Monax Mining Ltd SACOME Breakfast Presentation August 21 2014 Gary Ferris Managing Director

==> picture [715 x 224] intentionally omitted <==

==> picture [706 x 181] intentionally omitted <==

2

Profile

Vision: To move from explorer to producer via organic growth of current and acquired Cu-Au, Ni-Cu and Pb-Zn projects within South Australia.

Strategy: To concentrate on the identification of world-class exploration assets of IOCG, magmatic nickel-copper and leadzinc projects, thereby attracting developmental funding through JVs with major commodity houses.

Capital Structure

Ordinary Shares on Issue 214,072,318
Listed Options 21,407,394
Share price (as at 20/08/14) $0.018
Market Capitalisation $3.85M
Cash (as at 31/07/2014) $2.1M
Enterprise Value $1.7M

==> picture [250 x 172] intentionally omitted <==

----- Start of picture text -----

Antofagasta
7.99%
Other
Shareholders
85.9%
Board &
Management
6.1%
----- End of picture text -----

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 58] intentionally omitted <==

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 58] intentionally omitted <==

3

Key Projects

Parndana Project (100% Monax)

Significant target identified from gravity and induced polarisation surveys.

Drilling commenced late July.

Punt Hill Project

(Monax 49%; Antofagasta 51%) > Detailed gravity survey completed.

Fully funded by Chilean major Antofagasta.

Drilling planned for September.

Millers Creek Designated Project

IOCG target outlined by detailed gravity and magnetic surveys. > Fully funded by Antofagasta.

Drilling planned for September.

==> picture [276 x 57] intentionally omitted <==

==> picture [276 x 57] intentionally omitted <==

==> picture [104 x 243] intentionally omitted <==

4

==> picture [225 x 48] intentionally omitted <==

----- Start of picture text -----

Base Metals
----- End of picture text -----

5

Parndana Project – Drilling commenced late July

Base Metals > Bonaventura Prospect

  • Previous drilling has reported high-grade intersections ranging in thickness from 2-30m downhole with maximum values of:

Discover 3D Model

Zinc (red) and Lead (green) high-grade shoots from previous drilling at Bonaventura prospect.

  • 26.9% Zn

  • 9.4% Pb

  • 8.3 g/t Ag

> Best drill hole intersections are:

  • 5m @ 26.9% Zn & 1% Pb (Havilah)

  • 5m @ 5.8% Zn (PIRSA)

  • 10m @ 3.22% Zn & 1.62% Pb (Monax)

  • Gravity and IP surveys now completed with prominent gravity and chargeable anomaly outlined.

The information on this slide was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

6

==> picture [253 x 357] intentionally omitted <==

----- Start of picture text -----

Micro-gravity
data
----- End of picture text -----

==> picture [222 x 218] intentionally omitted <==

----- Start of picture text -----

6,049,000 mN6,049,000 mN6,049,000 mN6,049,000 mN # #
#
#
6,048,000 mN6,048,000 mN6,048,000 mN6,048,000 mN # #
#
6,047,000 mN6,047,000 mN6,047,000 mN6,047,000 mN # # # #
#
#
# #
6,046,000 mN6,046,000 mN6,046,000 mN6,046,000 mN # # # #
6,045,000 mN6,045,000 mN6,045,000 mN6,045,000 mN # # # # #
#
0 1
10,35010,35010,35010,35010,45010,45010,45010,450 10,55010,55010,55010,55010,65010,65010,65010,650 6800e
7150e
7500e7
5400e
701,000 mE701,000 mE701,000 mE701,000 mE 702,000 mE702,000 mE702,000 mE702,000 mE 703,000 mE703,000 mE703,000 mE703,000 mE 704,000 mE704,000 mE704,000 mE704,000 mE 705,000 mE705,000 mE705,000 mE705,000 mE 706,000 mE706,000 mE706,000 mE706,000 mE
----- End of picture text -----

==> picture [426 x 510] intentionally omitted <==

Stacked model display of combined receiver dipole (100m & 200m) chargeability.

==> picture [110 x 3] intentionally omitted <==

----- Start of picture text -----

kilometres
----- End of picture text -----

7

==> picture [225 x 48] intentionally omitted <==

----- Start of picture text -----

Copper/Gold
----- End of picture text -----

8

Punt Hill Project

  • Located within Olympic Iron-Oxide CopperGold (“IOCG”) Province in South Australia.

Province hosts major copper deposits at Olympic Dam, Prominent Hill, Carrapateena and Hillside.

Premier IOCG province in Australia which attracts large multi-national companies (BHP Billiton, Antofagasta and Vale) and is tightly held.

  • Importance of the Olympic IOCG Province highlighted by the three discoveries within last decade.

  • Monax signed a significant Farm-In Agreement with a wholly owned subsidiary of Chilean major, Antofagasta plc, on 31 August 2010.

The information on this slide was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. Drill hole reported, down hole length, true width unknown.

==> picture [286 x 451] intentionally omitted <==

9

Punt Hill Project – Drilling to commence September

Farm-In Agreement with Antofagasta plc, Antofagasta has earned 51% interest in the Punt Hill Project (Phase 1).

Antofagasta has an option to fund a further US$5 million on exploration to earn an additional 19% interest in the project (70% total interest) (Phase 2).

Monax has identified further targets for drilling, which is planned to commence in September after completion of heritage survey.

10

==> picture [234 x 53] intentionally omitted <==

----- Start of picture text -----

Strategic
----- End of picture text -----

11

Monax Antofagasta Strategic Alliance

Strategic Alliance announced in August 2011 with a wholly owned subsidiary of Antofagasta plc.

Antofagasta committed US$1 million over two years for copper project generation within South Australia.

Antofagasta has approved third year of funding up to $US400,000.

==> picture [110 x 69] intentionally omitted <==

==> picture [123 x 51] intentionally omitted <==

One current Alliance Project area Musgrave Province – four Applications.

Antofagasta to fund “Designated Projects” – US$4 million over three years to earn 70% interest per project.

One Designated Project – Millers Creek.

12

13

==> picture [87 x 18] intentionally omitted <==

==> picture [87 x 19] intentionally omitted <==

==> picture [87 x 19] intentionally omitted <==

==> picture [87 x 18] intentionally omitted <==

==> picture [87 x 19] intentionally omitted <==

==> picture [87 x 19] intentionally omitted <==

==> picture [87 x 18] intentionally omitted <==

Millers Creek Designated Project

  • New project focused on under-explored area between Olympic Dam and Prominent Hill in northern South Australia.

  • Detailed gravity and heli-borne magnetic surveys outlined potential IOCG target at Oliffes Dam.

  • Heritage survey completed; area cleared for drilling.

  • Monax finalising access/farm-in agreement with Maximus Resources and plan to commence drilling mid September.

  • Exploration fully funded by Antofagasta.

Background RTP Magnetic Image, further processed with a high pass filter, highlighting shorter wavelength features. 2013 WPA survey merged with open file gravity data with old pre 1970 data deleted. 5gu/0.5 Mgal contours.

==> picture [351 x 351] intentionally omitted <==

----- Start of picture text -----

.
----- End of picture text -----

14

==> picture [235 x 172] intentionally omitted <==

----- Start of picture text -----

Phar Lap IOCG
(MOX 100%)
WGC (Ni-Cu)
----- End of picture text -----

15

Phar Lap Project Bouger Gravity (first vertical derivative) showing the two IOCG-style targets.

Other Project Areas > Phar Lap IOCG

  • Located in the western margin of the Mt Woods Inlier–50km west of Prominent Hill.

  • Two IOCG targets identified by geophysical review.

> Target – PLDD002

  • Prominent Hill ‘setting’ | Carrapateena ‘size‘

  • Geophysical anomaly comparable to Carrapateena in size and amplitude.

  • Recently signed MOU with Antofagasta which covers early exploration including heritage and gravity surveys.

  • Based on results from the detailed gravity survey a decision to drill will be made.

==> picture [80 x 75] intentionally omitted <==

16

Other Project Areas > WGC (Ni-Cu)

Highly prospective 2,046km[2] tenement holding in the Fowler Domain ~150km west of Ceduna on SA’s West Coast.

Ni-Cu mineralisation target

  • (eg. Thompson Ni-Belt).

Comparable tectonic setting to Albany Fraser Belt in Western Australia which hosts the Nova Ni-Cu Deposit.

Potential for other styles of mineralisation (i.e. shear hosted gold like Tropicana). Area significantly unexplored.

  • Monax planning detailed magnetic survey over prominent basement target.

==> picture [344 x 450] intentionally omitted <==

17

Monax - Active, near term exploration and drilling programs planned.

Project Sub-project July August September October November December
Kangaroo
Island
Parndana Drilling
Punt Hill Clearance Drilling
Strategic
Alliance
Millers Creek Clearance Drilling
General General Geology
(Project Generation)
Phar Lap Clearance Geophysics ?Drilling
WGC ?Geophysics

Monax - Active, near term exploration and drilling programs planned

18

ALGEBUCKINA Antofagasta 51%/Monax 49%

19

  • › Active exploration and drilling programs commenced.

  • Parndana Project – Commenced drilling

  • Punt Hill – Drilling to commence September

  • Millers Creek – Drilling planned to commence mid-September

  • Phar Lap – Gravity to commence soon

  • › Supported by major Chilean copper producer Antofagasta:

  • › Punt Hill

  • › Strategic Alliance

  • › Designated Project(s)

==> picture [294 x 371] intentionally omitted <==

20

==> picture [228 x 144] intentionally omitted <==

----- Start of picture text -----

Gary Ferris
Managing Director
P (08) 8245 4900
M 0423 259 488
E [email protected]
----- End of picture text -----

21