Open in viewer

Opens in your device viewer

2 June 2015

Fourfold Increase in Bauxite Hills Ore Reserve

Metro Mining Limited announces a significant increase in its Bauxite Hills Project Ore Reserve from 12.1million tonnes* to 48.2 million tonnes.

Key Points

==> picture [25 x 17] intentionally omitted <==

41.8 million tonnes Proved Ore Reserve** (50.7% total Al2O3, 38.6% THA, 6.3% RxSi)

==> picture [25 x 16] intentionally omitted <==

6.4 million tonnes Probable Ore Reserve** (49.3% total Al2O3, 36.8% THA, 6.9% RxSi)

==> picture [25 x 17] intentionally omitted <==

Mine Life extended from 21 to 27 years

==> picture [25 x 17] intentionally omitted <==

Production of up to 2 million tonnes of Direct Shipping Ore (DSO) per year ***

Bauxite Hills Project Summary

The Bauxite Hills Mine Project is situated 95 km north of Weipa on Queensland’s Cape York Peninsula and five kilometres south-east of the port at Skardon River (see Figure 1). Western Cape York is worldrenowned for its deposits of high-quality, export-grade bauxite.

The Company completed a Pre-Feasibility Study (PFS) in February 2015. This study identified a Probable Ore Reserve of 12.1 million tonnes[*] (49.2 % total Al2O3, 36.6% THA, 7.4% RxSi) Direct Shipping Ore (DSO) compliant with the JORC 2012 code and based on the borehole analysis and geological modelling completed up to that date.

Since the completion of the PFS in February, Metro has completed the analysis of the BH1 boreholes drilled previously at 160m centres and has updated the geological model to include these results; refer Table 2. The geological model update resulted in the resource upgrade announced to the ASX on 2 June 2015.

The recent drill hole analysis and geological modelling continue to confirm that the resource at Bauxite Hills is suitable for Direct Shipping Ore (DSO) that is planned to be transhipped via the Skardon River.

The production of DSO allows the development of a mine with lower capital and lower operating costs than a mine producing a beneficiated bauxite product by avoiding a number of significant costs, including; reduced infrastructure costs with no requirement for a large beneficiation plant and associated reduced water, energy and tailings dam requirements.

  • Refer ASX Announcement 17 Feb* 2015 .

**Reserve estimated in accordance with guidelines in JORC (2012)

***Refer ASX Release 17 Feb 2015. Metro confirms all material assumptions underpinning the production target and corresponding financial information continue to apply and have not materially changed as per Listing Rule 5.19.2

==> picture [555 x 25] intentionally omitted <==

ASX Announcement | 2 June 2015 | Page 1

==> picture [512 x 370] intentionally omitted <==

----- Start of picture text -----

Fig 1: Bauxite Hills Tenement Area
----- End of picture text -----

Mining the Bauxite Hills Project

Mining Method

Open cut mining method utilising front end loaders for loading and trucks for hauling. The material does not need any drilling and blasting, however some ripping by dozer is likely to be required. The wheel loaders are recommended for loading because of its high manoeuvrability for blending purposes. This is the preferred mining method for bauxite deposits. The bauxite will be hauled to the ROM stockpile using Road Train Trucks. Waste material will be initially stored Ex-Pit onto barren or non-economical land while the In-Pit waste dumping is expected to commence within first six months of production. The waste volume is low for this deposit and it is not expected to represent a major problem in terms of waste storage or required capacity of mining equipment.

Equipment Assumptions

As part of the Pre-Feasibility Study, equipment sections were completed in two stages. Firstly to supply costs for equipment appropriate in such a deposit, these were then utilised as part of the pit optimisation. The second stage constituted a detailed equipment section to meet the production schedule defined in the PFS Revision. MEC Consultants derived the number of equipment units required for the loading, hauling, crushing and auxiliary. Loading and hauling cycle times for each mining area were calculated in the model using standard machinery operating guidelines. The data was combined with typical operational delay and utilisation of equipment to estimate the fleet productivity in order to achieve the planned annual production of up to 2Mtpa of mined and crushed Bauxite.

==> picture [554 x 25] intentionally omitted <==

ASX Announcement | 02 June 2015 | Page 2

Mining Boundaries

The PFS Revision considered two key boundaries in development of the mine plan and subsequent reserves. The Mining Lease boundaries were given a 50m clearance offset to allow for adequate haulage space and environmental buffer. The Bauxite Hills deposit also encroaches on areas defined as Matters of State Environmental Significance (MSES), these zones have been treated with a 100m off-set.

Mining Loss & Dilution

The nature of the deposit was considered along with the selected equipment types to determine appropriate loss and dilution factors. The product is a Run of Mine Ore or Direct Shipping Ore (DSO) and in order to minimise the degradation of quality of product, higher loss was accepted and modelled. The Reserves are adjusted for loss of 0.1m at the roof and 0.1m floor of the Bauxite interval. A dilution of 0.1m from the top horizon is assumed between top and bauxite horizons.

Other Mining Factors & Cut-off Grade

A Pit Optimisation was completed as part of the PFS in order to determine the economic mining limit of the ore resource. Mineralised zones were defined by grades ≥45% total Al2O3 and ≤8% RxSi.

Social and Environmental Factors

The Environmental Permit for Mining (EPM), Mining Lease and Native Title claims are mentioned in detail within the PFS and reserves report. The EPM is owned by Metro Mining and the Mining Leases are in “Application” status. Two Native Title claims have been lodged and Metro Mining is working on the “right to negotiate” process under Section 29 of the Act.

In addition an EIS study is currently being completed by CDM Smith. There are several environmentally sensitive areas surrounding the bauxite deposit but their location is accurately known; no bauxite resources have been included within these areas.

Production and Processing

The Bauxite Hills Project was assessed based on annual production of up to 2 million tonnes of wet DSO (10% moisture) product over a mine life of 27 years. The inferred ore and non-categorized ore utilised in the pit optimisation and the mining schedule is less than 10% of the schedule material and a positive project value is still achieved with its exclusion.

The ROM ore will be screened and crushed to remove organic material and reduce the top size of <100mm. No other beneficiation or processing is required.

Mineralised zones are defined by grades ≥45% total Al2O3 and ≤8% RxSi, based on saleable grade limitations.

Economic Pit Boundary

The Lerchs-Grossmann pit optimisation algorithm was utilised in the Vulcan software to determine the extent of economically mineable ore reserves. The individual block values were assigned considering product price and mining costs, along with quality variations. The ore blocks are spatially grouped in the process to determine the economical extent of the mining reserves.

The optimisation process also takes in account the capital expenditure which is applied during the optimisation analysis stage. Table 1 shows the initial capital expenditure figures used during the process of optimization. Additional capital will be required to cover the cost of development over the life of mine with initial CAPEX remaining at AU$27.4M. Capital expenditure will include the development of haul roads and pit access, camp and mine site facilities, loading and crushing facilities, acquisition of mining equipment and a contingency of 25% of total capital costs.

==> picture [555 x 26] intentionally omitted <==

ASX Announcement | 02 June 2015 | Page 3

Table 1: CAPEX :

Breakup of capital required for first production

2016 Construction 2016 Capex A$M
Mine Access (Haul Road) $2.8
Mine & barge Loading Infrastructure $10.6
Mine Camp & Airport $5.0
Mining Equipment $2.5
Contingency & Owners Costs $6.5
Total Capex $27.4

NB: additional anticipated capital of $18.1M will be required in years following first production for extending haul roads and sustaining capital.

Pit Design

Bauxite Quality and Market

The price of commodity used during the optimisation process varies on block by block basis. The variation reflects the change in quality of ore within mining blocks. Each 1% of increase in content of reactive silica (RxSi) in Bauxite is calculated to decrease the FOB price of the bauxite by a factor agreed with the customer. Each 1% increase in tri-hydrate alumina (THA) content of Cape Alumina bauxite is calculated to increase the FOB price of the bauxite by a factor agreed with the customer. The price of Bauxite FOB, North Queensland was provided by CM Group (CM), a commodity supply specialists hired by Metro Mining refer ASX release 17 Feb 2015. The optimisation process uses the average price as a base value which was then adjusted on block by block basis in accordance to changes in grade, as discussed above.

The Bauxite deposit is a very shallow deposit and does not require detailed batter design. Pit and stage designs were produced on the basis of batters at angle of repose. These designed were reserved in Deswik software for scheduling purposes.

Schedule & Financial Analysis

The economic block model reserves were used to define a mining limit with practical mining blocks then cut to a detailed scheduling as part of the Prefeasibility study. The detail dig and dump sequencing along with equipment numbers were then modelled in a discounted cash flow model to further justify the project value when full offsite cash costs are analysed.

The Bauxite Hills Project was assessed based on annual production of up to 2 million tonnes of product for a life of mine of about 27 years. For the purpose of realistic mine production modelling a portion of inferred and lesser confidence resources were included, removal of these from the economic modelling has no impact on the reserves stated in this estimate as the economic viability is tested on each block and a full site level with this portion representing less than 10% of the modelled production. It is important to note that Inferred Category and non-categorized material according to JORC Standard cannot be converted to Ore Reserves due to its lower confidence level.

Financial Modelling

The financial model was developed by Metro Mining. The mining schedule is the key input to this model. This model was reviewed by MEC Mining and demonstrated a positive NPV when full offsite cash costs and taxation was considered. This model was also sensitivity tested demonstrating positive project value for 20% variance modelling.

Reserve Estimate

Overview of Ore Reserves Estimation Processes

The ore reserves estimation process included completion of detailed pit optimisation with the resulting economic limits then used for detailed pit and stage design. The designed stages are reserved using appropriate modifying factors, and then scheduled inclusive of detailed haulage for full assessment through a financial model. This process was completed as part of the PFS and the PFS Revision.

==> picture [555 x 25] intentionally omitted <==

ASX Announcement | 02 June 2015 | Page 4

Estimated JORC Reserves

MEC Mining calculated that 41.8 Mt of Proved and 6.4 Mt of Probable Marketable Ore Reserves is a reasonable and reliable estimate of the Reserves in the area of Bauxite Hills. On average, the Proved Reserves contains 50.73% of total Al2O3 and 6.29% of reactive silica while the Probable Reserves on average contains 49.26% of total Al203 and 6.92% of reactive silica; all qualities are reported on a dry basis.

The stated ROM reserves represent the marketable product tonnes as this is a direct shipping ore, with no beneficiation and is saleable at ROM moistures.

In addition to the Reserves presented in table 2, for the purpose of realistic mine production modelling a portion of inferred and lesser confidence resources were included in the production schedule of the PFS, removal of these from the economic modelling has no impact on the reserves stated in this estimate. The non-categorised reserve represents 5Mt of the 53.1Mt scheduled, with an annualised summary of mined resources by category detailed in the PFS.

Table 2: Bauxite Hills – DSO Mineral and Ore Reserve estimates (refer Appendix 1)

Area Category DSO2
Tonnes
(Mt)1
DSO Bauxite Qualities (Dry Basis) DSO Bauxite Qualities (Dry Basis) DSO Bauxite Qualities (Dry Basis) DSO Bauxite Qualities (Dry Basis)
Total Al2O3
(%)
THA3 (%) Total SiO2
(%)
RxSi4 (%)
BH1 & BH6 Measured Resource(DryIn-situ) 41.8 51.0 39.2 11.0 6.1
BH1 & BH6 Indicated Resource(DryIn-situ) 8.3 49.3 37.1 14.0 6.8
BH1 & BH6 Inferred Resource (Dry**In-situ) ** 3.4 48.4 35.9 14.8 7.2

TOTAL RESOURCE
53.6 50.6 38.6 11.7 6.3
BH1 & BH6 Proved Reserve5
(ROM @ 10% Moisture)
41.8 50.7 38.6 10.9 6.3
BH1 & BH6 Probable Reserve6
(ROM @ 10% Moisture)
6.4 49.3 36.8 13.4 6.9
TOTAL MARKETABLE ORE RESERVES 48.2 50.2 38.4 11.2 6.4
  • 1 For BH1 and BH6 the tonnages are calculated using the following default bulk densities determined from a program of sonic drilling; 1.6g/cm[3] for BH1 and 2g/cm[3] for BH6. Actual values are used where measurements have been taken

  • 2 DSO or “Direct shipping ore” is defined as bauxite that can be exported directly with minimal processing and beneficiation.

  • 3 THA is trihydrate available alumina (gibbsite alumina + kaolinite alumina – low temperature desilication product (DSP) alumina) at 150[0] C.

  • 4 RxSi is reactive silica at 1500C .

  • 5 Proved Reserve - the probable reserve is included in the BH1 & BH6 Measured resource

  • 6 Probable Reserve - the probable reserve is included in the BH1 & BH6 Indicated resource

FORWARD LOOKING STATEMENT Statements and material contained in this ASX Announcement, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of Metro Mining Limited, industry growth or other trend projections are, or may be, forward looking statements. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. Graphs used in this ASX Announcement (including data used in the graphs) are sourced from third parties and Metro Mining has not independently verified the information. Metro Mining is at an early development stage and while it does not currently have a operating bauxite mine it is taking early and preliminary steps (such as but not limited to Prefeasibility studies etc.) that are intended to ultimately result in the building and construction of an operating mine at its project areas. Although reasonable care has been taken to ensure that the facts stated in this ASX Announcement are accurate and or that the opinions expressed are fair and reasonable, no reliance can be placed for any purpose whatsoever on the information contained in this document or on its completeness. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. Nothing in this ASX Announcement should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.

COMPETENT PERSON’S STATEMENT The information in this report to which this statement is attached that relates to the “Metro Mining – Bauxite Hills” Reserve Estimate based on information compiled by Maria Joyce, a consultant to Metro Mining and a Competent Person who is a Chartered Engineer of the Australasian Institute of Mining and Metallurgy. Maria Joyce is the head of the Technical Services division and full-time employee of MEC Mining Pty Ltd. Maria Joyce has sufficient experience that is relevant to the style of mineralization, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Maria Joyce consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

ASX Announcement | 02 June 2015 | Page 5

Appendix 1: JORC Code, 2012 Edition – Table 1 report template Bauxite Hills Project BH1 & BH6 Deposits – ‘Direct Shipping Ore’ (DSO) Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation - DSO (“Direct Shipping Ore”) JORC Code explanation - DSO (“Direct Shipping Ore”) Commentary
Sampling Nature and quality of sampling (e.g. cut channels, random chips, or Reverse Circulation aircore drill hole samples were collected in
Techniques specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc.). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.

plastic bags over 0.25 m intervals through a cyclone. All the
material within the interval was collected. All samples were
geologically logged at time of collection to determine 1) the type
of bauxite material, 2) when to stop the hole, 3) which samples to
retain for analyses and 4) which samples to composite over 0.5 m
intervals.

Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
Samples were composited, at the time of collection, over 0.5 m
intervals where the geologically logged material was similar or
collected as individual 0.25 m samples.
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
The entire sample was collected to ensure, as much as possible,
the representivity of the drilled material. Sample weights were
between 2 and 5 kg depending on whether they were
composited at the time of collection.
Samples that contained pisolites, in any volume, were assumed to
be bauxitic and were retained for analyses.
Drilling Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air The resource evaluation drilling was carried out by Wallis Drilling Pty
Techniques blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple
Ltd using a Mantis 100 Reverse Circulation aircore drill rig mounted
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc.).
on a light 4x4 truck. Shallow (4-6 m) holes were drilled vertically
using HQ rods with an aircore drill bit with a diameter of 96 mm.
Drilling to collect samples for bulk density and moisture
determinations was undertaken by GeoSonic Drilling Pty Ltd using
a small trailer-mounted sonic drill rig with an internal bit diameter
of 65 mm.
Drill Sample Method of recording and assessing core and chip sample recoveries Reverse Circulation aircore drilling was used because of its proven
Recovery
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
reliability in producing high sample recoveries and accurate
interval depths. No formal method of measuring and recording
recoveries was adopted.
and whether sample bias may have occurred due to preferential To ensure representivity of the material being drilled the entire
loss/gain of fine/coarse material. sample was collected from the drill hole.
The aircore drilling method was used to ensure collection of as
representative a sample as possible.

ASX Announcement | 02 June 2015 | Page 6

Criteria JORC Code explanation - DSO (“Direct Shipping Ore”) JORC Code explanation - DSO (“Direct Shipping Ore”) Commentary
The sonic drilling method was used to collect samples for bulk
density determinations as it is a proven method of collecting
continuous and intact samples that can be measured to
determine volumes and weighed to determine densities.
Logging Whether core and chip samples have been geologically and All drilled intervals were geologically logged at 0.25 m intervals.

geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections logged.
The logging was done in a qualitative manner and focussed on
documenting the amount of pisolitic material, soil, clays and
ironstone. In the field the bauxitic horizons were defined by the
presence of pisolites and the absence of ferricrete.
Sub- If core, whether cut or sawn and whether quarter, half or all core No sub-sampling of material was undertaken at the time of
Sampling
Techniques
and Sample
Preparation

taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
collection. The entire sample was collected over 0.25 m intervals
directly from the cyclone on the drill rig. The samples did not
require any drying prior to bagging.
For the analyses of DSO bauxite two sample preparation protocols
Quality control procedures adopted for all sub-sampling stages to were used as follows:
7maximize representivity of samples.
Measures taken to ensure that the sampling is representative of the in
1.
For samples from drill holes on a nominal 320m by 320m grid that
situ material collected, including for instance results for field were previously screened (+1.2mm) and analysed
duplicate/second-half sampling.
Create a composite sample (or samples) over the bauxite interval
Whether sample sizes are appropriate to the grain size of the material in each hole to be analysed using all the material in sample splits
being sampled. retained from earlier analyses of screened (beneficiated) samples
(undertaken either under the supervision of the company or at
ALS’s Virginia laboratory).

Report weight of received sample.

Riffle split each sample down to an acceptable size for pulverizing
and return split to original bag for storage (undertaken by ALS’s
Virginia laboratory in Brisbane).

Pulverise the smaller portion of the split to a nominal 85% passing
75 microns (undertaken by ALS’s Virginia laboratory in Brisbane).
2.
For samples from in-fill drill holes on a nominal 160m by 160m grid
that had not been previously prepared or analysed.

Report weight of received sample.

Riffle split each sample down to an acceptable size for pulverising
and return split to original bag for storage (undertaken by ALS’s
Virginia laboratory in Brisbane)

Pulverise the smaller portion of the split to a nominal 85% passing
75 microns (undertaken by ALS’s Virginia laboratory in Brisbane).

Approximately 15% of the samples are composite samples that
have been prepared in the laboratory by riffle splitting and
combining. The composites do not include more than two
samples.
This preparation isregarded as being appropriateforbauxite

ASX Announcement | 02 June 2015 | Page 7

Criteria JORC Code explanation - DSO (“Direct Shipping Ore”)

Commentary analyses.

  • Quality ofThe nature, quality and appropriateness of the assaying and Assay Data laboratory procedures used and whether the technique is considered partial or total.

  • & LaboratoryFor geophysical tools, spectrometers, handheld XRF instruments, etc.,

  • Tests the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established .

As the entire sample was collected in the field no duplicate sampling was possible or deemed to be required. Sample analyses were undertaken by ALS at its Stafford laboratory in Brisbane. The analytical methods applied to the pulverised sample were as follows :

  • Total oxides by XRF (ALS code ME-XRF13b). Al2O3, BaO, CaO, Cr2O3, Fe2O3, K2O, MgO, Na2O, P2O5, SiO2, SO3, SrO, TiO2, V2O5, Zn, ZrO20.

  • H2O/LOI by TGA furnace (ALS code ME-GRA05)

  • Available alumina in bauxite by ALS method Al-LICP01 (150[0] C)

  • Reactive silica by ALS method Si-LOCP01 (150[0] C)


duplicates, external laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision have been
_established. _
ZrO20.

H2O/LOI by TGA furnace (ALS code ME-GRA05)

Available alumina in bauxite by ALS method Al-LICP01 (1500C)

Reactive silica by ALS method Si-LOCP01 (1500C)
Two standard reference samples for bauxite were obtained from
Geostats Pty Ltd, renumbered, and provided to the laboratory to
insert in each batch. One of each sample was inserted
approximately every twenty (20) samples. This was regarded as a
measure of the accuracy of the laboratory. The results were all
within one standard deviation of the certified values indicating no
significant bias between sample batches.
No field duplicate samples were collected as the total sample was
submitted for analysis.
In the laboratory as a Quality Control measure, every 10th sample
was completed in duplicate and four laboratory standards and
one blank were run in conjunction with the samples and data
reported to the company.
Verification The verification of significant intersections by either independent or In the laboratory every 10th sample was completed in duplicate
of Sampling
and
Assaying

alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
as listed above.
Analyses from 21 twinned drill holes have been completed.
Duplicate holes had very high correlation coefficients for the total
Discuss any adjustment to assay data. silica, reactive silica, total alumina and available alumina grades
that indicated no inherent problems in the sampling or laboratory
protocol.
Analytical data were provided by the laboratory in csv format and
as pdf. The data have been compiled by the company into Excel
spreadsheets and merged with drill hole location data and sample
intervals.
Location of Accuracy and quality of surveys used to locate drill holes (collar and Drill hole collar positions were surveyed by Fugro Spatial Solutions
down-hole surveys), trenches, mine workings and other locations used PtyLtd usingTrimble RTKGPSunits. Three units were used;one base

ASX Announcement | 02 June 2015 | Page 8

Criteria JORC Code explanation - DSO (“Direct Shipping Ore”) JORC Code explanation - DSO (“Direct Shipping Ore”) Commentary
Data Points in Mineral Resource estimation. station and two rovers. Easting and Northing co-ordinates were

Specification of the grid system used.
Quality and adequacy of topographic control.
quoted to three decimal places based on datum GDA94 using
zone 54. Elevation was quoted to two decimal places using an
adopted AHD from Ausgeoid’09.
In late 2014 Lidar data was acquired which provides more
accurate elevation data. This data has been used in the resource
modelling.
Data Data spacing for reporting of Exploration Results. In the BH1 area 1,482 holes were drilled on a nominal 80m x 80m
Spacing &
Distribution
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications

north-south, east-west grid.
Samples from a subset of the drilling program, representing a
applied. nominal 160m x 160m grid were submitted for analyses. The
Whether sample compositing has been applied. remainder of the samples have been retained in storage.
This data spacing is deemed sufficient to establish the degree of
geological and grade continuity appropriate for an Measured
Mineral Resource estimate at BH1, where holes with a sonic density
reading are within 800m. This distance is based on the typical
distance generated by the variography of the various analysis.
For the purposes of the DSO bauxite Mineral Resource estimate at
BH1, samples have been composited over the entire bauxite
interval in each hole as determined by earlier analyses of
screened samples over 0.25 m and 0.5 m intervals.
In the BH6 area 505 holes were completed on a 160m x 160m grid.
Samples from a subset of the drilling program, representing a
nominal 160m x 160m grid, were submitted for analyses. This data
spacing was deemed sufficient to establish the degree of
geological and grade continuity appropriate for an Indicated
Mineral Resource estimate. In February 2015 the sonic drilling
program established a series of holes through the area allowing
the certainty to assign Measured Resource within 800m of the dry
bulk density analysis.
Samples from the 160m x 160m grid were composited over the
entire bauxite interval in each hole as determined by earlier
analyses of screened samples over 0.25 m and 0.5 m intervals. No
individual 0.25m or 0.5m samples remain from these holes
Approximately 15% of the samples from the 160m x 160m in-fill
drilling were composites prepared in the laboratory by riffle
splitting and combining a maximum of two samples. All other
samples were the original 0.25m or 0.5m samples.
Orientation Whether the orientation of sampling achieves unbiased sampling of Alldrill holes areverticalandintersect themineralisationatan

ASX Announcement | 02 June 2015 | Page 9

Criteria JORC Code explanation - DSO (“Direct Shipping Ore”) JORC Code explanation - DSO (“Direct Shipping Ore”) Commentary
of Data in possible structures and the extent to which this is known, considering approximate 900angle. The mineralisation is known to be near
Relation to
Geological
Structure
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralized structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
horizontal with a tabular attitude. This is typical of bauxite deposits
in the Weipa area. There is therefore no sampling bias resulting
from the orientation of the drilling and that of the mineralised
body.
Sample The measures taken to ensure sample security. The samples were collected in large plastic sample bags on site
Security which were secured with industrial quality duct tape and then
placed, along with other samples from the drill hole, in large
polyweave bags which were secured with cable ties.
Due to the nature of bauxite mineralisation there is little
opportunity to tamper with or otherwise modify the sample.
The samples used in the DSO bauxite Mineral Resource estimates
were stored in secure containers in a locked shed in a secured
industrial estate in Raceview, Ipswich, Queensland.
Audits or The results of any audits or reviews of sampling techniques and data. No independent audits of the aircore drilling and sampling
reviews procedures have been undertaken. Geos Mining has reviewed the
data and modelling methodology and provided
recommendations to enable sign off as a Competent Person for
the Mineral Resources at both BH1 and BH6 deposits.
A review of the bulk density determinations derived from the sonic
drilling program has been undertaken by Xstract Mining
Consultants Pty Ltd.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
Mineral Type, reference name/number, location and ownership including BH6 is located within EPM 16899 and BH1 within EPM 15376. The
Tenement
and Land
Tenure
Status
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
EPMs are held by Cape Alumina Limited a wholly owned subsidiary
of Metro Mining Limited. The tenements lie within the Mapoon
DOGIT with whom the company has a Conduct and
Compensation agreement.
The underlying tenements are in good standing.
Exploration Acknowledgment and appraisal of exploration by other parties. An appraisal has been undertaken of previous exploration for
Done by bauxite. Although some widespread sampling existed there was
Other Parties no evidence of systematic, grid-based drilling.
Geology Deposit type, geological setting and style of mineralization. The deposit type is lateritic bauxite derived from the weathering of
aluminous sediments in a tropical to sub-tropical environment.

ASX Announcement | 02 June 2015 | Page 10

Criteria JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
Drill Hole A summary of all information material to the understanding of the All the drill hole information, including surveyed collars with
Information exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
easting, northing, elevation and depth, geological logs and
analytical data are presented in Excel spreadsheets. These data
were used in the estimation of the Mineral Resources. The data are
stored within Metro Mining’s server which is regularly backed-up.
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
Data In reporting Exploration Results, weighting averaging techniques, For each drill hole, bauxite intervals are based on a cut-off of ≥45%
Aggregation
Methods


maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
total Al2O3and ≤8% Reactive SiO2based on the analyses of
beneficiated (+1.2mm) samples. A minimum thickness of 0.5 m was
applied and the top 0.25 m was considered to be overburden and
was not aggregated. Down-hole assays were weighted on the
basis of both intercept thickness and intercept recovery (wt%
+1.2mm material) to determine the weighted average assay for
should be clearly stated. the bauxite zone in each drill intercept. No upper cut-off grades
were applied.
Some DSO bauxite samples used in the Mineral Resource estimates
were created by compositing the splits over the entire bauxite
interval, as defined by the cut-offs described above, for each
hole. The remainder (~80%) are non-composited 0.25m or 0.5m
samples.
Relationship These relationships are particularly important in the reporting of All drill holes are vertical and intersect the mineralisation at an
between
Mineralizatio
n Widths and
Intercept
Lengths


Exploration Results.
If the geometry of the mineralization with respect to the drill hole angle
is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).

approximate 900angle. The mineralisation is known to be near
horizontal with a tabular attitude. Intercept lengths are therefore
approximately the same as the true widths of the mineralisation
This is typical of bauxite deposits in the Weipa area.
Diagrams Appropriate maps and sections (with scales) and tabulations of See diagrams in the report.
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not This is not deemed to be Material for the reporting of the Mineral
Reporting practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Resources which considers all the analytical data.
Exploration Results.
Other Other exploration data, if meaningful and material, should be reported
Apart from the samples obtained from the Reverse Circulation
Substantive including (but not limited to): geological observations; geophysical aircore drillinga small number of bulk samples were collected over

ASX Announcement | 02 June 2015 | Page 11

Criteria JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation – BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
Exploration survey results; geochemical survey results; bulk samples – size and 1 m intervals from the aircore drilling for dispatch to potential
Data method of treatment; metallurgical test results; bulk density, customers.
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
Further Work The nature and scale of planned further work (e.g. tests for lateral No further exploration drilling is planned at the BH6 plateau. Any
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
further drilling is likely to be for additional bulk density data, water
bores, environmental and mine planning.
provided this information is not commercially sensitive.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
Database Measures taken to ensure that data has not been corrupted by, for Analytical data was received from the laboratory in csv format
Integrity example, transcription or keying errors, between its initial collection
and its use for Mineral Resource estimation purposes.
and merged with drill hole locational and from-to data in Excel
spreadsheets. Checks were run to look for and correct duplicated
Datavalidationprocedures used. intervals, gaps and typing errors. Vulcans database import and
Compositing routines generated validation log files that were all
checked in detail. All issues identified were verified, checked and
corrected.
Site Visits Comment on any site visits undertaken by the Competent Person and The Competent Person for exploration results, Neil McLean,
the outcome of those visits.
If no site visits have been undertaken indicate why this is the case.
supervised the drilling program and was on site a number of times
during the program.
The Competent Person for the mineral resource estimate, Jeff
Randell, has carried out several mineral resource estimations on an
adjacent tenement that contains an extension of the BH6 deposit.
He has also supervised drilling programs over the past 6 years for
that company.
Geological Confidence in (or conversely, the uncertainty of) the geological The geological interpretation is grade-based using a threshold of
Interpretatio
n


interpretation of the mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral Resource
estimation.
The use of geology in guiding and controlling Mineral Resource
estimation.
≥45% total Al2O3and ≤8% reactive SiO2to define economic
bauxite. The continuity of the geological interpretation is
confirmed with a reasonable degree of confidence. The data
points are spaced at 160m in a nominal grid pattern over the
entire BH1 and BH6 deposit. Information from other deposits in the
The factors affecting continuity both of grade and geology. Weipa area, such as the company’s Pisolite Hills project where
Mineral Resource estimates exist, provide additional confidence in
the geological model.
Dimensions The extent and variability of the Mineral Resource expressed as length The mineralisation within the bauxite plateaus is flat lying and
(along strike or otherwise), plan width, and depth below surface to the tabular in form. The Mineral Resources have the following surface
areas, average bauxitethicknesses and average overburden

ASX Announcement | 02 June 2015 | Page 12

Criteria JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
upper and lower limits of the Mineral Resource. thicknesses.
BH6: Area 8.9 km2. Bauxite thickness 1.5 m. Overburden 0.5 m
BH1: Area 6.8 km2. Bauxite thickness 1.7 m. Overburden 0.6 m
Estimation & The nature and appropriateness of the estimation technique(s) A block model was created by constructing a DTM and model of
Modelling
Techniques
applied and key assumptions, including treatment of extreme grade
values, domaining, interpolation parameters and maximum distance
of extrapolation from data points. If a computer assisted estimation
method was chosen include a description of computer software and
parameters used.
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
the soil, bauxite and transition zone. The block model was cut to
tenement boundaries, environmentally sensitive areas and
bauxitic plateaus then filled with assay and bulk density data using
an Ordinary Kriging algorithm with variograms created for total
silica/ alumina, available alumina, reactive silica and dry bulk
density.
appropriate account of such data.
The assumptions made regarding recovery of by-products.
Estimation parameters used included:
Estimation of deleterious elements or other non-grade variables of
Block size 40m x 40mx 1.5m
economic significance (e.g. sulphur for acid mine drainage
Omnidirectional search ellipse with maximum search distance of
characterisation). 800m

In the case of block model interpolation, the block size in relation to
the average sample spacing and the search employed.
Any assumptions behind modelling of selective mining units.

lag intervals 100, 200, 400, 800, 1200m.

Nugget, major/ minor ranges determined by best fit variograms
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to control
the resource estimates.
Discussion of basis for using or not using grade cutting or capping.
The process of validation, the checking process used, the comparison
of model data to drill hole data, and use of reconciliation data if
available.
Moisture Whether the tonnages are estimated on a dry basis or with natural The tonnes are quoted on a dry basis. The moisture contents were
moisture, and the method of determination of the moisture content. measured by ALS on the sonic drill samples collected from BH6
and BH1. Following drying the samples were re-weighed to provide
a weight to use in the bulk density calculations.
Cut-off The basis of the adopted cut-off grade(s) or quality parameters Mineralised zones are defined by grades ≥45% total Al2O3and ≤8%
Parameters applied. reactive SiO2.
Mining Assumptions made regarding possible mining methods, minimum The resource model assumes open pit mining for all defined
factors or
Assumptions
mining dimensions and internal (or, if applicable, external) mining
dilution. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider
resources using loaders and trucks. No blasting is envisaged based
on bauxite mining operations elsewhere in the Weipa area.
potential mining methods, but the assumptions made regarding Grade control will be assisted by laser levelling equipment fitted to
mining methods and parameters when estimating Mineral Resources mining equipment with face grade control measured by the use of
may not always be rigorous. Where this is the case, this should be portable XRF equipment and/or field laboratory.
reported with an explanation of the basis of the mining assumptions
made.
Metallurgica The basis for assumptions orpredictions regarding metallurgical THA(trihydrate alumina) andRxSi(reactive silica) analyseshave

ASX Announcement | 02 June 2015 | Page 13

Criteria JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
l Factors or amenability. It is always necessary as part of the process of been undertaken an all beneficiated (+1.2mm) samples from BH6
Assumptions determining reasonable prospects for eventual economic extraction
to consider potential metallurgical methods, but the assumptions
regarding metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be rigorous. Where
this is the case, this should be reported with an explanation of the basis
of the metallurgical assumptions made.

as well as the composited, DSO bauxite samples from BH6. These
results are used together with the results from the XRF analyses to
calculate an estimated BA (boehmite alumina) content. The
calculation makes the assumption that all Al2O3is contained within
gibbsite, boehmite and kaolinite and that all SiO2occurs in
kaolinite and quartz. A small proportion of Al2O3may occur in an
amorphous form and result in a small error in the amount of
calculated BA. A small number of negative BA numbers were
reported from the calculation.
Environment Assumptions made regarding possible waste and process residue An EIS has not been undertaken over the Bauxite Hills deposits.
al Factors or
Assumptions
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction
to consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of
Small-scale mining of kaolin has been undertaken at the Skardon
Mine located to the south of the BH6 deposit indicating that the
district is not necessary regarded as ‘greenfields’.
potential environmental impacts, particularly for a greenfields project, There are several environmentally sensitive areas surrounding the
may not always be well advanced, the status of early consideration of bauxite deposit but their location is accurately known; no bauxite
these potential environmental impacts should be reported. Where resources have been included within these areas.
these aspects have not been considered this should be reported with
an explanation of the environmental assumptions made.
Bulk Density Whether assumed or determined. If assumed, the basis for the Bulk density data specific to the deposits at Bauxite Hills has been
assumptions. If determined, the method used, whether wet or dry, the
frequency of the measurements, the nature, size and
representativeness of the samples.
The bulk density for bulk material must have been measured by
methods that adequately account for void spaces (vugs, porosity,
etc.), moisture and differences between rock and alteration zones
within the deposit.
determined from measurements undertaken on 242 samples
collected from 27 sonic drill holes completed across the BH1, and
BH6 deposits. The methods of sample collection, measurement
and determination, as well as the results, have been
independently reviewed by Xstract Mining Consultants Pty Ltd. The
dry bulk density analysis was used to build a model using a
Discuss assumptions for bulk density estimates used in the evaluation triangulation surface fit to derive the values. The sonic drilling
process of the different materials. method was used to collect core samples for bulk density
determinations as it is a proven method of collecting continuous
and intact samples that can be measured to determine volumes
and weighed to determine densities.
Classificatio The basis for the classification of the Mineral Resources into varying The Mineral Resources have been classified as Measured,
n confidence categories.
Whether appropriate account has been taken of all relevant factors
(i.e. relative confidence in tonnage/grade estimations, reliability of
input data, confidence in continuity of geology and metal values,
Indicated and Inferred. This reflects the density of sampling at
nominal 160m centres, the availability of bulk density data and the
modelling method utilised.
quality, quantity and distribution of the data).
Whether the result appropriately reflects the Competent Person’s view
of the deposit.
Audits or The results of any audits or reviews of Mineral Resource estimates. Geos Mining has carried out an independent review of the Mineral
Reviews Resource data and techniques.
Discussion of
Where appropriate a statement of the relative accuracy and In accordance with the classification as Measured Resources,the

ASX Announcement | 02 June 2015 | Page 14

Criteria JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) JORC Code explanation –BH1 & BH6 DSO (“Direct Shipping Ore”) Commentary
Relative confidence level in the Mineral Resource estimate using an approach Competent Person considers that there is moderate confidence
Accuracy/
Confidence
or procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the resource within stated
confidence limits, or, if such an approach is not deemed appropriate,
a qualitative discussion of the factors that could affect the relative
accuracy and confidence of the estimate.
The statement should specify whether it relates to global or local
that the bulk density of each block represented in the model
based on analytical data. Measured resources were limited to
portions of the model within 800m of bore holes with bulk density
data. Significant variability has been noted within the deposits dry
bulk density analysis. This factor needs to be taken into account in
mine planning decisions.
estimates, and, if local, state the relevant tonnages, which should be
relevant to technical and economic evaluation. Documentation
should include assumptions made and the procedures used.
These statements of relative accuracy and confidence of the estimate
should be compared with production data, where available.

In accordance with the classification as Indicated Resources, the
Competent Person considers that there is moderate confidence
that the total silica and alumina grades in each block are as
estimated. This confidence is underpinned by the close spaced
(160m) drill holes, some of which have been assayed, and results
of the variography that suggest spatial continuity over distances of
up to 3kms. There is however a moderately high nugget that
suggests significant local variability in grade that must be
considered in further upgrades of resource classification.
The modelled available alumina and reactive silica grades should
be considered from a global perspective only as there insufficient
samples to predict local changes. Further sampling is required in
order to increase confidence in this parameter

Section 4 Table 1 Estimation and Reporting of Ore Resources

Criteria JORC Code explanation CP Comments
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral Resource estimate used as a basis for the
conversion to an Ore Reserve.

Clear statement as to whether the Mineral Resources are reported
additional to, or inclusive of, the Ore Reserves

The Bauxite hills deposit in both regions of BH6 and BH1 contain
Measured, Indicated and Inferred Resource as shown below from the
2nd June 2015 Resource Statement.
 The mineral resources in the June 2015 statement are inclusive of the
reserves in this estimation. With no material outside of the resource
areas converted to reserves.
Site visits
Comment on any site visits undertaken by the Competent Person and
the outcome of those visits.

If no site visits have been undertaken indicate why this is the case.

No Site visits undertaken by the mining reserves CP.

It is not an operating mine and it was decided that site visit is not
required. All information necessary are obtained by electronic data.
A representative of the CP had visited the site for confirmation of site
access assumptions.

ASX Announcement | 02 June 2015 | Page 15

Study status
The type and level of study undertaken to enable Mineral Resources to
be converted to Ore Reserves.

The Code requires that a study to at least Pre-Feasibility Study level has
been undertaken to convert Mineral Resources to Ore Reserves. Such
studies will have been carried out and will have determined a mine
plan that is technically achievable and economically viable, and that
material Modifying Factors have been considered.

A prefeasibility study revision(June 2015) was completed based on
the updated geological model and resources. This study included
open pit optimisation, final and pit stage designs, reserving and
detailed mine production scheduling inclusive of haulage modelling
and economic analysis in a detailed financial model. This study
demonstrated economic viability of the stated reserves at individual
basis and full project schedule, based on industry acceptable
modifying factors.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters applied.

Mineralised zones are defined by grades ≥45% total Al2O3 and ≤8%
RxSi, based on saleable grade limitations.
Mining factors
or
assumptions

The method and assumptions used as reported in the Pre-Feasibility or
Feasibility Study to convert the Mineral Resource to an Ore Reserve (i.e.
either by application of appropriate factors by optimisation or by
preliminary or detailed design).

The choice, nature and appropriateness of the selected mining
method(s) and other mining parameters including associated design
issues such as pre-strip, access, etc.

The assumptions made regarding geotechnical parameters (e.g. pit
slopes, stope sizes, etc.), grade control and pre-production drilling.

The major assumptions made and Mineral Resource model used for pit
and stope optimisation (if appropriate).

The mining dilution factors used.

The mining recovery factors used.

Any minimum mining widths used.

The manner in which Inferred Mineral Resources are utilised in mining
studies and the sensitivity of the outcome to their inclusion.

The infrastructure requirements of the selected mining methods.

The Lerchs-Grossmann pit optimisation algorithm is utilised by Vulcan
software to determine the extent of economically mineable ore
reserves. Each block is evaluated based on the Metro Mining’s base
price and the discount factor based on grade variability.

Simple mining method will be adopted to mine the bauxite ore – Pre-
stripping will be done by one Front End Loader which removes the
overburden material. Once the bauxite ore is exposed the FEL will
mine the bauxite down to the transition material.

Shallow deposit – pit slope parameters are to the natural angle of
repose. The mined out pit will be back-filled by the overburden.

Shallow deposit dug to angle of repose with additional standoffs was
deemed not to require geotechnical study.

Ore Roof loss = 0.1m; Ore Floor loss = 0.1m. Total loss = 0.2m
incorporated in the ROM tonnes

ASX Announcement | 02 June 2015 | Page 16

  • Criteria JORC Code explanation CP Comments Mining factors  Ore Roof dilution = 0.1m incorporated in the ROM tonnes or  40m minimum mining width is used. assumptions  The inferred ore and non-categorized ore is also utilised in the pit optimisation and the mining schedule. The portion of this is less than 10% of the schedule material and a positive project value is still achieved with its exclusion.
Ore Roof dilution = 0.1m incorporated in the ROM tonnes Ore Roof dilution = 0.1m incorporated in the ROM tonnes Ore Roof dilution = 0.1m incorporated in the ROM tonnes
40m minimum mining width is used.
The inferred ore and non-categorized ore is also utilised in the pit
optimisation and the mining schedule. The portion of this is less than
10% of the schedule material and a positive project value is still
achieved with its exclusion.
Detailed infrastructure and capital requirement are mentioned in the
report
Total Construction Capex (AUD M)
Feasibility and Owners Costs 3.0
Mine Access (Haul Road) 2.8
Mine Access (Haul Road 4.0
sustaining)
Mine & Barge Loading 10.6
Infrastructure
Airport upgrade 1.0
Mine Camp 4.0
Mining Equipment 2.5
Insurance 1.0
Sustaining Capex 13.2
Contingency 9.8
Total Capex 51.8

ASX Announcement | 02 June 2015 | Page 17

Criteria JORC Code explanation CP Comments
Metallurgical
factors or
assumptions

The basis for assumptions or predictions regarding metallurgical
amenability. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction
to consider potential metallurgical methods, but the assumptions
regarding metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be rigorous. Where
this is the case, this should be reported with an explanation of the basis
of the metallurgical assumptions made.

THA (trihydrate alumina) and RxSi (reactive silica) analyses have been
undertaken an all beneficiated (+1.2mm) samples from BH6 as well as
the composited, DSO bauxite samples from BH6. These results are
used together with the results from the XRF analyses to calculate an
estimated BA (boehmite alumina) content. The calculation makes the
assumption that all Al2O3 is contained within gibbsite, boehmite and
kaolinite and that all SiO2 occurs in kaolinite and quartz. A small
proportion of Al2O3 may occur in an amorphous form and result in a
small error in the amount of calculated BA. A small number of
negativeBA numberswerereportedfrom the calculation.
Environment
al Factors or
Assumptions

Assumptions made regarding possible waste and process residue
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction
to consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of
potential environmental impacts, particularly for a greenfields project,
may not always be well advanced, the status of early consideration of
these potential environmental impacts should be reported. Where
these aspects have not been considered this should be reported with
an explanation of the environmental assumptions made.

An EIS study is currently being completed by CDM Smith

There are several environmentally sensitive areas surrounding the
bauxite deposit but their location is accurately known; no bauxite
resources have been included within these areas.
Infrastructure
The existence of appropriate infrastructure: availability of land for plant
development, power, water, transportation (particularly for bulk
commodities), labour, accommodation; or the ease with which the
infrastructure can be provided, or accessed.

The infrastructure required for the project and the capital expenditure
are mentioned in this report. This includes minimal fixed infrastructure
for project flexibility. The summary of infrastructure investment is
detailed in the modifying factors section of this table.
Costs
The derivation of, or assumptions made, regarding projected capital
costs in the study.

The methodology used to estimate operating costs.

Allowances made for the content of deleterious elements.

The derivation of assumptions made of metal or commodity price(s),
for the principal minerals and co- products.

The source of exchange rates used in the study.

Derivation of transportation charges.

The basis for forecasting or source of treatment and refining charges,
penalties for failure to meet specification, etc.
The allowances made for royalties payable, both Government and
private.

The projected capital costs are obtained from the various suppliers of
the Clients.

The operating cost such as loading cost, haulage cost etc., are
calculated by the equipment operating parameters, haulage cost
etc.

NIL

The Metro Mining’s base price has been used as a part of CM Group’s

AUD 1.00 = USD 0.81

The haulage cost is calculated by the haul distance and equipment
operating cost. Transportation cost from the load out point to the
ship is done by barges.

The penalties/bonuses for the ore below/above specification has
been incorporated in the open pit optimisation process. A block
value is calculated based on the individual quality parameters for the
block.

The Government royalties (10% of product) and traditional land
owner’s royalty (1.5% of product) has been built in the optimisation
ore value.

ASX Announcement | 02 June 2015 | Page 18

Criteria JORC Code explanation CP Comments
Revenue
factors

The derivation of, or assumptions made regarding revenue factors
including head grade, metal or commodity price(s) exchange rates,
transportation and treatment charges, penalties, net smelter returns,
etc.

The derivation of assumptions made of metal or commodity price(s),
for the principal metals, minerals and co-products.

The penalties/bonuses for the ore below/above specification has
been incorporated in the open pit optimisation process. A block
value is calculated based on the individual quality parameters for the
block. This information was supplied by the CM group as part of an
independent marketing study.

Same as above.
Market
assessment

The demand, supply and stock situation for the particular commodity,
consumption trends and factors likely to affect supply and demand
into the future.

A customer and competitor analysis along with the identification of
likely market windows for the product.

Price and volume forecasts and the basis for these forecasts.

For industrial minerals the customer specification, testing and
acceptance requirements prior to a supply contract.

The market study completed by CM group for Metro Mining
considered product specification options, market demand and
global trade limitation.
Economic
The inputs to the economic analysis to produce the net present value
(NPV) in the study, the source and confidence of these economic
inputs including estimated inflation, discount rate, etc.

NPV ranges and sensitivity to variations in the significant assumptions
and inputs.

The mine production schedule results were incorporated for
revenue/cash flow and the NPV is calculated based on the capital
expenditure and sustaining capital expenditure for each period.

NPV (15%) real after tax = $193.1million and demonstrated a positive
NPV in sensitivity testing.
Social
The status of agreements with key stakeholders and matters leading to
social licence to operate.

EPM, Mining Lease and Native title claims are mentioned in detail
withing the PFS and reserves report. The EPM is owned by Metro
Mining and the Mining Leases are in “Application” status. 2 native
title claims have been lodged and Metro Mining is working on the
“right tonegotitate”process underSection 29 of theAct.
Other
To the extent relevant, the impact of the following on the project
and/or on the estimation and classification of the Ore Reserves:

Any identified material naturally occurring risks.

The status of material legal agreements and marketing arrangements.

The status of governmental agreements and approvals critical to the
viability of the project, such as mineral tenement status, and
government and statutory approvals. There must be reasonable
grounds to expect that all necessary Government approvals will be
received within the timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the materiality of any unresolved
matter that is dependent on a third party on which extraction of the
reserve is contingent.

Of the Mine schedule completed 5Mt of the 53.27Mt is of an inferred
or lower resource classification. Removal of this material value from
the mine schedule does not result in an uneconomic operation.

Presently this project is at pre-feasibility level and no contracts are
currently in place, progression to tender and contracts is being
completed as part of the DFS.

Lease and Native Title agreement applications and process are
currently being processed.
_Classificatio_n
The basis for the classification of the Ore Reserves into varying
confidence categories.

Whether the result appropriately reflects the Competent Person’s view
of the deposit.

The proportion of Probable Ore Reserves that have been derived from
Measured Mineral Resources (if any).

Review of modelling and drilling information along with planned
operating conditions resulted in all contained economic measured
resources being converted to Proved reserves, and alike indicated
resources to Probable reserves

The resource modelling confidence is accurate in MEC’s opinion

No such reserves

The stated ROM reserves represent the marketable product tonnes as
this is a direct shipping ore, with no benefication and saleable at ROM
moistures

ASX Announcement | 02 June 2015 | Page 19

Criteria JORC Code explanation CP Comments
Audits or
reviews

The results of any audits or reviews of Ore Reserve estimates.

MEC mining conducted internal peer reviews of the calculation
processes and schedule results. Further independent financial
modelling also confirmed the economic evaluations completed
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and
confidence level in the Ore Reserve estimate using an approach or
procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative
discussion of the factors which could affect the relative accuracy and
confidence of the estimate.

The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be
relevant to technical and economic evaluation. Documentation
should include assumptions made and the procedures used.

Accuracy and confidence discussions should extend to specific
discussions of any applied Modifying Factors that may have a material
impact on Ore Reserve viability, or for which there are remaining areas
of uncertainty at the current study stage.

It is recognised that this may not be possible or appropriate in all
circumstances. These statements of relative accuracy and confidence
of the estimate should be compared with production data, where
available.

No statistical or geostatistical procedures have been used in the
estimation of Reserves themselves.

The loss and dilution assumptions target higher losses to minimise
dilution to maintain the grade for a DSO product, current operations
in this region do not operate in this fashion. Assumptions on dilution
should be further compared to alternate regions for an actual
performance basis.

There are no remaining areas of material uncertainty relating to
modifying factors that could have an impact on Reserve viability.

ASX Announcement | 02 June 2015 | Page 20