GLOBE METALS & MINING LIMITED AGM Information 2022

Nov 29, 2022

64965_rns_2022-11-29_7a3aa37a-95c1-4067-b813-ffa1bfa5e4e6.pdf

AGM Information

Open in viewer

Opens in your device viewer

==> picture [595 x 93] intentionally omitted <==

----- Start of picture text -----

ASX Announcement
----- End of picture text -----

30 November 2022

AGM Presentation

The 2022 Annual General Meeting ( AGM ) of Globe Metals & Mining Limited (ASX: GBE) ( Globe ) will be held today at 2:00pm (WST).

In accordance with ASX Listing Rule 3.13.3, a copy of the CEO’s presentation that will be delivered at the AGM is attached.

This announcement was authorised for release by the CEO of Globe.

-ends-

For further information, please contact:

Grant Hudson Paul Hardie Chief Executive Officer Company Secretary [email protected] [email protected]

Globe Metals & Mining Limited | 45 Ventnor Avenue, West Perth WA 6005 | PO Box 1811, West Perth WA 6872 | P: +61 6118 7240 | F: +61 8 6323 0418 www.globemm.com | Email: [email protected] | ABN 33 114 400 609 | ASX: GBE

==> picture [960 x 360] intentionally omitted <==

----- Start of picture text -----

Annual General Meeting
30 November 2022
----- End of picture text -----

Globe Metals & Mining Limited (ASX: GBE)

Disclaimer

==> picture [118 x 46] intentionally omitted <==

This Presentation is strictly confidential and any disclosure, use, copying and circulation of this Presentation is prohibited without the consent of Globe Metals & Mining Limited ABN 33 114 400 609 (Globe).

The information in this presentation is an overview and does not contain all information necessary for making investment decisions. In making investment decisions, investors should rely on their own examination of the Kanyika Niobium Project and consult their own legal, technical, business and/or financial advisers. The information contained in this presentation has been prepared in good faith by Globe, however no representation or warranty expressed or implied is made as to the accuracy, correctness, completeness or adequacy of any statements, estimates, options, or other information contained in this presentation. To the maximum extent permitted by law, Globe, its Directors, officers, employees and agents disclaim liability for any loss or damage which may be suffered by any person through the use of reliance on anything contained in or omitted from this presentation.

Certain information in this Presentation may refer to the intentions of Globe with respect to the Kanyika Niobium Project, but these are not intended to be forecasts, forward looking statements or statements about the future matters for the purposes of the Corporations Act or any other applicable law. The occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause Kanyika Niobium Project’s actual results, performance or achievements to be materially different from the results, performance or achievements implied by the forward-looking statements. Such factors include, but are not limited to, general economic, market and business conditions, market prices for niobium, demand for niobium, niobium supply, concluding of off-take agreements, obtaining of all necessary permits for development and production as and when required, estimation of resources and reserves, development and production costs, transportation delays and costs, risks and uncertainties related to construction and commissioning, delays in construction of the mining operation, accidents, equipment breakdowns, title matters, labour disputes or other unanticipated difficulties with, or interruptions in, development or production, exchange rate fluctuations, and risks and uncertainties associated with doing business in Malawi. In addition, there may be information herein that is information about prospective results of operations, financial position or cash flows and which is provided only to assist in an evaluation of the Kanyika Niobium Project outlined herein, but are not to be relied upon as accurate representations of future results and may not be appropriate for any other purpose.

This presentation may contain forward looking statements including statements regarding our intent, belief or current expectations with respect to Kanyika Niobium Project’s performance, market, political, social and environmental conditions, project configuration, construction and commissioning costs and timelines, and general risks and uncertainties. Readers are cautioned not to place undue reliance on these forward looking statements. While due care has been used in the preparation of forecast information, actual results may vary in a materially positive or negative manner. Forecasts and hypothetical examples are subject to uncertainty and contingencies often outside Globe’s control. The information in this presentation is current as at the date of the publication of this presentation.

ASX: GBE 2

==> picture [960 x 483] intentionally omitted <==

----- Start of picture text -----

Niobium is powering
the future. From safer,
fast-charge batteries to
stronger wind-towers,
niobium is a key part of
the green revolution.
----- End of picture text -----

ASX: GBE 3

Huge emerging demand for Nb in Li-on batteries Why is Niobium important for LIB development?

==> picture [118 x 46] intentionally omitted <==

==> picture [710 x 329] intentionally omitted <==

Niobium production has risen ~25% over the past 7 years, with major producer (CBMM) recently announcing a 4.5X increase in niobium oxide production capacity to cater for increasing demand from the electric vehicle battery sector.

ASX: GBE 4

Kanyika – a solution for supply-side risk

==> picture [118 x 46] intentionally omitted <==

Excessive dependence on single supplier countries makes Europe vulnerable

==> picture [792 x 411] intentionally omitted <==

----- Start of picture text -----

Kanyika
Niobium
Action Plan on Critical Raw Materials: European Commission Report 03.09.2020
----- End of picture text -----

ASX: GBE 5

Electric Vehicles and Niobium Presentation

==> picture [118 x 46] intentionally omitted <==

Can be found on the Globe website: https://static1.squarespace.com/static/5f1565cb8ca4c17a208027 4f/t/6360de48154c925b60c5bfce/1667292786305/Niobium+EV+ Battery+Deck+-+FINAL+%28Amended%29.pdf

ASX: GBE 6

Strategic Positioning

==> picture [118 x 46] intentionally omitted <==

  • Niobium oxide market gaining significant traction – est. possible value of $1.7Bn by early 2030’s

  • Globe to enter the niobium oxide/metals market as soon as possible

  • Will be the 2[nd] -vertically integrated producer in the world (after CBMM)

  • Will utilise environmentally-friendly technology

  • Will be regionally-diverse i.e. not located in Brazil or Asia

  • Malawi and Namibia are ‘conflict-free’ countries of origin

  • Will grow production capacity to match market growth

ASX: GBE 7

Status Quo

==> picture [57 x 57] intentionally omitted <==

Kanyika Niobium Project (KNP) is positioned to be the first niobium mine into production in more than fifty years and the first ever in Africa

==> picture [57 x 57] intentionally omitted <==

Long life project up to 38 years: JORC (2012) compliant Mineral Resource Estimate of 68 Mt with grade of 0.283% Nb2O5 (M+I+I) (Cut-Off Grade = 1,500 ppm Nb2O5); based on ~33km of drilling

==> picture [57 x 57] intentionally omitted <==

Fully permitted, advanced staged; Large-scale mining licence, all environmental and land approvals in place to immediately commence construction

==> picture [57 x 57] intentionally omitted <==

Strong relationships with community, local leaders and senior government officials, as well as industry operators

==> picture [118 x 46] intentionally omitted <==

==> picture [57 x 57] intentionally omitted <==

An ESG friendly and highly efficient processing facility – staged development planned; Globe will be the only vertically integrated NB-oxide producer outside the Americas

==> picture [57 x 57] intentionally omitted <==

Niobium is a critical mineral in high demand across multiple sectors; favourable market dynamics and macro tailwinds;

ASX: GBE 8

Phase One: Low-cost start-up operations

==> picture [118 x 46] intentionally omitted <==

Kanyika mine site: Phase One Pilot

> > > > > > Open pit mining: Crushing: Milling: Flotation: Drying: Concentrate: Sale and Drill and blast Primary jaw and EDS mill Single stage: Locally produced Contains trucking: Load and haul secondary cone Ball mill Rougher, scavenger biomass as fuel radioactive nuclides Bulk bags loaded and cleaners onto flat bed trucks

Namibia refinery: Phase One Pilot

==> picture [56 x 56] intentionally omitted <==

==> picture [381 x 57] intentionally omitted <==

----- Start of picture text -----


+
----- End of picture text -----

==> picture [56 x 56] intentionally omitted <==

==> picture [28 x 29] intentionally omitted <==

----- Start of picture text -----


----- End of picture text -----

==> picture [56 x 56] intentionally omitted <==

Salt (NaCl):

Electrolysis of salt to produce chlorine

Concentrate and chlorine gas:

Chlorine is recycled from oxidation and reduction

Chlorination reactor:

Metals converted to gaseous chlorides at high temperature

Selective cooling gives primary separation of metal chlorides

Distillation and purification:

Very high purity >99% achievable in batch distillation

High grade niobium (and other) metal oxides and powders:

Regenerated chlorine is recycled back to the chlorinator

ASX: GBE 9

Refinery

==> picture [118 x 46] intentionally omitted <==

  • Has received the most focus over the past 10 months

  • Hydrofluoric acid leach process problematic

  • Gas-phase chlorination identified as best solution

  • Well-known technology - standard process for the production of titanium and magnesium metals

  • Scalable

  • Eminently suitable for ore that contains a suite of potential products

  • Lower operating costs

  • Significantly improved ‘green’ credentials

  • Plant can be built within the region (Namibia)

  • Infrastructure, construction & operational skills readily available in South Africa and Namibia

ASX: GBE 10

Potential Product Suite

==> picture [515 x 426] intentionally omitted <==

----- Start of picture text -----

Strong relationships with
community, local leaders and
senior government officials, as well
as industry operators
----- End of picture text -----

==> picture [57 x 57] intentionally omitted <==

==> picture [118 x 46] intentionally omitted <==

ASX: GBE 11

==> picture [960 x 131] intentionally omitted <==

----- Start of picture text -----

Namibia Site Location
----- End of picture text -----

==> picture [666 x 368] intentionally omitted <==

ASX: GBE 12 12

Phase One: Work to be done: Q4 2022 – Q3 2023

==> picture [118 x 46] intentionally omitted <==

  • TCM-Research/Resonant

  • Metallurgical laboratory-scale processing

  • Engineering & technical drawings for new refinery

  • Namibia site location – EIA etc.

  • MDA outstanding – negotiations complete awaiting document sign-off

from Attorney-General

ASX: GBE 13

Near-term value drivers

==> picture [118 x 46] intentionally omitted <==

2023

  • 2022 2023

  • Complete Commence Complete Design review of Complete Complete Commence Phase One mine-site sample advanced sample engineering Namibia EIA engineering and Phase One concentrator preparation test-work programs • Complete all cost estimation project and refinery for advanced • Milling through • Flow sheets other Namibian programs • Purchase engineering • Engineeringcontracts signed • engineeringtest-work Commence • EDS millGravity volumereduction •• Hazop studiesLayouts • regulatoryrequirementsComplete • Commencecapital raise forPhase One mine • miningequipmentMine site • MDA Phase Oneengineering Produce concentrate • Equipmentselection provisionuranium offtake and refinerypilot plants • developmentEPC contracts • programsComplete • Flotation • Complete CDAswith ‘qualified • agreementProduce • Commencerelocation of for concentratorand refinery Namibia siteselection and • Chlorination communities’ saleable Nb2O5 Project AffectedPersons • Exercise option commence EIA • Oxide sample sample for on refinery site production customer validation

  • • Update engineering design parameters

==> picture [93 x 13] intentionally omitted <==

----- Start of picture text -----

November
----- End of picture text -----

December

June August September

October December

ASX: GBE 14

==> picture [960 x 368] intentionally omitted <==

----- Start of picture text -----

ASX: GBE globemm.com
45 Ventnor Avenue
West Perth
Western Australia 6005
P: +61 (8) 6118 7240
Grant Hudson Michael Fry
Chief Executive Officer Chief Financial Officer
E: [email protected] E: [email protected]
M: +27 82 924 8452 M: 0417 996 454
----- End of picture text -----

ASX: GBE 15

Competent Persons Statement

==> picture [118 x 46] intentionally omitted <==

Mineral resource estimates:

The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The Company confirms that is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original ASX announcement.

Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project – Updated JORC Resource Estimate” is available to view at www.globemm.com

Ore reserves:

The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika Niobium Project – Project Feasibility and Economics” released to the Australian Securities Exchange (ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent Person’s consent was obtained. The Competent Person’s consent remains in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

The Company confirms that is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 19 August 2021 and, in the case of estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.

Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics” is available to view at www.globemm.com

ASX: GBE 16