AI assistant
RAMELIUS RESOURCES LIMITED — Capital/Financing Update 2004
Aug 18, 2004
65718_rns_2004-08-18_a7653fc6-8c25-468a-bff9-80dccf4eb658.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
Ramelius Resources Limited
ACN 001 717 540

140 Greenhill Road, Unlev SA 5061 GPO Box 1373, Adelaide, SA 5001 DX 52003, Unley Telephone (08) 8373 6473 or (08) 8373 5588 Facsimile (08) 8373 5917
ASX RELEASE
For Immediate Release 19 August 2004
General Manager The Company Announcements Office Australian Stock Exchange Limited PO Box H224 Australia Square Sydney NSW 1215
Dear Sir/Madam.
EXTENDED GOLD ZONE INDICATED BY SECOND ROUND OF RESOURCE DEFINITION DRILLING AT WATTLE DAM PROJECT
HIGHLIGHTS
- The gold mineralised system at the Wattle Dam 7800N prospect has been extended 60 $\bullet$ metres to the south and 40 metres to the north for a total increase in the strike length from 120 metres to 220 metres.
- Drilling has confirmed and further defined the extent of the potentially economic gold $\bullet$ mineralisation within the immediate locality, and significantly the anomalous gold "envelope" remains open along strike, particularly to the south.
- The shallow, high grade gold zone along the eastern side extends a further 20m south of $\bullet$ the previous drilling with drill hole WDRC027 returning from 29 metres depth, 3 metres at 9.2q/t gold (cut) that includes 1 metre at 28.2 g/t gold.
- The Company believes that a mining operation will be established at Wattle Dam within $\bullet$ six months.
SUMMARY
Ramelius has completed a second round of reverse circulation drilling totalling 1702m in 23 holes at its 7800N prospect at Wattle Dam Project at Spargoville, approximately 50 kilometres south east of Coolgardie.
This drilling was to extend the drilling coverage along strike to the north and south and to determine the nature of the mineralised system at depth. The drilling was conducted on lines spaced 20m apart with drill hole collars generally spaced at 20m intervals along the drill lines. All the holes were inclined at 60° to the east.
This drilling appears to have outlined the extent of the potentially economic gold mineralisation within the immediate locality. The gold mineralised system has been extended 60m to the south and 40 m to the north for a total strike length of 220 metres. However, the associated anomalous gold "envelope" remains open atong strike, particularly to the south. Significantly, the shallow, high grade gold zone along the eastern side was demonstrated to extend a further 20m south of the previous drilling with drill hole WDRC027 returning from 29m depth, 3 metres at 9.2g/t gold (cut) that includes 1m at 28.2 g/t gold.
Tabulated below is a listing of drilling details from this second round of drilling, including those intercepts greater than 2 gram metres down hole length. Unless otherwise commented upon grades greater than 20g/t have been cut to 20g/t to determine the average grade for the reported intervals.
| WATTLE DAM 7800N PROJECT | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| COLLAR DETAILS | RESULTS | COMMENT | ||||||||
| Hole No | North | East | Az | Dip | Depth | From | To | Length | Gold | |
| $\mathsf{m}$ | m | g/t | ||||||||
| WDRC026 | 6527700 | 356120 | 90 | $-60$ | 70 | |||||
| WDRC027 | 6527700 | 356100 | 90 | $-60$ | 70 | 29 | 32 | 3 | 9.2 | $>$ 20g/t gold cut to 20 g/t |
| includes | 29 | 30 | 1 | 28.2 | uncut | |||||
| 35 | $\overline{37}$ | $\overline{2}$ | 1.6 | |||||||
| 40 | 42 | 2 | 1.8 | |||||||
| WDRC028 | 6527700 | 356080 | 90 | $-60$ | 70 | $\ddot{\phantom{1}}$ | Ĭ. | |||
| WDRC029 | 6527700 | 356060 | 90 | $-60$ | 80 | 50 | 54 | 4 | 1.5 | |
| WDRC030 | 6527700 | 356040 | 90 | $-60$ | 70 | 58 | 60 | 2 | $\overline{2.3}$ | |
| WDRC031 | 6527680 | 356140 | 90 | $-60$ | 70 | ÷. | Ĭ. | $\bar{\phantom{a}}$ | ||
| WDRC032 | 6527680 | 356120 | 90 | $-60$ | $\overline{70}$ | $\ddot{\phantom{1}}$ | ÷, | $\overline{\phantom{a}}$ | ||
| WDRC033 | 6527680 | 356100 | 90 | $-60$ | 70 | $\overline{30}$ | $\overline{32}$ | $\overline{2}$ | $\overline{1.2}$ | |
| WDRC034 | 6527680 | 356080 | 90 | $-60$ | $\overline{70}$ | 63 | 65 | $\overline{2}$ | 9.1 | |
| WDRC035 | 6527680 | 356060 | 90 | $-60$ | $\overline{74}$ | 30 | $\overline{32}$ | $\overline{2}$ | 1.8 | |
| WDRC036 | 6527660 | 356125 | 90 | $-60$ | 66 | $\overline{a}$ | ||||
| WDRC037 | 6527660 | 356085 | 90 | $-60$ | 70 | $\overline{23}$ | $\overline{25}$ | $\overline{2}$ | 1.4 | |
| ÷ | ÷ | $\overline{\phantom{a}}$ | ||||||||
| WDRC038 | 6527860 | 356040 | 90 | $-60$ | 70 | $\overline{\phantom{a}}$ | $\blacksquare$ | $\blacksquare$ | ||
| WDRC039 | 6527860 | 356020 | $\overline{90}$ | $-60$ | $\overline{70}$ | 38 | 52 | 14 | 1.9 | includes<1g/t gold intercepts |
| includes | $\overline{38}$ | 40 | $\overline{2}$ | 4.7 | ||||||
| includes | 42 | 43 | $\overline{\mathbf{1}}$ | 1.7 | ||||||
| includes | 50 | 52 | $\overline{2}$ | 5.4 | ||||||
| WDRC040 | 6527860 | 356000 | 90 | $-60$ | 70 | $\overline{a}$ | ||||
| WDRC041 | 6527880 | 356040 | 90 | $-60$ | $\overline{70}$ | $\mathbf{r}$ | ||||
| WDRC042 | 6527880 | 356020 | 90 | $-60$ | $\overline{70}$ | |||||
| WDRC043 | 6527878 | 356000 | 90 | $-60$ | $\overline{70}$ | 58 | 60 | $\overline{c}$ | 1.7 | |
| WDRC044 | 6527905 | 356000 | 90 | $-60$ | $\overline{70}$ | $\overline{\phantom{a}}$ | Ĭ, | |||
| WDRC045 | 6527900 | 356080 | 90 90 |
$-60$ | 70 $\overline{122}$ |
|||||
| WDRC046 WDRC047 |
6527720 6527760 |
356070 356070 |
90 | $-60$ $-60$ |
$\overline{53}$ $\overline{72}$ |
55 74 |
$\overline{2}$ $\overline{2}$ |
1.9 1.8 |
||
| WDRC048 | 6527760 | 356100 | 90 | $-60$ | 120 50 |
21 | 23 | $\overline{2}$ | 1.1 | |
| 30 | $\overline{32}$ | $\overline{2}$ | $\overline{1.2}$ | |||||||
| 34 | $\overline{39}$ | 5 | 2.9 | |||||||
Drilling, Sampling and Analytical
The drilling was conducted using reverse circulation drilling methods with the samples being collected at 1m intervals using a cyclone, prior to riffle splitting to extract a sample of approximately 2 kilograms for submission to Genalysis Laboratory Services Pty Ltd. At the laboratory the entire sample was dried and pulverised prior to a sub-sample being taken for analysis for gold. The analytical method used was a 200gram Leachwell digestion and solvent extraction with AAS analysis. No duplicate or check samples have been taken at this stage. All the drill holes were geologically logged.
OUTLOOK
- A resource estimate is currently being undertaken and is expected to increase the level of $\bullet$ confidence of the previously inferred resource of 150,000 tonnes at 4.6g/t gold (cut)
- The Company believes it will establish a mining operation at Wattle Dam within six $\bullet$ months.
For further information please contact:
Mr. Joe Houldsworth Managing Director Ramelius Resources Limited Ph. 08 9250 6644