Metro Mining Limited (ASX:MMI)
Quarterly Activities Report | March 2015
----- End of picture text -----
Quarter Highlights
Bauxite Hills Project
==> picture [32 x 22] intentionally omitted <==
Bauxite Hills Pre-Feasibility Report Completed confirming:
-
Real Net Present Value (NPV 15%) of A$197 Million after tax
-
Capital cost is repaid from first production in 1.1 years
==> picture [31 x 21] intentionally omitted <==
Bauxite Hills total Resource of 61.5 Mt and Ore Reserve of 12.1Mt announced
==> picture [31 x 22] intentionally omitted <==
Demand for bauxite continues and strong market growth forecast
==> picture [31 x 22] intentionally omitted <==
Definitive Feasibility Study commenced
==> picture [31 x 22] intentionally omitted <==
Native Title Negotiations & Environmental approvals process ongoing
Corporate News
==> picture [31 x 21] intentionally omitted <==
Metro Mining Share Price (ASX:MMI) Increased by 115% during last quarter
- Average Annual Net Profit after tax A$38 Million
==> picture [31 x 22] intentionally omitted <==
Metro Mining starts Investor Relations program for Bauxite Hills Project
- Low Capital Expenditure A$27.4 Million
==> picture [31 x 22] intentionally omitted <==
George Lloyd, Independent Non-Executive Director appointed to Metro Mining Board
- Operating Margin A$28.60 per tonne
==> picture [31 x 21] intentionally omitted <==
MMI cash position as at 31 March A$4.6M
==> picture [528 x 216] intentionally omitted <==
----- Start of picture text -----
The Bauxite Hills Project is a simple low impact strip-mine, haul and tranship operation
----- End of picture text -----
==> picture [530 x 24] intentionally omitted <==
*Refer ASX Release 17 Feb 2015
Quarterly Activities Report March 2015 I Page 1
Bauxite Hills Project
SNAPSHOT OF PROJECT FINANCIALS
Pre-Feasibility Study Completed
The Bauxite Hills Project is located 95km north of Weipa on Western Cape York in North Queensland and consists of two resources situated south of the Skardon River.
Western Cape York is world-renowned for its deposits of high-quality, export-grade bauxite.
The Project Pre-Feasibility Study was based on a 21 year mine life, producing up to 2 million tonne per annum of Direct Shipping Ore from a Total Resource of 61.5 million tonnes*.
A Direct Shipping Ore operation allows a low capital and low operating cost mine to be developed as it avoids a number of significant costs associated with producing a beneficiated bauxite product.
Proposed mine operations are simple using trucks and front end loaders, with no blasting, and as such have minimal environmental impact. Topsoil and overburden will be stripped ahead of mining and replaced on the mined out areas progressively after mining.
The bauxite will then be hauled to the barge load-out facility at the Skardon River where it will be transported approximately 12 kilometres offshore then transhipped into bulk carriers for export to overseas customers.
It is anticipated that the Bauxite Hills Project will provide substantial economic and social benefits to the regional community during its +20 year mine life.
The Pre-Feasibility Study confirms the Project’s attractive economics with a Real Net Present Value (15%) of A$197Million after tax and Capital payback from first production being 1.1 years
Low Initial Capital of A$27.4M and operating costs (including royalty) of A$26.7/t FOB are attainable largely due to simple mining technique proposed and the fact that no beneficiation of the Direct Shipping Ore product is required.
Resource and Maiden Ore Reserve Total
The Pre-Feasibility Study was based on a total resource of 61.5Mt of which 30.3Mt was Indicated and 31.2Mt Inferred.
The Mine Plan is based on a total resource (Indicated and Inferred) of 61.5 million tonnes (49.9% total Al2O3, 37.8% THA[3] ,* 7.1% RxSi).
The Mine Plan includes a JORC 2012 Probable Ore Reserve, identified to date, of 12.1 million tonne Direct Shipping Ore (49.2% total Al2O3, 36.6% THA, 7.4% RxSi).
Further analyses of drill hole samples have been completed and the geological model is being updated to include these analyses. This will result in increased confidence in the resource with substantially greater percentage of the resource being in the Indicated category. Resource.
| Area | Category | DSO2 Tonnes (Mt)1 |
DSO Bauxite Qualites (Dry Basis) | DSO Bauxite Qualites (Dry Basis) | DSO Bauxite Qualites (Dry Basis) | DSO Bauxite Qualites (Dry Basis) |
|---|---|---|---|---|---|---|
| Total SiO2 (%) |
Total Al2O3 (%) |
THA3 (%) | RxSi4 (%) | |||
| BH1 | Inferred Resource (Dry**In-situ) ** | 31.2 | 9.1 | 51.5 | 40.7 | 6.2 |
| BH6 | Indicated Resource(Dry**In-situ) ** | 30.3 | 15.5 | 48.4 | 35.5 | 8.0 |
| TOTAL Resource | 61.5 | 12.2 | 49.9 | 37.8 | 7.1 | |
| BH6 | Probable Reserve5 (ROM @ 10% Moisture) | 12.1 | 14.8 | 49.2 | 36.6 | 7.4 |
1 For BH1 & BH6 the tonnages are calculated using the following default bulk densities determined from a program of sonic drilling;
1.6g/cm[3] for BH1 and 2g/cm[3] for BH6. Actual values are used where measurements have been taken
2 DSO or “Direct shipping ore” is defined as bauxite that can be exported directly with minimal processing and beneficiation.
3 THA is trihydrate available alumina (gibbsite alumina + kaolinite alumina – low temp desilication product (DSP) alumina) at 1500C. 4 RxSi is reactive silica at 1500C .
5 Probable Reserve - the probable reserve is included in the BH6 Indicated resource
==> picture [529 x 24] intentionally omitted <==
*Refer ASX Release 17 Feb 2015
Quarterly Activities Report March 2015 I Page 2
[Bauxite Hills Project ] Continued
Native Title Negotiations and Environmental Approvals
Metro Mining has commenced discussions with Native Title Parties, for the Bauxite Hills Project, giving notice under section 29 of the Commonwealth Native Title Act. 1993 as of 14 January 2015
Submission of the Environmental Impact Assessment (EIA) is scheduled for mid-2015.
Definitive Feasibility Study
Having completed the Pre-Feasibility Study the Bauxite Hills Project team has commenced work for the Definitive Feasibility Study.
The company is progressing towards finalisation via the ‘Right to Negotiate’ (RTN) process. This process has a statutory 6 month timeframe from the notification date of 14 January 2015, with Native Title Negotiating period concluding in July-2015.
An Environmental Impact Assessment (EIA) is being undertaken for the Bauxite Hills Project to meet State and Commonwealth environmental approval processes. This will ensure that the project follows all relevant environmental guidelines.
The EIA is significantly progressed, with baseline wet and dry season environmental studies complete and the Community Engagement Program now underway.
Liaison with State and Commonwealth regulators will continue throughout the process to ensure all regulatory requirements are met.
Currently the study is on schedule for the results to be announced during Third Quarter 2016.
Demand for Bauxite Continues and Strong Market Growth Forecast
During the quarter the marketability of the Bauxite Hills product was evaluated by CM Group for both high temperature and low temperature processing in Chinese refineries.
The CM Group estimates China’s bauxite import requirements to rise to 65-75 Mtpa (dry) by 2020, up from 40 Mtpa (dry) in 2014.
The CM Group has provided a forecast for FOB bauxite prices for Metro Mining’s Bauxite Hills project from 2015 to 2025 (US$/dmt) in Real Terms, (2015 dollars).
==> picture [389 x 177] intentionally omitted <==
==> picture [137 x 125] intentionally omitted <==
| Real US$/t MMI High Case, FOB MMI Base Case, FOB MMI Low Case, FOB |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 |
|---|---|---|---|---|---|---|---|---|---|---|
| 46.4 | 47.7 | 52.0 | 51.7 | 53.4 | 51.7 | 54.0 | 52.4 | 53.0 | 52.6 | |
| 43.5 | 44.5 | 45.5 | 45.4 | 47.1 | 48.5 | 50.2 | 47.9 | 49.7 | 49.7 | |
| 39.2 | 39.6 | 40.5 | 40.0 | 39.6 | 40.4 | 40.0 | 39.3 | 39.4 | 39.4 |
==> picture [529 x 24] intentionally omitted <==
Quarterly Activities Report March 2015 I Page 3
Corporate News
Share Price Increase
It is worth noting the Company’s increased market valuation in the past quarter and the release of the Bauxite Hills Project Pre-Feasibility Study.
Investor Relations for Bauxite Hills Project commenced
The Metro Mining (ASX:MMI) share price increased from 2.7 cents on 31 December 2014 to 5.8 cents on 31 March 2015, representing a 115% increase in the price. This has continued since the end of the quarter, the closing price on 10 April 2015 was 8 cents representing a further 38% increase in the MMI price.
CEO Simon Finnis selected high profile forums to ensure the national and international investment community is fully informed of the company’s focus and progressive achievements.
Bauxite Hills Project presentations were made at the RIU Explorers Perth Conference in March and will again be made at RIU Explorers Sydney conference in May. Presentations were also made at the Sydney and Melbourne Symposium Investor Roadshows in Sydney and at Hong Kong Mines & Money.
New Opportunities
As part of its strategy to review assets worldwide MMI has been reviewing green and brownfields opportunities in Myanmar.
Myanmar is one of Asia's great unexplored frontiers, with a world class tin/tungsten belt stretching 1,200kms in southern Myanmar and continuing into Indonesia, Malaysia and Thailand. There has been virtually no modern exploration in Myanmar with tin/tungsten mining mainly on a small scale.
Metro Mining will present to the Queensland Resources Council in late April.
Independent Non-Executive Director Appointed
George Lloyd has been appointed to the Metro Mining Board as an Independent Non-Executive Director. Mr Lloyd is also Chairman of Ausenco Ltd and has 30 years resource industry experience including senior board positions with listed and unlisted companies.
Metro Mining have engaged an Australian led, Myanmar based, Geological company to lead all company exploration activities in Myanmar. MMI await Mining Law reform which is required to justify foreign investment.
==> picture [77 x 77] intentionally omitted <==
ASX : MMI
ELECTRONIC COPIES & MORE INFORMATION AT WEBSITE: www.metromining.com.au FOR FURTHER INFORMATION: Email: [email protected] PHONE: +61 (0) 7 3009 8000 Fax: +61 (0) 7 3221 4811 CONTACT: CEO Mr Simon Finnis |Company Sec Mr Scott Waddell
FORWARD LOOKING STATEMENT Statements and material contained in this ASX Announcement, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of Metro Mining Limited, industry growth or other trend projections are, or may be, forward looking statements. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. Graphs used in this ASX Announcement (including data used in the graphs) are sourced from third parties and Metro Mining has not independently verified the information. Metro Mining is at an early development stage and while it does not currently have a operating bauxite mine it is taking early and preliminary steps (such as but not limited to Prefeasibility studies etc.) that are intended to ultimately result in the building and construction of an operating mine at its project areas. Although reasonable care has been taken to ensure that the facts stated in this ASX Announcement are accurate and or that the opinions expressed are fair and reasonable, no reliance can be placed for any purpose whatsoever on the information contained in this document or on its completeness. Actual results and developments may differ materially from those expressed or implied by these forward looking
statements depending on a variety of factors. Nothing in this ASX Announcement should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
COMPETENT PERSON’S STATEMENT The information in this report that relates to Exploration Results is based on information compiled by Neil McLean who is a consultant to Metro Mining and a Fellow of the Australian Institute of Mining and Metallurgy (F.Ausimm).Mr McLean has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr McLean consents to the inclusion in the report of the matters based on information in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Ed Radley who is a consultant to Metro Mining and a Member of the Austral Institute of Mining and Metallurgy (MAusIMM)). Review of this information was carried out by Jeff Randell of Geos Mining, a consultancy group contracted by Metro Mining Limited. Mr Randell is a Member of the Australian Institute of Geoscientists (MAIG), a Registered Professional Geoscientist (RPGeo) and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Randell consents to the inclusion in the report the matters based on information in the form and context in which it appears.
The information in this report to which this statement is attached that relates to the “Metro Mining – Bauxite Hills” Reserve Estimate based on information compiled by Maria Joyce, a consultant to Metro Mining and a Competent Person who is a Chartered Engineer of the Australasian Institute of Mining and Metallurgy. Maria Joyce is the head of the Technical Services division and full-time employee of MEC Mining Pty Ltd. Maria Joyce has sufficient experience that is relevant to the style of mineralization, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Maria Joyce consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.
==> picture [529 x 24] intentionally omitted <==
Quarterly Activities Report March 2015 I Page 4
Appendix 5B Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity Metro Mining Limited ABN 45 117 763 443
Quarter ended (“current quarter”) 31-Mar-15
Consolidated statement of cash flows
| Payments for: (a) exploration and evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income tax refund (R&D) 1.7 Other (Cancel Bank Guarantee to 3rd party) Net Operating Cash Flows 1.2 Cash flows related to operating activities 1.1 Receipts from product sales and related debtors |
Current quarter (Jan - Mar 2015) $A’000 |
Year to date (9 months) $A’000 |
|---|---|---|
| -173 -554 -539 16 0 377 |
-573 -1,000 -1,650 99 526 0 |
|
| -874 | -2,597 | |
| Cash flows related to investing activities Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets Proceeds from sale of: (a) prospects / tenements (b) equity investments (c) other fixed assets 1.11 Loans repaid to other entities 1.12 Other (Acquisition of Cape Alumina Ltd for shares) 1.13 Total operating and investing cash flows (carried forward) Net investing cash flows 1.9 1.10 Loans to other entities 1.8 |
728 | |
| 0 | 728 | |
| -874 | -1,869 |
- See chapter 19 for defined terms.
Appendix 5B Page 1
30/9/2001
Appendix 5B
Mining exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
-874 | -1,869 |
|---|---|---|
Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid Other (costs associated with the capital raising) Net financing cash flows 1.19 |
||
| 0 | 0 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end of quarter |
-874 5,506 |
-1,869 6,502 |
| 4,633 | 4,633 |
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
| 1.23 1.24 Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
|---|---|
| 55 | |
- 1.25 Explanation necessary for an understanding of the transactions
Payments to Related Parties (1.23) is for Director Fees
Non-cash financing and investing activities
-
2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
-
2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Financing facilities available
Add notes as necessary for an understanding of the position.
| Loan facilities - Convertible Note Loan facilities - Corporate Credit Card 3.1 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
|---|---|---|
| 0 20 |
0 5 |
|
- See chapter 19 for defined terms.
Appendix 5B Page 2
30/9/2001
Appendix 5B Mining exploration entity quarterly report
Estimated cash outflows for next quarter
| 4.2 Development 4.1 Exploration and evaluation 4.4 Administration 4.3 Production |
$A’000 |
|---|---|
| 80 | |
| 919 | |
| 440 | |
| Total | 1,439 |
Reconciliation of cash
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details - SecurityDeposits) Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter $A’000 |
Previous quarter $A’000 |
|---|---|---|
| 1,565 | 2,116 | |
| 3,068 | 3,391 | |
| Total: cash at end ofquarter(item 1.22) | 4,633 | 5,506 |
Changes in interests in mining tenements
| 6.1 | Interests in mining tenements relinquished, reduced or |
|---|---|
| lapsed | |
| 6.2 | Interests in mining tenements acquired or increased |
| Tenement reference | Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|
|---|---|---|---|---|
| 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased |
||||
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions 7.2 |
||||
| Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs 7.3 +Ordinary securities 7.4 |
288,717,999 | 288,717,999 | ||
| 7.5 +Convertible debt securities(description) |
- See chapter 19 for defined terms.
Appendix 5B Page 3
30/9/2001
| Appendix 5B Mining exploration entity quarterly report |
|||||
|---|---|---|---|---|---|
| 7.6 | Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
||||
| 7.9 7.1 7.7 7.8 |
Total number | Numberquoted | Exerciseprice | Expirydate | |
| Options (description and conversion factor) Options Options Options Issued during quarter Options Exercised during quarter Expired during quarter |
1,000,000 Unlisted options 1,000,000 Unlisted options 10,750,000 Unlisted options |
- - - - - |
23.5 cents 50 cents 6 cents |
11/07/2015 11/07/2015 11/01/2017 |
|
| 10,750,000 Unlisted options |
- | 6 cents | 11/01/2017 | ||
| 7.11 | Debentures (totals only) | ||||
| 7.12 | Unsecured notes(totals only) | - | - |
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).
-
2 This statement does give a true and fair view of the matters disclosed.
Signature on file Sign here: ............................................................ Date: 20 May 2015 (Company secretary) Print name: SCOTT WADDELL
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
-
4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==
- See chapter 19 for defined terms.
Appendix 5B Page 4
30/9/2001