GREENWING RESOURCES LTD Capital/Financing Update 2020

May 17, 2020

65029_rns_2020-05-17_61751e8b-c935-48d6-913e-7ecfa222cf80.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [221 x 81] intentionally omitted <==

ASX Announcement 18 May 2020

Exploration Update

Bass Metals Limited (ASX:BSM) (“ Bass ” or the “ Company ”) is pleased to provide an update on the continued exploration progress at the Graphmada Mining Complex.

HIGHLIGHTS

  • Bass recently completed an initial surface exploration program which identified mineralization of at least 4.5km in strike between the Mahela and Loharano large flake graphite deposits (the “Mineralized Trend”)(ASX announcement 29[th] April 2020) and identified several high priority targets.

  • The Company subsequently commenced an initial auger drilling program to an average depth of 10-12m (from surface) at the highly prospective Mangabe area located within this Mineralized Trend.

  • Bass is pleased to announce that extensive and pervasive large flake graphite mineralization has been identified at the newly named Mangabe Project (the “Project”).

  • 14 of the 15 holes drilled to date have recorded regolith hosted, large flake graphite mineralization present[1] .

  • The Project is a near-mine mineralization zone located a short 2km haul to well-established large flake graphite mining and processing infrastructure (Graphmada).

  • The Company plans for the results of this drilling, and follow up diamond drilling, to support materially expanding Graphmada’s Mineral Resource.

1 Important note: The Company is only reporting visual results that are yet to be assayed and analyzed and makes no comments about the grade or quality of the mineralization in the absence of any assay data.

Mangabe Historic Graphite Mine (sample locations)

==> picture [366 x 451] intentionally omitted <==

In addition to the drilling, samples were taken from an historic mining face, discovered when establishing the drill program in the area. The small historic graphite mine demonstrated up to 4.5m of large flake graphite mineralization from surface. Refer Table 4.

EXPLORATION STRATEGY

Bass has long been of the view that significant additional graphite mineralization exists in the broader Graphmada area, beyond the already substantial regolith hosted large flake graphite Mineral Resource[2] of 14.3 Mt @ at 4% Total Graphitic Carbon (TGC), estimated in accordance with the JORC Code (2012).

Table 1: The total Mineral Resources for Graphmada Mining Complex[3,4]

Total Tonnes TGC Contained
Graphite
Measured 0.4 Mt 4.1% 16 Kt
Indicated 4.0 Mt 4.3% 172 Kt
Inferred 9.9 Mt 3.9% 386 Kt
Total 14.3 Mt 4.0% 574 Kt

In 2019, the Company, with an extensive data set of historical exploration, incorporating auger and diamond drilling results, outcropping mineralization, field mapping, rock chip sample results, along with mine operational data and product sales performance, announced a brownfields Exploration Target estimate, in accordance with the JORC Code (2012)[5] .

Bass subsequently initiated exploration activities between the known deposits of Mahela and Loharano to test if the orientation of these orebodies was indeed a larger trend of mineralization extending the 4.5km between the deposits.

The Company then commenced a drilling program to an average depth of 1012m (from surface) at a highly prospective area located within this Mineralized Trend.

From this work, Bass is pleased to announce that extensive and pervasive large flake graphite mineralization has been identified at the newly named Mangabe Project (the “Project”).

2 ASX Announcement “Bass increases Mahefedok North graphite resource by 54%” released 25 November 2019 and ASX Announcement “Bass delivers outstanding increase in Mineral Resources” released 4 December 2019.

3 Reported in accordance with the 2012 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (‘the JORC Code 2012’) See ASX Announcement ‘Bass delivers outstanding increase in Mineral Resources’ released on the 4/12/19.

4 The Loharano Mineral Resource that forms part of the Company’s Mineral Resources herein was reported in accordance with the 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (‘the JORC Code 2004) at a >2% cut-off and first disclosed by Stratmin Global Resource PLC under the JORC Code 2004. Bass Metals notes that the estimates have not been updated to JORC Code 2012 on the basis that the information has not materially changed since it was last reported. Reference should be made to the Company's announcement of 2/09/15, for further detail.

5 ASX Announcement “Significant Exploration Program to commence at Graphmada” released 3 June 2019.

Bass is of the view that there is significant value for shareholders in the expansion of this Mineral Resource given it has been commercially proven to produce concentrates that have been sold into all major markets.

Bass’ produced concentrates provide several requisite properties for a spectrum of advanced applications, including a high proportion of large flake in concentrates and concentrates largely free of impurities as evidenced by an unblemished sales record of zero penalties or rejections to date.

Bass is advancing two separate Memorandums of Understanding (MOU) with a view to capitalizing on the rapidly emerging advanced materials market for Graphite based products.

EXPLORATION UPDATE

==> picture [412 x 432] intentionally omitted <==

----- Start of picture text -----

Mining &
Processing
Infrastructure
National
Highway to
the Port of
Tamatave
Collar locations for
holes reported
Scale: 1:1000
----- End of picture text -----

Location

The Mangabe Project is located approximately 2km from the Graphmada Mining and Processing infrastructure established at Loharano. The Project is immediately adjacent to the National highway giving excellent access to the Port of Tamatave, 110km to the north, and the location of Bass’ warehouse and logistics center. The Project is fully permitted for exploration and mining for 40 years as part of the Graphmada Mining Complex.

Drilling

To date, the Company has drilled 15 drill holes aiming for an average depth of 10-12m. 14 of the 15 holes drilled reported significant intercepts of visible large flake graphite mineralization.

Table 2: Collar Locations

Collar ID X Y Z Azimuth Inclination Depth(m)
MGBA001 288227.239 7904923.457 4.758 0 -90 4
MGBA002 288205.824 7904927.91 3.803 0 -90 5.5
MGBA003 288187.069 7904934.592 5.423 0 -90 12
MGBA004 288168.024 7904940.013 8.793 0 -90 5.5
MGBA005 288147.767 7904946.598 12.639 0 -90 3.5
MGBA006 288133.233 7904953.858 12.932 0 -90 6
MGBA007 288110.139 7904959.172 9.093 0 -90 3.2
MGBA008 288091.411 7904965.331 4.943 0 -90 6.3
MGBA009 288074.237 7904972.146 8.231 0 -90 10
MGBA010 288053.126 7904977.436 14.351 0 -90 7.8
MGBA011 288033.871 7904985.076 17.057 0 -90 13.2
MGBA012 288015.495 7904990.702 17.861 0 -90 14
MGBA013 287996.454 7904995.981 18.652 0 -90 11.5
MGBA014 287977.139 7905001.939 17.295 0 -90 14
MGBA015 287756.848 7905007.136 13.943 0 -90 13

Table 3: Geological logging

Collar ID From(m) To(m) Interval(m) Lithology Comments
MGBA001 0 0.1 0.1 Regolith
MGBA001 0.1 1.5 1.4 Regolith Visualgraphite
MGBA001 1.5 2 0.5 Regolith
MGBA001 2 4 2 Regolith
MGBA002 0 0.3 0.3 Regolith Visualgraphite
MGBA002 0.3 4 3.7 Regolith Visualgraphite
MGBA002 4 5 1 Regolith
MGBA003 0 0.3 0.3 Regolith Visualgraphite
MGBA003 0.3 3.5 3.2 Regolith Visualgraphite
MGBA003 3.5 6.5 3 Regolith
MGBA003 6.5 7 0.5 Regolith Visualgraphite
MGBA003 7 7.5 0.5 Regolith Visualgraphite
MGBA003 7.5 8.5 1 Regolith Visualgraphite
MGBA003 8.5 9.5 1 Regolith Visualgraphite
MGBA003 9.5 12 2.5 Regolith Visualgraphite
MGBA004 0 0.3 0.3 Regolith Visualgraphite
MGBA004 0.3 1 0.7 Regolith Visualgraphite
MGBA004 1 2.5 1.5 Regolith Visualgraphite
MGBA004 2.5 5.5 3 Regolith Visualgraphite
MGBA005 0 0.5 0.5 Regolith Visualgraphite
MGBA005 0.5 2 1.5 Regolith Visualgraphite
MGBA005 2 3.5 1.5 Regolith Visualgraphite
MGBA006 0 0.4 0.4 Regolith Visualgraphite
MGBA006 0.4 1.5 1.1 Regolith Visualgraphite
MGBA006 1.5 6 4.5 Regolith Visualgraphite
MGBA007 0 0.5 0.5 Regolith Visualgraphite
MGBA007 0.5 3 2.5 Regolith Visualgraphite
MGBA007 3 3.2 0.2 Regolith Visualgraphite
MGBA008 0 2 2 Regolith Visualgraphite
MGBA008 2 3 1 Regolith Visualgraphite
MGBA008 3 6.3 3.3 Regolith Visualgraphite
MGBA009 0 0.5 0.5 Regolith Visualgraphite
MGBA009 0.5 1.5 1 Regolith Visualgraphite
MGBA009 1.5 3 1.5 Regolith Visualgraphite
MGBA009 3 10 7 Regolith Visualgraphite
MGBA010 0 0.5 0.5 Regolith
MGBA010 0.5 1.5 1 Regolith Visualgraphite
MGBA010 1.5 3.3 1.8 Regolith Visualgraphite
MGBA010 3.3 6.5 3.2 Regolith Visualgraphite
MGBA010 6.5 7.8 1.3 Regolith Visualgraphite
MGBA011 0 0.5 0.5 Regolith
MGBA011 0.5 2.7 2.2 Regolith Visualgraphite
MGBA011 2.7 3.5 0.8 Regolith Visualgraphite
MGBA011 3.5 4 0.5 Regolith Visualgraphite
MGBA011 4 4.7 0.7 Regolith Visualgraphite
MGBA011 4.7 6.5 1.8 Regolith Visualgraphite
MGBA011 6.5 9 2.5 Regolith Visualgraphite
MGBA011 9 12 3 Regolith Visualgraphite
MGBA011 12 13.2 1.2 Regolith Visualgraphite
MGBA012 0 0.5 0.5 Regolith
MGBA012 0.5 1 0.5 Regolith
MGBA012 1 4.5 3.5 Regolith
MGBA012 4.5 6.5 2 Regolith Visualgraphite
MGBA012 6.5 8.5 2 Regolith Visualgraphite
MGBA012 8.5 9.5 1 Regolith Visualgraphite
MGBA012 9.5 12 2.5 Regolith Visualgraphite
MGBA012 12 14 2 Regolith Visualgraphite
MGBA013 0 0.5 0.5 Regolith
MGBA013 0.5 1.5 1 Regolith
MGBA013 1.5 2.2 0.7 Regolith
MGBA013 2.2 5 2.8 Regolith
MGBA013 5 6 1 Regolith
MGBA013 6 8.5 2.5 Regolith
MGBA013 8.5 9.5 1 Regolith
MGBA013 9.5 11.5 2 Regolith
MGBA014 0 0.5 0.5 Regolith
MGBA014 0.5 4 3.5 Regolith
MGBA014 4 5 1 Regolith
MGBA014 5 5.5 0.5 Regolith
MGBA014 5.5 11.5 6 Regolith Visualgraphite
MGBA014 11.5 14 2.5 Regolith Visualgraphite
MGBA015 0 0.5 0.5 Regolith
MGBA015 0.5 1.2 0.7 Regolith
MGBA015 1.2 3.2 2 Regolith
MGBA015 3.2 5 1.8 Regolith
MGBA015 5 8.7 3.7 Regolith Visualgraphite
MGBA015 8.7 9.5 0.8 Regolith
MGBA015 9.5 11 1.5 Regolith
MGBA015 11 12.5 1.5 Regolith
MGBA015 12.5 13 0.5 Regolith

Historic graphite mine located within Project area

In addition to the drilling, samples were taken from an historic mining face, discovered when establishing the drill program in the area. The small historic graphite mine demonstrated up to 4.5m of large flake graphite mineralization from surface.

Table 4: Mangabe face samples

Trench ID From(m) To(m) Int(m) Lithology Comments
MGBT001 0 0.5 0.5 Regolith Visual Graphite
0.5 2.5 2 Regolith Visual Graphite
2.5 4 1.5 Regolith Visual Graphite
4 4.5 0.5 Regolith Visual Graphite

TIM MCMANUS CEO

“Mangabe is an exciting prospect for the Company. We will continue to drill this Project with the aim to determine the true extent of the Project, as it remains open in all directions.

We look forward to updating the market in the near term of the assay results from these first holes drilled into Mangabe.”

For more information, please contact:

Tim McManus Peter Wright Chief Executive Officer Executive Director

Phone: (07) 3063 3233 Email: [email protected]

www.bassmetals.com.au

This announcement has been approved by the Company’s Disclosure Committee for release.

JORC CODE, 2012 EDITION – TABLE 1

Discussion and results within this appendix relate to Mahela-Loharano Trend.

Section 1 Sampling Techniques and Data

Criteria Commentary
Sampling techniques Auger samples were collected and included composite samples of the graphite
bearing host rocks. Visual estimation of graphite percentages and flake sizes have
been used to define mineralisation prior to return of assays. The samples were solar
dried, manually crushed, split twice through a 50/50 riffle splitter to obtain a
representative sub-sample, weighing between 100-150g that was sent to the Bass
Metals in-house laboratory for Fixed Carbon analysis.
Drilling techniques Drilling was vertical (-90 °) with the aim to achieve an average depth of 10-12m.
Drill sample recovery Not applicable
Logging Samples were all geologically logged and photographed, and geological recording of
relevant data was captured on Bass Metals logging templates. All data was codified
to a set company codes system as per sampling and logging procedures which are in
place. All logging included lithological features, estimates of graphite percentages and
flake sizes which is quantitative and is recorded on the logging sheets. Photographs
have been taken as a qualitative check on logging when the need arises.
Sub-sampling
techniques and sample
preparation
Samples were solar dried, crushed and split twice using a 50:50 riffle splitter. The
crushing and splitting equipment were cleaned according to best practice procedures
prior to every run. Each sample was manually crushed to nominal -2mm and
approximately 100-150g sub-samples was collected and sent to the Bass Metals in-
house laboratory in Madagascar. The in-house laboratory then pulverized such that
80% of the sample is -75 micron or less in size. consultant will conduct analysis on all
blanks, standards and duplicates to maintain QAQC standards.
Quality of assay data
and laboratory tests
Samples are currently being analysed at the Bass Metals in-house laboratory for a
preliminary evaluation of the carbon grade. The Muffle Furnace method was used to
determine Loss on Ignition (LoI), Volatile Matter (VM) and Fixed Carbon (FC).
LoI Test: a crucible is placed on an electronic balance, primarily zeroed and the
weight recorded. 1 gram +- 0.01 of the sample are added, the weight of crucible +
sample are recorded. The crucible is placed in the Muffle Furnace at 950°C +-25°C
for 8 hours continuously. After the crucible is removed and cooled, the ash + crucible
is then weighed and recorded. The LoI % is calculated as follows:
LOI % = (1 -
Weight of ash
Weigh of original sample
) × 100
VM Test: a crucible is placed on an electronic balance, primarily zeroed and the
weight recorded. 2 grams +- 0.01 of the sample are added, the weight of crucible +
sample are recorded. The crucible is placed in the Muffle Furnace at 950°C +- 25°C
for 7 minutes. After the crucible is removed and cooled, the ash + crucible is then
weighed and recorded. The VM % is calculated as follows:
V M % = (1 -
Weight of ash
Weigh of original sample
) × 100
The FC % of the sample is calculated as follows:
FC % = (LOI % - VM %)
Certified graphite standards (GC-09 and GC-10) and silica blanks (AMIS0439) were
inserted with the samples. An external, independent
Verification of sampling
and assaying
All work was completed by Bass Metals personnel. Significant mineralization
intersections were verified by an external consultant and by internal peer review. No
twinned holes were drilled as this was reconnaissance drilling. All data was collected
initially on paper log sheets by Bass Metals personnel. This data was hand entered
into spreadsheets and validated by an external consultant. All paper log sheets were
scanned, and electronic spreadsheets stored together with the photographs of the
geological features logged. The master collar and assay database with all
photographs are backed-up via cloud storage.
No adjustments were made to the data.
Location of data points DGPS’s were used to locate collar locations, and final location coordinates were
completed with estimated positional errors between 15 and 30 centimetres. The
WGS84 UTM Zone 39S projection system was used.
Data spacing and
distribution
The purpose of the auger locations was to confirm the presence of graphitic units
within the project area. The data collected is insufficient to determine a Mineral
Resource and are considered preliminary exploration results only. Sample
compositing has not been applied.
Orientation of data in
relation to geological
structure
Not applicable.
Sample security Samples were stored in a secure storage area at the Bass Metals sample storage
facility. Samples bags were sealed as soon as sampling was completed and stored
securely until dispatch to the preparation laboratory in Antananarivo and after to the
laboratory (SGS) in South Africa via courier.
Audits or reviews The sampling techniques and data are reviewed by an external consultant and
internally peer reviewed.
It is considered by the Company that industry best practice methods have been
implemented by the Company at all stages of exploration.

Section 2 Reporting of Exploration Results

Criteria listed in the preceding section also applies to this section.

Criteria Commentary
Mineral tenement and
land tenure status
Exploitation permit no PE 26670 is located in the Toamasina Province of Madagascar
and held by the Malagasy company, Graphmada SARL which is a wholly owned
subsidiary of the ASX listed company, Bass Metals Ltd. Permit no PE 26670 was
granted on 21/01/2008 and is valid for 40 years. The permit is in good standing, and
all statuary approvals are in place to conduct exploration and exploitation activities
throughout this permit area, including mining.
Exploration done by
otherparties
Not applicable as the mineralization is a virgin discovery by Bass Metals and has had
no previous work completed by other Parties.
Geology Crystalline “hard rock” flake graphite deposits occur in graphitic gneisses within
Neoproterozoic metasedimentary type rocks and include accessory minerals of biotite
(± sillimanite / kyanite, ± garnet). Due to the tropical climate and because graphite is
comparatively inert, weathering of the “hard rock” graphitic gneiss units further
concentrate the graphite to form residual regolith-hosted accumulations within the
weathered profile. Regolith refers to weathered material that occurs above
unweathered bedrock. Two primary subdivisions are the pedolith (PED) and the
saprolith (SAP). Secondary subdivisions of the pedolith, from the surface downwards,
include soil (SL), ferruginous zone (FZ), and the mottled zone (MZ). Secondary
subdivisions of the saprolith, include saprolite (SP) and saprock (SR).
Drill hole Information A summary of all information material to the understanding of the exploration results
including a tabulation of visually logged data is supplied in the above announcement.
Data aggregation
methods
Samples are currently being assayed for in-situ Fixed Carbon (FC) grades by the in-
house Graphmada laboratory. No Metal Equivalents have been stated.
Relationship between
mineralisation widths
and intercept lengths
The mineralization is hosted within a weathered regolith profile and the main
mineralized lenses / horizons are suspected to dip towards the west at between 30°
and 45°. The samples, taken vertically, are reported as true width and tables have
been annotated in the above announcement.
Diagrams This information has been accurately represented in the announcement and contains all
relevant information required for the reader to understand the nature of the graphitic
mineralization.
Balanced reporting The summary table of all the auger sample results is contained within the
announcement.
Other substantive
exploration data
Not applicable.
Further work A systematic exploration program will be planned, including further auger and pitting
with sampling, to be followed by a potential drilling and sampling program for grade
estimation, flake size distribution and metallurgical testing.

Disclaimer

This document has been prepared by Bass Metals Limited (the “Company”). It should not be considered as an invitation or offer to subscribe for or purchase any securities in the Company or as an inducement to make an invitation or offer with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this document.

This document is provided on the basis that neither the Company nor its officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the document and nothing contained in the document is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law.

Forward Looking Statements

This announcement contains certain ‘forward-looking statements’ within the meaning of the securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward-looking words such as ‘may,’ ‘should,’ ‘expect,’ ‘anticipate,’ ‘estimate,’ ‘scheduled’ or ‘continue’ or the negative version of them or comparable terminology.

Any forecasts or other forward-looking statements contained in this announcement are subject to known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future events which may or may not be correct. There are usually differences between forecast and actual results because events and actual circumstances frequently do not occur as forecast and these differences may be material.

Bass Metals does not give any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this announcement will actually occur and you are cautioned not to place undue reliance on forward-looking statements. The information in this document does not take into account the objectives, financial situation or particular needs of any person. Nothing contained in this document constitutes investment, legal, tax or other advice.

Important information

This announcement does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States, or in any other jurisdiction in which such an offer would be illegal. The securities referred to in this document have not been and will not be registered under the United States Securities Act of 1933 (the ‘US Securities Act’), or under the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly, within the United States, unless the securities have been registered under the US Securities Act or an exemption from the registration requirements of the US Securities Act is available.

This document may not be distributed or released in the United States.

Competent Person Statement

The information in this document that relates to Exploration Results, Exploration Targets and Mineral Resources is based on information compiled by Tim McManus, a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy and a full-time employee of the Company.

Tim McManus has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

Tim McManus consents to the inclusion of the information in this document in the form and context in which it appears.