Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

RAMELIUS RESOURCES LIMITED Capital/Financing Update 2004

Jul 15, 2004

65718_rns_2004-07-15_6c379c08-eabb-44f2-93dc-fa21743851f5.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Ramelius Resources Limited

ACN 001 717 540

140 Greenhill Road, Unlev SA 5061 GPO Box 1373, Adelaide, SA 5001 DX 52003, Unley Telephone (08) 8373 6473 or (08) 8373 5588 Facsimile (08) 8373 5917

ASX RELEASE

For Immediate Release 16 July 2004

General Manager The Company Announcements Office Australian Stock Exchange Limited PO Box H224 Australia Square Sydney NSW 1215

Dear Sir/Madam.

PRELIMINARY RESULTS FROM RESOURCE DEFINITION DRILLING AT WATTLE DAM PROJECT

HIGHLIGHTS

  • Resource Definition drilling identifies shallow high grade gold intersections and wide lower grade envelopes at the Wattle Dam 7800N prospect. The mineralisation remains open along strike in both directions.
  • Gold intersections include 1 metre at 130 g/t at a depth of 7 to 8 metres and 2 metres at 47g/t at a depth of 17 to 19 metres.
  • Drilling results are expected to increase the level of confidence of the previously inferred resource of 150,000 tonnes at 4.6g/t gold (cut)
  • A preliminary resource estimate will be made within the next two weeks prior to further extensional drilling.
  • A mining operation could reasonably be expected to be developed on this resource.

SUMMARY

Ramelius has completed a reverse circulation drilling programme of 1900m in 25 holes at its 7800N prospect at Wattle Dam Project at Spargoville, approximately 50 kilometres south east of Coolgardie.

This drilling was to evaluate and better define the inferred resource of 150,000 tonnes at 4.6 g/t gold (cut) that had been previously estimated at the 7800N prospect. The drilling was conducted on lines spaced 20m apart with drill hole collars generally spaced at 20m intervals along the drill lines. All the holes were inclined at 60° to the east.

Significant Results

Shallow high grade intersections were obtained in several adjacent holes located along strike within the resource and are tabulated below. This zone is open to the south.

COLLAR DETAILS (AMG) RESULTS
Hole No North East Azimuth Dip. Depth m From m To m Lenath m Gold g/t
WDRC006 6527740 356110 90 $-60$ 60 8 130
Within 5 10 5 $6.1*$
45 46 14.7
Within 39 47 8 3.2
WDRC008 6527720 356110 90 $-60$ 70 17 19 2 47
Within 12 24 12 $6.1*$
WDRC012 6527760 356110 90 $-60$ 70 12 21 9 8.3
WDRC013 6527760
$\cdots$
356090 90
.
$-60$ 70 50 52 2 8.7

* gold values greater than 20g/t cut to 20g/t.

Tabulated below is a listing of drilling details including those intercepts greater than 2 gram metres down hole length. Unless otherwise commented upon grades greater than 20g/t have been cut to 20g/t to determine the average grade for the reported intervals. The mineralisation is open to the north west and the south.

Check, repeat and duplicate sampling has not yet been undertaken.

WATTLE DAM 7800N PROJECT
RESULTS COMMENT
Hole No North COLLAR DETAILS (AMG)
East
Azimuth Dip Depth m From
$\mathbf{m}$
To
m
Length
m
Gold
g/t
WDRC002 6527780 356100 90 $-60$ 70 $^\dagger$ 3 $\overline{c}$ 1.1
$\overline{t}$ 11 $\overline{4}$ $\overline{2}$
WDRC003 6527780 356080 90 $-60$ 92 19 22 3 1.4
26 28 $\overline{2}$ 1.3
54 59 5 1.9
61 67 6 1.8
WDRC004 6527780 356040 90 $-60$ 70 18 56 38 1.3 includes<1g/t gold intercepts
includes 18 23 5 1.9
includes 27 30 3 1.6
includes 38 45 7 $\overline{\mathbf{2}}$
includes 47 49 $\overline{a}$ 1.3
includes 53 56 3 2.2
WDRC006 6527740 356110 90 $-60$ 60 0 2 2 1.2
5 10 5 6.1 > 20g/t gold cut to 20 g/t
includes $\overline{r}$ 8 1 130 uncut
18 47 29 1.6 includes<1g/t gold intercepts
includes 18 20 $\overline{c}$ 1.5
includes 24 26 $\overline{2}$ 5
includes 39 47 8 3.2
includes 45 46 1 14.7
I
RESULTS COMMENT
COLLAR DETAILS (AMG) From Length Gold
Hole No North East Azimuth Dip Depth m m m m g/t
WDRC008 6527720 356110 90 $-60$ 70 $^\dagger$ 3 $\overline{c}$ $\overline{c}$
12 24 12 6.1 > 20g/t gold cut to 20 g/t
includes 17 19 $\overline{c}$ 47 uncut
WDRC009 6527720 356090 90 -60 70 0 2 2 3.6
62 70 8 2.6 hole ended in mineralisation
WDRC010 6527720 356050 90 $-60$ 70 20 22 $\overline{c}$ 1.2
27 30 3 5.8
WDRC012 6527760 356110 90 $-60$ 70 0 $\boldsymbol{2}$ $\overline{\mathbf{c}}$ 1.2
12 21 $\pmb{9}$ 8.3
WDRC013 6527760 356090 90 $-60$ 70 50 52 2 8.7
WDRC017 6527800 356080 90 $-60-$ 74 26 35 9 1.8
38 40 $\overline{2}$ 1.3
53 56 3 1.7
WDRC018 6527800 356060 90 -60 $70\,$ $\overline{4}$ 6 2 2.3
28 40 12 1.2 includes<1g/t gold intercepts
including 28 30 $\overline{c}$ 2.4
including 33 36 3 1.1
including 38 40 $\overline{2}$ 1.3
57 59 2 1.4
WDRC019 6527800 356040 90 $-60$ 70 37 43 6 1.8
WDRC020 6527800 356020 90 -60 86 49 51 $\overline{2}$ 2.5
59 80 21 1.9 includes<1g/t gold intercepts
including 59 61 2 8.7
including 72 $74\,$ $\overline{c}$ 2.1
including 78 80 $\overline{2}$ $5.2\,$
WDRC023 6527840 356040 90 $-60$ 70 13 32 19 1.1 includes<1g/t gold intercepts
including 13 15 $\overline{c}$ 2.9
including 22 $27\,$ $\overline{5}$ 1.7
including 30 32 $\overline{2}$ 1.5
WDRC024 6527840 356020 90 $-60$ $80\,$ 51 56 5 1.2
65 $67\,$ $\mathbf 2$ 4.8
WDRC025 6527820 356040 90 $-60$ 100 13 31 18 1.2 includes<1g/t gold intercepts
including 13 15 $\overline{2}$ 1.6
including 17 22 $\overline{5}$ 1.4
including $28\,$ 31 3 $2.5\,$

Drilling, Sampling and Analytical

The drilling was conducted using reverse circulation drilling methods with the samples being collected at 1m intervals using a cyclone, prior to riffle splitting to extract a sample of approximately 2 kilograms for submission to Genalysis Laboratory Services Pty Ltd. At the laboratory the entire sample was dried and pulverised prior to a sub-sample being taken for analysis for gold. The analytical method used was a 200gram Leachwell digestion and solvent extraction with AAS analysis. No duplicate or check samples have been taken at this stage. All the drill holes were geologically logged.

OUTLOOK

  • A preliminary resource estimate is currently being undertaken and is expected to increase the level of confidence of the previously inferred resource of 150,000 tonnes at 4.6g/t gold (cut)
  • A further drilling program comprising approximately 26 holes for 2000 metres of RC drilling will commence within two weeks to test the north western and southern extensions.
  • The latest results suggest that a mining operation could reasonably be expected to be developed on this resource.

For further information please contact:

Mr. Joe Houldsworth Managing Director Ramelius Resources Limited Ph. 08 9250 6644