ASX Announcement
20 November 2023
Appointment of Project Manager
Globe Metals & Mining Limited (ASX: GBE) (“ Globe ” or “ Company ”) is pleased to advise the appointment of Mr Louis Schoeman as Project Manager to assist Globe with the development of the Kanyika Niobium Project in Malawi.
Previously, Mr Schoeman spent over 6 years at Kumba Iron Ore, a division of Anglo American, where he rose to the posi�on of Senior Project Manager. In this role, he was part of the team that completed the successful Kolomela Iron Ore Mine in the Northern Cape province of South Africa
Before this, Mr Schoeman worked for 20 years at various construc�on and engineering companies in Africa and Australia where he held senior posi�ons across the petrochemical, mining, and industrial chemical processing sectors.
Mr Schoeman has a N. Dip (Mech Eng) from Vaal University of Technology (formerly Vaal Triangle College for Advanced Technical Educa�on) and has completed the Programme in Project Management from the University of Pretoria in South Africa.
his enthusiasm, sta�ng:
“We are pleased to welcome Louis to our growing team of industry experts, and his appointment comes at a pivotal time for Globe as it transitions to production. With his deep understanding of the challenges associated with the implementation of mining projects in Africa, Louis will play a vital role in advancing Globe’s shovel ready Kanyika Niobium Project in Malawi”.
Authorisation for Release
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant Hudson.
For further information, please contact:
Grant Hudson Charles Altshuler Chief Executive Officer Chief Financial Officer +61 8 6118 7240 +61 8 6118 7240 [email protected] [email protected]
==> picture [114 x 42] intentionally omitted <==
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of tenure and the right to mine niobium, tantalum, and deleterious uranium.
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned the pilot plant design work to demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies have improved recoveries from 62% in 2012 to 75% today, through novel patented metallurgical processes.
==> picture [422 x 308] intentionally omitted <==
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to ASX on 11 July 2018 as follows:
2
==> picture [114 x 42] intentionally omitted <==
Table 1: MRE for KNP using a 1,500 ppm Nb2O5 lower cut Table 2: MRE for KNP using a 3,000 ppm Nb2O5 lower cut
| Category | Resource (Mt) |
Nb2O5 (ppm) | Ta2O5(ppm) | Category | Resource (Mt) |
Nb2O5 (ppm) | Ta2O5(ppm) | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Measured | 5.3 | 3,790 | 180 | Measured | 3.4 | 4,790 | 220 | |||
| Indicated | 47 | 2,860 | 135 | Indicated | 16.6 | 4,120 | 160 | |||
| Inferred | 16 | 2,430 | 120 | Inferred | 2.8 | 4,110 | 190 | |||
| TOTAL | 68.3 | 2,830 | 135 | TOTAL | 22.8 | 4,220 | 190 |
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project – Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is withdrawn or replaced by a subsequent report and accompanying consent.
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC Resource Es�mate” available to view at www.globemm.com.