AI assistant
MOHO RESOURCES LIMITED — Investor Presentation 2020
Nov 10, 2020
65359_rns_2020-11-10_bd6ac4f3-efc7-4565-8714-b2157c325038.pdf
Investor Presentation
Open in viewerOpens in your device viewer
THE MOHOROVICIC DISCONTINUITY:
THE BOUNDARY SEPARATING THE CRUST & MANTLE OF THE EARTH ACROSS WHICH SEISMIC WAVES CHANGE VELOCITIES
==> picture [894 x 152] intentionally omitted <==
INVESTOR PRESENTATION – November 2020
==> picture [960 x 12] intentionally omitted <==
This presentation is not a prospectus nor an offer or inducement to subscribe for shares in Moho Resources Ltd (Moho) and has not been lodged with the Australian Securities and Investments Commission. Except for any liability which cannot be excluded by law, Moho and its affiliates expressly disclaim and accept no responsibility or liability (including liability for negligence) for the contents of this document.
This presentation has been prepared for the consideration of interested parties in Moho and does not carry any right of publication or disclosure to any other party. This presentation is incomplete without reference to and should be viewed solely in conjunctions with the oral briefing provided by Moho’s management. Neither this presentation nor its content may be used for any other purpose without prior written consent of Moho.
The information contained in this presentation is of general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavour to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act upon such information without appropriate professional advice after a thorough examination of the particular situation.
This document may contain forward-looking statements. Investors are cautioned that forward‐looking statements are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward‐looking statements due to the inherent uncertainty therein.
This presentation is authorised for release by the board.
Disclaimer
==> picture [196 x 171] intentionally omitted <==
==> picture [960 x 12] intentionally omitted <==
KEY OBJECTIVIES
-
Increase share price through successful exploration
-
Maximise shareholder value through early stage cashflow generation
-
Minimise shareholder dilution by becoming a self-funded explorer
CAPITAL STRUCTURE
SHARES
OPTIONS
==> picture [456 x 181] intentionally omitted <==
----- Start of picture text -----
75M 27M
On Issue
(100%) (100%)
Share Price $0.115*
Option Price $0.035
Market Cap ~ $8.6M
Top 20 ~33%
----- End of picture text -----*
-
*Total number at COB 9 Nov 2020
-
**Share price at COB 9 Nov 2020
-
***Option price at COB 9 Nov 2020
****Options include director performance milestones
TIGHT CAPITAL STRUCTURE
==> picture [960 x 12] intentionally omitted <==
4
EXPERIENCED BOARD & TECHNICAL TEAM
• DIRECTORS
-
Terry Streeter (Non-Exec Chairman)
-
Shane Sadleir (Managing Director) - Geoscientist
-
Ralph Winter (Commercial Director) – Corporate
-
Adrian Larking (Non-Exec Director) - Geologist & Lawyer
-
TECHNICAL TEAM
-
Robert (Bob) Affleck (Exploration Manager)
-
Max Nind (Principal Geologist)
-
Dr Jon Hronsky (OAM) (Consultant geologist)
-
Kim Frankcombe (Consultant geophysicist)
-
Richard Carver (Consultant geochemist)
==> picture [960 x 12] intentionally omitted <==
5
==> picture [609 x 311] intentionally omitted <==
WINDOW OF OPPORTUNITY
-
current high gold price (~A$2,600/oz)
-
granted mining tenements prospective for gold mineralisation
-
proximity to existing gold mining infrastructure and toll treatment facilities
-
mining-friendly government and community in WA
PROJECTS
• Focus on Gold in WA & QLD
- Exposure to Nickel in prospective ground holdings around Poseidon’s Black Swan Nickel Operations
==> picture [371 x 347] intentionally omitted <==
==> picture [960 x 12] intentionally omitted <==
7
EMPRESS SPRINGS (QLD) – Au EXPLORING WORLD CLASS DEPOSITS MOHO’S COMPANY MAKER
-
Exploration for giant gold deposits under cover in virgin area
-
Moho discovered 3 separate mineralised areas
-
Moho holds most of the prospective ground (> 2,300km[2] )
-
20 km south of Croydon Goldfield (1.2M oz historic Au production)
-
Farm-in with IGO – 70% interest soon to be earned by Moho
==> picture [354 x 316] intentionally omitted <==
==> picture [355 x 178] intentionally omitted <==
==> picture [960 x 12] intentionally omitted <==
8
BURRACOPPIN (WA) - Au NEW DISCOVERY IN GREENSTONE BELT
-
Gold/silver mineralisation discovered by Moho in bedrock
-
In wheatbelt ~20km west of Edna May
-
On structural trend to Tampia gold deposit
-
Follow-up drilling planned Q1 2021
==> picture [960 x 12] intentionally omitted <==
9
EXPLORING FOR COMPANY MAKERS HOW DO WE GET THERE?
-
Mining studies towards gold production potential at 100% owned East Sampson Dam
-
Ramping up resource definition drilling at East Sampson Dam
-
Exploration drilling planned for additional resources at Silver Swan North project
Silver Swan North Gold Project (WA) Near Kalgoorlie
-
Potential for early stage cashflow
-
Extensive Land holding ~102km[2] (100% ownership)
-
Gold mineralisation at East Sampson Dam
-
High grade gold intersections on granted mining lease
-
Close proximity to mining infrastructure
==> picture [376 x 467] intentionally omitted <==
==> picture [960 x 12] intentionally omitted <==
11
Ideally Located to Mining Infrastructure
-
50km from Australia’s gold mining capital at Kalgoorlie
-
11 gold processing plants within 100km
-
Abundance of mining infrastructure, skills and services
==> picture [512 x 512] intentionally omitted <==
----- Start of picture text -----
12
----- End of picture text -----
Exploration Prioritised Towards Early Gold Production
-
Infill RC and diamond drill programs for maiden JORC Resource and Scoping Study at East Sampson Dam (ESD) within granted mining lease M27/263
-
Aircore drilling to test gold auger anomalies on M27/263 over 2.5km
-
Surface sampling confirms semi-continuous gold anomalism within Moho’s 100% owned tenements
-
Additional ground acquired
==> picture [392 x 494] intentionally omitted <==
----- Start of picture text -----
11km
----- End of picture text -----
==> picture [960 x 12] intentionally omitted <==
13
GOLD MINING INVESTIGATIONS UNDERWAY
==> picture [385 x 216] intentionally omitted <==
-
Excellent preliminary metallurgical results & Phase 1 RC drilling completed – Aug 2020
-
Flora and Fauna survey completed - no environmental impediments identified
-
Aboriginal heritage survey completed – no sites of cultural or archaeological significance identified
-
Potential toll milling arrangements under investigation
-
Pit optimisation studies - ongoing
-
Phases 2 RC and diamond drilling at East Sampson Dam - underway
-
Maiden JORC Mineral Resource* – Q1 2021
-
Scoping Study* – H1 2021
==> picture [960 x 12] intentionally omitted <==
14
*Subject to drill rig availability
==> picture [683 x 540] intentionally omitted <==
----- Start of picture text -----
15
----- End of picture text -----
ON TRACK TO BECOME SELF FUNDED EXPLORER AND PRODUCER
Cashflow from East Sampson Dam gold production will enable exploration for company maker gold deposits