Globe Metals & Mining Limited ASX: GBE
ABN 33 114 400 609 +61 8 6118 7240
45 Ventnor Avenue [email protected]
West Perth WA 6005 globemm.com
----- End of picture text -----
ASX Announcement
16 March 2026
Investor Roadshow and Project Update
Globe Metals & Mining Limited (ASX: GBE) ( Globe or Company ) is pleased to announce an investor roadshow and project update.
The Company confirms that the updated Bankable Feasibility Study ( BFS ) for the Kanyika Niobium Project is in the final stages of preparation. The updated BFS incorporates refinements to engineering design, operating parameters and capital estimates and will provide the technical and economic foundation to support the Company’s financing strategy and progression toward development of the project.
The Company expects the updated BFS to be submitted to the ASX and released to shareholders by the end of March 2026.
As part of the Company’s ongoing investor engagement program, management recently held meetings with potential investors, strategic partners and industry participants across key global financial centres to advance financing, strategic partnership and potential offtake discussions for the Kanyika Niobium Project in Malawi.
The Company also participated in the Prospectors & Developers Association of Canada ( PDAC ) Convention in Toronto, where management hosted a booth and met with investors, industry participants, strategic partners and government representatives to discuss the development of the Kanyika Project.
Interest from market participants has been strong, reflecting the growing strategic importance of niobium and the need for diversified, conflict-free supply to support demand across advanced manufacturing, aerospace, electronics and defence industries, particularly amid rising geopolitical tensions and increasing defence and strategic technology requirements.
==> picture [111 x 32] intentionally omitted <==
This announcement was authorised for release by the Interim CEO & CFO, Charles Altshuler
For further information, please contact:
Charles Altshuler
Interim CEO & CFO
P: +61 8 6118 7240
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of Kasangu. The Project is secured by Large-Scale Mining Licence No. LML0216/21, which grants the Company security of tenure and the right to mine niobium, tantalum, deleterious uranium, Zircon, Hafnium, Praesidium and Neodymium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of mineralisation. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral Resource Estimate (refer below) and given rise to significant improvements and simplifications in the process flowsheet.
The Kanyika Project will be developed in two phases, substantially de-risking the project. The project will be fully integrated on the mine site – Mining, Concentration and Refining, to produce high-purity, high-value Niobium and Tantalum oxides for direct export to foreign markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2O5 lower cut Table 2: MRE for KNP using a 3,000 ppm Nb2O5 lower cut
| Category | Resource (Mt) |
Nb2O5 (ppm) | Ta2O5(ppm) | Category | Resource (Mt) |
Nb2O5 (ppm) | Ta2O5(ppm) | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Measured | 5.3 | 3,790 | 180 | Measured | 3.4 | 4,790 | 220 | |||
| Indicated | 47 | 2,860 | 135 | Indicated | 16.6 | 4,120 | 160 | |||
| Inferred | 16 | 2,430 | 120 | Inferred | 2.8 | 4,110 | 190 | |||
| TOTAL | 68.3 | 2,830 | 135 | TOTAL | 22.8 | 4,220 | 190 |
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2028 titled “Kanyika Niobium Project – Updated JORC Resource Estimate” avaialble to view at www.globemm.com.