffield advises that it is withdrawing its March 2026 quarter production and shipment outlook for the Kimberley Mineral Sands (KMS) owned Thunderbird Mineral Sands Mine (Thunderbird) in Western Australia as a result of uncertainty arising from the matters described below.

March quarter mine production has been impacted by the reduced dozer fleet availability, lower mine contractor productivity and seasonal weather impacts reported in the December quarter continuing into the March quarter. February ore mined was higher than January as a result of an improvement in dozer fleet availability and despite ongoing seasonal weather impacts. The KMS team is continuing to work with the mining contractor to improve fleet dozer availability and mine productivity.

Given these challenges with mine production KMS has implemented a change in management with a site based Head of Operations with a track record of operational improvement appointed in March.

The improvement in dozer fleet availability seen in February continued into March ore however the Dry Mining Unit (DMU) suffered a mechanical failure on 9 March. A recovery plan is being developed by KMS and the mining contractor however mine production is expected to be impacted for at least a week as result of the failure.

The lower mine production had already resulted in lower concentrate production prior to the DMU failure. A higher proportion of HiTi concentrate (previously called leucoxene concentrate and renamed to better reflect the concentrate composition) is also being produced as result of optimisation of the process plant settings since resuming production of this additional concentrate product in late 2025. HiTi shipments are expected to commence during March.

This ASX announcement has been authorised for release by the Company’s Board of Directors.

ENDS

For further information please contact:

Bruce Griffin Executive Chair Tel: 08 9215 6500 [email protected] Website: www.sheffieldresources.com.au

==> picture [25 x 24] intentionally omitted <==

==> picture [22 x 22] intentionally omitted <==

==> picture [21 x 22] intentionally omitted <==

@Sheffield_ASX

Sheffield Resources

LinkedIn

ASX AND MEDIA RELEASE 11 March 2026

==> picture [93 x 61] intentionally omitted <==

ABOUT SHEFFIELD RESOURCES

Sheffield Resources Limited is focused on assembling a portfolio of global mineral sands development and production assets to generate cash returns and growth.

Our core asset is our 50% investment in Kimberley Mineral Sands Pty Ltd (KMS), the owner of the world class Thunderbird Mineral Sands Mine in operation in north-west Western Australia.

Additionally, Sheffield executed a binding agreement in February 2023, providing the Company with an option to acquire up to an initial 20% interest in the South Atlantic Mineral Sands Project in Brazil, and owns 10% of Capital Metals Plc (AIM: CMET), the owner of the Taprobane Mineral Sands Project in Sri Lanka.

KIMBERLEY MINERAL SANDS

Kimberley Mineral Sands Pty Ltd, (KMS) is a 50:50 Joint Venture between Sheffield and Yansteel. The joint venture owns and operates the Thunderbird Mineral Sands Mine and actively exploring adjacent tenements on the Dampier Peninsula.

KMS is governed by a four person Board of Directors with Sheffield and Yansteel each nominating two directors. Key Joint Venture decisions require unanimous approval of both shareholders. KMS operates as a standalone entity with its own management and employees.

THUNDERBIRD MINERAL SANDS MINE

The Thunderbird Mineral Sands Mine (“Thunderbird”) is one of the largest and highest grade mineral sands discoveries in the last 30 years.

Now in production Thunderbird is expected to generate a high-quality suite of mineral sands concentrate products suited to market requirements. These products include a zircon concentrate and an ilmenite concentrate that contains a high quality ilmenite suitable smelting into chloride slag or for manufacturing titanium dioxide pigment.

Thunderbird is located in one of the world’s most attractive mining investment jurisdictions and is well placed to deliver long term, secure supply of high quality products to a range of potential customers over a decades long mine life.

ABOUT YANSTEEL

Yansteel is a wholly-owned subsidiary of Tangshan Yanshan Iron & Steel Co., Ltd, a privately owned steel manufacturer headquartered in Hebei, China producing approximately 10mt per annum of steel products and has annual revenues of ~A$6bn.

Yansteel’s 500ktpa integrated titanium dioxide processing facility, which includes a titanium slag smelter, will consume the magnetic concentrate from Stage 1 of the Thunderbird Mineral Sands Project under a take or pay offtake agreement.

SOUTH ATLANTIC PROJECT

The South Atlantic Project is located in south east Brazil. Four main deposits have been identified within the project area: Retiro, Estreito, Capao do Meio and Bujuru with Mineral Resources developed for the Retiro and Bujuru deposits. The combined Mineral Resource for Retiro and Bujuru is 771Mt of material at an average grade of 3.0% THM (please refer to ASX announcement dated 25 June 2025 titled “ South Atlantic Project: Maiden Mineral Resource & Retiro Licence Approval”.

The tenements are held by RGM. Sheffield entered into an option agreement with RGM in February 2023, with subsequent extensions agreed in August 2024 and October 2025. Sheffield will provide funding for project related activities over an initial 48 month period and earn an option to acquire up to 20% of RGM a total investment of US$15m, less any funds contributed during the option period. Should Sheffield elect to exercise the option, subject to various conditions being satisfied, including project financing being obtained and all funds required for project construction being secured, Sheffield may exercise a further option to increase its interest in RGM up to 80%.

ASX AND MEDIA RELEASE 11 March 2026

==> picture [93 x 61] intentionally omitted <==

FORWARD LOOKING AND CAUTIONARY STATEMENTS

The contents of this announcement reflect various technical and economic conditions at the time of writing. Given the nature of the resources industry, these conditions can change significantly over relatively short periods of time. Consequently, actual results may vary from those detailed in this announcement.

Some statements in this announcement regarding estimates or future events are forward-looking statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forwardlooking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “forecast”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”, “conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in this announcement are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions.

Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward-looking statements may be affected by a range of variables that could cause actual results to differ from estimated results, and may cause the Company’s actual performance and financial results in future periods to materially differ from any projections of future performance or results expressed or implied by such forward-looking statements. There can be no assurance that actual outcomes will not materially differ from these forward-looking statements.