MEC RESOURCES LIMITED Interim / Quarterly Report 2022

May 31, 2022

65353_rns_2022-05-31_c717500d-90b2-48bb-9acb-449c20e8d178.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [139 x 60] intentionally omitted <==

MEC RESOURCES LTD ABN 44 113 900 020

MEC Resources Ltd and its controlled entities

Contents

Appendix 4D -Half year report

Results for announcement to the market

Appendix 4D -Half year report
Results for announcement to the market
Name of Entity MEC Resources Limited
ABN 44 113 900 020
Half Year Ended 31 December 2021
Previous CorrespondingReportingPeriod 31 December 2020
$A'000 $A'000
Revenues from ordinary activities
(Loss) from ordinary activities after tax attributable to members
Net (loss) for the period attributable to members
Up
0%
to
0
down
69%
to
(331)
down
69%
to
(331)
Dividends (distributions) Amount per
security
Franked amount
per security
Final dividend
Interim dividend
Nil Nil
Previous corresponding period N/A N/A

Please refer to attached accounts for commentary on the results

Other notes to the condensed financial statements

Other notes to the condensed financial statements
Ratios Current period Previous
corresponding
Period
Loss before tax / revenue
Consolidated (loss) from ordinary activities before tax as a
percentage of revenue
0% 0%
Loss after tax / equity interests
Consolidated net (loss) from ordinary activities after tax attributable
to members as a percentage of equity (similarly attributable) at the
end of theperiod
(4.75)% (6.51)%
NTA Backing Current period Previous
corresponding
Period
Net tangible asset backing per ordinary security (0.00) cps (0.00) cps

Contents

MEC Resources Ltd and its controlled entities

Directors’ Report ............................................................................................................................... 1 Auditor Independence Declaration ............................................................................................... 9 Directors’ Declaration .................................................................................................................... 10 Consolidated Statement of Profit or Loss and Other Comprehensive Income ......................... 11 Consolidated Statement of Financial Position ............................................................................. 12 Consolidated Statement of Changes in Equity ........................................................................... 13 Consolidated Statement of Cash Flows ....................................................................................... 14 Notes to the Financial Statements ................................................................................................ 15 Independent Auditor’s Review Report ......................................................................................... 20

Directors’ Report

MEC Resources Ltd and its controlled entities

Directors

David Breeze – Managing Director (appointed 23 October 2020) Andrew Jones – Non-Executive Director (appointed 23 September 2020) Anthony Huston – Non-Executive Director (appointed 23 October 2020) Steve James – Non-Executive Director (appointed 4 March 2022)

Company Secretary

Auditor

Moore Australia Audit (WA) Level 15, Exchange Tower 2 The Esplanade PERTH WA 6000

Share Registry

Boardroom Pty Ltd Level 12 225 George St SYDNEY NSW 2000

Robert Marusco

Australian Securities Exchange Listing

Registered Office Level 1 9 Bowman Street SOUTH PERTH WA

Australian Securities Exchange Limited (Home Exchange: Perth, Western Australia) ASX Code: MMR

Australian Business Number

Principal Business Address Level 1, 9 Bowman Street SOUTH PERTH WA 6151 Telephone: (08) 9217 2400 Facsimile: (08) 9217 2401 Website: www.mecresources.com.au E-mail: [email protected]

44 113 900 020

1

Directors’ Report

MEC Resources Ltd and its controlled entities

The directors of MEC Resources Ltd (“ MEC Resources ” or the “ Company ”) submit herewith the financial report for the half year ended 31 December 2021. In order to comply with the provisions of the Corporations Act 2001 , the directors report as follows:

Directors

The names of the directors of the Company during or since the end of the period are:

D Breeze (appointed 23 October 2020) A Jones (appointed 23 September 2020) A Huston (appointed 23 October 2020)

S James (appointed 4 March 2022)

G Murray (appointed 23 October 2020, resigned 4 March 2022) D Verley (appointed 11 February 2020 resigned 4 March 2022)

Review of Operations

Operating loss for the entity after tax for the half-year ended 31 December 2021 was $330,848 (2020: $475,577).

MEC Resources Ltd

  • On 17 January 2020, the securities of MEC Resources were suspended from quotation on the ASX. The Company has been in dialogue with the ASX following its original submission on 16 December 2020 and subsequent submission on 12 January 2022, which included a shareholder meeting seeking approval of various resolutions the aim of which is to have MEC Resources readmitted to trading status. The ASX are currently assessing the submission. Noting that in anticipation of feedback from the ASX the Company is also working of an entitlement offer document aimed at recapitalising MEC Resources. The shares in MEC Resources remain suspended from trading.

  • Following suspension from the ASX the Company has provided the market with Voluntary Suspension updates in the previous financial year and further updates on 26 August 2021, 21 October 2021 and 14 January 2022.

  • During the half year MEC Resources continued to monitor and manage its investment in investee Advent Energy Limited (“ Advent ”) with the key announcements concerning Advent outlined below.

  • Advent’s assets include PEP11 (85%) in the offshore Sydney Basin and RL1 (100%) in the onshore Bonaparte Basin in the Northern Territory. On 16 December 2021 MEC Resources announced to market that the Federal Government would refuse the first one of two of the joint venture’s applications to extend the PEP 11 Permit for gas exploration in the offshore Sydney Basin. Advent received a formal notification of this decision from the National Offshore Petroleum Title Administrator (NOPTA). This is subject to legal review.

  • The Company has two new investments projects during the last quarter via its investee company Advent.

  • On 7 December 2021 BPH Energy Ltd (ASX:BPH) requested a trading halt which centered around participation of MEC’s investee company Advent in a Farm In Agreement. As at the

2

Directors’ Report

MEC Resources Ltd and its controlled entities

reporting date of this half year report details of the Farm in Agreement were yet to be released to market by both BPH and MEC.

  • On 13 December 2021 the Company held a shareholder meeting where approval was granted to issue 124,708,409 fully paid ordinary shares to Advent as part settlement of Advent writs. These shares were issued by the Company on 17 December 2021 at a deemed issue price of $0.0044 per Share to discharge the sum of $548,717 of the Advent Debt. As a result, the outstanding Advent Debt had been reduced from $872,741 to $324,024. Pursuant to the Deed of Settlement announced by the Company on 14 December 2020 Advent will be able to participate in a future rights issue or capital raise of MEC Resources to the extent of the balance of the Shares at a deemed issue price of $0.0044 per Share to settle the remaining balance of the Advent Debt being $324,024. The Advent Debt Conversion allows the Company to improve its balance sheet position and pay down the remaining $324,024 in outstanding debt which it would otherwise need to pay in cash.

  • Following the end of the half year on 21 January 2022 the Company held its AGM noting that all resolutions were approved by Shareholders.

  • Following the end of the half year on 4 March 2022 the Company announced that both Mr Douglas Verley and Mr Geoff Murray had resigned as non-executive directors and concurrently Mr Steve James has joined the board as a non-executive director.

  • Following the end of the half year on 5 April 2022 MEC Resources announced to market investee Advent had signed a farm out agreement with OMV New Zealand Limited in three offshore Taranaki Basin exploration permits.

  • Following the end of the half year on 24 May 2022 information regarding a second proposed new investment in hydrogen production technology was released to market by BPH Energy Ltd (“BPH”) whereby BPH and MEC’s investee company Advent entered into a binding term share with Clean Hydrogen Technologies Corporation to subscribe for fully paid shares in Clean Hydrogen Technologies Corporation representing a total of 2 % of the total issued capital of Clean Hydrogen Technologies Corporation after the issue of the subscription shares noting that the investment by BPH is subject to BPH shareholder approval at a shareholder meeting set on 21 June 2022.

  • During the half year MEC Resources investment in Advent reduced to 38.27% (from 48.2%) as a result of the issue of additional shares by Advent thereby diluting MEC Resource’s interest in Advent.

Advent Energy Limited

Investee Advent is an unlisted oil and gas exploration and development company with onshore and offshore exploration and near-term development assets around Australia. Advent’s assets include PEP11 (85%) in the offshore Sydney Basin and RL1 (100%) in the onshore Bonaparte Basin in the Northern territory and 2 additional project details of which are yet to be released to market. MEC Resources holds a 38.27% interest in Advent.

Investee Advent has submitted to the National Offshore Petroleum Titles Administrator ( NOPTA ) an application to enable the drilling of the Baleen drill target in the PEP11 permit offshore NSW. The PEP11 Joint Venture has reviewed the work program and now proposes to proceed with the drilling of a well at Baleen (to be called Seablue-1) subject to approvals from NOPTA and other regulatory authorities, and financing, and has made an application to NOPTA to change the current Permit conditions. The

3

Directors’ Report

MEC Resources Ltd and its controlled entities

current permit expiry date is in February 2021. The permit remains in place during this review period. The application to NOPTA includes the extension of the permit title for up to two years to enable the drilling and includes an application for the removal of the requirement for a 500 sq. km 3D seismic program. NOPTA has confirmed that this application is now in the final decision phase.

On 5 February 2021 MEC advised that investee Advent has on behalf of the PEP11 joint venture submitted to the National Offshore Petroleum Titles Administrator (NOPTA) an application to suspend and extend the PEP11 permit offshore NSW. The application has been made under the COVID-19 - Work Bid Exploration Permits announcement released by the Federal Government on 20 April 2020. In that release the Government recognised that the COVID-19 pandemic was having a significant impact on the offshore petroleum sector and that additional flexibility would be required to assist titleholders to manage the COVID -19 crisis. The Joint Authority confirmed in that release that it regarded the COVID-19 pandemic as a force majeure event. The application for a 24-month suspension of the Permit Year 4 work program commitments, with a corresponding 24-month extension of the permit term and was accepted for processing by NOPTA on 4 Feb 2021. This application was lodged to ensure the company is not in breach of the Year 4 PEP11 work program and expenditure commitments.

On 8 March 2021 MEC advised that Advent had appointed a Drilling Manager to facilitate the Preliminary Well Services Agreement with Add Energy relating to the preparation for drilling of the Baleen well to undertake a phased approach to provide technical support in the following areas: -

  • Review of current well design documentation

  • Develop a suitable well design and cost estimates

  • Develop drilling schedule and define a ready to drill tentative window

The scope of work to be conducted included review of existing data and latest geological prognoses for the well, documentation of the subsurface well design envelope and compilation of a preliminary well design, project costs and schedule to complete the Seablue – 1 Exploration well. The report received from Add Energy documents the Basis of Well Design (BOWD) and rationale for design of the well, the well cost compilation and the project schedule. The report addresses the revised drill target on the Baleen prospect initially announced with total depth of 2150 metres on seismic data line B4-18. Advent now intends, subject to approvals and funding, to undertake deeper drilling to also undertake evaluation of the Offshore Sydney Basin for carbon sequestration (storage). This has resulted in a revised specification of a well to target early Permian sandstones for both hydrocarbon and carbon sequestration potential with a revised total depth being set at 3150 metres.

Advent is a strong supporter of plans for Net Zero by 2050 and sees the company playing a direct role in achieving that target, especially in New South Wales. It aims to do this in two ways. First, by finding gas closest to Australia’s biggest domestic energy market, gas which can be used to provide reliable back-up for increased uptake of renewable energy in NSW. Second, through its plans to explore for opportunities in offshore NSW for CCS, a key clean energy technology. The significance of the carbon storage objective in addition to gas has been highlighted by the report from The Australian Financial Review (7 April 2021) “Carbon prices tipped to surge” which references dramatic action in Europe’s carbon markets with “carbon prices almost doubling in the last four months from Euro 23 (A$35) a tonne in November 2020 to Euro 41 (A$62) in March 2021 as more ambitious (carbon) markets aligned with net zero emissions goals to drive prices higher.”

On 26 February 2021 MEC advised that its investee Advent had confirmed the engagement with Add Energy for the Xodus Group to undertake a preliminary environmental screening assessment of the proposed Baleen well in preparation for drilling of the Seablue-1 well in offshore licence PEP11. Xodus Group are a leading global energy environmental consultancy with a strong track record in the Australian offshore sector where they are subject matter experts in environmental impact assessment and regulatory approvals. The report was facilitated by the pre-existing environmental information from

4

Directors’ Report

MEC Resources Ltd and its controlled entities

the prior technical work in the licence including the Environmental Plan which was accepted by the authorities for a 2D Seismic survey which was commissioned by Advent and carried out in 2018. The report has confirmed the program required to undertake an environmental impact assessment to support the required approvals for the Seablue-1 well. The aims of the preliminary environmental impact assessment were to:

  1. Produce a detailed summary of required technical inputs.

  2. Produce a detailed summary of required environmental inputs.

  3. Outline a proposed approach for stakeholder consultation; and

  4. Identify key controls potentially required to manage the activity

Advent subsequently appointed Xodus under a lump sum contract to prepare the Environmental Plan for first submission to NOPSEMA. Xodus’s appointment was based on their high quality of engagement, willingness to provide a staged lump sum proposal, and recent experience by their Principal Consultant in working for NOPSEMA.

Advent’s 100% owned subsidiary, Asset Energy, has issued a Call for Tender for the provision of subsea wellhead equipment, materials and associated services for the Baleen drilling program. This equipment provides the ‘foundation’ for the Baleen well and is the first stage of well construction. This is an important step in the preparation and planning for the Seablue-1 well ensures that Asset will be ready to commence drilling after relevant approvals have been received. When the well has reached total depth and been fully evaluated, the well will be plugged and abandoned in line with pre-drill planning as an exploration well, and the well head and associated equipment well be removed from the seabed.

A Call for Tender for the provision of drilling rig services the Seablue-1 exploration well has also been issued. The tender has been issued to multiple drilling contractors who have semi-submersible drilling units in the region. The Seablue-1 well is planned to be drilled in 125m of water approximately 26 km offshore and approximately 30 km SSW of the City of Newcastle. The drilling of the well is subject to regulatory approvals and is expected to take around 40 days to reach total depth. The Seablue-1 well has two objectives: (i) a gas target and (ii) evaluation for Carbon Capture Storage, subject to funding.

Advent 100% subsidiary Onshore Energy Pty Ltd (“ Onshore ”) made an application for suspension and extension of the permit conditions in EP386 which was not accepted by the Department (DMIRS). Onshore sought a review of the decision by the Minister of Resources who responded setting out a course of action in relation to that decision which Onshore is following. Onshore lodged an appeal against this decision with the State Administrative Tribunal (“ SAT ”) (The matter will now be referred to the WA Supreme Court) .

Advent has continued with various aspects of the operational development of the PEP11 as noted above including the following key items ASX announcements made by MEC Resources;

  • 5 July 2021 -Advent Called for Tender for the provision of Conductor and Surface Casing & Associated Services for Advent’s upcoming exploration well had been issued.

  • 21 July 2021 – Advent Called for Tender for the provision of Drilling and Project Management Services for their upcoming exploration well had been issued

  • 16 August 2021 – A Letter of Intent has been issued by Advent to DQ Holdings Pty Ltd (Dril-Quip) for the provision of subsea wellhead equipment, materials and associated services for the upcoming Seablue-1 exploration well.

  • 7 September 2021 – A Letter of Intent had been issued by Advent, through its’ subsidiary Asset Energy Pty Ltd, to Aztech Well Construction Services Pty Ltd (Aztech) for the provision of Drilling

5

Directors’ Report

MEC Resources Ltd and its controlled entities

Project Management services for the upcoming Seablue-1 exploration well.

  • 15 September 2021 – A Letter of Intent had been issued by Advent, through its’ subsidiary Asset Energy, to Oil States Industries (Asia) Pte Ltd (Oil States) for the provision of Conductor and Surface Casing & associated services for the planned Seablue-1 exploration well.

  • 14 October 2021 - A Letter of Intent has been issued by Advent, through its’ subsidiary Asset Energy, to Weatherford Australia Pty Ltd (Weatherford) for the provision of Liner Hanger & Expandable Equipment and Services for the planned Seablue-1 exploration well.

  • 22 November 2021 - A Letter of Intent has been issued by Advent, through its’ subsidiary Asset Energy for the provision of Drilling Fluids & Solids Control Equipment, Materials and Services for the planned Seablue-1 exploration well.

  • 25 November 2021 – A Call for Tender has been issued by Advent, through its’ subsidiary Asset Energy, for the provision of Directional Drilling, Measurement While Drilling and Logging While Drilling for the Seablue-1 gas exploration well.

As noted above on 16 December 2021 MEC announced to market that the Federal Government would refuse the joint venture’s first of two applications to extend the PEP 11 Permit for gas exploration in the offshore Sydney Basin. Advent received a formal notification of this decision from the National Offshore Petroleum Title Administrator (NOPTA).

Onshore Bonaparte Basin

Advent Energy Ltd, through wholly owned subsidiary Onshore, holds 100% of RL 1 in the onshore Bonaparte Basin in northern Australia. The Bonaparte Basin is a highly prospective petroliferous basin, with significant reserves of oil and gas. Most of the basin is located offshore, covering 250,000 square kilometres, compared to just over 20,000 square kilometres onshore.

In the Northern Territory, Advent holds Retention Licence RL1 (166 square kilometres in area), which covers the Weaber Gas Field, originally discovered in 1985. Advent has previously advised that the 2C Contingent Resources for the Weaber Gas Field in RL1 are 11.5 billion cubic feet (Bcf) of natural gas following an independent audit by RISC. Significant upside 3C Contingent Resources of 45.8 Bcf have also been assessed by RISC.

The current rapid development of the Kununurra region in northern Western Australia, including the Ord River Irrigation Area phase 2, the township of Kununurra, and numerous regional resource projects provides an exceptional opportunity for Advent to potentially develop its nearby gas resources. Market studies have identified a current market demand of up to 30.8 TJ per day of power generation capacity across the Kimberley region that could potentially be supplied by Advent Energy’s conventional gas project RL1.

Onshore made an application for suspension and extension of the permit conditions in EP386 which was not accepted by the Department (DMIRS). Onshore sought a review of the decision by the Minister of Resources who responded setting out a course of action in relation to that decision which Onshore is following. Onshore has lodged an appeal against this decision with the State Administrative Tribunal (“ SAT” ) and the matter is now to be referred to the Supreme Court of Western Australia.

PDF Status Update

MEC was notified on 5 February 2021 by the Innovation Investment Committee of Innovation and Science Australia (the “ Committee ”) that the Committee had revoked MEC’s PDF registration as a

6

Directors’ Report

MEC Resources Ltd and its controlled entities

result of the Company contravening ss19(1), 27, 27A and 42 of the Pooled Development Fund Act 1992 (“ PDF Act ”).

Following this notification on 1 March 2021 MEC informed the PDF Committee that it would exercise its right of review, had appointed legal counsel on the matter and would provide further information to the Committee and further noting on 12 March 2021 that it was informed by the Department of Industry, Science, Energy and Resources that it would commence a review of the decision that led to the revocation of MEC’s PDF registration. MEC confirmed that the internal review is a merit-based process and enables a decision maker (not involved in the first decision in this circumstance) to take a fresh look at its original decision.

On 6 May 2021 MEC announced that the Delegate of Innovation and Science Australia, as required by s55(5) of the PDF Act, has reconsidered the Committee’s decision of 3 February 2021 and following review of further information provided by MEC on 18 March 2021 and 15 April 2021, the Delegate has informed MEC via letter dated 30 April 2021 that he confirms the Committee’s decision of 3 February 2021 to revoke MEC’s registration declaration as a PDF under s47 of the PDF Act.

Following the decision from the Delegate of Innovation and Science Australia, MEC announced on 13 May 2021 that it had applied, through its legal representative, to the Administrative Appeals Tribunal under the Administrative Appeals Tribunal Act 1975 for review of the decision by the PDF Board. This appeal notice was lodged on 12 May 2021 well within the lodgment deadline of 28th May 2021.

On 30 September 2021 MEC filed written submissions to the Administrative Appeals Tribunal in support of stay application pursuant relating the revocation of its PDF status. This was followed by an interlocutory hearing on the 18 October 2021 the result of which was that no decision was given on the 18 October 2021 and further no timeframe provided as to when a decision would be given.

On 3 November 2021 the Administrative Appeals Tribunal advised the Company that it had refused MEC’s request for a stay in relation to the revocation of its PDF registration.

Following the end of the quarter on the 27 & 28 January 2022 the Company attending its Administrative Appeals Tribunal (AAT) hearing. MEC has submitted its final written submissions and a final submissions hearing will be held on the 9[th] June.

The Company will continue to manage and monitor the PDF appeal process. In addition, MEC will engage further with the ASX in relation to the PDF status following reservation of the decision at the AAT hearing.

Subsequent Events

Following the end of the half year on 21 January 2022 the Company held its AGM noting that all resolutions were approved by Shareholders.

Following the end of the half year on the 27 & 28 January 2022 the Company attending its Administrative Appeals Tribunal (AAT) hearing in relation to its PDF Registration revocation. MEC Resources submitted its final written submissions and a final submissions hearing will be held on the 9[th] June.

.

Following the end of the half year on 4 March 2022 the Company announced that both Mr Douglas Verley and Mr Geoff Murray had resigned as non-executive directors and concurrently Mr Steve James has joined the board as a non-executive director.

7

Directors’ Report

MEC Resources Ltd and its controlled entities

Following the end of the half year on 31 March 2022 MEC provided a general market update in relation to the PEP 11 Permit held via investee Advent whereby the PEP 11 Joint Venture had been given notice by the National Offshore Petroleum Titles Administrator (NOPTA) that NOPTA has refused the Joint Venture Application initially submitted on 24 December 2019 for a secondary work program variation and a 24-month suspension of the Permit Year 4 Work Program Commitment and the corresponding 24-month extension of the Permit Term. The second application made by Advent is still in review.

The Joint Venture has statutory legal rights to seek a review of the decision referred to in the notice under the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and is obtaining legal advice on such review process.

Following the end of the half year on 5 April 2022 MEC Resources announced to market investee Advent had signed a farm out agreement with OMV New Zealand Limited in three offshore Taranaki Basin exploration permits.

Following the end of the half year on 24 May 2022 information regarding a second proposed new investment in hydrogen production technology was released to market by BPH Energy Ltd (“ BPH ”) whereby BPH and MEC’s investee company Advent entered into a binding term share with Clean Hydrogen Technologies Corporation to subscribe for fully paid shares in Clean Hydrogen Technologies Corporation representing a total of 10% of the total issued capital of Clean Hydrogen Technologies Corporation(BPH 8% and Advent 2%) after the issue of the subscription shares noting that the investment by BPH is subject to BPH shareholder approval at a shareholder meeting set on 21 June 2022.

Dividends

The Directors recommend that no dividend be paid in respect of the current period and no dividends have been paid or declared since the commencement of the period.

Auditor’s Independence

The directors received a declaration of independence from the auditor. This is included in the financial report on page 9.

Signed in accordance with a resolution of the directors made pursuant to s306(3) of the Corporations Act 2001 .

On behalf of the Directors

==> picture [100 x 20] intentionally omitted <==

David Breeze Managing Director PERTH, 31 May 2022

8

==> picture [109 x 30] intentionally omitted <==

Moore Australia Audit (WA)

Level 15, Exchange Tower, 2 The Esplanade, Perth, WA 6000 PO Box 5785, St Georges Terrace, WA 6831 T +61 8 9225 5355 F +61 8 9225 6181 www.moore-australia.com.au

AUDITOR’S INDEPENDENCE DECLARATION UNDER SECTION 307c OF THE CORPORATIONS ACT 2001 TO THE DIRECTORS OF MEC RESOURCES LIMITED

As lead auditor for the review of MEC Resources Limited for the half-year ended 31 December 2021, I declare that, to the best of my knowledge and belief, there have been:

  • a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the review; and

  • b) no contraventions of any applicable code of professional conduct in relation to the review.

==> picture [72 x 36] intentionally omitted <==

==> picture [112 x 30] intentionally omitted <==

NEIL PACE MOORE AUSTRALIA AUDIT (WA) PARTNER CHARTERED ACCOUNTANTS

Signed at Perth this 1[st] day of June 2022.

9

Moore Australia Audit (WA) – ABN 16 874 357 907. An independent member of Moore Global Network Limited - members in principal cities throughout the world. Liability limited by a scheme approved under Professional Standards Legislation.

Directors’ Declaration

MEC Resources Ltd and its controlled entities

The directors declare that:

  • (a) in the directors’ opinion, there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable; and

  • (b) in the directors’ opinion, the attached financial statements and notes thereto are in accordance with the Corporations Act 2001 , including compliance with accounting standards and giving a true and fair view of the financial position and performance of the consolidated entity.

Signed in accordance with a resolution of the directors made pursuant to s.303(5) of the Corporations Act 2001 .

On behalf of the Directors

==> picture [101 x 21] intentionally omitted <==

David Breeze Managing Director PERTH, 31 May 2022

10

Consolidated Statement of Profit or Loss and Other Comprehensive Income for the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

Note
Revenue
Revenue from ordinary activities
3
Other losses
3
Other income
3
Administration expenses
Consulting and legal expenses
3
Employee Benefits expense
Interest expense
Insurance expenditure
Exploration expenditure write off
Other expenses
Traveling expense
Loss before income tax
Income tax expense
Loss from continuing operations
Profit and loss from Discontinued Operations
Other Comprehensive Income
Total Comprehensive Income for the period
Loss attributable to non-controlling interest
Loss attributable to members of the parent entity
Total Comprehensive Loss attributable to non-
controlling interest
Total Comprehensive Loss attributable to parent
Earnings Per Share -
Basic and Diluted (cents per share)
Consolidated
31 December
2021
31 December
2020
$
-
-
-
-
-
-
(120,376)
(134,418)
(48,910)
(210,367)
(158,136)
(102,989)
-
-
-
-
-
-
(3,426)
(27,803)
-
-
(330,848)
(475,577)
-
-
(330,848)
(475,577)
(330,848)
(475,577)
-
-
-
-
-
-
(330,848)
(475,577)
-
-
(330,848)
(475,577)
(0.00)
(0.00)

The accompanying notes form part of these financial statements.

11

Consolidated Statement of Financial Position as at 31 December 2021

MEC Resources Ltd and its controlled entities

Note
Current Assets
Cash and cash equivalents
4
Other current assets
Total Current Assets
Non-Current Assets
Financial Assets
9
Property, plant & equipment
Total Non-Current Assets
Total Assets
Current Liabilities
Trade and other payables
Financial liabilities
10
Total Current Liabilities
Total Liabilities
Net Assets
Equity
Issued capital
5
Option Reserve
Accumulated losses
Total Equity Attributable to Owners
Non-controlling Interest
Total Equity
Consolidated
31 December
2021
$
30 June
2021
$
16,707
130,516
2,164
2,164
18,870
132,680
8,867,418
8,867,418
1,683
1,983
8,869,101
8,869,401
8,887,971
9,002,081
1,063,810
847,072
324,024
872,741
1,387,834
1,719,813
1,387,834
1,719,813
7,500,137
7,282,268
31,193,095
30,644,378
442,274
442,274
(24,135,232)
(23,804,384)
7,500,137
7,282,268
-
-
7,500,137
7,282,268

The accompanying notes form part of these financial statements.

12

Consolidated Statement of Changes in Equity as at 31 December 2021

MEC Resources Ltd and its controlled entities

Balance at 1 July
2020
Loss attributable to
continuing
operations
Other
comprehensive
income
Total comprehensive
income
Shares issued during
the period
Capital raising costs
Balance at the half
year
ended
31
December 2020
Balance at 1 July
2021
Loss attributable to
members
of
the
consolidated entity
Other
comprehensive
income
Total comprehensive
income
Shares issued during
the period
Capital raising costs
Balance at the half
year
ended
31
December 2021
Issued
Capital
$
Accumulated
losses
$
Option
Reserve
$
Contribution
Reserve
$
Total
attributable to
owners
S
Non-
Controlling
Interest
$
Total
Equity
$
30,644,378
(22,770,332)
442,273
-
8,316,320
-
8,316,320
-
(475,577)
-
-
(475,577)
-
(475,577)
-
-
-
-
-
-
-
-
(475,577)
-
-
(475,577)
-
(475,577)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
30,644,378
(23,245,909)
442,273
-
7,840,743
-
7,840,743
30,644,378
(23,804,383)
442,274
-
7,282,268
-
7,282,268
-
(330,848)
-
-
(330,848)
-
(330,848)
-
-
-
-
-
-
-
-
(330,848)
-
-
(330,848)
-
(330,848)
548,717
-
-
-
548,717
-
548,717
-
-
-
-
-
-
-
31,193,095
(24,135,232)
442,274
-
7,500,137
-
7,500,137

The accompanying notes form part of these financial statements.

13

Consolidated Statement of Cash Flows for the half year ended 31 December 2021

MEC Resources Ltd and its controlled entities

Note
Cash Flows from Operating Activities
Payments to suppliers and employees
Research and Development incentives
Net GST movement
Interest received
Net cash used in operating activities
Cash Flows from Investing Activities
Payment for PPE
Repayment of loans to other entities
Loans to other entities
Deferred exploration costs
Net cash used in investing activities
Cash Flows from Financing Activities
Proceeds from share issues
Net cash used in financing activities

Net increase/(decrease) in Cash Held
Cash at the Beginning of The Period
Cash at The End of The Period
4
Consolidated
31 December
2021
$
31 December
2020
$
(103,882)
(247,818)
-
-
(9,928)
-
-
-
(113,810)
(247,818)
-
-
-
(367)
-
-
-
-
-
(367)
-
-
-
-
(113,810)
(248,185)
130,516
437,880
16,707
189,925

The accompanying notes form part of these financial statements

14

Notes to the Financial Statements For the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

1. CORPORATE INFORMATION

The financial report of MEC Resources Ltd (the company) and its controlled entities for the half-year ended 31 December 2021 was authorised for issue in accordance with a resolution of the directors on 31 May 2022.

MEC Resources Ltd is a company incorporated in Australia and limited by shares which are publicly traded on the Australian Securities Exchange.

2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

(a) Basis of preparation

The half-year financial report is a general-purpose financial report prepared in accordance with the requirements of the Corporations Act 2001 and Australian Accounting Standard AASB 134: Interim Financial Reporting. Compliance with AASB 134 ensures compliance with International Financial Reporting Standards IAS 34 Interim Financial Reporting.

The half-year financial report does not include all of the notes of the type normally included within the annual financial report and therefore cannot be expected to provide as full an understanding of the financial performance, financial position and financing and investing activities of the consolidated entity as the full financial report.

The half-year financial report should be read in conjunction with the Annual Financial Report of MEC Resources Ltd as at 30 June 2021. For the purpose of preparing the half-year financial report, the halfyear has been treated as a discrete reporting period.

It is also recommended that the half-year financial report be considered together with any public announcements made by MEC Resources Ltd and its controlled entities during the half-year ended 31 December 2021 in accordance with the continuous disclosure obligations arising under the Corporations Act 2001 and the ASX Listing Rules.

(b) Significant Accounting Policies

The same accounting policies and methods of computation have been followed in this interim financial report as were applied in the most recent annual financial statements except for those as described in note 2(d) below.

(c) Financial Position/Going Concern

The Company has incurred losses for the half year ended 31 December 2021 of $330,848 and has cash assets of $16,707 as at 31 December 2021. The company also has a significant working capital deficiency as at 31 December 2021.

Based on the Company’s working capital deficiency and cash flow forecast, the Company will require additional funding in the next 12 months to enable to continue its normal business activities and to ensure the realisation of assets and extinguishment of liabilities as and when they fall due.

The continuing viability of the Company and its ability to continue as a going concern and meet its debts and commitments as they fall due is therefore dependent upon:

  • the Company’s operating cash requirements not exceeding its historical levels;

15

Notes to the Financial Statements For the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

  • The creditors of the Company continuing to support it by not demanding repayment of amounts due to them; and

  • the directors being successful in obtaining future funding to meet the Company’s objectives and payment obligations as and when they fall due by engaging with parties in raising additional capital or issuing debt in which the Company has demonstrated a history of success in this regard. In this regard the Company is working to complete a placement to raise working capital.

As a result of the above matters, there exists a material uncertainty that casts doubt on the Company’s ability to continue as a going concern and therefore it may be unable to realise its assets and discharge its liabilities in the normal course of business. T

Notwithstanding the above, the Directors are of the opinion that the Company is a going concern and, as a result, the financial report for the half year ended 31 December 2021 does not include any adjustments relating to the recoverability and classification of the recorded asset amounts or to the amounts and classification of liabilities that might be necessary should the Group not continue as a going concern.

(d) Application of New and Revised Accounting Standards

Standards and Interpretations applicable to the 31 December 2021 Interim Period

In the half year ended 31 December 2021, the Directors have reviewed all the new and revised Standards and Interpretations issued by the AASB that are relevant to the Company and effective for the half year reporting periods beginning on or after 1 July 2021.

As a result of their review, the Directors have determined that there is no material impact of the new and revised Standards and Interpretations on the presented financial statements of the Company. Accordingly, no retrospective adjustments were required as a result of adopting these new accounting standards.

Standards and Interpretations issued but not yet adopted by the Group

The Directors have also reviewed all of the new and revised Standards and Interpretations Issued but not yet adopted that are relevant to the Company and effective for the half year reporting periods beginning on or after 1 January 2021.

None of the above standards are expected to have a significant impact on the Group.

3. REVENUE, INCOME AND EXPENSES

REVENUE, INCOME AND EXPENSES
Revenue
Interest revenue: other entities
Other gains and losses
Loss on Legal Settlement
Consolidated
31 December
2021
$
31 December
2020
$
-
-
-
-
-
-
-
-

16

Notes to the Financial Statements For the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

Expenses
Consulting and legal expenses
Consulting
Legal
-
66,914
48,910
143,453
48,910
210,367

4. CASH AND CASH EQUIVALENTS

Consolidated

ASH AND CASH EQUIVALENTS Consolidated
For the purpose of the half-year condensed
consolidated statement of cash flows, cash and cash
equivalents are comprised of the following:
Cash at bank and in hand
ONTRIBUTED EQUITY
Ordinary shares (i)
Equity issued for part settlement Advent Writ/ loan
payable to Advent Energy Limited
Less: Capital Raising Costs
31 December
2021
$
30 June
2021
$
16,707
130,516
16,707
130,516
Consolidated
31 December
2021
$
30 June
2021
$
30,644,378
548,717
30,644,378
-
-
-
31,193,095
30,644,378

5. CONTRIBUTED EQUITY

(i) Fully paid ordinary shares carry one vote per share and carry the right to dividends.

Movement in ordinary shares on issue
As at 1 July 2021
Equity issued for part settlement Advent Writs/loan
payable to Advent Energy Limited
Balance as at 31 December 2021
Number
$
684,454,926
124,708,409
2,737,820
548,717
809,163,335
3,286,537

17

Notes to the Financial Statements For the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

6. CONTINGENT ASSETS AND LIABILITIES

There has been no change in contingent liabilities since the last annual reporting date.

7. COMMITMENTS

There were no capital commitments at balance date.

8. EVENTS AFTER THE BALANCE DATE

Following the end of the half year on the 27 & 28 January 2022 the Company attending its Administrative Appeals Tribunal ( AAT ) hearing in relation to its PDF Registration revocation. MEC Resources has submitted final written submissions. A decision on the matter is anticipated by end of June 2022 following a final submissions hearing on the 9[th] June .

Consolidated

INANCIAL ASSETS
Non-Current
Loan receivables – Advent Energy Ltd (a)
Investment in Advent Energy Ltd
Loan receivables – Catalyst 1 Pty Ltd
31 December
2021
$
30 June
2021
$
31 December
2021
$
30 June
2021
$
4,161,135
4,161,135
4,705,917
4,705,917
367
367
8,867,418
8,867,418

9. FINANCIAL ASSETS

  • (a) This loan is recoverable only by conversion to shares of Advent one month prior to the scheduled commencement date for the drilling of a well within the PEP-11 permit area. The shares are calculated at 80% of 5-day VWAP of Advent Energy Ltd immediately prior to that date or if as at that date Advent shares are not listed on any securities exchange, the price at which ordinary shares in Advent were last issued.

The ability of the Company to recover the book values of the investment in and loans to Advent and its controlled entities is dependent upon the ability of Advent to successfully commercialise and/or sell its core exploration and other assets (which includes an 85% interest in PEP11), thereby realising sufficient value from which the Company can recoup the value of its loans to and investment in Advent, the outcome and timing of which is subject to significant uncertainty. As noted above on 31 March 2022 the National Offshore Petroleum Titles Administrator (NOPTA) that NOPTA has refused the Joint Venture Application initially submitted on 24 December 2019 for a secondary work program variation and a 24-month suspension of the Permit Year 4 Work Program Commitment and the corresponding 24-month extension of the Permit Term. The Joint Venture has statutory legal rights to seek a review of the decision referred to in the notice under the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and is obtaining legal advice on such review process. A decision on a second application is still pending .

18

Notes to the Financial Statements For the half year ended 31 December 2021 MEC Resources Ltd and its controlled entities

10. FINANCIAL LIABILITIES

FINANCIAL LIABILITIES
Loans payable
Loan from Advent Energy Limited
Repayment by issue of shares in the
Company
Consolidated
31 December
2021
$
30 June
2021
$
872,741
(548,717)
872,741
-
324,024
872,741

19

==> picture [109 x 30] intentionally omitted <==

INDEPENDENT AUDITOR’S REVIEW REPORT TO THE MEMBERS OF MEC RESOURCES LIMITED

Moore Australia Audit (WA)

Level 15, Exchange Tower, 2 The Esplanade, Perth, WA 6000 PO Box 5785, St Georges Terrace, WA 6831 T +61 8 9225 5355 F +61 8 9225 6181 www.moore-australia.com.au

Report on the Half-Year Financial Report

Conclusion

We have reviewed the accompanying half-year financial report of MEC Resources Limited (the company), which comprises the statement of financial position as at 31 December 2021, the statement of profit or loss and other comprehensive income, the statement of changes in equity, the statement of cash flows for the half-year ended on that date, notes comprising a summary of significant accounting policies and other explanatory information and the directors’ declaration.

Based on our review, which is not an audit, we have not become aware of any matter that makes us believe that the half-year financial report of the company is not in accordance with the Corporations Act 2001 , including:

  • a) giving a true and fair view of the Company’s financial position as at 31 December 2021 and of its performance for the half-year ended on that date; and

  • b) complying with Accounting Standard AASB 134: Interim Financial Reporting and the Corporations Regulations 2001.

Material Uncertainty Related to Going Concern

In forming our opinion on the half-year financial report, which is not modified, we have considered the adequacy of the disclosure made in Note 2(c) to the financial report concerning the Company’s ability to continue as a going concern. The conditions explained in Note 2(c) to the financial report indicate the existence of a material uncertainty which casts significant doubt about the Company’s ability to continue as a going concern. Given the significance of the matters set out in Note 2 (c) we are not able to conclude that the Company will be able to continue to operate as a going concern for at least the next 12 months. The Company’s half-year financial report does not include any adjustments that would result if the Company were unable to continue as a going concern.

Material Uncertainty - Carrying Value of Loans Receivable from and Investment in Advent Energy Limited

We draw attention to Note 9 to the half-year financial report and specifically to the loans receivable from Advent Energy Limited amounting to $4,166,473. We also draw attention to the Investment in Advent Energy Limited of $4,705,917. The ability of the Company to recover the book values of the investment In and loans to Advent Energy Limited and its controlled entities is largely dependent upon the ability of Advent Energy Limited to successfully commercialise and /or sell its core exploration assets, thereby realising sufficient value from which the Company can recoup the value of its loans and investment in Advent Energy Limited, the outcome and timing of which is subject to significant uncertainty. Our opinion is not modified in respect of this matter.

Directors’ Responsibility for the Half-Year Financial Report

The directors of the company are responsible for the preparation of the half-year financial report that gives a true and fair view in accordance with Australian Accounting Standards (including Australian Accounting Interpretations) and the Corporations Act 2001 and for such internal control as the directors determine is necessary to enable the preparation of the half-year financial report that is free from material misstatement, whether due to fraud or error.

20

Moore Australia Audit (WA) – ABN 16 874 357 907. An independent member of Moore Global Network Limited - members in principal cities throughout the world. Liability limited by a scheme approved under Professional Standards Legislation.

==> picture [109 x 30] intentionally omitted <==

INDEPENDENT AUDITOR’S REVIEW REPORT TO THE MEMBERS OF MEC RESOURCES LIMITED (CONTINUED)

Auditor’s Responsibility

Our responsibility is to express a conclusion on the half-year financial report based on our review. We conducted our review in accordance with Auditing Standards on Review Engagements ASRE 2410: Review of Interim and Other Financial Reports Performed by the Independent Auditor of the Entity , in order to state whether, on the basis of the procedures described, we have become aware of any matter that makes us believe that the half-year financial report is not in accordance with the Corporations Act 2001 including:

  • a) giving a true and fair view of the company’s financial position as at 31 December 2021 and its performance for the half-year ended on that date; and

  • b) complying with Accounting Standard AASB 134: Interim Financial Reporting and the Corporations Regulations 2001.

As the auditor of the company, ASRE 2410 requires that we comply with the ethical requirements relevant to the audit of the annual financial report.

A review of a half-year financial report consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and review procedures. A review is substantially less in scope than an audit conducted in accordance with Australian Auditing Standards and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Independence

In conducting our review, we have complied with the independence requirements of the Corporations Act 2001 . We confirm that the independence declaration required by the Corporations Act 2001 , which has been given to the directors of the company, would be in the same terms if provided to the directors as at the time of this auditor’s review report.

==> picture [72 x 35] intentionally omitted <==

NEIL PACE PARTNER

==> picture [128 x 34] intentionally omitted <==

MOORE AUSTRALIA AUDIT (WA) CHARTERED ACCOUNTANTS

Signed at Perth this 1[st] day of June 2022.

21