29 April 2016
Manager Companies Companies Announcements Office Australian Stock Exchange Limited
Quarterly report for the three months to March 31, 2016
Highlights
-
Achievement of a 2C ISG Gas Resource of 2,963.9 PJ at the Leigh Creek Energy Project independently assessed and certified by MHA Petroleum Consultants LLC (USA) in accordance with the Society of Petroleum Engineers – Petroleum Resources Management System (refer to ASX release dated 8 January 2016).
-
Treasury Share Sale Complete (refer to ASX release dated 16 February 2016).
Subsequent to quarter end the following has occurred;
-
Heads of Agreement signed with Shanghai Electric Power Generation Group (refer to ASX release dated 6 April 2016).
-
Gas Storage Exploration License ( GSEL ) obtained (refer ASX release dated 14 April 2016).
-
Placement to raise A$10.77m complete (refer ASX release dated 28 April 2016).
Leigh Creek Energy Project (LCEP)
Leigh Creek Energy ( LCK ) is developing the LCEP using in situ gasification ( ISG ) methods. This will initially deliver pipeline methane into the supply constrained gas market and generate reliable electricity supply for South Australian mining industrial users.
Initial PRMS ISG Gas Resources Certification
On 8 January 2016, LCK announced an initial ISG Gas Resource at the LCEP of:
1C 2,747.7 PJ
- 2C 2,963.9 PJ
3C 3,303.1 PJ
This was provided by MHA Petroleum Consultants LLC ( MHA ) and reported in accordance with the Society of Petroleum Engineers – Petroleum Resources Management System ( PRMS ).
==> picture [594 x 60] intentionally omitted <==
Seismic survey
LCK, in Feb 2016 acquired 18.3 line kilometres of new 2D seismic data at the LCEP. This survey provided valuable data enabling LCK to select a specific site for the ISG pre commercial facility planned for Q4 2016.
Engineering
The Basis of Design and aboveground and underground work scopes for the ISG pre commercial facility have been completed and put out to tender for detailed engineering design to begin. LCK is actively working with suppliers and fabricators in the upper Spencer Gulf region to construct and commission the pre commercial facility.
Approval for Pre Commercial Facility
LCK has begun the approvals process for the pre commercial facility, including the preparation of an Environmental Impact Report and associated Statement of Environmental Objectives. The approvals process will involve some drilling of wells on the site which will be used for baseline monitoring. These wells are planned to be drilled during the current quarter.
Path Forward – Pre Commercial Facility
The engineering and approvals work for the ISG pre commercial facility is underway. We anticipate operation of the facility towards the end of 2016. Successful operation of the pre commercial facility will result in the data and knowledge needed to finalise the commercial phase facility designs. The pre commercial facility will use commercial scale equipment and for this reason the transition from pre commercial to commercial will only require replication.
CO2 Sequestration
Initial work on carbon capture, and consumption of CO2 into various products has commenced in our efforts to reduce the carbon footprint of the LCEP. The primary focus remains investigating carbon sequestration within cavities underground.
Gas Storage Exploration Licence
LCK has obtained a Gas Storage Exploration License (GSEL 662) which will allow the LCEP to investigate the storage of product gas (methane) but also CO2.
As of 31 March 2016, LCK had a 100% interest in the licences listed below, all in South Australia, through LCK’s wholly owned subsidiary ARP TriEnergy Pty Ltd.
-
Petroleum Exploration Licence 650
-
Gas Storage Exploration Licence 662
-
Petroleum Exploration Licence Application 582
-
Petroleum Exploration Licence Application 643
-
Petroleum Exploration Licence Application 644
-
Petroleum Exploration Licence Application 647
-
Petroleum Exploration Licence Application 649
-
Exploration Licence 5596
-
Exploration Licence 5597
Page 2 of 4
Corporate
Heads of Agreement signed with Shanghai Electric Power Generation Group
LCK announced the signing of a Heads of Agreement ( HoA ) with Shanghai Electric Power Generation Group ( SEC ) to discuss the formation of a joint venture ( JV ) company to build, own and operate a gas fired power station in South Australia.
With the pending closure of the coal fired power stations located at Port Augusta, South Australia is more susceptible to power interruption caused by the variable dispatch of wind energy, related electricity grid destabilization and dependence on the electricity interconnect into Victoria on high electricity demand days when wind is not dispatching.
LCK understands that existing manufacturing and mining operations in South Australia are also facing increased power costs with future contracts for power supply being offered at more than double the price of the last few years. The combination of increasing power costs and increasing frequency of power interruption is problematic and costly for manufacturing and mining.
Power generated by the JV Company would come from syngas, not pipeline methane gas. Syngas is lower cost for the LCEP to produce because it does not involve the same level of gas processing and because it is likely we would use air and not oxygen as the principle oxygen supply medium.
Finance
At the end of the quarter, LCK’s cash balance was $778K. A summary of the cash flows for the quarter are attached in the Appendix 5B.
LCK had 6.2 million Treasury shares at the start of the quarter which have since been sold.
Placement to raise A$10.77m complete – post end of quarter
The Company announced that it had successfully completed a A$10.77m capital raising (before costs) by way of a private placement of 35,894,999 new fully paid ordinary shares in the Company ( Shares ) to sophisticated, professional and other investors at an issue price of A$0.30 per Share ( Placement ). State One Equities Pty Ltd acted as Sole Lead Manager to the Placement and was supported by the Company’s US advisor, New York based EAS Advisors LLC, acting through Merriman Capital, Inc.
The Company will also undertake an offer of options, which offer will be open only to the persons to whom the Shares offered under the Placement are issued and allotted. The offer will be a subscription for one option for every two Shares issued and allotted to it pursuant to the Placement at an exercise price of A$0.50 per Share, with an expiry date two years from the date of issue of the option. The grant of the options will be subject to the Company applying for the options to be admitted to official quotation on ASX. Further details on the placement and options can be found in the ASX release dated 28 April 2016.
The placement was another important step forward for the Company. To be able to raise this amount of money in what can safely be described as a “difficult” market was a great endorsement for LCK.
Pleasingly the capital raise was supported by many of our existing sophisticated investors and also new institutional (fund) investors located in Australia and also North America.
Page 3 of 4
Commenting on the quarterly progress, Executive Chairman Justyn Peters said:
“We are very pleased with the progress we have made this quarter with SEC and to have developed our relationship with SEC to the point where we have now agreed through a HoA to discuss the formation of a Joint Venture Company to generate reliable gas fired base load power in South Australia.
We see this as a great first step in our development as an energy company. The building, owning and operating of a power station ensures the success of our project, but also has the ability to provide cheaper, reliable power to industry and mines in South Australia.
The LCEP is also planned to produce methane for sale to external customers via a new pipeline.
In addition, the successful placement enables the Company to progress with baseline studies and work towards the ISG pre commercial facility at Leigh Creek.
Our efforts in South Australia have the potential to positively impact our wide community and importantly will help support existing businesses and potentially new businesses to our State by providing reliable and affordable power.”
For further information contact: Media
Justyn Peters Adam Jarvis Executive Chairman Six Degrees Investor Relations Leigh Creek Energy Ph: 0424 297 736 Ph: (08) 8132 9100 Email: [email protected]
Gas Resource Statement
Gas Resources reported in this announcement were initially reported and released to the ASX on 8 January 2016. Leigh Creek Energy Limited is not aware of any new information or data that materially affects the information included in the 8 January 2016 announcement and that all the material assumptions and technical parameters underpinning the estimates in that announcement continue to apply and have not materially changed. All Estimates are based on the deterministic method for estimation of petroleum resources.
About Leigh Creek Energy
Leigh Creek Energy Limited (LCK) is an emerging gas company focused on developing its Leigh Creek Energy Project (LCEP), located in South Australia. The LCEP will produce high value products such as methane, electricity and potentially fertiliser from the remnant coal resources at Leigh Creek utilising In Situ Gasification technologies, and will provide long term growth and opportunities to the communities of the northern Flinders Ranges and South Australia.
The Company is committed to developing the LCEP using a best practice approach to mitigate the technical, environmental and financial project risks to as low as can be reasonably achieved.
Leigh Creek Energy – bringing reliable energy to South Australia.
Page 4 of 4
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
Leigh Creek Energy Limited
ABN 31 107 531 822
Quarter ended (“current quarter”) 31 March 2016
Consolidated statement of cash flows
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other (provide details if material) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (9 months) $A’000 |
|---|---|---|
| (416) (1398) 1 |
(958) (3169) 4 |
|
| (1813) | (4123) | |
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
||
- See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 1
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
(1813) | (4123) |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) Net financing cash flows |
1720 | 3427 |
| 1720 | 3427 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end ofquarter |
(93) | (696) |
| 778 | 778 |
Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities
| 1.23 1.24 |
Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
|---|---|---|
| 171 | ||
| - | ||
| 1.25 | Explanation necessaryfor an understandingof the transactions | |
| 1.23 includes salaries and directors fees |
Non-cash financing and investing activities
- 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
N/A
- See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
N/A
Financing facilities available
Add notes as necessary for an understanding of the position.
| 3.1 Loan facilities 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
|---|---|---|
| Nil | - | |
| Nil | - |
Estimated cash outflows for next quarter
-
4.1 Exploration and evaluation
-
4.2 Development 4.3 Production 4.4 Administration Total
| $A’000 | ||||
|---|---|---|---|---|
| 4273 | ||||
| - | ||||
| - | ||||
| 1048 | ||||
| 5321 | ||||
| (*note: | the | Company | has | just |
| completed a A$10.77m capital raise) |
Reconciliation of cash
| Reconciliation of cash | ||
|---|---|---|
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter $A’000 |
Previous quarter $A’000 |
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) |
691 | 802 |
| 87 | 69 | |
| - | - | |
| - | - | |
| Total: cash at end of quarter(item 1.22) | 778 | 871 |
- See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 3
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
| 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements and petroleum tenements acquired or increased |
Tenement reference and location |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| N/A | ||||
| GSEL 662 | LCK’s wholly owned subsidiary ARP TriEnergy Pty Ltd acquired 100% of Gas Storage Exploration Licence 662. |
0% | 100% |
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note3) (cents) |
Amount paid up per security (see note3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs, redemptions |
N/A | |||
| 7.3 +Ordinary securities |
230,519,472 | 230,519,472 (Of which 104,767,190 Escrowed for 2 years from 03.07.2015 and 35,544,493 Escrowed for 1 year from 29.06.2015) |
- See chapter 19 for defined terms.
Appendix 5B Page 4
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
| 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs |
||||
|---|---|---|---|---|
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
N/A | |||
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
1,000,000 1,000,000 2,000,000 10,250,000 |
Exercise price 0.212 Exercise price 0.25 Exercise price 1.50 Exercise price 0.30 |
Expiry date 19.10.2019 Expiry date 19.10.2020 Expiry date 31.07.2020 Expiry date 30.11.2020 |
|
| 7.11 Debentures (totals only) |
||||
| 7.12 Unsecured notes(totals only) |
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
-
See chapter 19 for defined terms.
01/05/2010 Appendix 5B Page 5
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
- 2 This statement does give a true and fair view of the matters disclosed.
==> picture [126 x 49] intentionally omitted <==
Sign here: Company secretary Date: 29 April 2016
Print name: Jordan Mehrtens
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
-
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==
- See chapter 19 for defined terms.
Appendix 5B Page 6