RAIDEN RESOURCES LIMITED Investor Presentation 2018

Aug 14, 2018

65675_rns_2018-08-14_f2e81577-0f00-4af1-9858-dd336acdc204.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

Australian Investor Roadshow August 2018

Disclaimer

Certain statements contained in this presentation, and in certain documents incorporated by reference in this presentation, constitute "forwardlooking statements". All statements other than statements of historical fact contained in this presentation, including, without limitation, those regarding Raiden Resources Ltd’s (the “Corporation‘”) future financial position and results of operations, strategy, plans, objectives, goals and targets, future developments in the markets where the Corporation participates or is seeking to participate, and any statements preceded by, followed by or that include the words "believe", "expect", "aim", "intend", "plan", "continue", "will", "may", "would", "anticipate", "estimate", "forecast", "predict", "project", "seek", "should" or similar expressions or the negative thereof, are forward-looking statements. These statements are not historical facts but instead represent only the Corporation's expectations, estimates and projections regarding future events. These statements are not guarantees of future performance and involve assumptions, risks and uncertainties that are difficult to predict. Therefore, actual results may differ materially from what is expressed, implied or forecasted in such forward-looking statements. Additional factors that could cause actual results, performance or achievements to differ materially include, but are not limited to, those discussed under "Risk Factors" in the short form prospectus to which this presentation relates. Management provides forward looking statements because it believes they provide useful information to readers when considering their investment objectives and cautions readers that the information may not be appropriate for other purposes. Consequently, all of the forward-looking statements made in this presentation are qualified by these cautionary statements and other cautionary statements or factors contained herein, and there can be no assurance that the actual results or developments will be realized or, even if substantially realized, that they will have the expected consequences to, or effects on, the Corporation. These forwardlooking statements are made as of the date of this presentation and the Corporation assumes no obligation to update or revise them to reflect subsequent information, events or circumstances or otherwise, except as required by law. The forward-looking statements in this presentation are based on numerous assumptions regarding the Corporation's present and future business strategies and the environment in which the Corporation will operate in the future, including assumptions regarding expected yields, future prices and business and operating strategies. Some of the risks which could affect future results and could cause results to differ materially from those expressed in the forward looking statements contained herein, including risks associated with the Corporation, such as lack of revenue, risks associated with the Corporation's business, such as the failure to obtain or maintain necessary licenses, and risks associated with the common shares of the Corporation, such as stock market volatility.

The information in this presentation relating to the exploration results for the Company’s projects are extracted from the Company’s announcement entitled “Update on Stara Planina Project” dated 5 June 2018. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement.

2 Australian Investor Roadshow August 2018

Key Investment Highlights

==> picture [52 x 68] intentionally omitted <==

==> picture [58 x 72] intentionally omitted <==

==> picture [38 x 59] intentionally omitted <==

==> picture [57 x 60] intentionally omitted <==

Established in Portfolio Offers Well Capitalised for Serbia World-Class Outstanding Opportunity 2018 Exploration Experienced Jurisdiction for a Tier 1 Discovery Budget Management Team

==> picture [40 x 40] intentionally omitted <==

==> picture [41 x 40] intentionally omitted <==

==> picture [41 x 40] intentionally omitted <==

==> picture [41 x 40] intentionally omitted <==

Significant land position in the mineral endowed Tethyan belt with projects in the world class Timok district

Joint Venture with Rio Tinto on 2 of the 6 projects

Large drill targets in a region known to host world class discoveries

Drilling commenced at Stara Planina

$3.7 million cash[1]

to fund aggressive exploration campaign

De-risk cashflow through Joint Ventures with majors on early stage projects

Serbian based

management team and international industry professionals with a track record of success

Experience in all stages of exploration through development

==> picture [77 x 72] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

==> picture [67 x 47] intentionally omitted <==

  1. as at 30 June 2018

3 Australian Investor Roadshow August 2018

Corporate Overview

Corporate Snapshot

TICKER SHARES ON ISSUE ASX:RDN 410.4 million

62.5 million Performance AShares 62.5 million Performance B Shares 75.0 million Performance C Shares 50 million Options exercisable at $0.02

Directors and Management

Australian executive with extensive experience in oil and gas and resources. Mr Davy is a director and owner of a number of successful private companies. During the past five years Mr Davy has held directorships in numerous ASX listed companies.

MICHAEL DAVY

NON-EXECUTIVE CHAIRMAN

(Corporate)

MARKET CAP CASH BALANCE

$6.9 million $3.7 million1

(undiluted at A$0.017)

Shareholder Breakdown

==> picture [312 x 152] intentionally omitted <==

----- Start of picture text -----

32%
68%
----- End of picture text -----

Top 50 Public

==> picture [9 x 9] intentionally omitted <==

DUSKO LJUBOJEVIC

MANAGING DIRECTOR

(Geologist)

MARTIN PAWLITSCHEK

NON-EXECUTIVE DIRECTOR

(Geologist)

NICHOLAS YOUNG NON-EXECUTIVE DIRECTOR

(Corporate)

KYLA GARLIC COMPANY SECRETARY

(Chartered Accountant)

13 years’ mining experience globally with a significant period of time spent in Eastern Europe. Dusko acted as an advisor and Head of Small Scale Mining within Barrick Gold Corporations’ Asset DevelopmentGroup.

Over 20 years mining and exploration experience, including management positions with a number of junior explorers, private equity investment funds, majors (BHP) and development companies (MDL, Taranga).

Australian advisor specialising in the ASX markets. Mr Young has extensive capital markets experience and is currently a nonexecutive director of Vysarn Limited.

Chartered Accountant and Company Secretary working in the ASX markets. Kyla is a Director of Onyx Corporate.

Performance A Shares convert upon announcement of Mineral Resource of at least 100Kt of Cu Eqv at or above 0.2% Cu Eq. Performance B Shares convert upon completion of Scoping Study and decision to undertake a Pre-Feasibility Study Performance C Shares convert upon announcement of a Positive Pre-Feasibility Study

1. As at 30 June 2018

==> picture [75 x 55] intentionally omitted <==

----- Start of picture text -----

4
----- End of picture text -----

==> picture [67 x 47] intentionally omitted <==

4 Australian Investor Roadshow August 2018

Asset Portfolio

Stara Planina

  • (JV with local entity – path to 100% - 63km[2] )

  • Shear-related Au and intrusion related Cu-Au mineralisation plus high grade Au-Cu targets

Donje Nevlje Project

(100% Raiden – 74km[2] ) – Rio JV

  • Historical exploration defined porphyry style targets

Majdanpek

(100% - 76km[2] ) – Rio JV

  • Strategic tenure adjacent to major mining operations (Majdanpek mine)

Pirot Project

(Executing Application - 21km[2] )

  • Targets include porphyry, skarns, massive sulphide

Bor

==> picture [517 x 367] intentionally omitted <==

  • (100% - ~35km[2] ) – partially granted/pending application

  • Strategic tenure adjacent to major mining operations (Bor and Majdanpek mines)

Zupa project

(100% Raiden – PENDING TRANSFER– 85km[2] )

  • Intrusive and related mineralisation

5 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

HISTORICAL DATA

HIGH GRADE COPPER AND GOLD MINERALISATION IDENTIFIED

  • Joint Venture with private Serbian company, option to buy 100% for €300k at any time

  • Gradiste and Aldinac drill targets defined by geochemistry, geophysics and surface sampling

  • Historic data highlights two large, continuous multi-element soil anomalies with an approx. strike length of 3km

  • Aggressive exploration program commenced over Stara Planina license

  • High grade copper and gold mineralisation identified from historic data

  • Historic underground high grade mine peripheral to main anomaly

==> picture [461 x 528] intentionally omitted <==

6 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

ALDINAC TARGET

  • Aldinac target is defined by copper, molybdenum and gold in soil anomaly which extends over 2.5km x 0.75km area

  • Results of historical soil survey confirmed a persistent Cu (100-2,070 ppm) and Mo (15-240 ppm) anomalism along a NNW structural trend and within this zone gold is anomalous (100-1,330 ppb)

  • Previous explorer Reservoir Capital reported rock sampling results including 8 samples between 2- 12.5 g/t Au, indicating high grade mineralisation is present within the system

  • Completed IP geophysical program in 2017-18, interpreted as silicified massive & disseminated sulphide zone

  • Drilling on schedule to commence in Q3

==> picture [421 x 557] intentionally omitted <==

7 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

ALDINAC TARGET

Defined chargeability anomaly (600m wide with a 300m vertical extent), as well as a coincidental resistivity anomaly

==> picture [505 x 379] intentionally omitted <==

==> picture [412 x 555] intentionally omitted <==

8 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

ALDINAC TARGET

Aldinac IP Target Zone

==> picture [113 x 93] intentionally omitted <==

  • Very intense chargeability values

  • Large and consistent anomaly

  • Interpreted as silicified massive & disseminated sulphide zone

  • Drilling commenced & results due in September

  • 450m vertical extent (Possibly open at depth)

Aldinac IP Chargeability 3D model +15 mV/V Voxel grid (pink grid) +19mV/V shell (dark red)

9 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

GRADISTE TARGET

  • Gradiste target is a 3Km x 1Km coppermolybdenum-gold soil anomaly, with values exceeding 1000ppm Cu; 5ppm Mo; and isolated samples with elevated gold up to 8ppm Au

  • Highlighted historical sampling results:

  • Trench 8m (2m @ 10.55g/t Au and 6m @ 7.37 g/t Au)

  • Trench 4.5m @ 6.4 g/t Au and 0.16% Cu, inc. 0.5 [email protected]/t Au

  • Continuous rock chip samples [email protected] g/t gold

  • 6 meters @ 3.76 g/t Au and 0.17% Cu

  • 2018 IP survey completed – results being processed and interpreted

  • Drilling commenced in Q3 2018 – results due in September

==> picture [443 x 557] intentionally omitted <==

10 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

GRADISTE TARGET

==> picture [394 x 523] intentionally omitted <==

----- Start of picture text -----

Aljin Do Historical
Mine
----- End of picture text -----

  • 2017 IP Survey - Chargeability anomaly extends over 1000m across the anomaly and extends over 200m vertically

  • Interpretation of single IP line indicate a strong chargeable and resistive anomaly

  • Overlapping chargeability and resistivity values

==> picture [394 x 277] intentionally omitted <==

11 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

PROSPECTIVE FOR

COPPER-PORPHYRY, SKARNS AND MASSIVE SULPHIDE MINERALISATION

  • Cretaceous volcanics and intrusives (same suite as the Timok magmatic complex (‘TMC”)

  • Identified as a ‘porphyry Cu target’ in the 60’s, as a result of and a mapping, geochemistry magnetic

  • survey

  • Historic Magnetic survey suggests an intrusive magmatic complex, which is reminiscent of TMC Magnetic signature around Bor.

  • Raiden conducted preliminary a reconnaissance field visit - observed altered volcano-sedimentary sequence, located on a mineralised granodiorite contact

  • Prospective for copper-porphyry, skarns and massive sulphide mineralisation

  • The project area has not seen systematic exploration with virtually no work carried out since the 1960’s

  • Magnetic highs were never drilled

==> picture [461 x 367] intentionally omitted <==

==> picture [244 x 174] intentionally omitted <==

==> picture [199 x 174] intentionally omitted <==

==> picture [67 x 32] intentionally omitted <==

12 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

OPPORTUNITY TO DISCOVER

A LARGE INTRUSIVE SYSTEM IN DISTRICT

  • Visible mineralisation in outcrop with likely epithermal manifestations

  • Permit approved – transfer in progress - (100% Raiden)

  • Palaeozoic sediments bordered by mineralised andesite-limestone contacts. Contacts host skarn deposits in the district

  • Palaeozoic sediment hosted alteration zones coincident with a topographical high

  • Mapping has also defined numerous areas of outcropping alteration & structural complexity indicative of a blind intrusive

  • Raiden considers a blind intrusive to be the likely source of the mineralised fluids which are manifested as skarn and replacement mineralisation at surface

  • Opportunity to discover a large intrusive system in district where porphyry and related targets remain unexplored

==> picture [461 x 382] intentionally omitted <==

==> picture [381 x 232] intentionally omitted <==

==> picture [67 x 45] intentionally omitted <==

13 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

==> picture [239 x 282] intentionally omitted <==

==> picture [225 x 282] intentionally omitted <==

  • Significant polymetallic skarn mineralization and anomalies in the district – no defined source of fluids so far

  • Observations of mineralisation on Zupa permit leads to theory of a centrally located / blind source – remains untested to date

==> picture [754 x 308] intentionally omitted <==

----- Start of picture text -----

Cadinje Deposit
Zupa anomaly
Schematic representation of hypothetical setting of Zupa
----- End of picture text -----*

==> picture [67 x 45] intentionally omitted <==

  • Schematic representation of hypothetical setting of Zupa

14 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

4 PORPHYRY DEPOSITS NEIGHBOUR THE APPLICATION

  • 1 application approved (~5.8km[2] ), 3 pending (~30Km[2] )

  • 4 porphyry deposits neighbor the applications

  • Located within prolific Bor trend and directly adjacent to numerous world class deposits and smelter

  • Most of the porphyries contain a peripheral high grade skarn/epithermal component to the mineralisation, which have small footprints = exploration target

  • Targeting the peripheral high sulphidation mineralisation (Cukaru Peki style), at depth

==> picture [403 x 570] intentionally omitted <==

==> picture [67 x 45] intentionally omitted <==

15 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

RIO TINTO ARE TARGETING LARGE PORPHYRY SYSTEMS

  • Joint Venture agreement covers three of Raiden’s exploration licenses (Majdanpek West; Majdanpek Pojas and Donje Nevlje)

  • Rio Tinto have commenced exploration on licenses and have option to spend up to US$31.5m (~AUD$40m) to earn up to 75% project-level interest over three stages

  • Rio Tinto are targeting large porphyry systems and associated high sulphidation Cu-Au deposits

  • Transaction validates the prospectivity of these licenses

  • The Joint Venture will provide significant source of funding and will enable the Company to devote resources to exploration and development of its other assets

==> picture [462 x 562] intentionally omitted <==

==> picture [67 x 45] intentionally omitted <==

16 Australian Investor Roadshow August 2018

==> picture [39 x 49] intentionally omitted <==

Porphyry Cu-Au and epithermal targets

Leja Prospect

  • Located within the TMC volcanics with historical Cu anomalies

  • Adjacent to dormant, high grade Coka Marin deposit

  • Well developed infrastructure and within 10 km of large Majdanpek porphyry deposit

Gold Targets

Carlin Prospect

  • Targeting N-S striking sedimentary units

  • Numerous large deposits (2.4Moz)[1] within a few Km to the south (Dundee)

  • Previously defined geochemical anomalies (based on limited exploration completed

Blagojev Kamen

  • Ground holding adjacent to historical, high grade Au/Ag/W mines.

  • 17 Australian Investor Roadshow August 2018

==> picture [497 x 557] intentionally omitted <==

----- Start of picture text -----

Majdanpek
Epithermal
Majdnpek – 1 Bn ton
Au/Ag/W
Cu porphyry
Carlin Leja
prospect
prospect
Coka Marin – High grade epithermal
Au deposit/prospect poly-metalic deposit (undeveloped)
Cu deposit/prospect
Operating mine
Dormant mine
----- End of picture text -----

==> picture [67 x 45] intentionally omitted <==

  1. AVZ 2015 Corporate Presentation

==> picture [39 x 49] intentionally omitted <==

  • Cretaceous volcanic and intrusive (same suite as the Timok magmatic complex (‘TMC’), state defined as a ‘prospective Cu target’ in the 1960’s, as a result of mapping and magnetic survey

  • Historic magnetic survey suggests intrusive magmatic complex, which is reminiscent of TMC magnetic signature

  • Untested IP and geochemical anomalies

  • Anomalous historical drill results (281m@ ~0.1% Cu), no follow up drilling

  • Historic high grade Cu rock samples at surface

  • Significant Cu in soil anomaly (peaking +1000ppm Cu)

==> picture [495 x 416] intentionally omitted <==

  • Potential for discovery of entire new district

==> picture [67 x 45] intentionally omitted <==

18 Australian Investor Roadshow August 2018

Exploration Strategy

Aggressive exploration program geared towards discovery Well capitalised to deliver its 2018 exploration program De-risk cashflow through Joint Ventures with majors on early stage projects

==> picture [40 x 40] intentionally omitted <==

Stara Planina Project

- Q2 2018 COMPLETED Q3 2018 Ground IP, Mapping Maiden Drill and Sampling Program

==> picture [34 x 35] intentionally omitted <==

==> picture [34 x 35] intentionally omitted <==

Majdanpek West; Majdanpek Pojas and Donje Nevlje (Rio JV Projects) Exploration commenced Q3 2018 – VTEM and AM Program commenced over Majdanpek West/Pojas Projects. Donje Nevlje preparations finalized – field activities commencing soon.

Q4 2018 H1 2019 Phase 2 Drill Program Targeting Maiden Resource Pirot Project; Zupa Project; Bor Project Exploration programs are pending final approval by ministry

19 Australian Investor Roadshow August 2018

E. [email protected] M. Serbia: +381 656 027 968 M. Norway: +47 469 75786

ASX Copper Companies

Competitive Landscape – ASX Copper Companies

==> picture [952 x 514] intentionally omitted <==

----- Start of picture text -----

3.0bn 1.5bn 480m 460m
300
Producer
Explorer/developer Contained Cu (Right Hand Axis)
250
200
181
150
125
100
89
64
56
51 51
50
28 RDN
18
15
11
7 7
0
OZL SFR AMI AVB FND MOD KGL AL8 HAV HGO TLM RXM MEP HLX KMT RDN HMX
4000
3500
3000
2500
2000
Market Cap (A$m) Contained Cu (Kt)
1500
1000
500
0
----- End of picture text -----

Source: Discovery Capital Partners

21 Australian Investor Roadshow August 2018

Why Serbia?

Globally Significant and Underexplored Region

  • Government committed to increasing role of mining in economy

  • World class geology – Tier 1 deposits in operation & recent major discoveries

  • Modern exploration only recently commenced

  • Favourable regulatory structure:

  • No restrictions on foreign ownership

  • No government participation

  • 15% corporate tax rate

  • 5% NSR royalty

  • Modern mining law - exploration (8 years & exclusive right to mining licence)

  • Low energy costs – approx. $0.06 / kwh

  • Well serviced network of roads/rail linking mines to various port & smelters

  • All projects well serviced by roads, power and near rail

  • Granted EU candidate status (March 2012)

  • Highly skilled and cost competitive workforce

==> picture [415 x 588] intentionally omitted <==

22 Australian Investor Roadshow August 2018

Established Mining Jurisdiction

==> picture [118 x 56] intentionally omitted <==

Majors attracted by:

  • Numerous world-class discoveries

  • Long and established mining history

  • Government support and commitment to resource sector

Juniors attracted by:

  • Favourable geology with potential for major deposits

  • Lack of exploration since the 80’s / recent entrants rewarded

  • with Tier 1 discoveries (eg. Reservoir – Cukaru Peki)

  • Low cost operating environment

Private development companies attracted by:

  • Established legal framework for mine commissioning & operation

  • Low cost environment & mining skills allowing for profitability on small scale operations

==> picture [355 x 184] intentionally omitted <==

==> picture [274 x 147] intentionally omitted <==

==> picture [108 x 69] intentionally omitted <==

==> picture [325 x 116] intentionally omitted <==

  • 23 Australian Investor Roadshow August 2018