Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

FireFly Metals Ltd. Interim / Quarterly Report 2009

Apr 29, 2009

48548_rns_2009-04-29_09bb3b60-d0d4-4689-917b-f10139e4b144.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

Exploration Office Warehouse I, 5 Butler Blvd Burbridge Business Park Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950

ABN: 96 110 336 733

Tel: +61 8 8375 3900 Fax: +61 8 8375 3999 www.monaxmining.com.au

==> picture [595 x 10] intentionally omitted <==

For immediate release 30 April 2009

Monax Mining Limited

Quarterly Report For the period ending 31 March 2009

HIGHLIGHTS

  • Joint Venture partner Marmota Energy Limited achieves first 25% earn in across all commodities on the Ambrosia tenement

  • Drilling to commence on Ambrosia IOCGU targets

  • Drilling commenced on palaeochannel uranium targets on the Mulyungarie tenement

  • Geochemical and biogeochemical sampling on Kangaroo Island tenements shows good correlation with gold and base metal mineralisation

Ambrosia Project

(Monax Mining Ltd 75%, Marmota Energy Limited 25%, earning 50%)

The Ambrosia Project EL 3358) covers an area of 854 km[2] approximately 100km northwest of Tarcoola in the north of South Australia. The area is considered by Monax to be prospective for Iron Oxide Copper Gold (IOCG) and palaeochannel roll-front uranium styles of mineralisation.

==> picture [253 x 175] intentionally omitted <==

Quarterly report for the period ending March 31 2009

~ 1 ~

Exploration Office Warehouse I, 5 Butler Blvd Burbridge Business Park Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950

ABN: 96 110 336 733

Tel: +61 8 8375 3900 Fax: +61 8 8375 3999 www.monaxmining.com.au

==> picture [595 x 10] intentionally omitted <==

Under a Joint Venture agreement with Monax, Marmota Energy is earning 50% equity across all commodities for an exploration expenditure of $2,000,000. Marmota has currently achieved a 25% interest after reaching a total spend of $1,000,000 during the quarter.

High resolution magnetic, radiometric, airborne electromagnetic, geochemical and gravity surveys have been completed and have been used to define a number of palaeochannel uranium and discrete conductive basement IOCG targets.

An initial phase of drilling targeting uranium in palaeochannels confirmed the presence of the correct geological conditions for the formation of roll-front style mineralisation along with the presence of anomalous uranium in some drill holes. Both Companies are encouraged by the results and have planned further drilling to follow up the initial results.

A further drill program will be undertaken in late April to test a number of discrete basement IOCG targets. The targets are interpreted to be at shallow depth and have been defined by a combination of gravity, magnetic and discrete electromagnetic anomalism.

Mulyungarie

(Monax Mining 100%, Marmota Energy earning 70% of uranium rights only)

Marmota Energy has undertaken a 24 hole drilling program on the Mulyungarie (EL 3910) project to test for shallow palaeochannel hosted rollfront uranium. The project is located 18 km south east of the Honeymoon uranium mine and 50 km west of Broken Hill and is located close to good road and rail infrastructure.

The drilling primarily targeted the Eyre Formation which hosts the nearby Honeymoon uranium mine but is also investigating the potential of the Namba Formation which hosts the uranium mineralisation at the Beverly uranium mine.

==> picture [283 x 26] intentionally omitted <==

==> picture [283 x 26] intentionally omitted <==

==> picture [283 x 25] intentionally omitted <==

==> picture [283 x 26] intentionally omitted <==

==> picture [283 x 26] intentionally omitted <==

==> picture [283 x 26] intentionally omitted <==

==> picture [283 x 25] intentionally omitted <==

==> picture [283 x 26] intentionally omitted <==

High resolution geophysical data has been used to define extensions of the Yarramba Palaeochannel which extend onto the Mulyungarie tenement.

Initial results from the drilling have confirmed the presence of the uranium prospective Eyre and Namba Formations within the tenement.

Quarterly report for the period ending March 31 2009

~ 2 ~

Exploration Office Warehouse I, 5 Butler Blvd Burbridge Business Park Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950

ABN: 96 110 336 733

Tel: +61 8 8375 3900 Fax: +61 8 8375 3999 www.monaxmining.com.au

==> picture [595 x 10] intentionally omitted <==

Parndana/Western River/Pioneer Bend

Bonaventura Zinc-Lead Prospect

Monax Mining Limited has now received all results from its diamond drilling program at its Bonaventura Prospect on Kangaroo Island. The program was designed to test the extent of high grade zinc and lead mineralisation intersected in previous drilling at the prospect. Monax is aiming to define a near surface high grade economic resource.

Eight diamond holes were drilled into the structure in an attempt to extend the zone of previously identified high grade mineralisation.

==> picture [260 x 151] intentionally omitted <==

Diamond drilling was mainly designed to test the depth extensions of high grade zinc and lead mineralisation. In addition, the program tested potential extensions of the mineralisation along several structures recently revealed by a program of mapping, trenching and surface sampling. All eight holes intersected sulphide intervals, which were present down to depths of 230 m. Drill results from the diamond drilling campaign, have now been received. Interpretation and construction of a 3D model and a resource evaluation is under way.

Bonaventura Biogeochemical Sampling

Twenty four samples were collected in March 2008 to assess the use of vegetation sampling through cover on Kangaroo Island. The method was tested at Bonaventura Prospect across known mineralisation.

The recently received results showed a strong response from silver in Grass Tree (yakka) leaves across the top of the mineralisation.

To confirm the effectiveness of this method of exploration a further 50 samples have been collected and will be submitted for analysis. If further confirmation of the effectiveness of the technique is received, then a regional program to cover the large areas of the Kangaroo Island leases, which are under cover and currently unexplored, is planned.

Kohinoor and Mt Brown (Rainbow’s End) Prospects Soil Sampling

As part of an ongoing program, 191 hand auger soil samples were collected from around the Kohinoor and Mt Brown Prospects (Figures 1 and 2).

Quarterly report for the period ending March 31 2009

~ 3 ~

Exploration Office Warehouse I, 5 Butler Blvd Burbridge Business Park Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950

ABN: 96 110 336 733

Tel: +61 8 8375 3900 Fax: +61 8 8375 3999 www.monaxmining.com.au

==> picture [595 x 10] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 19] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

The object of this program was to follow outcropping gold mineralisation below surface and identify repeats of the known mineralisation, if present. Further sampling is planned to extend coverage at these prospects.

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [325 x 18] intentionally omitted <==

==> picture [328 x 18] intentionally omitted <==

==> picture [328 x 17] intentionally omitted <==

==> picture [328 x 18] intentionally omitted <==

Michael Schwarz Managing Director Monax Mining Limited

==> picture [328 x 17] intentionally omitted <==

==> picture [328 x 18] intentionally omitted <==

==> picture [328 x 17] intentionally omitted <==

==> picture [328 x 18] intentionally omitted <==

==> picture [328 x 17] intentionally omitted <==

For further information please contact:

==> picture [328 x 18] intentionally omitted <==

==> picture [328 x 17] intentionally omitted <==

==> picture [328 x 18] intentionally omitted <==

Michael Schwarz, Managing Director, Monax Mining Ph: (08) 8375 3900 Email: [email protected]

‘The information in the Annual Report that relates to Exploration Results, Mineral Resources, Ore Reserves or targets is based on information compiled by Mr M P Schwarz, who is a Member of the Australian Institute of Geoscientists. Mr Schwarz is employed full time by the Company as Managing Director and, has a minimum of five years relevant experience in the style of mineralisation and type of deposit under consideration and qualifies as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” Mr Schwarz consents to the inclusion of the information in this report in the form and context in which it appears.’

Quarterly report for the period ending March 31 2009

~ 4 ~

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity

Name of entity
Monax Mining Limited
ABN
96 110 336 733
Consolidated statement of cash flows
31 March 2009
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration and evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material) )
Grant Income
GST
Other
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(9.months)
$A’000
-
(219)
-
-
(155)
-
20
-
-
-
3
-
-
(1,372)
-
-
(517)
-
122
-
-
75
42
-
(351) (1,650)
Cash flows related to investing activities
1.8
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material)
Payments relating to the sale of subsidiary
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
-
-
-
-
-
-
-
6
-
-
-
(18)
-
-
-
(69)
63
-
6 (24)
(345) (1,674)
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

1.13
Total operating and investing cash flows
(brought forward)
(345) (1,674)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
Payments relating to issue of shares / options
Net financing cash flows
-
-
-
-
-
-
400
-
-
-
-
(8)
- 392
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end of quarter
(345)
1,704
-
(1,282)
2,641
-
1,359 1,359

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
119
-
1.25 Explanation necessaryfor an understandingof the transactions
The amount at 1.23 above represents non executive directors’ fees and executive director’s salary
(including SGC superannuation) and legal fees paid to a legal firm in which a director is a partner.
The amount at 1.24 above represents contribution to the setup costs of a 50% owned associate
company which provides management services, shared resources and logistics to the entity from 1
July2008.

Non-cash financing and investing activities

2.1
2.2
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
Details of outlays made by other entities to establish or increase their share in projects in which the
reportingentityhas an interest
Marmota Energy Limited pursuant to the Farm-In and Joint Venture Agreements for EL 3358, EL
3355, EL 3356, EL 3359, EL 3458, EL 3561, EL 3684, EL 3685, EL 3357, and EL 3775 has
incurred on an accruals basis$137,384 in thequarter ending31 March 2009.
  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000

Amount used
$A’000
Nil
Nil
Nil
Nil

Note:

Estimated cash outflows for next quarter

Estimated cash outflows for next quarter
4.1
Exploration and evaluation
4.2
Development
$A’000
150
-
Total 150

Reconciliation of cash

Reconciliation of cash Reconciliation of cash
Reconciliation of cash at the end of the quarter (as Current quarter Previous quarter
shown in the consolidated statement of cash flows) to $A’000 $A’000
the related items in the accounts is as follows.
5.1 Cash on hand and at bank 56 186
5.2 Deposits at call 1,300 1,515
5.3 Bank overdraft
- -
5.4 Other (provide details) – IPO Trust Account 3 3
Total: cash at end of quarter(item 1.22) 1,359 1,704
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Changes in interests in mining tenements

6.1
Interests in mining
tenements
relinquished, reduced
or lapsed
6.2
Interests in mining
tenements acquired
or increased.
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest
at end of
quarter
EL 3358 Pursuant to the Ambrosia Farm-in
and Joint Venture Agreement,
Marmota Energy Limited has
acquired rights to 25% of all minerals
and entered into a joint venture
arrangement with Monax Mining
Limited to explore for minerals on
this tenement.
100% 75%
N/A

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital,buy-backs
70,647,057 70,647,057
7.5
+Convertible
debt securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured,
converted
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

7.7
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
7.10
Expired during
quarter
2,500,000
2,500,000
750,000
450,000
365,000
260,000
Nil Exercise Price
$0.30
$0.40
$0.26
$0.666
$0.246
$0.0517
Expiry Date
30/06/2009
31/12/2010
12/04/2011
14/02/2012
18/07/2013
23/12/2013
7.11
Debentures
(totals only)
7.12
Unsecured notes
(totals only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does ~~/does not*~~ (delete one) give a true and fair view of the matters disclosed.

Print name: Virginia Suttell.................................. Date: ....30/04/2009........................ ~~(Director~~ /Company Secretary)

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001

Appendix 5B Mining exploration entity quarterly report

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 6

30/9/2001