AI assistant
METRO MINING LIMITED — Capital/Financing Update 2010
Sep 12, 2010
65351_rns_2010-09-12_13abfc23-ddfd-4031-aec0-953ec821ac53.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [128 x 105] intentionally omitted <==
ACN 117 763 443
ASX ANNOUNCEMENT
13 September 2010
CHINA COAL RECEIVES FINAL MAJOR APPROVAL
MetroCoal Limited (ASX-MTE) is pleased to announce that China Coal Import & Export Company ( CCIEC ), a wholly owned subsidiary of China National Coal Group Corp ( China Coal ) has advised that they have received approval from The State Administration of Foreign Exchange for the transfer of $30 million to China Coal‟s Australian subsidiary.
This is the final major approval required from the People‟s Republic of China for China Coal‟s $30 million joint venture with MetroCoal on its Columboola tenement (EPC1165) near Miles in the Surat Basin. (see Figure below).
The transaction has been approved by the Foreign Investment Review Board ( FIRB ) and the joint venture agreement ( JVA ) will now become unconditional upon the Minister giving indicative consent to the assignment of a 51% interest in the tenement to CCIEC.
MetroCoal CEO Mike O‟Brien said the company was now on the verge of starting the joint venture with China Coal. “As soon as funds are received, exploration will be commencing on the Columboola coal project.‟‟
==> picture [452 x 326] intentionally omitted <==
==> picture [596 x 96] intentionally omitted <==
About the CCIEC Joint Venture
Under the terms of the JVA, CCIEC acquires a 51% interest in MetroCoal‟s EPC 1165 Columboola in the Surat Basin, Queensland (see Figure above) for an agreed expenditure commitment of AUD$30 million on EPC 1165. The funds will be used for exploring and evaluating the potential for future commercialisation options within the Columboola tenement and also opens up the opportunity for participation in MetroCoal‟s other tenements. The Columboola JVA requires a minimum expenditure of $4 million within the first two years of the agreement.
Other salient aspects of the Joint Venture Agreement are:
-
within 10 days of receipt by CCIEC of the $30 million, MetroCoal will amend the ownership of EPC 1165 with Queensland Mines and Energy;
-
after the first $4 million has been expended, either party may withdraw from the joint venture and the withdrawing party will forfeit its interest in the Joint Venture;
-
when the $30 million has been fully expended each party will be required to contribute in proportion to their respective Joint Venture interests;
-
CCIEC will be the Manager of the Joint Venture; and
-
CCIEC will also have first right to enter into a Joint Venture over the other MetroCoal tenements.
For further information, please contact:
Mr Mike O’Brien Mr Theo Psaros Chief Executive Officer Chief Operating Officer and Company Secretary Mob: 0488 700 745 Mob: 0414 988 009 Phone: +61 (7) 3249 3040 Fax: +61 (7) 3249 3041 Email: [email protected] Postal Address: GPO Box 122, Brisbane QLD 4001
Further information on MetroCoal can be found on our website www.metrocoal.com.au
About MetroCoal Limited (ASX code: MTE)
MetroCoal is an Australian based emerging coal and energy company focused on its 100% owned coal projects in the Surat Basin in South East Queensland. MetroCoal listed on the ASX on 4 December 2009 after closing a fully subscribed IPO raising $10 million.
MetroCoal‟s vision is to build a substantial cleaner energy and coal business based on:
- Export thermal coal from underground mining and where possible, open cut mining; and 2. Underground Coal Gasification („UCG‟) with small scale power generation and an integrated gas synthesis process producing high quality, clean liquid fuel (e.g. clean diesel and jet fuel), chemicals and fertilizers.
MetroCoal holds extensive coal exploration tenements in the Surat Coal Basin covering approximately 4,000km[2] . These tenements are down dip of well known resources including Wandoan, Elimatta, Cameby Downs and Woori. Based on the geological information from the historic drilling programs and its own drilling results, MetroCoal has a thermal coal Exploration Target of between 2.5 and 3.5 billion tonnes* with a JORC Code classification of “inferred” or better, within the next two years for evaluation for conventional underground coal mining and where more suited - UCG.
==> picture [596 x 96] intentionally omitted <==
***** The potential quantity and quality is conceptual in nature, and that there has been insufficient exploration to define a Mineral Resource or Ore Reserve and that it is uncertain if further exploration will result in the determination of a Mineral Resource or Ore Reserve.
Competent Person Statement
The information in this Announcement that relates to the Exploration Targets is based on information compiled by Mr Neil Mackenzie-Forbes who is a Member of the Australian Institute of Geoscientists (Membership No 2035). Mr Mackenzie-Forbes is currently the exploration manager of MetroCoal. Mr Mackenzie-Forbes has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Mackenzie-Forbes has consented in writing to the inclusion in this announcement of the matters based on the information in the form and context it appears.