ASX Announcement
31 August 2022
----- End of picture text -----
==> picture [595 x 50] intentionally omitted <==
----- Start of picture text -----
Half Year Financial Report for the period ended 30 June 2022
----- End of picture text -----
Half Year Results
Metro Mining Limited (ASX: MMI) has released its half year financial results for the period ended 30 June 2022, recording a loss for the half-year of $29.4 million (30 June 2021: loss of $87.1 million). The financial performance for the half-year period was impacted by the following operational and seasonal factors:
-
The planned wet season shutdown of operations from 16 February 2022 to 10 April 2022;
-
An increase in unplanned maintenance on an ageing heavy truck fleet in April 2022; since remedied by short-term replacement hire for the remainder of the financial period; and
-
Unseasonably poor weather conditions impacting shipping at Skardon River in May and June 2022.
During the half-year period Metro has reduced uncertainty and exposure to volatility through the following measures:
-
Ocean freight exposure has been reduced with the execution of Contracts of Affreightment, resulting in freight coverage on substantially all CIF contracted sales through to 2024;
-
Foreign currency exposure is being managed through foreign exchange hedging instruments in place for the remainder of the financial period; and
-
Expansion of the Bauxite Hills Mine from 4 to 7 million Wet Metric Tonnes (WMT) capacity per annum has been approved by the Board, subject to financing. The expansion is underpinned by a definitive feasibility study and additional offtake from foundation customer Xinfa, increasing the Group’s committed offtake volume to 5 million Dry Metric Tonnes (DMT) for 2023 and 6 million DMT for 2024.
Subsequent to the half-year period, Metro successfully completed a $25.4 million two-tranche capital placement, comprised of $18.9 million in additional funds and a $6.5 million loan conversion of a portion of the short-term working capital facilities, and a Share Purchase Plan capped at $2 million.
The first placement tranche of $14.9 million was received in August 2022 with the second placement tranche, comprised of the remaining $4.0 million in additional funds and loan conversion, subject to shareholder approval at an Extraordinary General Meeting to be held on 15 September 2022.
Production Update
Since the release of the Q2 2022 Activities Report the operation has experienced further shipping delays due to unseasonably adverse weather. The additional shipping delays has reduced the likelihood of Metro achieving the upper end of the previous guidance given the existing floating crane capacity. On this basis, the 2022 production guidance has been revised to a range of 3.6 to 3.8 million wet metric tonnes (WMT), reduced from a range of 3.6 to 4.0 million WMT as communicated in the Q2 2022 activities report.
==> picture [596 x 134] intentionally omitted <==
----- Start of picture text -----
ASX Announcement
31 August 2022
----- End of picture text -----
==> picture [70 x 75] intentionally omitted <==
ASX: MMI | ACN 117 763 443
Further Info: P : +61 (0) 7 3009 8000 | E : [email protected] |W: www.metromining.com.au Contact: Simon Wensley, Managing Director & CEO | Mitchell Petrie, Co Secretary Address: Level 2, 247 Adelaide St, Brisbane | GPO Box 10955, Brisbane Q 4000 This ASX Announcement has been authorised by, Metro Mining Director, Simon Wensley.
FORWARD LOOKING STATEMENT Statements & material contained in this ASX Release, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of Metro Mining, industry growth or other trend projections are, or may be, forward looking statements. Such statements relate to future events & expectations and, as such, involve known and unknown risks & uncertainties. Although reasonable care has been taken to ensure facts stated in this Release are accurate and/or that the opinions expressed are fair & reasonable, no reliance can be placed for any purpose whatsoever on the information contained in this document or on its completeness. Actual results & developments may differ materially from those expressed or implied by these forward-looking statements depending on a variety of factors. Nothing in this Release should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
Metro Mining Limited and Controlled Entities
ABN 45 117 763 443
Appendix 4D
Results for announcement to the market
(all comparisons to half-year ended 30 June 2021)
| Results for announcement to the market (all comparisons to half-year ended 30 June 2021) |
|||
|---|---|---|---|
| Revenue from ordinary activities Loss after tax from ordinary activities Underlying loss before tax from ordinary activities(i) Underlying EBITDA from ordinary activities(i) |
$’000s | Movement | Movement% |
| 63,409 (29,392) (27,428) (18,492) |
Increase Decrease Increase Decrease |
100% 66% (20%) (12%) |
(i) The financial results of Metro Mining Limited are reported under International Financial Reporting Standards (IFRS). These half-year results include certain non-IFRS measures including Underlying Loss after Tax from Ordinary Activities and Underlying EBITDA. These measures are consistent with measures used internally and are presented to enable understanding of the underlying performance of the Company. Non-IFRS measures have not been subject to audit or review. A reconciliation to Loss after Tax from Ordinary Activities is included below.
The financial performance for the half-year period was impacted by the following operational and seasonal factors: (i) The planned wet season shutdown of operations from 16 February 2022 to 10 April 2022; (ii) an increase in unplanned maintenance on an ageing heavy truck fleet in April 2022; since remedied by short-term replacement hire for the remainder of the financial period; and (iii) unseasonably poor weather conditions impacting shipping at Skardon River in May and June 2022.
Dividend information
No dividends were declared or paid during the financial period.
Net tangible assets per security
| Net tangible assets per security | ||
|---|---|---|
| Net tangible assets per security | 30 Jun 2022 | 30 Jun 2021 |
| $0.002 | $0.018 |
Reconciliation of loss before tax from ordinary activities to underlying EBITDA from ordinary activities
| Loss before tax from continuing operations Foreign exchange loss Amortisation of deferred borrowing costs Impairment Underlying loss before tax Net finance costs (excluding leasing expense) Depreciation and amortisation Underlying EBITDA from ordinary activities |
6 Months | 6 Months |
|---|---|---|
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000s | $’000s | |
| (29,392) 1,964 - - |
(77,939) (280) 39 55,316 |
|
| (27,428) 2,734 6,202 |
(22,864) 1,837 4,522 |
|
| (18,492) | (16,505) |
1
Metro Mining Limited and Controlled Entities
ABN 45 117 763 443
Appendix 4D (Continued)
This information should be read in conjunction with the 31 December 2021 Annual Report.
Additional information supporting the Appendix 4D disclosure requirements can be found in the Directors’ Report and the consolidated financial statements for the half-year ended 30 June 2022.
This report is based on the consolidated financial statements for the half-year ended 30 June 2022 which have been reviewed by Ernst & Young.
2
==> picture [255 x 223] intentionally omitted <==
Metro Mining Limited and Controlled Entities ABN 45 117 763 443
Interim Financial Report for the Half-Year Ended 30 June 2022
CONTENTS
| Page | |
|---|---|
| Directors’ Report | 1 |
| Auditor’s Independence Declaration | 6 |
| Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income | 7 |
| Condensed Consolidated Balance Sheet | 8 |
| Condensed Consolidated Statement of Changes in Equity | 9 |
| Condensed Consolidated Statement of Cash Flows | 10 |
| Notes to the Condensed Financial Statements | 11 |
| Directors’ Declaration | 22 |
| Independent Auditor’s Review Report to the Members | 23 |
Metro Mining Limited is a company limited by shares, incorporated, and domiciled in Australia. Its registered office and principal place of business is at Level 2, 247 Adelaide Street, Brisbane, Queensland 4000. Its shares are listed on the Australian Securities Exchange.
Metro Mining Limited Directors’ Report 30 June 2022
The directors present their report on the consolidated entity consisting of Metro Mining Limited (the Company and the entities it controlled at the end of, or during, the half-year ended 30 June 2022 (the Group).
1. DIRECTORS
The directors of the Group during the half-year ended 30 June 2022 and up to the date of this report are set out below. Directors were in office for the entire period unless otherwise stated.
-
Douglas Ritchie Independent Non-Executive Director and Chairman
-
Fiona Murdoch Independent Non-Executive Director
-
Stephen Everett Independent Non-Executive Director – Resigned 28 February 2022
-
Andrew Lloyd Independent Non-Executive Director – Appointed 28 February 2022
-
Mark Sawyer Non-Executive Director
-
Simon Wensley Managing Director and Chief Executive Officer
2. REVIEW OF OPERATIONS
The loss for the half-year was $29.39 million (30 June 2021: loss of $87.10 million). The financial performance for the half-year period was impacted by the following operational and seasonal factors:
-
The planned wet season shutdown of operations from 16 February 2022 to 10 April 2022;
-
An increase in unplanned maintenance on an ageing heavy truck fleet in April 2022; since remedied by short-term replacement hire for the remainder of the financial period; and
-
Unseasonably poor weather conditions impacting shipping at Skardon River in May and June 2022.
The Group has reduced uncertainty and exposure to volatility through the following measures:
-
Ocean freight exposure has been reduced with the execution of Contracts of Affreightment, resulting in freight coverage on substantially all CIF contracted sales through to 2024;
-
Foreign currency exposure is being managed through foreign exchange hedging instruments in place for the remainder of the financial period; and
-
Expansion of the Bauxite Hills Mine from 4 to 7 million Wet Metric Tonnes (WMT) capacity per annum has been approved by the Board, subject to financing. The expansion is underpinned by a definitive feasibility study and additional offtake from foundation customer Xinfa, increasing the Group’s committed offtake volume to 5 million Dry Metric Tonnes (DMT) for 2023 and 6 million DMT for 2024.
Overview
The Group’s key project is the Bauxite Hills mine located in Cape York, Queensland. This has been the focus of Group activities during the first half of 2022. Operational highlights include:
-
Shipments of 1,179k WMT for the half-year following the extension of operations into the wet season until 16 February to satisfy customer sales contracts;
-
The average price received for the half-year period was A$53.78/WMT;
-
The Floating Crane Barge loading rates and capability continued to improve in the period, achieving nameplate capacity as processes and operator experience improves; and
-
The 2022 rehabilitation program is well progressed with over 50 hectares prepared in readiness for seeding.
1
2. REVIEW OF OPERATIONS (continued)
Sales Outlook
As part of the expansion plan announced in June 2022, the Group announced that a Binding Offtake Agreement has been signed with the Xinfa Group to supply an additional 1 million DMT in 2023 on a CIF basis and 2 million DMT in 2024 on an FOB basis at fixed prices above current contract levels. This is in addition to the existing 3-year 2 million DMT per annum FOB contract which features a quarterly negotiated pricing mechanism to reflect the market.
Financial Performance Summary
For the half-year ended 30 June 2022, the Group generated revenue of $63.41 million from bauxite sales and recorded a net loss after tax of $29.39 million. Cash and trade and other receivables for the Group was $17.34 million and net current liabilities at half-year end were $37.75 million.
| Revenue from contracts with customers Cost of sales Gross loss Impairment Other income / (expenses) Loss before income tax and net finance expenses Financial income Financial expenses Loss before income tax benefit / (expense) Income tax benefit / (expense) Loss after income tax from continuing operations |
6 Months | 6 Months |
|---|---|---|
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| 63,409 (84,112) (20,703) - (4,485) (25,188) 23 (4,227) (29,392) - (29,392) |
31,650 (48,862) (17,212) (55,316) (2,628) (75,156) 550 (3,333) (77,939) (9,156) (87,095) |
Underlying EBITDA Result (non-IFRS measure)
Underlying EBITDA reflects statutory EBITDA as adjusted to reflect the directors’ assessment of the result for the ongoing business activities of the Group. These numbers have not been audited.
| Loss before tax from continuing operations Foreign exchange loss / (gain) Amortisation of deferred borrowing costs Impairment of Bauxite Hills cash-generating unit Underlying loss before tax Net finance costs (excluding leasing expense) Depreciation and amortisation Underlying EBITDA from ordinary activities |
(29,392) 1,964 - - (27,428) 2,734 6,202 (18,492) |
(77,939) (280) 39 55,316 (22,864) 1,837 4,522 (16,505) |
|---|---|---|
2
2. REVIEW OF OPERATIONS (continued)
Cashflow
For the half-year ended 30 June 2022 net cash outflow was $2.28 million. The net outflow from operating activities was $0.37 million and net cash outflows from investing activities were $2.54 million. The net cash inflow of $0.63 million from financing activities relates to proceeds from additional finance facilities, the payment of interest, and the net repayment of loan principal and lease payments.
| Net cash at the beginning of the half-year Net cash from operating activities Net cash from investing activities Net cash from financing activities Net decrease in cash held Net foreign exchange difference Net cash at the end of the half-year Bauxite Hills Project – Cape York, Queensland Bauxite Production and Sales Review Key Statistics Bauxite mined Bauxite shipped Average sales price per tonne shipped |
6 Months | 6 Months |
|---|---|---|
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| 13,883 (366) (2,549) 634 |
25,447 (10,881) (271) (5,861) |
|
| (2,281) (1,008) 10,594 |
(17,013) 116 8,550 |
|
| 6 Months | 6 Months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| ‘000 WMT | ‘000 WMT | |
| 1,044 1,179 |
729 629 |
|
| 6 Months | 6 Months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| A$ per WMT | A$ per WMT | |
| $53.78 | $49.90 |
3
2. REVIEW OF OPERATIONS (continued)
Bauxite Hills Project – Cape York, Queensland (continued)
Bauxite Production and Sales Review
Mining for the half-year was 1,044k WMT with 1,179k WMT shipped, at the end of the half-year period there was 87k WMT on the stockpile.
Several initiatives and major improvements were implemented to improve operational resilience:
-
Incorporation of lessons learned from operating in the 2021/22 wet season, including changes to screen sizes and operational practice, and conveyor belt maintenance programs;
-
Dry hire and maintenance contract with mobile mining fleet partner, Blake Machinery Group Pty Ltd, of additional prime movers on a short-term basis to replace the ageing fleet; and
-
Additional workforce for labour coverage in the event of COVID and flu outbreaks to provide additional capacity and consistency of operational performance.
The 2022 rehabilitation program progressed during the half year period with over 50 hectares prepared in readiness for seeding later in the year. Rehabilitation activities were on track and undertaken in accordance with the mine rehabilitation strategy.
Stage 2 Expansion
In June 2022 the Group’s announced approval, subject to financing, of its Bauxite Hills expansion strategy to increase annual production capacity to 7 million WMT per annum.
The key components of the expansion are:
-
Construction and mobilisation to Skardon River of a second Floating Crane Barge;
-
Optimisation and upgrading the existing screening, conveying and barge loading facilities; and
-
Scaling up of the current haulage and transhipment fleet.
Indigenous Engagement
The Group continues to prioritise the employment of personnel from the traditional owners of the land, the Ankamuthi people, and other Indigenous employees. Approximately 30% of positions at the Bauxite Hills mine are held by indigenous employees which meets the Group’s indigenous workforce target 30%.
The Group continues to promote engagement with the local communities in which it operates and is pleased to sponsor community events that encourage and maintain the cultural heritage of the region. Included among the activities undertaken during the half-year were:
-
The Group has recently finalised arrangements with an Ankamuthi led business to conduct cultural heritage monitoring services at the Bauxite Hills Mine site.
-
The sponsorship of, and direct engagement in, a number of events. These included indigenous art and literacy workshops for primary schools in the communities of Mapoon, Bamaga, Injinoo, Hope Vale, Weipa and Aurukun; the Northern Peninsula Area Regional Council’s (NPARC) ‘Keep the Flame of Culture Burning’ Festival, that held indigenous cultural events across all five communities in the NPARC; and the OMAC, Mapoon Aboriginal Council and Tangaroa Blue’s Beach Clean-up initiative at the start of NAIDOC Week, with the theme Healing Country.
The Group views the promotion of cultural awareness among its employees and contract partners as a priority. All employees and contract partners are required to complete cultural awareness training prior to commencement of their work on site.
4
2. REVIEW OF OPERATIONS (continued)
Bauxite Hills Project – Cape York, Queensland (continued)
Safety Performance
The Group is committed to providing a safe working environment for its employees and contract partners and to fostering a good safety culture. All incidents are thoroughly investigated, and the findings acted on to continuously improve the Group’s safety systems.
Debt Facilities
The Group has two drawn senior debt facilities, $27.5 million outstanding to Ingatatus AG Pty Ltd (a related party of the Group’s substantial shareholder, Balanced Property Pty Ltd) and $7.5 million outstanding to substantial shareholder, Lambhill Pty Ltd (Lambhill). Under the existing terms of the Ingatatus AG Pty Ltd facility an initial principal payment of $9.2 million is due and payable on 1 June 2023 and has been classified as a currently liability for the half year period ended 30 June 2022.
During the half-year period, Lambhill and Greenstone Resources II (Australia) Holdings L.P. (Greenstone) provided unsecured short-term working capital facilities of $4.5 million and $5.0 million, respectively, maturing on 14 October 2022. The facilities include an option at the lender’s discretion to convert to equity a portion of the facility, limited to maintaining its existing shareholdings, in the event of the Group issuing shares to raise capital. Following the Group’s capital raise on 28 July 2022, Lambhill and Greenstone provided notice to the Group of the intention to convert to equity $1.6 million and $4.9 million, respectively, subject to shareholder approval at an Extraordinary General Meeting to be held on 15 September 2022.
The Financial Close sunset date of the $47.5 million loan facility with the Northern Australia Infrastructure Facility (NAIF) was extended to 31 December 2022. Following the approval of the Stage 2 expansion, the Group has engaged with NAIF to refresh the credit approval process based on the expansion’s definitive feasibility study with the intention of achieving Financial Close in the current financial period.
3. AUDITOR’S INDEPENDENCE DECLARATION
The auditor’s independence declaration under Section 307C of the Corporations Act 2001 is set out on page 6 for the half-year ended 30 June 2022.
4. ROUNDING OF AMOUNTS
The Group is of a kind referred to in ASIC Legislative Instrument 2016/191 relating to the ‘rounding off’ of amounts in the directors’ report and financial report. Amounts in the directors’ report and financial report have been rounded off to the nearest thousand dollars in accordance with this instrument.
This report is signed in accordance with a resolution of the Board of Directors.
Signed:
==> picture [154 x 79] intentionally omitted <==
Douglas Ritchie Chairman Date: 30 August 2022
5
==> picture [86 x 101] intentionally omitted <==
Ernst & Young Tel: +61 7 3011 3333 111 Eagle Street Fax: +61 7 3011 3100 Brisbane QLD 4000 Australia ey.com/au GPO Box 7878 Brisbane QLD 4001
Auditor’s Independence Declaration to the Directors of Metro Mining Limited
As lead auditor for the review of the half-year financial report of Metro Mining Limited for the half-year ended 30 June 2022, I declare to the best of my knowledge and belief, there have been:
-
a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the review ; and
-
b) no contraventions of any applicable code of professional conduct in relation to the review.
-
c) No non-audit services provided that contravene any applicable code of professional conduct in relation to the review.
This declaration is in respect of Metro Mining Limited and the entities it controlled during the financial period.
==> picture [140 x 77] intentionally omitted <==
Ernst & Young
==> picture [98 x 61] intentionally omitted <==
Matthew Taylor Partner 30 August 2022
A member firm of Ernst & Young Global Limited Liability limited by a scheme approved under Professional Standards Legislation
Metro Mining Limited Condensed consolidated statement of profit or loss and other comprehensive income For the half-year ended 30 June 2022
| Note Revenue from contracts with customers 2 Cost of sales Gross loss Other income Impairment expense 3 Exploration expenses Administrative expenses Operating loss Finance costs Finance income 3 Foreign exchange gains / (losses) Loss before tax from continuing operations Income tax benefit / (expense) 3 Loss for the half-year from continuing operations Other comprehensive income Items that will be reclassified to profit or loss when specific conditions are met: Foreign currency translation differences Loss for the half-year Attributable to: Owners of the Company Basic loss per share Diluted loss per share |
Consolidated | Consolidated |
|---|---|---|
| 6 months | 6 months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| 63,409 (84,112) |
31,650 (48,862) |
|
| (20,703) 172 - (71) (2,622) |
(17,212) 52 (55,316) (7) (2,953) |
|
| (23,224) (4,227) 23 (1,964) |
(75,436) (3,333) 550 280 |
|
| (29,392) - |
(77,939) (9,156) |
|
| (29,392) | (87,095) | |
| - | - | |
| (29,392) | (87,095) | |
| (29,392) | (87,095) | |
| (29,392) | (87,095) | |
| Cents | Cents | |
| (0.98) (0.98) |
(6.27) (6.27) |
The above condensed consolidated statement of profit or loss and other comprehensive income should be read in conjunction with the accompanying notes.
7
Metro Mining Limited Condensed consolidated balance sheet As at 30 June 2022
| Note Assets Current assets Cash and cash equivalents Inventories Trade and other receivables Restricted cash Other assets Total current assets Non-current assets Property, plant and equipment 6 Right-of-use assets Exploration and evaluation assets Total non-current assets Total assets Liabilities Current liabilities Trade and other payables Lease liabilities 7 Borrowings 8 Other financial liabilities Provisions Total current liabilities Non-current liabilities Trade and other payables Lease liabilities 7 Borrowings 8 Provisions Total non-current liabilities Total liabilities Net assets Equity Contributed equity 9 Reserves Accumulated losses Total equity |
Consolidated | Consolidated |
|---|---|---|
| 30 Jun 2022 | 31 Dec 2021 | |
| $’000 | $’000 | |
| 10,594 4,264 6,741 788 2,520 |
13,883 6,400 16,805 - 3,534 |
|
| 24,907 80,229 26,806 1,253 |
40,622 79,385 31,073 1,186 |
|
| 108,288 133,195 32,501 9,013 19,273 1,227 646 |
111,644 152,266 35,047 9,929 1,167 - 771 |
|
| 62,660 5,219 18,170 25,429 8,935 |
46,914 - 21,670 34,596 7,093 |
|
| 57,753 120,413 12,782 |
63,359 110,273 41,993 |
|
| 200,959 10,080 (198,257) |
200,959 9,899 (168,865) |
|
| 12,782 | 41,993 |
The above condensed consolidated balance sheet should be read in conjunction with the accompanying notes.
8
Metro Mining Limited
Condensed consolidated statement of changes in equity For the half-year ended 30 June 2022
| Consolidated Balance at 1 January 2021 Comprehensive loss for the half-year Loss after income tax benefit Other comprehensive income, net of tax Total comprehensive loss for the half-year Transactions with owners in their capacity as owners Shares subscribed for during the half-year Share-based payments – employees Total transactions with owners Balance at 30 June 2021 Balance at 1 January 2022 Comprehensive loss for the half-year Loss after income tax benefit Other comprehensive income, net of tax Total comprehensive loss for the half-year Transactions with owners in their capacity as owners Shares subscribed for during the half-year Share-based payments – employees Total transactions with owners Balance at 30 June 2022 |
Contributed | Translation | Options | Employee Share Acq. |
Accumulated | Total |
|---|---|---|---|---|---|---|
| Equity | Reserve | Reserve | Reserve | Losses | Equity | |
| $’000 | $’000 | $’000 | $’000 | $’000 | $’000 | |
| 176,419 - - |
1 - - |
9,868 - - |
(8) - - |
(63,365) (87,095) - |
122,915 (87,095) - |
|
| - | - | - | - | (87,095) | (87,095) | |
| 71 | - | - | - | - | 71 | |
| - | - | (112) | - | - | (112) | |
| 71 | - | (112) | - | - | (41) | |
| 176,490 | 1 | 9,756 | (8) | (150,460) | 35,779 | |
| 200,959 - - |
1 - (8) |
9,906 - - |
(8) - - |
(168,865) (29,392) - |
41,993 (29,392) (8) |
|
| - | (8) | - | - | (29,392) | (29,400) | |
| - - |
- - |
- 189 |
- - |
- - |
- 189 |
|
| - | - | - | - | - | - | |
| 200,959 | (7) | 10,095 | (8) | (198,257) | 12,782 |
The above condensed consolidated statement of changes in equity should be read in conjunction with the accompanying notes.
9
Metro Mining Limited Condensed consolidated statement of cash flows For the half-year ended 30 June 2022
| Cash flows from operating activities Receipts from customers Payments to suppliers and employees Other revenue Interest received Net cash outflow from operating activities Cash flows from investing activities Payments for plant and equipment Payments for exploration and evaluation assets Payments for assets under construction Return of / (payments for) financial assurance and other security bonds Net cash inflow / (outflow) from investing activities Cash flows from financing activities Proceeds from subscription for shares Share issue transaction costs Proceeds from borrowings Repayment of borrowings Interest paid Principal elements of lease payments Debt facility transaction costs Net cash outflow from financing activities Net decrease in cash and cash equivalents Net foreign exchange difference Cash and cash equivalents at the beginning of the half-year Cash and cash equivalents at the end of the half-year |
Consolidated | Consolidated |
|---|---|---|
| 6 months | 6 months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| 73,682 (74,243) |
22,564 (33,511) |
|
| (561) 172 23 |
(10,947) 52 14 |
|
| (366) | (10,881) | |
| (1,071) (690) - (788) |
(40) (93) (129) (9) |
|
| (2,549) | (271) | |
| - - 9,500 (549) (2,069) (6,043) (205) |
71 (43) - (367) (3,001) (2,495) (26) |
|
| 634 | (5,861) | |
| (2,281) (1,008) 13,883 |
(17,013) 116 25,447 |
|
| 10,594 | 8,550 |
The above condensed consolidated statement of cash flows should be read in conjunction with the accompanying notes.
10
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
1. GOING CONCERN
At 30 June 2022, the Group had $10.59 million (31 December 2021: $13.88 million) in cash on hand, net current liabilities of $37.75 million (31 December 2021: $6.29 million) and recorded a net loss of $29.39 million (30 June 2021: loss of $87.10 million) for the half-year. The Group’s net cash operating outflows for the halfyear was $0.37 million (30 June 2021: $10.88 million).
The financial performance for the half-year period was impacted by the following operational and seasonal factors:
-
The planned wet season shutdown of operations from 16 February 2022 to 10 April 2022;
-
An increase in unplanned maintenance on an ageing heavy truck fleet in April 2022; since remedied by short-term replacement hire for the remainder of the financial period; and
-
Unseasonably poor weather conditions impacting shipping at Skardon River in May and June 2022.
Offsetting the above and implemented during the period to 30 June 2022, the Group has reduced uncertainty and exposure to volatility through the following measures:
-
Ocean freight exposure has been reduced with the execution of Contracts of Affreightment, resulting in freight coverage on substantially all CIF contracted sales to 2024;
-
Foreign currency exposure is being managed through foreign exchange hedging instruments in place for the remainder of the financial period; and
-
Expansion of the Bauxite Hills Mine has been approved, subject to financing, and underpinned by binding offtake up to 5 million and 6 million WMT in 2023 and 2024, respectively.
The Directors, in their consideration of the appropriateness of the going concern basis for the preparation of the half year financial statements, have prepared a cash flow forecast through to at least 12 months from approving these financial statements, which includes the following measures in their assessment:
-
Completion of a $25.4 million two-tranche capital placement, comprised of $18.9m in additional funds and a $6.5m loan conversion of a portion of the short-term working capital facilities. The first tranche of $14.9m has been received in August 2022. Receipt of the second tranche, comprised of the remaining $4.0m in additional funds and loan conversion, is subject to shareholder approval at an Extraordinary General Meeting to be held on 15 September 2022;
-
Ability to restructure the entire senior debt to a longer tenor facility prior to its expiry. The first principal payments of $11.7m will become due and payable in June 2023 and July 2023; and
-
Continued support from lenders, creditors and regulatory bodies.
-
Continued improvement in Floating Crane Barge loading rates and its capacity to achieve production guidance
Based on the measures outlined above, ongoing cash management, a history of flexibility shown by lenders and creditors, and a refinancing process which is underway, the directors believe that it remains appropriate to prepare the financial statements on a going concern basis, which contemplates the continuity of normal business activities and the realisation of assets and settlement of liabilities in the ordinary course of business.
The financial report does not include any adjustments relating to the recoverability and classification of recorded asset amounts or to the amounts and classification of liabilities that might be necessary should the entity not continue as a going concern.
11
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
2. REVENUE
The loss for the half-year includes the following items:
| Revenue from contracts with customers Revenue from sales of bauxite |
Consolidated | Consolidated |
|---|---|---|
| 6 months | 6 months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| 63,409 | 31,650 |
Seasonality of operations
Revenue for the half-year ended 30 June 2022 was generated from the shipment of 1,179k Wet Metric Tonnes (WMT) of bauxite (30 June 2021: 629k WMT) from the Group’s Bauxite Hills operation.
The Bauxite Hills operation continued to mine and ship into the wet season to satisfy customer contracts, shipping 330k WMT from 1 January 2022 to 16 February 2022. On recommencement of shipping, a further 849k WMT was shipped from 11 April 2022 to 30 June 2022.
3. PROFIT AND LOSS INFORMATION
The loss for the half-year includes the following select items that are unusual because of their nature, size or incidence:
| Gains Gain on loan modification (i) Expenses Impairment expense – Bauxite Hills cash generating unit (ii) Income tax (benefit) / expense (iii) |
Consolidated | Consolidated |
|---|---|---|
| 6 months | 6 months | |
| 30 Jun 2022 | 30 Jun 2021 | |
| $’000 | $’000 | |
| - - - |
544 (55,316) (9,156) |
(i) Gain on loan modification
In the prior financial period, the Group renegotiated the terms of its existing loan facilities with its senior secured lenders by extending the loan repayment dates for each facility. The renegotiation resulted in the recognition of a non-recurring modification gain of $544,142 which was included in Finance Income in the consolidated statement of profit or loss in the prior period.
(ii) Impairment expense – Bauxite Hills cash generating unit
In the prior period an impairment expenses of $55,316,000 was recognised in relation to the Bauxite Hills Cash Generating Unit (CGU).
12
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
3. PROFIT AND LOSS INFORMATION (CONTINUED)
(iii) Income tax (benefit) / expense
derived in future periods against which to offset these assets.
the probability associated with realising these cash flows, and determines whether the deferred tax assets of the Group should continue to be recognised.
The Group has previously assessed that it can no longer be considered probable that the portion of the Group’s carry-forward tax losses and temporary differences previously recognised will be used to offset future taxable profits. The Group continues to assess that it is not probable that tax losses and temporary differences will be utilised to offset future taxable profits, until such time as the Group’s planned Stage 2 expansion of the Bauxite Hills operation is financed and operating. The Group’s deferred tax assets, including carry forward losses, were derecognised in full at 30 June 2021.
4. SEGMENT REPORTING
Identification of reportable operating segments
The Group has identified its operating segments based on the internal reports that are reviewed and used by the Board of Directors (chief operating decision makers) in assessing performance and determining the allocation of resources. Financial information provided to the Board is currently at the consolidated level.
The Group is managed primarily on a geographic basis; that is the location of the respective areas of interest (tenements). Management currently identifies the Group as having only one reportable segment, being the production and sale of bauxite from its Australian project at the Bauxite Hills mine in Queensland. All significant operating decisions are based upon analysis of the Group as one segment. The financial results from this segment are equivalent to the financial statements of the Group as a whole.
The Group’s customers are all located in one geographic area, China, with 100% of the revenue from sales of bauxite derived in the half-year being from that area. The Group had two customers who accounted for 100% of its revenue from contracts with customers during the half-year.
5. DIVIDENDS
No dividends were declared or paid during the half-year.
13
Notes to the condensed financial statements For the half-year ended 30 June 2022
Metro Mining Limited
6. PROPERTY, PLANT AND EQUIPMENT
| Consolidated At 31 December 2021 Cost Impairment Expense (i) Accumulated depreciation Net book amount Half-year ended 30 June 2022 Opening net book amount Additions Transferred from assets under construction Disposals Depreciation expense Closing net book amount |
Other | Assets | ||||
|---|---|---|---|---|---|---|
| Plant and | Infra- | Ancillary | mineral | under | ||
| equipment | structure | assets | assets | construction | Total | |
| $’000 | $’000 | $’000 | $’000 | $’000 | $’000 | |
| 5,701 (160) |
37,271 (15,689) (754) |
1,504 (541) |
90,634 (38,586) (1,867) |
1,872 - |
136,982 (54,275) (3,322) |
|
| 5,541 | 20,828 | 963 | 50,181 | 1,872 | 79,385 | |
| 5,541 496 - - (105) |
20,828 - - - (448) |
963 519 - (3) (275) |
50,181 1,711 - - (1,107) |
1,872 1,068 (1,012) - - |
79,385 3,794 (1,012) (3) (1,935) |
|
| 5,932 | 20,380 | 1,204 | 50,785 | 1,928 | 80,229 |
14
6. PROPERTY, PLANT AND EQUIPMENT (continued)
- (i) AASB 136 Impairment of Assets requires the Group to assess throughout the reporting period whether there is any indication that an asset may be impaired. If any such indication exists, an entity shall estimate the recoverable amount of the asset or cash generating unit to which it relates.
As 30 June 2021 an impairment of $55.3 million was recognised by the Group following an assessment of the recoverable amount of its Bauxite Hills cash generating unit (CGU) (refer to Note 3). As part of this assessment, the Group’s Infrastructure Assets and Other Mineral Assets were identified as carried at values exceeding their recoverable amounts. Accordingly, $54.3 million of the total $55.3 million impairment was allocated to these CGU asset categories. The remainder of the impairment charge ($1.0 million) was allocated to the Group’s capitalised Exploration and Evaluation expenditure.
At 30 June 2022, the Group performed an impairment indicator assessment, and considered whether any indicators of impairment or reversal of the previously recorded impairment were present. The Group has identified no further indicators were present with conditions in line with previous expectations.
| 7. LEASE LIABILITIES Current Lease liabilities Non-current Lease liabilities |
Consolidated | Consolidated |
|---|---|---|
| 30 Jun 2022 | 31 Dec 2021 | |
| $’000 | $’000 | |
| 9,013 | 9,929 | |
| 18,170 | 21,670 |
Classification of lease liabilities – equipment finance facility
The Group has an existing equipment finance facility on which it has drawn down in four separate tranches in prior financial periods. During the half-year period the first tranche has been repaid. The remaining tranches have been classified as lease liabilities in accordance with the requirements of AASB 16 Leases .
15
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
| 8. BORROWINGS Current Secured liabilities Loans – senior secured lenders Loans – Other Total current borrowing secured liabilities Unsecured liabilities Loans – short term working capital facility Total current borrowings unsecured liabilities Total current borrowings Non-current Secured liabilities Loans – senior secured lenders Loans - other Total non-current borrowings |
Consolidated | Consolidated |
|---|---|---|
| 30 Jun 2022 | 31 Dec 2021 | |
| $’000 | $’000 | |
| 9,621 - |
459 708 |
|
| 9,621 | 1,167 | |
| 9,652 | - | |
| 9,652 | - | |
| 19,273 | 1,167 | |
| 25,429 - |
34,596 - |
|
| 25,429 | 34,596 |
Senior secured lenders
Under the existing terms of the Ingatatus AG Pty Ltd facility an initial principal payment of $9.2 million is due and payable 1 June 2023. This initial principal payment and accrued interest on all senior secured lender facilities is classified as a current liability.
Short term working capital facility
During the half-year period, Lambhill and Greenstone provided unsecured short-term working capital facilities of $4.5 million and $5.0 million, respectively, maturing on 14 October 2022. The key terms are as follows:
-
(i) Lambhill – Principal $4.5 million
-
The maturing date for the loan is 14 October 2022;
-
The rate of interest is 14% coupon, capitalised monthly and paid on maturity;
-
This facility is unsecured.
-
The lender has the right to convert an amount to equity equal to the existing shareholding subsequent to the Group issuing shares for the purpose of raising capital.
Subsequent to the Group’s capital raise on 28 July 2022, Lambhill provided notice of its intention to convert $1.6 million of its working capital facility to equity, subject to shareholder approval, amounting to an allotment of 77,750,001 conversion shares at $0.02 per share.
16
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
8. BORROWINGS (continued)
-
(ii) Greenstone Resources II (Australia) Holdings L.P. – Principal $5.0 million
-
The maturing date for the loan is 14 October 2022.
-
The rate of interest is 14% coupon, capitalised monthly and paid on maturity.
-
This facility is unsecured.
-
The lender has the right to convert an amount to equity equal to the existing shareholding subsequent to the Group issuing shares for the purpose of raising capital.
Subsequent to the Group’s capital raise on 28 July 2022, Greenstone provided notice of its intention to convert $4.9 million of its working capital facility to equity, subject to shareholder approval, amounting to an allotment of 245,830,999 conversion shares at $0.02 per share.
Northern Australia Infrastructure Facility (NAIF)
On 12 November 2019, the Group announced that the board of the Northern Australia Infrastructure Facility had made an investment decision to offer a loan facility of $47.5 million to the Group to assist in the financing of the stage 2 expansion of production at the Bauxite Hills operation. The loan facility has not yet been drawn down. During the half-year period, the sunset date for Financial Close was extended to 31 December 2022. Following the approval of the Stage 2 expansion, the Group has engaged with NAIF to refresh the credit approval process based on the expansion’s definitive feasibility study with the intention of achieving Financial Close in the current financial period.
Equipment financing facility
The Group has an Australian dollar denominated equipment financing facility on which it has made four separate draw downs in prior financial periods for the purpose of re-financing existing items of plant and equipment and increasing haulage and production capacity at the mine. The first drawdown on the facility was classified by the Group as borrowings. This tranche was repaid in the half-year period ended 30 June 2022. The remaining tranches have been classified as lease liabilities in accordance with AASB 16.
As at the end of the year, the financial ratio covenant had been breached and this has been reported to the financier. It is the Group’s expectation the facility will continue until paid out on 31 March 2023 in accordance with the financing agreement. The remaining payments are classified as current on the basis of the facility’s maturity.
17
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
8. BORROWINGS (continued)
Financial liability maturity analysis
As at 30 June 2022, the contractual maturities of the Group’s non-derivative financial liabilities are as follows:
| Contractual maturities of Financial liabilities At 30 June 2022 Trade payables Other payables Lease liabilities Borrowings Other financial liabilities Total contractual and expected outflows |
Between | Total | Carrying | |
|---|---|---|---|---|
| Less than | 1 and 5 | Contractual | amount of | |
| 12 months | years | cash flows | liabilities | |
| $’000 | $’000 | $’000 | $’000 | |
| 19,219 13,282 9,013 19,273 1,227 |
2,741 2,478 18,170 25,429 - |
21,960 15,760 27,183 44,702 1,227 |
21,960 15,760 27,183 44,702 1,227 |
|
| 62,014 | 48,818 | 110,832 | 110,832 |
| Contractual maturities of Financial liabilities At 31 December 2021 Trade payables Other payables Lease liabilities Borrowings Total contractual and expected outflows |
Between | Total | Carrying | |
|---|---|---|---|---|
| Less than | 1 and 5 | Contractual | amount of | |
| 12 months | years | cash flows | liabilities | |
| $’000 | $’000 | $’000 | $’000 | |
| 16,280 18,605 9,929 1,167 |
- - 24,012 35,000 |
16,280 18,605 33,941 36,167 |
16,280 18,605 33,941 36,167 |
|
| 45,981 | 59,012 | 104,993 | 104,993 |
9. CONTRIBUTED EQUITY
Ordinary shares – fully paid Ordinary shares Balance at the beginning of the half-year Other Shares Subscribed For:
Balance at the end of the half-year
| Consolidated | Consolidated |
|---|---|
| 30 Jun 2022 | 30 Jun 2022 |
| No. of Shares | |
| ‘000s | $’000 |
| 2,988,770 | 200,959 |
| 2,988,770 - |
200,959 - |
| 2,988,770 | 200,959 |
18
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
10. WARRANTS, OPTIONS AND PERFORMANCE RIGHTS
A summary of the movements of all warrants, options and performance rights issued is as follows:
| 30 Jun 2022 Grant Date |
Balance at | Expired/ | Balance at End of Half-Year |
||||
|---|---|---|---|---|---|---|---|
| Expiry | Exercise | Start of | Granted | Exercised | Forfeited/ | ||
| Date | Price | Half-Year | Other | ||||
| No. ’000 | No. ’000 | No. ’000 | No. ’000 | No. ’000 | |||
| Warrants 27/08/2017 Perf. Rights 05/07/2021 05/07/2021 05/07/2021 01/01/2022(i) |
27/08/2022 31/12/2021 31/12/2021 31/12/2021 30/06/2022 |
$0.183 n/a n/a n/a n/a |
11,100 6,551 6,300 5,463 - |
- 542 - - 6,888 |
- - - - - |
- - - - - |
11,100 7,093 6,300 5,463 6,888 |
| Total warrants,options andperf. rights | 29,414 | 7,430 | - | - | 36,844 |
Warrants
All warrants issued by the Group to a former lender have vested.
Performance rights
- (i) The Board resolved that the director’s fees (exclusive of superannuation) payable to Mr Douglas Ritchie as Independent Non-executive Chairman and to Mr Andrew Lloyd as Independent Nonexecutive Director for the half year period ended 30 June 2022 would be equity settled. For the half-year period, 2,234,849 and 1,425,546 performance rights were issued to Mr Douglas Ritchie and Mr Andrew Lloyd, respectively. The Board also resolved to issue 20% of the Chief Executive Officer’s remuneration (exclusive of superannuation) payable to Mr Simon Wensley for the half-year period ended 30 June 2022. For the half-year period, 3,227,719 performance rights were issued.
19
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
11. MINE REHABILITATION
Mine rehabilitation – financial provisioning scheme
The Group has continued to adopt a staged approach to rehabilitation in the half-year period, preparing land for rehabilitating as areas became available. Backfilling and spreading of topsoil occur progressively as close as possible to active mining areas and thereby reducing materials double handling. This approach allows for the immediate replacement of topsoil and thereby preserving the viability of the soil seed bed. Native seed used for rehabilitation are endemic to the Cape York region and are sourced from the local Indigenous communities working both on and offsite under the Group’s Seed Collection Program and when necessary, third-party contract seed collectors. The application of seed and fertiliser is undertaken by a local Ankamuthi contractor.
A Financial Provisioning Scheme (the Scheme) was established by the Queensland State Government in 2019 to assist in the management of the financial risk exposure to mining and energy resource projects failing to comply with their environmental management and rehabilitation obligations.
A provision has been recognised for the costs to be incurred to rehabilitate the Bauxite Hills mining tenements in accordance with the requirements of the site’s environmental authorities. The provision has been prepared using the Queensland State Government’s rehabilitation calculator and is based on the current disturbance program for the Bauxite Hills mine. Rehabilitation will continue to occur progressively in parallel to mining operations with final rehabilitation expected to conclude within 24 months of mining ceasing.
The rehabilitation liability is adjusted annually, commensurate upon the level of disturbance present and planned to occur at the Bauxite Hills Mine, less the total area under active rehabilitation.
In April 2021 the Scheme Manager assessed the Group as not meeting the prerequisite risk profile for provisioning by way of contribution to the Scheme Fund and, as a result, the Group was notified of the requirement to lodge financial surety. Having regard to the nature of the change in the provisioning requirement and consistent with the relevant powers of the Scheme Manager under the Mineral and Energy Resources (Financial Provisioning) Act 2018 , a Surety Provisioning Arrangement with the Scheme was entered into in September 2021, which was further amended in June 2022. The total amount of the financial surety balance is $10.6 million, of which $788,000 has been paid. Further payments are to be made through the current and future financial periods. Amounts paid as surety are recorded as restricted cash in the financial statements. The financial surety balance will be repaid to the group on the completion of the rehabilitation.
12. SUBSEQUENT EVENTS
On 28 July 2022, the Group completed a $25.4 million two-tranche capital placement, comprised of $18.9 million in additional funds and a $6.5 million loan conversion of a portion of the short-term working capital facilities. The first tranche of $14.9 million has been received in August 2022 with the second tranche, comprised of the remaining $4.0 million in additional funds and loan conversion, subject to shareholder approval at an Extraordinary General Meeting to be held on 15 September 2022.
20
Metro Mining Limited Notes to the condensed financial statements For the half-year ended 30 June 2022
13. RELATED PARTY TRANSACTIONS
Rights granted to a related party in a prior financial year
On 12 July 2016, the Company announced that it had executed binding documentation (Agreements) with Greenstone whereby Greenstone would take up 105 million shares in the Company and potentially provide the Company with further ongoing strategic and financial support for the development of the Bauxite Hills Mine. Greenstone is an entity in which Mark Sawyer, a director of the Company, holds a beneficial interest.
The Agreements also provided Greenstone with the following rights:
Anti-dilution rights
The Agreements contain anti-dilution provisions which enable Greenstone to maintain its equity interest in the Company on issue of further shares. On execution of the Agreements, Greenstone held a 19.94% interest in the Company. Having participated in subsequent equity raisings and exercised its anti-dilution rights, at 30 June 2022, Greenstone held 587,785,791 shares in the Company; a 19.67% interest.
Customer nomination rights
The Agreements provide Greenstone with the right to nominate customers to purchase bauxite production, pro-rata to Greenstone’s shareholding in the Company, on an arm’s length basis and on no less favourable terms than could be achieved elsewhere. The customer nomination rights are only exercisable after the mine has been in production for four years.
Both the anti-dilution rights and, subject to certain exemptions, the customer nomination rights, are contingent upon Greenstone retaining at least a 10% interest in the Company.
14. BASIS OF PREPARATION OF HALF-YEAR REPORT
This condensed consolidated interim financial report for the half-year reporting period ended 30 June 2022 has been prepared in accordance with Accounting Standard AASB 134: Interim Financial Reporting and the Corporations Act 2001 .
The interim report does not include all the notes of the type normally included in an annual financial report. Accordingly, this report is to be read in conjunction with the annual report for the year ended 31 December 2021 and any public announcements made by Metro Mining Limited during the interim reporting period in accordance with the continuous disclosure requirements of the Corporations Act 2001 .
The accounting policies adopted are consistent with those of the previous financial year and corresponding interim reporting period, except for the adoption of new and amended standards as set out below.
a) New and amended standards adopted by the Group
A number of new or amended standards became applicable for the current reporting period. The Group did not have to change its accounting policies or make retrospective adjustments as a result of adopting these standards.
b) Impact of standards issued but not yet applied by the entity
Certain new accounting standards and interpretations have been published that are not mandatory for 30 June 2022 reporting periods and have not been early adopted by the Group. These standards are not expected to have a material impact on the Group in the current or future reporting periods or on foreseeable future transactions.
21
Metro Mining Limited Directors’ Declaration
The directors of the Company declare that:
-
The financial statements and notes, as set out on pages 7 to 21, are in accordance with the Corporations Act 2001 , including:
-
a) complying with Australian Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 200 1, and
-
b) giving a true and fair view of the Group’s financial position as at 30 June 2022 and of its performance for the half-year ended on that date.
-
In the directors' opinion, there are reasonable grounds to believe that Metro Mining Limited will be able to pay its debts as and when they become due and payable.
This declaration is made in accordance with a resolution of the Board of Directors.
==> picture [149 x 77] intentionally omitted <==
Douglas Ritchie Chairman
Date: 30 August 2022
22
==> picture [86 x 100] intentionally omitted <==
Ernst & Young Tel: +61 7 3011 3333 111 Eagle Street Fax: +61 7 3011 3100 Brisbane QLD 4000 Australia ey.com/au GPO Box 7878 Brisbane QLD 4001
Independent Auditor's Review Report to the Members of Metro Mining Limited
Report on the Half-Year Financial Report
Conclusion
We have reviewed the accompanying half-year financial report of Metro Mining Limited (the Company) and its subsidiaries (collectively the Group), which comprises the Condensed consolidated balance sheet as at 30 June 2022, the Condensed consolidated statement of profit or loss and other comprehensive income, Condensed consolidated statement of changes in equity and Condensed consolidated statement of cash flows for the half-year ended on that date, notes comprising a summary of significant accounting policies and other explanatory information, and the directors’ declaration.
Based on our review, which is not an audit, nothing has come to our attention that causes us to believe that the half-year financial report of the Group is not in accordance with the Corporations Act 2001 , including:
-
a) giving a true and fair view of the consolidated financial position of the Group as at 30 June 2022 and of its consolidated financial performance for the half-year ended on that date; and
-
b) complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001 .
Basis for Conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by the Independent Auditor of the Entity (ASRE 2410). Our responsibilities are further described in the Auditor’s responsibilities for the review of the half-year financial report section of our report. We are independent of the Group in accordance with the auditor independence requirements of the Corporations Act 2001 and the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110 Code of Ethics for Professional Accountants ( including Independence Standards) (the Code) that are relevant to our audit of the annual financial report in Australia. We have also fulfilled our other ethical responsibilities in accordance with the Code.
Material Uncertainty Related to Going Concern
We draw attention to Note 1 in the half-year financial report, which describes the principal conditions that raise doubt about the Group’s ability to continue as a going concern. These events or conditions indicate that a material uncertainty exists that may cast significant doubt on the Group’s ability to continue as a going concern. Our conclusion is not modified in respect of this matter.
Directors’ Responsibility for the Half-Year Financial Report
The directors of the Company are responsible for the preparation of the half-year financial report that gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001 and for such internal control as the directors determine is necessary to enable the preparation of the half-year financial report that is free from material misstatement, whether due to fraud or error.
A member firm of Ernst & Young Global Limited Liability limited by a scheme approved under Professional Standards Legislation
==> picture [86 x 101] intentionally omitted <==
Auditor’s Responsibility
Our responsibility is to express a conclusion on the half-year financial report based on our review. ASRE 2410 requires us to conclude whether we have become aware of any matter that makes us believe that the half-year financial report is not in accordance with the Corporations Act 2001 including giving a true and fair view of the Group’s financial position as at 30 June 2021 and its performance for the half-year ended on that date, and complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001 .
A review of a half-year financial report consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with Australian Auditing Standards and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
==> picture [140 x 77] intentionally omitted <==
Ernst & Young
==> picture [98 x 61] intentionally omitted <==
Matthew Taylor Partner Brisbane 30 August 2022
A member firm of Ernst & Young Global Limited Liability limited by a scheme approved under Professional Standards Legislation