A Review & Update for Shareholders
Annual General Meeting of Shareholders 27 November 2007
Mike Rosenstreich Managing Director
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Disclaimer
An important notice
----- End of picture text -----
Statements contained in this material, particularly those regarding possible or assumed future performance, costs, dividends, production levels or rates, prices, reserves or potential growth of Bass Metals Ltd, industry growth or
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
other trend projections are, or may be, forward-looking statements. Such
statements relate to future events and expectations and, as such, involve
known and unknown risks and uncertainties. Actual results and developments
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
may differ materially from those expressed or implied by these forward looking
statements depending on a variety of factors.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
solicitation of an offer to buy or sell shares in any jurisdiction.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Discussion Outline
A review and update
----- End of picture text -----
1. Review year’s results Early Exploration
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Advanced Projects
Mine Development
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
2. Base Metals Business Update
•
Que River Operations
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Growth opportunities – Hellyer focus
3. Corporate Review
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
-
4. Wrap up
•
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Review of the year’s results
Early Exploration milestones
----- End of picture text -----
-
Discovery early stage successes • Switchback – new “Hellyer style” alteration system with 2
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
to 5% Pb + Zn.
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
� 3.5 metres at 5% Pb, 1.1% Zn, 4 oz./t Ag and 1.1 g/t Au,
� Including a 0.7m interval grading 21.6% Pb, 3% Zn, 550g/t Ag and 3.7
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Southern Barite Lens – unexpectedly thick & high-grade
�
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Ni-Co-Cr in soil anomalies at Heazlewood.
�
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
ranging from 3,642 to 5,135 ppm (0.36 to 0.51%) Ni.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Review of the year’s results
Advanced Exploration milestones
----- End of picture text -----
– Advanced projects track record of growth
- Base metals resource
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
� June 2007 - 736kt resource at Que River (includes reserves)
� October 2007- 750kt at 15% Zn (eq) at Hellyer – total resource now at
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
1.5Mt at 15% Zn (eq)
� Current contained metal - 94kt Zinc, 52kt lead, 11kt Copper, 4.0Moz
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Gold Resources
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
March 2005 - No Mineral Resources
� October 2006 – 6.1Mt at 1.2g/t Au & 36 g/t Ag (380koz Au eq.)
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Review of the year’s results
Mine development milestones
----- End of picture text -----
Que River mine development milestones
• Oct 2006 submitted a development plan (DPEMP) for Que Rive
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
•
March 2007 – Government approvals received.
•
Feb-May 2007 – Trial mining and Hellyer ore trials completed.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
June 2007 signed HoA with Zinifex for Ore Sales Agreement.
•
August 2007 Zinifex ore trials completed and BSM Board
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
September 2007 site establishment activities start and first ore
delivered to ZFX-Rosebery plant on 24 September 2007.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
Base Metals Update Que River Mine
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 79] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
75km south of Burnie 4km south of Hellyer deposit 42 km by road from Rosebery
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
• Stage 1 -2 open pits; PQ pit and S-Lens pit.
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Utilising significant
infrastructure from pre-
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
(1978-91)
•
Pre-start cost estimate
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
of A$0.5M is on track
(somewhat under)
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
weeks behind &
catching up.
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
(1 in 100 year rainfall event delayed
water dam construction.)
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [480 x 360] intentionally omitted <==
Initial surface clearing & blasting at S-Lens
Project is managed for BSM by local, experienced mining group Mancala Mining Pty Ltd under an Alliance Agmt.
Mancala’s drill & blast rig
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [468 x 352] intentionally omitted <==
PQ North (7650 ore pod) Grade control drilling
Strong geological control identified approx. another 1,000t of high-grade (c.25% Zn) additional to the current Mine Plan at this location.
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [483 x 363] intentionally omitted <==
PQ South – waste mining Productivity and unit costs on track toward budget –after initial impact of very wet/muddy conditions in pre-stripping. Operations now well into primary rock
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [370 x 277] intentionally omitted <==
S-Lens Pit ore mining To contain water run-off, the water dam had to be complete before mining started at S-lens. Hence initial delay. S-lens pit now progressing well.
==> picture [310 x 412] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [463 x 348] intentionally omitted <==
PQ pit ore stockpile PQ ore – generally grading 15 to 25% Pb & Zn (also with payable Ag & Au) Early days but positive ore reconciliations
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [480 x 361] intentionally omitted <==
S-Lens pit ore stockpile Generally grading 10 to 12% Pb & Zn (also with payable Ag, Au & Cu) Early days but also positive ore reconciliations
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
==> picture [433 x 325] intentionally omitted <==
Loading ore for delivery to Rosebery
-
Polymetallic ore containing payable Zn, Pb, Ag, Au and Cu
-
Ore Sales Contract for – 5,000 to 8,000t per month.
-
Costs are on track as per budget forecasts of A$175/t sold
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
Dewatering UG workings
Neutralisation in settlement dam
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 79] intentionally omitted <==
Environmental Management – part of a sustainable mine operation
-
Environmental management important aspect of Stage 1 operating plan, particularly water management related to legacy and existing mine operations.
-
• Early optimisation work looking positive to utilise MgO instead of lime to increase pH and drop-out metals from run-off water; resulting in a better environmental impact at lower cost.
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
PQ Pit
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 79] intentionally omitted <==
S-Lens Nth Pit
Test Pit
-
Looking SW at completion of Stage 1 mining phase
-
Stage 1 – c. 120kt at 8% Zn, 4% Pb, .7% Cu, 99g/t Ag & 2g/t Au
-
This is Stage 1 of a possible 4 stage mining plan spanning 3 to 5 years
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Que River Mine
----- End of picture text -----
Key Risks
Metal prices
-
Completed a floor price Pb & Zn hedging structure covering c. 65 to 70% of payable production
-
Capped FX exposure at US$0.91 for all assumed Stage 1 US$ revenue
These hedges do not limit exposure to rising metal prices or falling FX rate Key Opportunities
Positive ore reconciliations - reducing the strip ratio increasing mined metals. Feasibility on possible stages 2 to 4 assessing the viability of the remaining 620kt Mineral Resource at Que River.
Operating improvements to focus on cost reductions.
Testing for shallow lens extensions and new lenses - highly prospective geological environment.
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Base Metals Update
Growth Opportunities
----- End of picture text -----
1. Hellyer Mine Project – 0.75Mt resource & exciting resource potential at Southern Barite Lens
2. Que River
-
several targets prospective for new mineralised lens positions
-
Extensions to known lenses
3. Advanced targets – Farrell, Magnet & Oonah (significant historic production centres
==> picture [721 x 78] intentionally omitted <==
Advanced Base Metals Projects Hellyer Mine Project – new targets & resources
Que River Mining Area
Near surface
Hellyer Plant Site
Hellyer Deposit trend
==> picture [34 x 217] intentionally omitted <==
Hellyer Mine Portal
Plunging deeper to the North
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Hellyer Mine Project
World class high grade VHMS deposit
----- End of picture text -----
==> picture [676 x 188] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
- Pre mining Mineral Resource
17Mt at 14% Zn, 7% Pb, 0.4% Cu, 5oz./t Ag & 2.5g/t Au Mined between 1987 to 2000
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Hellyer Mine Project
Initial Mineral Resource estimate
----- End of picture text -----
| >5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
>5% Combined Pb + Zn Lower Cut Off Summary of Classified Hellyer Mineral Resources October 2007 |
|||
|---|---|---|---|---|---|---|---|---|---|---|
| Mineralisation Type | Category JORC Code |
(000's) Tonnes |
% Zn |
% Pb |
% Cu |
g/t Ag |
g/t Au |
|||
| Stringer Zones | Indicated | 255 | 4.4 | 2.7 | 0.4 | 48 | 0.9 | |||
| Remnant Pillar & Surrounds Base Metals Sulphide |
Indicated Indicated |
195 190 |
6.4 10.6 |
3.8 6.0 |
0.3 0.4 |
70 145 |
1.2 2.0 |
|||
| TOTAL INDICATED | 641 | 68 | 40 | 04 | 83 | 13 | ||||
| . | . | . | . | |||||||
Base Metals Sulphide Stringer Zones |
Inferred Inferred |
27 24 |
8.9 7.3 |
5.7 3.6 |
0.2 0.1 |
138 69 |
1.7 0.9 |
|||
| Remnant Pillar & Surrounds | Inferred | 56 | 8.0 | 5.1 | 0.3 | 109 | 1.6 | |||
| TOTAL INFERRED | 107 | 8.1 | 4.9 | 0.2 | 107 | 1.5 | ||||
| TOTAL MINERAL RESOURCE | 748 | 7.0 | 4.1 | 0.3 | 87 | 1.3 |
Estimate and classification by Coffey Mining with input from BSM and former Hellyer employees. Refer ASX Release (c 25 Oct 07) for full details.
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Hellyer Mine Project
750kt resource–without Southern Barite Lens
----- End of picture text -----
SBL Resource target 750kt of Hellyer resources
==> picture [721 x 78] intentionally omitted <==
==> picture [682 x 156] intentionally omitted <==
==> picture [682 x 156] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Hellyer Mine Project
Southern Barite Lens - resource target
----- End of picture text -----
==> picture [335 x 229] intentionally omitted <==
300m
13.5m at 6.7% Zn, 3.8 Pb, 170 g/t Ag & 3.6g/t Au
7.2m at 21.6% Zn, 9.7% Pb, 1.0% Cu, 142 g/t Ag & 2.3g/t Au
5.3m at 9.4% Zn, 5.4% Pb, 166 g/t Ag & 2.3g/t Au
57.5 metres at 9.2% Zn, 4.7% Pb, 94 g/t Ag & 2.89 g/t Au 14.3m at 4.7% Zn, 3.1% Pb, 190 g/t Ag & 4.4g/t Au
Pink text box, BSM result, others historic intercepts
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Hellyer Mine Project
Southern Barite Lens - resource target
----- End of picture text -----
– SBL drilling resumed
-
Hellyer Mine Project Plans • SBL drilling & resource
-
• Scoping study on existing Hellyer resource
-
• Met test work-process options.
==> picture [320 x 146] intentionally omitted <==
==> picture [320 x 147] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Corporate Snapshot
A review since the last AGM
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
- -
2006 AGM 2007 AGM
Share price 29 cents 38 cents
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Mkt Cap $18M $38M
No. of shares 63.3M 99.8M
Shareholders c. 600 c. 1,300
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
Cash $2.6M $5M (as at 31 oct.07 after Creditors)
Receivables $0.2M $1.5M (as at 31 oct.07)
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Inventory nil $0.2M (as at 31 oct.07)
Hedging nil 65-70% of Pb & Zn covered with Puts
•Avg. prices to Nov 2009 of:
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
–Zn price of A$3,700 & US$2,250/t
–Pb price of A$3,000 & US$2,875/t
•FX - 100% of revenue is capped at US$0.91.
----- End of picture text -----
Status Explorer Producer - under prudent management
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Proposition for BSM Investors
Production growth & exploration success
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Exposure to production and advanced projects
•
Que River Mine; high grade, polymetallic-commenced production
•
Significant resource base
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
•
Hellyer – growth path for production leveraging off local infrastructure
advantages
Exposure to Discovery - the Elephant Hunt
----- End of picture text -----
==> picture [721 x 79] intentionally omitted <==
----- Start of picture text -----
•
Positive results to date – Que, Hellyer, Iris River and Heazlewood
•
Constantly drilling through the past year – up to 4 rigs at a time
•
Spending c. A$4 million pa on exploration
•
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
Exposure to volatile markets
•
BSM is in the best shape ever with:
� Strong cash position
----- End of picture text -----
==> picture [721 x 78] intentionally omitted <==
----- Start of picture text -----
� Cash flow from production – underpinned with uncommitted hedging,
� significant resource base comprising base metals & gold
� Abundant prospective exploration targets
� Experienced and talented team growing the assets and managing the Company.
----- End of picture text -----
Successfully implementing a twin strategy of Production and Discovery to generate shareholder value.
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 78] intentionally omitted <==
==> picture [721 x 79] intentionally omitted <==
Developing Mines - Actively exploring for “ Elephants ” www.bassmetals.com.au
==> picture [721 x 78] intentionally omitted <==