GLOBE METALS & MINING LIMITED Investor Presentation 2021

Aug 31, 2021

64965_rns_2021-08-31_8803b6a5-d076-45fb-b2f2-56594f7ca4e5.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [595 x 94] intentionally omitted <==

----- Start of picture text -----

ASX Announcement
1 September 2021
----- End of picture text -----

==> picture [280 x 45] intentionally omitted <==

About Globe

  • Globe Metals & Mining Limited is a Perth based company listed on Australian Stock Exchange (ASX Code: GBE)

Kanyika Niobium Project Updated Presentation

Investment Summary

  • 100% interest held in Kanyika Niobium Project in Malawi (Africa)

Directors and Management

Ms Alice Wong - Non-Executive Chairperson Mr Alistair Stephens - Managing Director Mr William Hayden - Non-executive Director Mr Bo Tan - Non-executive Director Mr Ricky Lau – Non-executive Director Mr Michael Fry – CFO/Company Secretary

Post the grant of a Large-Scale Mining Licence for the Kanika Niobium Project (LML0216/21), Globe Metals & Mining Limited (ASX: GBE , Globe or the Company ) hereby a provides an updated presentation for its Kanyika Niobium Project which incorporates the highlights of its Feasibility Study results and economics as contained in the Company’s ASX announcement of 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Results”.

Authorisation for Release

This presentation has been authorised for release by the Company’s Managing Director, Alistair Stephens.

Capital Structure

Shares on Issue: 465,922,373

For further information please contact:

Substantial Shareholders

Apollo Metals: 52.79% Ao-Zhong International Minerals: 25.36%

Alistair Stephens Michael Fry Managing Director Company Secretary +61 8 6118 7240 +61 8 6118 7240

Director Holdings*

Mr Alice Wong: 245,983,611 (52.80%) Mr William Hayden: 1,276,923 (0.27%) Director Stephens: 1,200,000 (0.26%)

* both direct and indirect

Contact

Alistair Stephens Managing Director [email protected] T: +61 (0)8 6118 7240

==> picture [101 x 37] intentionally omitted <==

ASX: GBE Unit 1, 26 Elliott Street, Midvale Western Australia 6056 www.globemm.com P: +61 (8) 6118 7240

Kanyika Niobium Project Positioned to be the first niobium mine in fifty years

Enabling Excellence in Engineering

Critical to Technology

Project Overview September 2021

==> picture [175 x 110] intentionally omitted <==

ASX: GBE Unit 1, 26 Elliott Street, Midvale Western Australia 6056

www.globemm.com P: +61 (8) 6118 7240

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Disclaimer
----- End of picture text -----

This Presentation is strictly confidential and any disclosure, use, copying and circulation of this Presentation is prohibited without the consent of Globe Metals & Mining Limited ABN 33 114 400 609 (Globe).

The information in this presentation is an overview and does not contain all information necessary for making investment decisions. In making investment decisions, investors should rely on their own examination of the Kanyika Niobium Project and consult their own legal, technical, business and/or financial advisers. The information contained in this presentation has been prepared in good faith by Globe, however no representation or warranty expressed or implied is made as to the accuracy, correctness, completeness or adequacy of any statements, estimates, options, or other information contained in this presentation. To the maximum extent permitted by law, Globe, its Directors, officers, employees and agents disclaim liability for any loss or damage which may be suffered by any person through the use of reliance on anything contained in or omitted from this presentation.

Certain information in this Presentation refers to the intentions of Globe with respect to the Kanyika Niobium Project, but these are not intended to be forecasts, forward looking statements or statements about the future matters for the purposes of the Corporations Act or any other applicable law. The occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause Kanyika Niobium Project’s actual results, performance or achievements to be materially different from the results, performance or achievements implied by the forward-looking statements. Such factors include, but are not limited to, general economic, market and business conditions, market prices for niobium, demand for niobium, niobium supply, concluding of off-take agreements, obtaining of all necessary permits for development and production as and when required, estimation of resources and reserves, development and production costs, transportation delays and costs, risks and uncertainties related to construction and commissioning, delays in construction of the mining operation, accidents, equipment breakdowns, title matters, labour disputes or other unanticipated difficulties with, or interruptions in, development or production, exchange rate fluctuations, and risks and uncertainties associated with doing business in Malawi. In addition, there may be information herein that is information about prospective results of operations, financial position or cash flows and which is provided only to assist in an evaluation of the Kanyika Niobium Project outlined herein, but are not to be relied upon as accurate representations of future results and may not be appropriate for any other purpose.

This presentation may contain forward looking statements including statements regarding our intent, belief or current expectations with respect to Kanyika Niobium Project’s performance, market, political, social and environmental conditions, project configuration, construction and commissioning costs and timelines, and general risks and uncertainties. Readers are cautioned not to place undue reliance on these forward looking statements. While due care has been used in the preparation of forecast information, actual results may vary in a materially positive or negative manner. Forecasts and hypothetical examples are subject to uncertainty and contingencies often outside Globe’s control. The information in this presentation is current as at the date of the publication of this presentation.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

About Globe
----- End of picture text -----

Who we are

Publicly listed company working towards mine construction and operation in order to commence manufacture of niobium and tantalum products principally for use in the engineering, battery and electronics industries.

Incorporation and Listing

Incorporated in May 2005

Listed on Australian Stock Exchange December 2005 to present (ASX: GBE)

Office Locations

Headquarters in Perth, Western Australia Operations in Lilongwe, Malawi

Shareholding Information

Shares On Issue: 465.92 million Top 20: 90.99%

Substantial Holders:

Apollo Metals Investment Co. (52.80%) Ao-Zhong International Minerals (25.36%)

Key Market Statistics

Market Capitalisation: 55.9M (based on 12c close on 26-Aug-2021) 52-week price high: 19c (24-Jun-2021) Cash at Bank: $2.82m (end Jun 2021)

==> picture [386 x 278] intentionally omitted <==

“Niobium – critical to technological advancement”

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Board & Management
----- End of picture text -----

Alice Wong Chairperson

Bo Tan

Non-Executive Director

  • Apollo Nominee

  • MBA and CFA

  • Hon. Business Administration Accounting; AICPA

  • Over 15 years experience in finance and investment

  • Extensive career in investment banking

  • Deep understanding of the Greater China market

Alistair Stephens

Managing Director and CEO

Ricky Lau

Non-Executive Director

  • Over 30 years experience as geologist and mining company executive

  • Instrumental in developing Arafura Resources

  • Joined Globe in May 2013

  • Extensive career in investment banking and real estate

  • Managing Partner of Crane Capital

  • Former Partner and Co-Head of TPG Capital Asia

  • Humanitarian and philanthropist

Senior Management

  • Michael Fry – CFO & Company Secretary

  • Benny Tsung – President of Global Sales and Marketing

William Hayden

Non-Executive Director

  • Dr Marc Steffens – Consulting Metallurgist

  • Co-founder and President of Ivanhoe Nickel and Platinum Ltd

  • Neville Huxham – In-Country Manager, Director – GBE Malawi Subsidiary

  • Grant Hudson– General Manager Corporate Services – GBE Malawi Subsidiary

  • Dean Lungu – Chairman – GBE Malawi Subsidiary

  • Current director of a number of ASX and TSX listed companies

  • Geophysicist with over 40 years experience in minerals exploration industry

  • Lisungu Banda – Senior Accountant / Director – GBE Malawi Subsidiary

Project Highlights Project Highlights
First niobium Project in Kanyika Niobium Project is positioned to be the first ever niobium mine in Africa and
fifty years Globe the first new producer in 50 years.
68.3 Mt Resource JORC (2012) compliant mineral resource estimate of 68 Mt with grade of
0.283% Nb2O5 (M+I+I) (Cut-Off Grade = 1,500 ppm Nb2O5)
Favourable metallurgy Patented metallurgical advancements allowing substantially simpler beneficiation
with greater recovery and lower process OPEX.
Integrated operations Project is configured to maximise leverage off existing supporting industries and
central to markets
High growth industries Project provides an opportunity to participate in the growing alloy market, and the
high-growth battery and electronics industries.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Location
----- End of picture text -----

==> picture [421 x 366] intentionally omitted <==

  • ~250kms north of capital city of Lilongwe

~800kms WNW of Nacala Port, Mozambique

KNP is located in the Mzimba District in the Northern Region of Malawi, approximately 55km north east of the town of Kasungu. The Kanyika Project is located at 1,050masl some 60km west of Lake Malawi. The topography of the project area is moderate with small hills and incised streams and river valleys. The Milenje River cuts across the northern section of the deposit. The most prominent topographical feature in the area is Mphunju, a hill approximately 5km east of the ore body.

Most of the project footprint is located within degraded miombotype woodland areas that have been extensively disturbed through various land use activities, most significantly by cultivation, harvesting of timber and grazing by livestock.

The area is well populated with extensive subsistence level agriculture and domestic cattle, chickens and goats with limited commercial crops.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Brief Project Timeline
----- End of picture text -----

Discovered in 2006

Discovery of the Kanyika Nb-U-Ta-Zr deposit publicly announced by Globe in November 2006, following field programmes that included ground radiometric surveys, soil and rock-chip sampling and geological sampling.

JORC resource

Between 2007 and 2009, Globe completed 19,396 metres (236 holes) of RC drilling and 2,984 metres (32 holes) of diamond drilling and publicly announced a JORC Mineral Resource Estimate.

Project configuration

Infill drilling comprising a further 9,207 metres (67 hoes) of RC drilling and 811 metres (3 holes) of diamond drilling, Mine Geotechnical Study, Environmental Impact Assessment, Mineral Processing Studies completed.

Mining Licence

Notice of grant of mining licence received in June 2015, conditional on the signing of a Development Agreement with the Government of Malawi.

New Mines Act MRC recommendation

New Mines and Mineral Act 2018 introduced (effective from 1 September 2019). New Act eliminates the requirement for execution of a Development Agreement as a condition of grant.

On 3 June 2021, Globe received a formal letter from the principal Secretary of Mining informing it that the Mineral Resource Committee had recommended the grant of a Mining Licence to Globe.

Large-Scale Mining Licence granted

Large-Scale Mining Licence No. LML0216/21 issued 13 August 2021; valid for initial term of 25 years.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Niobium
----- End of picture text -----

==> picture [164 x 137] intentionally omitted <==

Supply concentred to Brazil and Canada. African niobium will provide welcome geographical
Geographical risk diversification.
CBMM currently supplies ~ 85% of the market’s requirements.
Market would benefit from
Concentration risk having additional suppliers.
Remaining mine lifes of Catalao (Brazil) and Niobec (Canada) both of which first commenced
Minelife in decline commercial production in 1976 are in decline. World needs another producing niobium mine
within next 5 years.
Key ingredient for
Steel Industry
Over 90% of niobium is consumed as ferro-niobium a key input in the manufacture of High
Strength Low Alloy steels. Steel production growing year on year.
Increasingly important
in electric vehicles
Niobium becomingly increasingly important in quantum electronics and in electric vehicle
industry with niobium batteries achieving ultra-rapid re-charge and improved range capabilities.
Critical to military, Strategic metal for USA, UK and Russia due to its many military applications (missiles, jets
aerospace, space, tanks, etc). Critical to the space industry due to its strength, corrosion resistance and othe
nuclear industries attractive features; used in many important components: rocket engines, nozzles, etc.
Globe to manufacture
high-spec products
Globe aims to manufacture high specification niobium pentoxide products to support the
electronics industry (quantum computing, medical imaging, super-conductors, capacitors
military, aerospace and space travel applications) and electric vehicle industry.

~ CBMM currently supplies 85% of the market’s requirements. Market would benefit from having additional suppliers.

Remaining mine lifes of Catalao (Brazil) and Niobec (Canada) both of which first commenced commercial production in 1976 are in decline. World needs another producing niobium mine within next 5 years.

==> picture [91 x 94] intentionally omitted <==

Over 90% of niobium is consumed as ferro-niobium a key input in the manufacture of High Strength Low Alloy steels. Steel production growing year on year.

==> picture [127 x 135] intentionally omitted <==

Strategic metal for USA, UK and Russia due to its many military applications (missiles, jets, tanks, etc). Critical to the space industry due to its strength, corrosion resistance and other attractive features; used in many important components: rocket engines, nozzles, etc.

Globe aims to manufacture high specification niobium pentoxide products to support the electronics industry (quantum computing, medical imaging, super-conductors, capacitors, military, aerospace and space travel applications) and electric vehicle industry.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Conventional Uses for Niobium - by Industry
----- End of picture text -----

==> picture [119 x 353] intentionally omitted <==

----- Start of picture text -----

Oil & gas
16%
pipelines
Superalloys 3%
Other 4%
Shipbuilding 6%
Automotive 23%
Construction 45%
Stainless steels 3%
----- End of picture text -----

==> picture [728 x 361] intentionally omitted <==

----- Start of picture text -----

High-Rise Construction Automobile Super & Master Alloys Oil and Gas Pipeline Military & Aerospace
----- End of picture text -----

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Niobium
----- End of picture text -----

==> picture [144 x 153] intentionally omitted <==

==> picture [144 x 159] intentionally omitted <==

==> picture [144 x 148] intentionally omitted <==

Scientists and manufacturers are only now beginning to imagine the range of technological applications for niobium.C

Emerging Uses for Niobium

==> picture [383 x 370] intentionally omitted <==

----- Start of picture text -----

High-Rise Construction Electric Vehicles Automobile Electronics
----- End of picture text -----

==> picture [167 x 367] intentionally omitted <==

----- Start of picture text -----

Medical Imaging
----- End of picture text -----

==> picture [166 x 368] intentionally omitted <==

----- Start of picture text -----

Superconducting
Magnets
----- End of picture text -----

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Niobium Supply
----- End of picture text -----

  • Supply concentred primarily to Brazil and Canada. African niobium will provide welcome geographical diversification

  • CBMM (Brazil) currently supplies ~ 85% of the market’s requirements. Market would benefit from having additional suppliers.

  • Remaining mine life of Catalao (Brazil) and Niobec (Canada) both of which first commenced commercial production in 1976 are in decline. Industry view: the world needs another producing niobium mine within next 5 years.

  • In 2020 the mine production of niobium was estimated at 78,000 metric tons worldwide.

  • Niobium producers have increased their production capabilities significantly in recent times to cater for increasing demand from the steel industry and growing demand from the electric vehicle industry, military and space industries and medical industry.

  • CBMM, the world’s largest supplier of niobium, recently announced that by 2030 it expects to produce and sell 45,000 tons of niobium oxide, used in the production of batteries, up from just 100 tons presently.

==> picture [169 x 162] intentionally omitted <==

==> picture [226 x 134] intentionally omitted <==

Source: Metals-hub.com

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Niobium Demand
----- End of picture text -----

  • Niobium (Nb) was initially applied in 1933 to stabilize stainless steels against intergranular corrosion.

  • Around 1970, niobium started to be used in many technological applications, especially in heat treatments at high temperatures, in the form of superalloys and, over the past four decades, Nb has been employed on an industrial scale.

  • In recent years, applications of niobium have increased steadily in various segments such as: micro-alloyed steels, super alloys, thin films, medical implants, titanium and aluminum alloys, superconductors and copper alloys, electrolytic and ceramic capacitors.

  • Approximately 90% of niobium is currently consumed as ferro-niobium. As such, the main drivers for niobium usage are the volume of steel manufactured, which is growing year on year, and intensity of use of niobium in steel, which is growing rapidly as the demand/need for higher quality steel increases, this is particularly so in China which has a strategy of using and producing higher quality steels and being compensated accordingly.

  • Niobium market is predicted to grow by Compound Average Growth Rate

  • (CAGR) of 5% between 2021 and 2026. Source: Mordor Intelligence “Niobium Market: Growth, Trends, COVID-19, Impact and Forecasts (2021 – 2026)”

==> picture [310 x 131] intentionally omitted <==

==> picture [300 x 131] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Resources
----- End of picture text -----

Mineral Resources:

Classification Tonnes (Mt) Nb2O5 (ppm) Contained
Nb2O5 (t)
Ta2O5 (ppm) Contained
Ta2O5 (t)
Measured 5.3 3,770 19,981 180 954
Indicated 47 2,860 134,420 135 6,345
Inferred 16 2,430 38,880 120 1,920
Total 68.3 2,830 193,281 135 9,219

Ore Reserve:

Reserve
Classification
Tonnes (Mt) Nb2O5 (ppm) Contained
Nb2O5 (t)
Ta2O5 (ppm) Contained
Ta2O5 (t)
Proved 5.3 3,680 19,504 171 906
Probable 28.5 2,930 83,505 136 3,876
Total 33.8 3,048 103,009 141 4,782

Refer Competent Person Information and Ore Reserve and Mineral Resource Estimate information at rear

==> picture [270 x 389] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Mine Development Agreement
----- End of picture text -----

  • The Project Mine Development Agreement (MDA) between the Malawi Government and Globe is presently in FINAL DRAFT and is expected to be executed soon.

  • The MDA sets out the terms upon which Globe is able to develop the Project, including terms not otherwise required through existing regulations.

  • In executing the MDA, the Malawi Government recognises that Globe has previously undertaken significant expenditure in exploration over the license area, and has complied with all license conditions, through technical, environmental, social and community programs, and undertaken rehabilitation of the relevant area without environmental or social detriment.

Key Terms of Final Draft DA:

  • ❖ 10% free carried interest to Malawi Government;

  • ❖ Malawi Government to receive 5% Gross Metal Royalty;

  • ❖ Stability : 10 year standstill on taxes to commence upon formal notice from Globe or first day of production;

  • ❖ Globe exempted from import duty and import excise and zero rated for VAT on imports of capital goods, consumables and services;

  • ❖ Project excluded from expropriation

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Community Development Agreement
----- End of picture text -----

  • Kanyika Community to receive a 0.45% Gross Metal Royalty from revenue at mine gate.

  • Royalty funds are to be directed to community programs as determined by Kanyika Community Development Committee.

  • Kanyika Community Development Committee to comprise representatives of Kanyika Community, the Mzimba District and Globe.

  • CDA required to be signed prior to operations commencement

==> picture [548 x 236] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Community Development Initiatives
----- End of picture text -----

Globe is committed to resourcing projects with high community need, i.e. those that would not be addressed without Globe and where Globe can make a significant difference

Globe’s objectives are effective outcomes, collaboration and sustainability

==> picture [558 x 280] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Kanyika Project Environmental Certification
----- End of picture text -----

  • The Project has received full environmental accreditation.

  • Globe is committed to protecting the environment and operating in a way that is consistent with this objective.

  • Globe aims to earn the confidence of our people, regulators and shareholders, as well as contribute to the communities in which we operate as good neighbours.

  • Globe’s approach to environmental management is based on the robust identification, assessment and management of risks (both threats and opportunities) across all phases of our activities, including development, Niobium market controlled by 3 producers,

  • operation and closure.

==> picture [271 x 362] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Feasibility Study Partners
----- End of picture text -----

The Company is satisfied that the project has undertaken studies and programs that are both relevant, recent and of sufficient quality to qualify the project to meet the criteria of a Feasibility Study and the Company has used;

  • Wood Engineering (previously named AMEC Foster Wheeler) undertook detailed engineering design for process plant and associated infrastructure while Coffey Mining undertook geotechnical studies and assessments of the project, and Oreology Mining Consultants undertook a detailed mine design and mine schedule,

  • GIRCU, a reputable specialist metallurgical consultant company in China with specific commodity experience for the development of a flotation regime and pilot plant for the recovery of pyrochlore, (with subsequent registration of an Intellectual Property Patent for flotation – but now superseded with optimised processing intellectual property),

  • Knight Piesold Consulting undertook studies for waste rock characterisation and tailings dam waste storage design, Jones and Wagner Consulting Civil Engineers for studies on hydrology and hydrogeology, and Knight Piesold Consulting outlined the costs and time for a conceptual mine closure plan, and the Company collected a bulk sample and pilot plant test work program to assess recovery regimes and flow sheet design under a continual process,

  • An EIA has been completed by Synergistics Environmental Services and the Company has Environmental Licences Certificates that enable it to proceed with access and construction of the site.

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Overview of Financial Projections
----- End of picture text -----

Feasibility Study highlights a robust project with strong economics:

  • 23-year mine life, plant operating at 1.5 Mtpa;

  • ability to extend mine life to 38 years by conversion of inferred resources through further drilling

IRR (before tax) of ~50%

Capital Investment of ~US$250 m

NPV (Before Tax) @8% = US$1.018b

  • estimated average annual production of 3,250 tonnes of niobium and 140 tonnes of tantalum

  • Recoveries of ~75% for niobium and ~73% for tantalum

Pre-tax NPV of US$1.018b (8% disc rate) :

  • Pre-production capital costs of ~US$250m

  • US$5.6B of revenue over 23-year mine life

Avg. Annual Production: Nb O 2 5 – 3,250 t/a Ta O 2 5 – 140 t/a

Annual Cash Flow = US$225 m

  • Pre-tax IRR ~50x%

  • Payback period ~1.5 years (from production commencing)

  • Key price assumptions:

  • US$55/kg for Nb2O5

  • US$410/kg for Ta2O5

Payback period = 1.5 years

==> picture [179 x 113] intentionally omitted <==

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Project Funding
----- End of picture text -----

  • Globe aims to debt-fund the majority of the Project construction cost

  • Globe has had preliminary discussions with a number of prospective financiers; with parties awaiting issue of mining licence to Globe. Now that the mining licence has been issued, work can begin in earnest.

  • Significant preliminary interest received from African development banks and financial institutions.

  • High potential for off-take partners to offer debt-funding options.

  • Newly appointed President of Global Sales and Marketing has ‘hit-the-ground’ running with market response being that it is genuinely excited about prospect of first new niobium mine in over 50 years.

  • Cash at bank at end of June 2021: $2.82 million

==> picture [960 x 540] intentionally omitted <==

----- Start of picture text -----

The Kanyika Project
Key Next Steps
• Execute Development Agreement
Tenure

Execute and deliver agreed programs in accordance with Community Development Agreement
Community

Complete sales and off-take agreements, and secure financing
Financing

Construct minesite plant and build refinery, commission plant and commence production
Construction

Operate safely, in accordance with environmental considerations, and efficiently

Position Globe’s niobium and tantalum products to maximise revenue opportunities
Operations • Build industry relationships
----- End of picture text -----

==> picture [148 x 54] intentionally omitted <==

E: [email protected]

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Competent Persons Statement
----- End of picture text -----

Mineral Resource Estimates:

– The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for ~~subsequent release~~ s by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The Company confirms that is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original ASX announcement.

– Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project Updated JORC Resource Estimate” is available to view at www.globemm.com

Ore Reserves:

– The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika Niobium Project Project Feasibility and Economics” released to the Australian Securities Exchange (ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent Person’s consent was obtained. The Competent Person’s consent remains in place for ~~subsequent release~~ s by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The Company confirms that is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 19 August 2021 and, in the case of estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.

– Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project Project Feasibility and Economics” is available to view at www.globemm.com