24 November 2009
ASX RELEASE
JAMESON RESOURCES LTD
ACN 126 398 294
79 Hay Street, Subiaco 6008 Western Australia Phone +61 (8) 9200 4473 Fax +61 (8) 9200 4463
Suite 800, 1199 West Hastings St Vancouver, BC V6E 3TS +1 (604) 687 2038
CONTACT:
JOHN HOLMES
Executive Director [email protected]
DAVID PRENTICE
Non Executive Director [email protected]
Jameson Commits to Expanded Mine Case Feasibility Study
Highlights
-
Feasibility study for expanded mine case at optimised level of production anticipated first quarter 2010
-
Preliminary estimates support robust cash operating margin of approximately US$20 per tonne based on late 2010 futures contract pricing of thermal coal, the anticipated start date of commercial production
-
Initial start up production rate of approximately 500,000 tonnes per annum with potential ramp-up to a targeted 1 million tonnes per annum
-
Capital requirements for new wash plant, rail load-out facility, and other infrastructure required to recommission mine estimated at approximately US$20 million
-
Reserve estimate to support expanded mine case due on receipt of recent drilling results
ART PALM
Non Executive Director [email protected]
WEBSITE
www.jamesonresources.com.au
DIRECTORS:
Jeff Bennett (Non Exec. Chairman) John Holmes (Executive Director) David Prentice (Non Exec.Director) Stephen Anastos (Non Exec.Director) Art Palm (Non Exec.Director)
ASX CODE:
JAL (Fully paid Ordinary Shares)
Jameson Resources Limited (“Jameson” or the “Company”) would like to announce that it has amended Norwest Corporations (“Norwest”) brief to complete the feasibility study on the expanded mine case at an optimal annual production rate. It has been advised that construction of a new wash plant facility will require only slightly more capital than upgrading the existing wash plant to a standard capable of producing an export quality product at an increased capacity. Opportunities for enhanced project economics are expected from the expanded mine case. This work is expected to be completed in the first quarter of calendar 2010.
The outlook for thermal coal prices of similar quality to Basin has improved significantly with futures contract for delivery late 2010 trading at approximately US$85/tonne and over US$100/tonne for delivery in 2012 (ICE Europe). Pulverised coal injection (“PCI”) coals of similar quality to Basin’s PCI product attract a premium of 10-20% above Newcastle thermal coal prices are also forecast to rise significantly.
PROJECT UPDATE
Feasibility Study
The Company together with its consultants Norwest Corporation (“Norwest”) has identified opportunities for revised operating cost assumptions in the expanded mine case scenario with a relatively minor impact on start up capital. As such, the Company has revised Norwest’s brief to determine and complete the feasibility study at the optimal level for start up production for the project which is expected to be approximately 500,000 tonnes per annum. Subject to reserve definition and amendments to the existing mining permit, the Company is aiming towards ramping up from an initial rate of 500,000 tonnes per annum to a targeted rate of as high as 1 million tonnes per annum.
Preliminary estimates of the capital required to refurbish the existing wash plant suggest that the construction of a more efficient larger capacity plant will deliver enhanced project economics. Norwest have identified that the refurbishment of the existing wash plant will require significant upgrading including the addition of new circuits in order to run efficiently and to produce a export quality product.
Initial engineering studies on a new wash plant facility designed to produce a thermal product at 12.5% ash or both a thermal coal and pulverised injection coal (“PCI”) product have been completed. Financial modelling on both options is being undertaken as part of feasibility study. The final wash plant design will be such that production capacity can be increased with only minor capital expenditure on delineation of additional reserves. Some components of the existing wash plant can be incorporated into the proposed new plant. Estimated capital required to construct a new wash plant facility is approximately US$8-12 million.
Additional capital for site infrastructure, logging road upgrades, and the proposed rail load-out facility will also be required. Pre-feasibility estimates indicate approximately US$20million will be required to bring the project into operation, which is approximately 1/3 of the typical Australian capital expenditure per tonne of production.
It is proposed to haul the coal from Basin using 42 tonne B-train trucks along the shortest route (110km) to the proposed rail load-out. The proposed route is a combination of forestry roads and major highway. Road upgrades include the re-establishment of a 6.7km logging trail to connect two well maintained roads. Advanced discussions are underway with the preferred transport companies.
The outlook for thermal coal prices of similar quality to Basin has improved significantly with futures contracts for delivery late 2010 at approximately US$85/tonne and over US$100/tonne for delivery in 2012 (ICE Europe), showing markets expect a rise in coal prices going forward. Chinese domestic prices are approaching US$100/tonne, providing further incentive for imports and thereby placing upward momentum on world prices.
Based on late 2010 futures contract pricing of thermal coal, operating cash margins of approximately US$20 per tonne are anticipated. Discussions with potential domestic and international buyers of the coal that will likely be produced from Basin are continuing.
Exploration Program
Jameson has recently completed a diamond drilling and trenching program at Basin. The drilling and coal quality program is under the supervision of Mr R.J. Morris, M.Sc., P. Geo from Moose Mountain Technical Services. The objective of the program was to further define the coal structure in the northern portion of the property and determine the coal quality, particularly levels of ash on both the Main and Lower coal seams. A reserve estimate to support the expanded mine case will be completed on receipt of the coal quality data.
Trenches were excavated to confirm the position of the modelled coal seams prior to drilling. A total of 7 trenches were excavated and sampled. Samples were collected for proximate analysis and bulk sample washability test work.
Drilling was undertaken by local drilling contractor Foraco Drilling Ltd using a skid mounted drill rig (Figure 2). A total of 6 HQ3 diamond core holes were drilled for an advance of 886m. Hole locations are shown on Figure 3. Average hole depth was 147m. Five holes were drilled on 300m spacings over the northern half of the resource. An additional hole was drilled in the southern portion of the property to confirm earlier drilling work and provide additional samples for coal quality characterization. All holes were geophysically logged within the drill stem by Century Wireline Services. Drilling statistics are summarised in Table 1.
| Hole ID | Northing | Easting | Depth |
|---|---|---|---|
| DH09-01 | 5485981 | 661571 | 150.1 |
| DH09-02 | 5487268 | 661303 | 89.4 |
| DH09-03 | 5487633 | 661467 | 128.5 |
| DH09-04 | 5487884 | 661660 | 178.3 |
| DH09-05 | 5487841 | 661934 | 169.8 |
| DH09-06 | 5487696 | 662283 | 164.7 |
| TOTAL | 885.77 |
Table 1 – Diamond Drilling Program Summary Table
Coal seams were intersected in all 6 holes. Coal seam thickness including partings correlated relatively well with the existing resource model, though ash levels increase significantly to the north. All coal plys greater than 1m thickness are summarised in Table 2. Samples were collected at varying intervals through both the Main and Lower seams as determined from the geological and geophysical logs. All samples have been sent to Birtley Coal and Minerals Testing Division of GWIL industries in Calgary for coal quality analysis.
It is anticipated that all coal quality analytical results are expected by the end of November and will compliment existing coal quality data. Drilling results will be used to calculate the initial reserve estimate as part of the expanded mine case feasibility study. This estimate will be focussed on the area of low strip ratio coal proximal to the existing mine.
Any enquiries regarding this announcement should be directed to Jameson’s Executive Director, John Holmes.
==> picture [74 x 48] intentionally omitted <==
John Holmes
The information pertaining to the technical content of this report has been reviewed by Mr John Holmes, who is a member of the Australian Institute of Geoscientists. Mr. Holmes is employed by Jameson Resources Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Holmes consents to the inclusion in the report of the technical information in the form and context in which it appears.
==> picture [416 x 416] intentionally omitted <==
Figure 1 - Location Diagram – Basin Thermal Coal Project
==> picture [415 x 183] intentionally omitted <==
Figure 2 – Trenching and Diamond Drilling
==> picture [399 x 617] intentionally omitted <==
----- Start of picture text -----
2
----- End of picture text -----
Figure 3 - Drill Hole Location Plan
| Hole ID Seam From (m) To (m) Coal Ply Thickness |
Hole ID Seam From (m) To (m) Coal Ply Thickness |
Hole ID Seam From (m) To (m) Coal Ply Thickness |
Hole ID Seam From (m) To (m) Coal Ply Thickness |
Hole ID Seam From (m) To (m) Coal Ply Thickness |
|---|---|---|---|---|
| DH09‐01 | Main Seam | 77.2 | 78.8 | 1.6 |
| DH09‐01 | Main Seam | 79.8 | 84.6 | 4.8 |
| DH09‐01 | Main Seam | 84.6 | 86.2 | 1.6 |
| DH09‐01 | Main Seam | 86.2 | 90 | 3.8 |
| DH09‐01 | Main Seam | 90 | 94 | 4 |
| DH09‐01 | Main Seam | 94 | 96.4 | 2.4 |
| DH09‐01 | Lower Seam | 119.8 | 122.4 | 2.6 |
| DH09‐01 | Lower Seam | 122.4 | 125.8 | 3.4 |
| DH09‐01 | Lower Seam | 125.8 | 127.8 | 2 |
| DH09‐01 | Lower Seam | 139.6 | 140.8 | 1.2 |
| DH09‐02 | Main Seam | 5.8 | 7.3 | 1.5 |
| DH09‐02 | Main Seam | 7.3 | 10.25 | 2.95 |
| DH09‐02 | Main Seam | 10.25 | 13.7 | 3.45 |
| DH09‐02 | Main Seam | 13.7 | 18.5 | 4.8 |
| DH09‐02 | Main Seam | 18.5 | 24.5 | 6 |
| DH09‐02 | Main Seam | 24.5 | 30.1 | 5.6 |
| DH09‐02 | Main Seam | 30.1 | 33.3 | 3.2 |
| DH09‐02 | Main Seam | 33.3 | 36.75 | 3.45 |
| DH09‐02 | Main Seam | 36.75 | 41.1 | 4.35 |
| DH09‐02 | Lower Seam | 65.7 | 67.9 | 2.2 |
| DH09‐02 | Lower Seam | 67.9 | 70.1 | 2.2 |
| DH09‐02 | Lower Seam | 70.1 | 73.1 | 3 |
| DH09‐02 | Lower Seam | 73.1 | 77.2 | 4.1 |
| DH09‐02 | Lower Seam | 82.4 | 85.2 | 2.8 |
| DH09‐03 | Main Seam | 42.55 | 44.8 | 2.25 |
| DH09‐03 | Main Seam | 46.1 | 50.3 | 4.2 |
| DH09‐03 | Main Seam | 53.6 | 58.5 | 4.9 |
| DH09‐03 | Main Seam | 58.5 | 59.85 | 1.35 |
| DH09‐03 | Main Seam | 61 | 66.8 | 5.8 |
| DH09‐03 | Main Seam | 68.1 | 70.75 | 2.65 |
| DH09‐03 | Main Seam | 70.75 | 74.1 | 3.35 |
| DH09‐03 | Lower Seam | 95.2 | 97.6 | 2.4 |
| DH09‐03 | Lower Seam | 97.6 | 100.15 | 2.55 |
| DH09‐03 | Lower Seam | 105.75 | 107.8 | 2.05 |
| DH09‐04 | Main Seam | 15.9 | 20.5 | 4.6 |
| DH09‐04 | Main Seam | 22.6 | 24.9 | 2.3 |
| DH09‐04 | Main Seam | 24.9 | 30.8 | 5.9 |
| DH09‐04 | Main Seam | 31.8 | 36.3 | 4.5 |
| DH09‐04 | Main Seam | 36.3 | 40.1 | 3.8 |
| DH09‐04 | Lower Seam | 73.9 | 78.2 | 4.3 |
| DH09‐04 | Lower Seam | 79.7 | 81.3 | 1.6 |
| DH09‐04 | Lower Seam | 82.7 | 86.9 | 4.2 |
| DH09‐04 | Lower Seam | 97.6 | 99.1 | 1.5 |
| DH09‐05 | Main Seam | 82.1 | 83.9 | 1.8 |
| DH09‐05 | Lower Seam | 141.3 | 142.3 | 1 |
| DH09‐06 | Main Seam | 84.4 | 86.6 | 2.2 |
| DH09‐06 | Main Seam | 95.4 | 96.4 | 1 |
| DH09‐06 | Main Seam | 115 | 116.7 | 1.7 |
| DH09‐06 | Lower Seam | 155.1 | 156.6 | 1.5 |
| DH09‐06 | Lower Seam | 157.8 | 158.9 | 1.1 |
Table 2 – Coal Plys > 1m thick