Superior and Sustainable Metals Production

Gordon Chiu Building [01 Department of Chemical Engineering Maze Crescent University of Sydney NSW 2006 Australia

Telephone: +612-9351-6741 Facsimile: +612-9351-7180 Email: [email protected] Website: www.intec.com.au

19 September 2005

Companies Announcements Office Australian Stock Exchange Limited

Official opening of the Intec Hellyer Metals Demonstration Plant

The Intec Hellyer Metals polymetallic demonstration plant at Burnie was officially opened on Thursday 15 September 2005 by the Hon. Bryan Green MHA, Tasmanian Minister for Infrastructure, Energy and Resources. The opening was well attended by over 100 international, mainland and Tasmanian guests, including governmental representatives, financial supporters, equipment suppliers, service providers and the electronic and print media. Following a comprehensive presentation by Intec, proceedings culminated with the Minister addressing the audience prior to unveiling the plaque shown below.

The official opening was followed by conducted tours of the demonstration plant (currently well advanced in its commissioning phase) and then a trip 80km south to the Hellyer Metals Project site. Here, both Intec Hellyer Metals Pty Ltd and Resource Finance and Investments Limited (RFI, of which Intec owns $45.4\%$ ) gave presentations. RFI is currently raising up to A\$3,500,000 in its Initial Public Offering, with the intention of then being admitted for quotation on ASX.

All of the day's presentations are set out below and may also be found at http://www.intec.com.au/html/news.shtm.

Yours sincerely

Kity R. Wood

Philip R Wood Managing Director and Chief Executive Officer

The Hellyer Metals Project

Presentation at the Official Opening of the Burnie Demonstration Plant

by Philip Wood, Managing Director & CEO Intec Ltd (ASX Code: INL)

The Hellyer Metals Project aims to profitably recover five base and precious metals (zinc, lead, silver, gold and copper) with an in-situ value of A\$1.8 billion from the tailings dam at the Hellyer mine site and to treat other metals-bearing residues supplied to it, all in an environmentally beneficial manner.

Hellyer Metals Project Zn/Pb/Cu/Au/Ag Mt Read Volcanics Belt Que River $-Ag/Pb/Zn$ $Rosebery - Ag/Pb/Zn$ Henty - Gold $Mt$ Lyell – Copper/gold Renison - Tin

Allegiance Mining -Nickel Projects

Hellyer Mine History

Intec Lid

  • Aberfoyle's Que River mine commences operation, with ore 1983: trucked to Rosebery
  • Aberfoyle commences mining at Hellyer reserves of 15 mt 1988: @ 13%Zn, 6.7%Pb, 158g/t Ag, 0.3%Cu, 2.4 g/t Au
  • Hellyer mill commenced operation 1989:
  • Western Metals takeover of Aberfoyle 1998:
  • Hellyer mine depleted and mill placed on care $\&$ maintenance 2000:
  • 2003: Western Metals placed in receivership
  • Intee/Ammtec acquire Hellyer Metals Project/Burnie 2004:

Road & Rail

Tailings Dam

50 hectares

Acces

Mine Adit

(pluged)

1.5 mtpa Hellyer Mill

Site for Electricity Grid Re-treatmen Tailings Dam

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

William

Acquisition of Hellyer Metals Project

Intee Ltd

$\blacksquare$ Assets acquired:

Tailings dam: A\$1.8 billion above-ground metal value

Mill: 1.5 mtpa capacity

Mining $\&$ exploration tenements (RFI)

Burnie Research Laboratory (Ammtec)

Hellyer Tailings Dam

$\begin{minipage}{.4\linewidth} \hbox{\textbf{0.00000000000000000000000000000000000$ . ................ 2 milionari mandan mana 1990 - Jan James James James James James James James James James James James James James James James James J . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

The 11mt Hellyer Tailings Resource

MINGC LICH
Grade Quantity In-situ ASm * $\%$ of metal
value
2.6 $g/t$ 910,000 ozs 530 $29\%$
$2.8\%$ 305,000t 552 30%
$3.0\%$ 330,000t 382 $21\%$
$88 \text{ g/t}$ 30,850,000 ozs 280 15%
0.16% 17,400t 85 $5\%$
\$1,829 100%

15 September 2005

Hellyer Metals Project – Development Schedule Jan-Sep 2004: Pilot leach plant campaign (Brookvale, Sydney) Laboratory zinc purification (Sydney University) Gold recovery (AJ Parker Centre, Perth) Pre-feasibility study by H.G. Engineering (Canada) Dec Qtr 2004: A\$12 million capital raising Lease of 20 River Road, Burnie Ist half 2005: Zinc electrowinning (Sydney University) Design and construct Burnie demonstration plant (SEMF) $2nd$ half 2005: Commissioning & operation of demonstration plant Mar Qtr 2006 Complete bankable feasibility study by WorleyParsons 2nd Qtr 2006: Project financing by Macquarie Bank 7/06-9/07: Construction and commissioning of commercial plant at Hellyer

Dec Qtr 2007: First commercial production

Intec Hellyer/Gold Pilot Plant

en mensen the company of the company of the company of the . . . . . . . . . . . . . . . . . . . . a shekarar wasan ƙwallon ƙafa ta ƙasar Ingila. The Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Commun THE REAL PROPERTY AND LODGED AT A THE REAL PROPERTY AND RELEASED FOR A STATE OF A STATE OF A STATE OF A STATE OF A STATE OF A STATE OF A STATE OF 1999 - James James Communication (f. 1989)

UUUUHImminimee The Communication of the Communication THE REPORT OF STATISTICS

The Company of the Company of the Company of the Company of the Company of the Company of the Company of the C

$\ddotsc$ compared a manana amin'ny fivondronan-

a mana ana amin'ny faritr'i Nord-America. the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control of the control

agains a

and the company of the company of the company of the company of the company of the company of the company of the

Results of 'steady state' pilot plant campaigns on Hellyer tailings in Sydney in 2004 Intec Ltd

Element Average $\%$
extraction over
three campaigns
Highest %
extraction in
single campaign
Lead 99.0 99.6
Zinc 98.8 99.0
Copper 93.5 97.0
Silver 91.2 94.8
Gold 32.8 49.3
Weighted average %
extraction of metal value
78.1% 83.9%
15 September 2005 11

Hellyer Metals Process Flow Diagram

Zinc EW Represents Successful Intec Engineering

$\sim$ $\sim$

Intec Ltd

Production of Prime Western Grade zinc cathode at University of Sydney $1.5 \text{ m X} 1.0 \text{ m}$

15 September 2005

MARIA AND CONTRACTOR

Early 2005 at 20 River Road, Burnie

Intee Ltd

.................

MARINE COMMENTANCE
.
,,,,,,,,,,,,,,,,,,,,,,
.
and the company of the company of the company of the company of the company of the company of the company of the a shekara ta 1999 na matsayin a shekara ta 1999 na shekara ta 1999 na shekara ta 1999 na shekara ta 1999 na sh
The Commission Commission $\sim 10^{10}$ M ${\odot}$ M ${\odot}$ M ${\odot}$ M ${\odot}$
Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria Maria M
Maria Alemania (h. 1878).
a se provincia de la construcción de la construcción de la construcción de la construcción de la construcción
Contract Contract Contract Contract
The company of the company of the company of the company of the company of the company of the company of the c anno 1980 ann an C
UNITED STATES Contractor Contractor
$\label{eq:11} \begin{array}{ c c c c c c c c c c c c c c c c c c c$
u mara mana massa
na manana manana manana ma
Tantan Maria San San San San San San San San San Sa
1989 - Johann Stein, martin sanat masjid asl a shekara ta 1989 - An tsarani a shekara ta 1989 - An tsarani a

15 September 2005

Large pressure filter finally arrives after being stranded by Mumbai floods

- 1
30000000000000000000000000000000000000 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a shekara ta 1999 a sh

. The Committee of the Committee of the Committee
and the second
--------------------------------------- e grupo de la provincia de la provincia de la provincia de la provincia de la provincia de la provincia de la
umumiumu
The Communication 100000000000000000000000000000000000000
www.
STANDARD
WINDOW SEA
The Communication of the Communication of the Communication of the Communication of the Communication of the Co and and $\mathcal{P}$
1999 - Andre Maria Barcelona, americana altre altres altres altres altres altres altres altres altres altres wana ma
73. MARTIN
1999 - Jan Jawa Barat, pamo 30000000000000000000000000000000000000
The Company of the Company's Service www
e a componente de la componente de la componente de la componente de la componente de la componente de la comp
UNICOLOGICAL COMPANY NA POSTA
Martin Alexandria (Martin Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexandria Alexand
an sa mga
The Communication of the Communication 1999 - Johann Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry Harry H
Tanzania (h. 1878).
THE COURSE OF STATE
IMMONDIAN IN INDIANA SA PAN
William March 200
ggynymessä www
THE REAL PROPERTY AND RELEASED

Photos taken prior to shipment from India

Burnie is an excellent deepwater port

Andrew Maria (1989)
Comment of Comment
The Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Communication of the Commun
1989 - James Barnett, fransk politik (d. 1989)
a sa mga mga mga mga mga mga mga mga mga mg
CONTRACTOR
The communication of the communication
a se proposta de la construcción de la construcción de la construcción de la construcción de la construcción d
gan manazarta
TIMOTTO TA PATENTE PA The Committee of the Committee of the Committee of the Committee of the Committee of the Committee of the Commi The Committee of the Committee of the Committee of the Committee of the Committee of the Committee of the Commi
1989 - Andrea Andrew Maria (h. 1989).
and the third company of the
1980 - An Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhlachd ann an Dùbhla
WANTED TO BE THE UPPER TO BE THE UPPER ---------------------------------------
The Common Common TIME OF STRAIGHT Alexandria de la conte Contract of the Contract of Second
www.com.com/www.com/www.com
кю
m
œ
œ
œ
m
œ
m
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,
m
89 œ
m
ammo
.
---------------------------------------
89
waxaa
m
89
œ
œ
83
m
1989 - Jan Barnett, fransk fotballsk politik (f. 1989)

---------------------------------------
59
œ
88
.
---------------------------------------
tomonis e
m
œ
41
m
œ
.
.
a a shekara
- 1980
83
80
---------------------------------------
.
æ the contract of the contract of the contract of the contract of the contract of
mana a
œ
œ
---------------------------------------
Contract Communication
the contract of the contract of the contract of the contract of the contract of the contract of the contract of
W. .
0000000000000000000000000000000000000
.
œ
.
the contract of the contract of the contract of the contract of the contract of the contract of the contract of

Burnie port has excellent minerals handling capabilities

  • The Company of Company $\frac{1}{2}$ . The component of $\frac{1}{2}$ Maria Maria (m. 1988)
  • TELEVISION CONTINUES IN A SERVICE OF A SERVICE OF A SERVICE OF A SERVICE OF A SERVICE OF A SERVICE OF A SERVICE

And if it doesn't...

Contract Communist

______________________________________ $\cdots$

. . . . . . . . . . . . . . . . . . . . $\begin{minipage}{0.5\linewidth} \begin{tabular}{|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c$ ...................................... manang pa

.......................................

1999 - Jan James Barn, margaret ingilang kalendari periodor (h. 1974). 1999 - Jan James Barn, mars filmsk politik, francusk forsk politik, francusk forsk politik, francusk forsk po

The Committee Committee Committee Committee Committee Committee 1989 - Andrea Maria Maria Alemania de Caractería de Caractería de Caractería (

1999 - Jan Albert Maria (f. 1989) Service Company

Hill Martin Hill Martin Hill Martin State Books and the Barbara and State Books and the Barbara and State Books and State Books and State Books and State Books and State Books and State Books and State Books and State Bo

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Maria Maria Maria Maria Maria Maria Maria Monte a Pa CONTRACTOR CONTRACTOR CONTRACTOR CONTRACTOR

THE CONTRACTOR

The Committee Committee

Electric Arc Furnace (EAF) Dust

'Steel Mini Mill'

$\overline{P}$ EAF

Scrap steel $\mathfrak{g}$

I

(incl. galvanised steel)

Annual world production of EAF dust $\sim$ 5 million tonnes Hazardous waste that incurs high disposal costs $> A\$200$ Smorgon and OneSteel EAF dust co-treated in pilot plant: 85-95%-Zn extraction

Steel

• Australian and overseas producers considering EAF dust supply contracts

Intec Ltd

EAF Dust $\sim$ 20-40% zinc

Benefits of EAF Dust as Supplementary Feed

Intec Lid

Increased project life

O

  • Higher zinc grade feed but only 30,000 tpa Australasian EAF dust $\blacksquare$ grades $>30\%$ zinc
  • Potential for receipt of EAF dust treatment fees
  • Assists in oxidation of gold-bearing pyrite at Hellyer
  • Forms 'Base Case' economic model for WorleyParsons bankable feasibility study

450,000 tonnes Zeehan Slag Dump

Intec Ltd

  • Acquisition from current owners proceeding
  • 90km by trucking road from Hellyer
  • A\$325 value contained metal per tonne
  • A\$146 million total value contained metal
  • 13.4%-Zn, 1.7%-Pb, 54g/t-Ag, 50g/t-In

Revenue Composition

Operating Cost Breakdown

Intec Ltd Operating Cost Breakdown Tails dredging and pumping Admin 3% 2% Maintenance 15% Energy 39% Consumables 24% Labour 17% Source: September 2004 Pre-Feasibility Study by H.G. Engineering (Toronto, Canada) 23 15 September 2005

Hellyer Project - Indicative Economics *

Intee Ltd

BASE CASE AS
Production 0.5mtpa tailings
0.1 mtpa zinc residues eg EAF dust
Project Life 22 years
Capital Cost A\$136 million
Operating Cost A\$28 million pa
Net Sales Revenue A\$91 million pa
Margin 70%
Cash flow A\$62 million pa
IRR (all equity/post tax) 32%
NPV @ 10% A\$242 million

* Metal prices & US\$/A\$ exchange rate @ 18 May 2004

15 September 2005

Risk Analysis

Intec Ltd

• Process risks reducing from medium (HGE/Umicore) Overall Process, Materials of Construction $\&$ Zinc Electrowinning all to be demonstrated at Burnie Project risks are low (WorleyParsons) Infrastructure, Resource, Tailings Recovery, Political, Market $\&$ Environmental • Financing risks are manageable (Macquarie Bank) • Management risks are low (Intec/Ammtec) Excellent Process and Project teams

Bankable Feasibility Study Team

Intee Ltd

Principal Contractor:

WorleyParsons, a leading Australian-based international engineering firm.

Sub-contractors:

Tailings resource: Demonstration plant reporting: Environmental: Geotechnical & residue dam design: Engineering plant design: Process control & instrumentation: Tailings recovery: Zinc tank house design:

AMC Consultants Ammtec Caloundra Environmental GHD H.G. Engineering Honeywell Neumann Dredging Umicore

Project Management Team - Ammtec

Geoff Richmond & Justin Resta, Burnie Research Laboratory (Ammtec). Principally responsible for the development and commercialisation of the world's first commercial scale copper hydrometallurgical plant (Mt Gordon)

______________________________________

Mt Gordon 50,000 tpa Copper Plant in Queensland

(The patented Mt) Gordon Process is now owned by Intec)

• 20 Ammtec employees at Burnie Demonstration Plant, plus Linda Dean

Project Management Team – Intec Group

  • John Moyes Technical Director
  • Kieran Rodgers MD, Intec Hellyer Metals Pty Ltd

  • Director, RFI

  • Andrew Platts General Manager, Intec Hellyer Metals Project

  • U. Jean-Louis Huens Chief Operating Officer
  • General Manager, IHM Demonstration Plant
  • Joe Lam Senior Process Engineer I
  • Andrew Tong Senior Metallurgist and Laboratory Manager START
  • Maritza Valencia-Bejarano Process Engineer IJ
  • Adam Randall Maintenance Supervisor U
  • Larissa Brown (Office Manager) and Gail Williams L (Administration Manager) have organised today.

Intec Group: Directors

Intec Ltd

Non-Executive

Richard Jenkins (Chairman): Jan Ross:

Ken Severs:

Executive Philip Wood John Moyes

Intec Hellyer Metals Pty Ltd Kieran Rodgers Andrew Platts

Group Secretary Robert Waring

Shell Cove Capital Management Ivanhoe Mines Representative Ex-Anglo American $& Rio Timto$

Managing Director $&$ CEO Technical Director

Managing Director General Manager

Company Secretary

15 September 2005

Intec Ltd

Intec SharePrice History

Intec Ltd

15 September 2005

Contact Intec Ltd

Philip Wood Managing Director Chief Executive Officer [email protected] Email: John Moyes Technical Director [email protected] Enal Kieran Rodgers Chief Financial Officer [email protected] Email:

Intee Ltd Gordon Chiu Building, J01 Department of Chemical Engineering Maze Crescent, University of Sydney NSW 2006 AUSTRALIA

Tel:
Fax:
Web:

$+61 - 2 - 9351 - 6741$ $+61 - 2 - 9351 - 7180$ www.intec.com.au

Contact Intec Hellyer Metals Pty Ltd

Inter Ltd

Jean-Louis Huens General Manager IHM Demonstration Plant Email: [email protected]

Andrew Platts General Manager Hellyer Metals Project Email: [email protected]

Intee Hellyer Metals Pty Ltd 39 River Road Porto TAS 7320 Australia ÖΓ. The Hellyer Mine Cradle Mountain Link Road Wynyard Waratah Council District TAS 7321 Australia

Tel: $+61-3-6431-6156$ Fax: $+61-3-6431-6896$ Web: www. intec.com.au

The Hellyer Metals Project

Kieran Rodgers, CFO - Intec Ltd Managing Director - Intec Hellyer Metals Pty Ltd

Burnie port Hellyer Metals Project Zn/Pb/Cu/Au/Ag Mt Read Volcanics Belt Que River $-Ag/Pb/Zn$ $Rosebery - Ag/Pb/Zn$ Henty - Gold $Mt$ Lyell – Copper/gold Renison - Tin

Allegiance Mining -Nickel Projects

Hellyer Access Road - 11 August 2005

Hellyer Access Road - 11 August 2005

Maximising value from the Hellyer Mill, which is not required for Project

Partial View of Flotation Plant

  • Mill cost A\$67 million to build state-of-the-art in 1988.
  • 1.5 mtpa crushing, grinding $\&$ flotation circuit.
  • Limited usage, currently operable $\&$ well maintained. IJ
  • Dominates northern portion of Mt Read Volcanics Belt. L
  • Can liberate value of regional ore bodies D

Hellyer/Que River exploration assets vended into Resource Finance & Investments Limited (RFI)

Following A\$3.5m IPO, RFI to be listed on ASX early October 2005

Priority entitlement to Intec Ltd shareholders

Intec post-IPO interest: 21%

RESOURCE FINANCE & INVESTMENTS LIMITED

Intec Ltd's Demonstration Plant Opening represented by

ZV.

Don Boyer, Mike Rosenstreich, Craig McGown, Mark Derriman, Kieran Rodgers & Steve Richardson

September 15 2005

  • Excellent address Mt Read Volcanies. . .
  • Large Prospective ground position "with stepping stones". y.
  • 2 Advanced prospects: p W
  • V MRCharter potential for large seale gold deposit
  • ZA SE SE SE SA SE SUA VACE SI DA LONZO DE CON EL LIBRO
  • Zinifex and CXL Alliance provides the means to "work" the 7. W land position to extract value.
  • Interne Eing Eressionne ignalismen senteng broessing - 5 BY OCHLES AN

Tantara Regiones de Co Martin Barbara TITE ASSESS CORTITY LOCATION

The largest exploration land-holding in NW TEGALE

OISYSING EISTRIGHT ING IYO (STV ACHED, ZTV AU) OGTHEGT C. Zahistone andownent RH TESTOVA OF BRESDERING SHOUTH A DEALL

Line in the community

ZA SESTITUTTA SE STATISTIKA I PARTIKA U (Zir Nine Brzinin) Gorian IS GENERAL MARINE RHIFIELD/GOLOVICENT eunio

HOING CHOICA THAT INS O CHARLES COMPANY AND A CHARLES COMPANY minsiya Garibi Rahis FROWN OF ORDER ENGAGEMENT VAN ING DAVIDE SANDISHIDI

THE MICHAELOR HILL . . . . . . . . . . . . . . . . . . . --------------------------------------Volcantes Rainas - 60% of DIES DES IVERETIDINE

THE CONSTRUCTION VHMSRÖHIGE ATLEN EN ANAL STREET Material Metalum Ma Rahas 30% or ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

MERRITOS AGINALITYS I VINSZÖNT BIGBES TERPRETRUM TERRITORIA Rahas Kabupatén In Inafaffina

INSTRICTS STATE valitat vasta EXO OF HOMES SKIVE IN EQUIPMENT AND HOMES OF PYREMIC to provide a pheline of new targets

ZANTES ATTENDE

EThe polymetalic deposits of the West Coast of Tasnant rahkanong thahighesignade daosits Tarta e Mori de la forma primera di Sichera III de exploration targets," said Zinitex's Chief Executive Officer Mr Greic Ceilev.

Funts alliance with RELatives us access to potental new discoveries that will enable us to eaptalise on the substantial infrastructure Investinguente werke konintnikosabery and HODELLY ME Gailey added.

REM Ceoinformatics (CXL) - Aliance Parinership

ARIOVER OTERTITOES

COXL constructed a full siD geological model in collaboration with Mineral ECONOMIC COMPANY

OPEVELOPED TIS OWN Process and fechnologies to targeting Hellyer style (VHIVS) and Renison style (intrusive IGENED TEGOSILS IN TESMENTE.

SKSVAJOIN MAJNICI SANIJA VIIM ZSK Interesting exploriton licences.

NATODINOL BINANCO Heliyer Profect - advanced prospects

  • AGVanescrotospeels
  • an kore da a
  • ASI TELESTI

PILS 40 other riggis DICES DESCRIPTION Feliver/Que River Sivie deposits and gold.

Targets Fault Tenement boundary Major deposits - abandoned Prospect Major road

MARTING PRANTICE a di kacamatan ing kabupatèn Kabupatèn I THE LAND CLOSE COMPANY OF REAL PROPERTY

Hellyer Project - S-Lens (copper resource)

NAVAROL HAMAR

2370kt at 1.7% Cu, 64 g/t Ag, 4.2% Zn & Sg/t Au 944% Indicated & 56% Interred Resource

(In accordance with 2004 JORC Code)

MAGIARET HAANGE alienska francuska politika († 1878) Hellyer Profect - MtGharier (Gold)

QLETICE STRITOW Coloration ANGY 26 SViencifeally tested for gold.

MARTING PINANDA a portama de la componencia de la componencia de la componencia de la componencia de la componencia de la comp
En 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en 1970, en

REGIORIE PROFESE COOPER COOPERT ET AND PROFES

WECON ENGINEERING the Mt Bischoff Regional profect.

Watcher Marten (Original

PIATONI KONTINANTON MITTING AT A THE STATE OF A STATE

  • TITE MECHEMINE
  • Eisterle preduction on n GO TOOL 517 6% ZA 427 OR Ac and 5.7% Pb beween THE MILLER
  • Minerallsallon openin all Z E DESCRIPTION

The STORAGE SERVATIVE STORAGE Sm at 1.3% Pb, 1.8% Zn & 87g/(7Ag 3m at 434% Pb Za & 139.0/t Aq 27 Anii 243 AMA 252 Anii 272 Anii 28

Sone offic regional exploration prospects...

A A C-1 C-1 C-1 C-1 C-2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2

MADILIAN SINANG. Maria Maria Maria Maria 1994

The Magnet Mine

NISODNO I DIVANCI

SCOOLOGIC CHARGE CONFIDENCIAL CONSTANTINO TOSTO CONTRACTO

WEIGH METSCHOIK IC.

  • Tenure surrounding the old Mt Bischoff Mine (to be reopened by Birestone Thi
  • Strikerweidels
  • NERGE GOOD
  • Great Mexico (1999) and the contract of much of the ground incloating

, a regional de la composición de la composición de la composición de la composición de la composición de la c Storate of The Part ITS

National Marian De AVENTY ATEIODIC?

Sn Pavilla Ag

Magnet Mine

HEAZLEWOOD

Geology and Mineral Occurrences

Bouger Gravity

In anomalism, red >95th percentile
stream sediment data

RESOURCE EINANGE

Sonte of the regional exploration prospects.

Leven Riveratea (NEM) E SIVERI

  • Same stratigraphic position CONGRETA
  • Sante structures as Heliver
  • Untested Electromagnetic (Condidator) anomalies
  • Sonc Innostaling a lower delened previous prospeciers
  • A target that can be rapidly 2000 - 1000 - 1000

Alean-Baring tan sekara Statisticion de l'al TATION WAS ,,,,,,,,,,,,,,,, atan ita mat

Ofossafilitäroleh ABING ISING UTG atolshiton and to keep the first Mena Men

REIVERSTREIG olineavandringen gga sa masang

NAVING ENANGE

Some of the regional exploration prospects.

Leven River area (NE of Heliyen)

  • Same stratigraphic position as Hellyer
  • Sane structures as Heliver
  • Untested Electromagnetic (conductor) 90000000000000000000000000000000000000
  • Some thin post-mineral cover deterred DIEVIOUS DIESECCIE
  • A target that can be rapidly advanced to chiliteet vistatus

TITTES CO E Britchits in the (Contineter) a martin

OOTET MASTERINITE

Historic production of

  • 868,000t at 1.05% Cu 1.23% Pb 0.98% Sira (Stillati
  • Eurher potential indicated by: -5.9m at 1.75% Sn, 2.4% Ou & 205g/t Ag

-2.7m at 1.15% Sn, 1.1% Cu & 148e/1Ae

+5.8m at 1.51% Sn, 1.9% Cu & 156c/t Ag

46.8m at 1.2% Sn. 1.0% Ou & 1086/1 Ac

-0.85m at 6.3% Sn, 5.3% Ou & 87g/t Ag

-3.7m at 0.5% Sn, 0.61% Cu & 98g/t Ag

Strategie Assets & Alliances

Fellyer Mill - processing opportuntes

2000 merupakan membawa mengentuk mengentuk mengentuk menambawa mengentuk mengentuk mengentuk mengentuk menge

Gantal Stribute
Maximin Stissenshon Brists
NOTO ISTETES No oi Colore Magneticist Manyannes
Shares on issue at the date of the Prospectus ASZEROSE s (719 Brazilia
Options on issue at the date of the Prospectus. 5760000 ya k
Shares to be issued to Ceophornalles
pursuant to an agreement dated 10 May 2005.
150101010 oza OK PA
Options to be issued to Pioneer Nickel.
pursuant to an agreement dated 27 April
Isokolojoj OK YA
Sigies (obesissies fol VID en ASX Islne)
pursuant to employment agreement dated 28
SINYALORS
PROTOLOGY OKOS oran
Incentive Options to be issued to MD on ASX
ISIRCI
iteratore ge till del
Shares now offered under the Prospectus FASSIONS.CO 484 Cente
Options now offered under the Prespectus. 43761000 E WAR
Total Strates and Options on Issue at the
complemento fine Orien
KETHNIK REPARTION TNUNHU
FOIMANDIES SIZERODE HOLLON
*Undiluted Market Capitalisation of the Company on listing on ASX at Issue price of 20 cents per share will be \$7.23

TANISTI

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

CASTASM

RFIODGOIVES - Stepping stores to development & CILONALI Shorkom as in the stan

  • reach a development decision on the S-lens copper-silver an
    Carl resource and possibly commence production;
  • advance the Mt Charter Gold deposit to a Mineral Resource and gan
    Milit have commenced a feasibility study;
  • evaluate numerous Hellyer style Zn-Pb-Ag-Au targets on the en eller
    Senskt Hellyer leases through the exploration allance with Zinifex; and,
  • develop and evaluate the base metal, gold, nickel and tin en
    1 potental of the sprathling tenements which includes significant ZIR CZSIWSIARIIRCIE ISZ I CRAWEJ MEG I KOROZ POROZ PRODECT E RODO Z targets at Selina east of Henty, as well as Hellyer style (Zn-Pb-ACHAUNGIOGIS

REIOBEGIVES - Stepping stones to development? CILONIA Medium to long term

  • Lutilise cash flow from potential S-Lens operations to contribute yan
    Mala to the development of the Mt Charter Gold deposit;
  • In association with Zinifex complete feasibility work and preen
    Mala CEVEIODINEN COMENZANTE DE AUROISCOVENES EN ENCLOSE IONNINE SXOIOICHUODERIICH
  • develop the Mt Charter gold deposit to provide funding to ngan
    Balla develop the base metals assets, grow the business, and,
  • continue with Geomformatios' regional exploration work to gang
    Sanda maintain a pipeline of new opportunities in this very highly mineralised region.

FRIEDRICH SEINER SEINER SEINER EINER EINER EINER EINER EINER EINER EINER EINER EINER EINER EINER EINER EINER E

The people – highly experienced team –we know the Minerals Industry

  • Board -sound technical, corporate and commercial skills residing in an Ľ EXPERIENCE FREICH COMPIE INC.
  • Exploration Service
  • WICH ROUGHER
  • A Oralg Motown
  • EXPRESS ROLES

None Executive Citemata Managing Director NOREXCOMMODICOO Nore Excourver Messical

  • Technical Team Geologists with significant Tasmanian experience.
    Including fulltime Tasmanian based Exploration Manager-Mark nas
    Santa DCIIIICH
  • Alliances Zinifex, Geoinformatics & Intec Ltd (major shareholder) en
    Deskri