AI assistant
FAR LIMITED — Investor Presentation 2016
Aug 31, 2016
64899_rns_2016-08-31_81a28625-efd9-47fe-bb2c-20e642b2aa38.pdf
Investor Presentation
Open in viewerOpens in your device viewer
Breaking through towards future SNE development
FAR Ltd September 2016
==> picture [148 x 64] intentionally omitted <==
About FAR
-
Leading Africa focussed oil company with high potential exploration, pre-appraisal and appraisal assets
-
Sixth largest independent exploration & production company listed on the Australian Securities Exchange
-
Basin opening FAN-1 and SNE-1 oil discoveries offshore Senegal in 2014
-
SNE ranked as the world’s No. 1 discovery in 2014 by IHS
-
RISC audited SNE field 2C contingent recoverable oil resource 641 mmbbls (gross) with further upside
-
A robust balance sheet (no debt), experienced board and management team with strong relationships in Africa
-
Awarded 2016 ‘Breakthrough Company of the Year’ by the Oil and Gas Council, Africa
| ASX Ticker | FAR |
|---|---|
| Share price* | A$0.073 |
| Cash* | A$66.3m |
| Issued shares | 4.46bn |
| Market capitalisation | A$326M |
| Average broker rating / target | Buy, A$0.15 |
- *Share price as at 31 August 2016. Cash balance as at 30 June 2016
Share Register
==> picture [83 x 130] intentionally omitted <==
==> picture [11 x 11] intentionally omitted <==
==> picture [101 x 110] intentionally omitted <==
----- Start of picture text -----
Retail 46%
Institutional 24%
High Net Worth 22%
Investment bank 5%
Management 3%
----- End of picture text -----
As at July 2016
2
FAR in Senegal
-
Senegal is a peaceful democracy with a stable outlook (S&P sovereign credit rating B+/B)
-
FAR has been in Senegal since 2006
-
Farmed down to Cairn Energy and ConocoPhillips for US$196m in forward carry
-
Drilled FAN-1 and SNE-1 in 2014
-
6 highly successful exploration and appraisal wells now drilled
-
Progressing towards development of SNE with first production targeted from 2022
-
Cairn Energy (operator) NPV of US$12.75/bbl and unlevered IRR of 38% at project FID and assuming US$70/bbl oil price*
-
PSC partners: Cairn Energy (Operator) 40%, ConocoPhillips 35%, FAR 15%, Petrosen 10%
==> picture [80 x 81] intentionally omitted <==
OFFSHORE SENEGAL PSC
FAR 16.7% paying interest, 15% beneficial interest Operator: Cairn Energy PLC
==> picture [335 x 358] intentionally omitted <==
*Source: Cairn Energy estimates (Cairn Energy Half Yearly Result 16/08/2016)
3
Regional oil and gas discoveries
2013 – No deep water drilling offshore Senegal
==> picture [334 x 333] intentionally omitted <==
2016 – Offshore oil and gas discoveries
==> picture [334 x 333] intentionally omitted <==
The basin opening FAN-1 and SNE-1 oil discoveries have made Senegal one of the world’s most attractive locations for exploration. Major gas discoveries have also recently been made north of FAR in Senegal and Mauritanian waters
4
Senegal schematic section
==> picture [80 x 81] intentionally omitted <==
==> picture [140 x 10] intentionally omitted <==
----- Start of picture text -----
SNE-1 oil discovery (Nov 2014)
----- End of picture text -----
-
Oil gravity 32 degrees API
-
Gross oil column 96m
-
• Gross oil-bearing interval of > 500m
-
• FAR gross contingent No water-bearing sands intersected recoverable resource[*] P90 (1C): 348 mmbbls, P50 (2C): 641 mmbbls, P10 (3C): 1128 mmbbls
-
Excellent reservoir
FAN-1 oil discovery (Oct 2014)
==> picture [144 x 11] intentionally omitted <==
----- Start of picture text -----
Oil gravity 28-41 degrees API
----- End of picture text -----
-
Gross oil bearing interval >500m
-
Operator gross oil (STOIIP) in place[*] P90: 250 mmbbls, P50: 950 mmbbls, P10: 2,500 mmbbls
-
Proved prolific source and de-risked future shelf drilling
==> picture [127 x 30] intentionally omitted <==
----- Start of picture text -----
Shelf Edge play
----- End of picture text -----
Fan play
5
*Reference FAR ASX releases dated 13 Apr 2015 and 23 August 2016, best estimate, gross resources, 100% basis, oil only
SNE field outline and well locations
==> picture [80 x 81] intentionally omitted <==
~9km
~5km
Each SNE well has confirmed:
-
~100m gross oil column
-
High quality 32⁰ API oil
-
Presence and
correlation of principle reservoir units
SNE field
area >350 km²
6
SNE 2015/16 appraisal program
==> picture [80 x 81] intentionally omitted <==
Progress of the appraisal drilling to date
-
Size of oil pool ✔
-
Test reservoir
-
properties and deliverability from logging, coring and testing ✔
Future activity
• Measure field connectivity , particularly upper units to help fine tune development concept
==> picture [514 x 350] intentionally omitted <==
----- Start of picture text -----
●
----- End of picture text -----
7
SNE resource growth
==> picture [148 x 257] intentionally omitted <==
==> picture [159 x 257] intentionally omitted <==
==> picture [185 x 257] intentionally omitted <==
==> picture [80 x 81] intentionally omitted <==
==> picture [189 x 257] intentionally omitted <==
Pre-Drill Post discovery RISC audited Latest RISC audited (Oct 2014) (Nov 2014) (April 2016) (August 2016) P90 : 50mmbbls 1C: 150 mmbbls 1C: 277 mmbbls 1C: 348 mmbbls P50 : 154 mmbbls 2C: 330 mmbbls 2C: 561 mmbbls 2C: 641 mmbbls P10 : 350 mmbbls 3C: 670 mmbbls 3C: 1071 mmbbls 3C: 1128 mmbbls
*Reference FAR ASX releases dated 23 August 2016, 13 April 2016, 20 Nov 2014: unrisked contingent resources, 100% basis, oil only RISC is an independent technical expert that reviewed and modified a probabilistic resource evaluation carried out by FAR in accordance with industry standard SPE-PRMS definitions
8
==> picture [80 x 81] intentionally omitted <==
SNE-2 and SNE-3 flow test results
Confirmed reservoir quality and ability to flow at commercial rates
==> picture [293 x 164] intentionally omitted <==
----- Start of picture text -----
SNE-2 flow test
----- End of picture text -----
SNE-2 lower and upper reservoirs units
-
Gross 12m: 8,000 bopd through 3/4“ choke (stabilised constrained flow)
-
Gross 15m: 1,000 bopd through 3/8“ choke (unstabilised)
==> picture [309 x 202] intentionally omitted <==
----- Start of picture text -----
3
----- End of picture text -----
- Flowed higher than estimates
SNE-3 tested upper reservoir units
-
Gross 15m: 5,400 bopd / 4,000 bopd through a 7/8“ choke (stabilised)
-
Gross 20.5m zone: 4,500 bopd co-mingled through a 7/8“ choke (stabilised)
-
Flow higher than estimated and confirmed the field is larger to the south
9
==> picture [80 x 81] intentionally omitted <==
Future Senegal drilling program
New Senegal drilling program to commence late 2016
==> picture [410 x 309] intentionally omitted <==
----- Start of picture text -----
SNE-3 flow test
----- End of picture text -----
-
New drilling program based on two firm wells plus options*
-
FAR is fully funded through the proposed firm well program
Drilling program objectives:
-
Improving SNE project definition in terms of scale
-
Confirm volumes, connectivity and productivity:
-
Interference program between wells
-
Evaluate reservoirs not tested to
date
*Cairn Energy Half Yearly Result 16/08/2016
10
==> picture [80 x 81] intentionally omitted <==
Capturing more shelf edge exposure
==> picture [370 x 379] intentionally omitted <==
-
Undrilled exploration prospects with >1bn bbls (unrisked) potential
-
New joint venture 2015 3D seismic shot along trend from SNE
-
New FAR Djiffere 3D seismic earned FAR option over 75% W.I.
-
Preliminary processed seismic products now at hand and final products arriving Q3
*Reference FAR ASX release dated 24 September 2015 and 4 January 2016
11
SNE maturity classification (SPE-PRMS)
SNE project classified by FAR as Development Pending
Planning is now underway to determine the optimum SNE development scenario: Currently in pre-FEED stage (concept select) * Project to deliver cost reductions (25% lower development well costs from prior operator estimates*)
==> picture [458 x 321] intentionally omitted <==
==> picture [90 x 47] intentionally omitted <==
Categorisation
Source: Society of Petroleum Engineers, Petroleum Resource Management System
*Cairn Energy Half Yearly Result 16/08/2016
12
==> picture [80 x 81] intentionally omitted <==
SNE development and tie back concept
- SNE development project expected to benefit from:
==> picture [427 x 313] intentionally omitted <==
-
Project optimisation
-
Cost deflation
-
Standardisation
-
Standalone FPSO: with expansion capability for satellite tie-backs
-
Plateau production: rate expected to be 140,000 bopd (based on FAR’s 2C contingent resource and other assumptions)
-
Development expenditure: Based on US$12- US$15/bbl* (previous US$17-US$26/bbl)
-
Operating expenditure: Preliminary analysis of <US$10/bbl* (previous US$5-US$15/bbl)
Reference FAR ASX release dated 24 September 2015 and 4 January 2016 *Cairn Energy Half Yearly Result 16/08/2016
13
O erator economic develo ment scenario p p
SNE stand alone development (based on Cairn 2C 473 mmbbls)
==> picture [80 x 81] intentionally omitted <==
==> picture [696 x 379] intentionally omitted <==
----- Start of picture text -----
Prior Cairn Energy
----- End of picture text -----
Source: Cairn Energy estimates (refer Cairn Energy Half Yearly Result 16/08/2016 and Cairn Energy Capital Markets Day presentation 11/05/2015)
14
FAR value adding activity
-
FAR’s 2C contingent recoverable SNE resource estimate upgraded by 14% to 641 mmbbls*
-
Joint Venture pre-FEED studies initiated for an SNE field anchor development with scope for phasing
-
FAR statement on SNE commerciality
-
Update on FAR’s prospective exploration resources offshore Senegal, including Djiffere
-
Drilling and evaluation operations to resume offshore Senegal from late 2016
-
Preparing for Senegal PSC declaration of commerciality (DOC) and development and exploitation plan
-
First SNE oil production expected from 2022
*Reference FAR ASX release dated 23 August 2016: unrisked contingent resources, 100% basis, oil only
==> picture [148 x 64] intentionally omitted <==
Contact us
Level 17, 530 Collins Street Melbourne VIC 3000 Australia T: +61 3 9618 2550 [email protected] far.com.au
Connect with FAR Limited:
==> picture [171 x 36] intentionally omitted <==
==> picture [148 x 64] intentionally omitted <==
Disclaimer
-
This presentation has been prepared by FAR Limited (‘FAR’). It should not be considered as an offer or invitation to subscribe for or purchase any shares in FAR or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for shares in FAR will be entered into on the basis of this presentation.
-
This presentation contains forward-looking statements that are not based on historical fact, including those identified by the use of forward-looking terminology containing such words as ‘believes’, ‘may’, ‘will’, ‘estimates’, ‘continue’, ‘anticipates’, ‘intends’, ‘expects’, ‘should’, ‘schedule’, ‘program’, ‘potential’ or the negatives thereof and words of similar import.
-
FAR cautions that these forward-looking statements are subject to risks and uncertainties that could cause actual events or results to differ materially from those expressed or implied by the statements. The forward looking statements are expressly subject to this caution. FAR makes no representation, warranty (express or implied), or assurance as to the completeness or accuracy of these forward-looking statements and, accordingly, expresses no opinion or any other form of assurance regarding them. FAR will not necessarily publish updates or revisions of these forwardlooking statements to reflect FAR’s circumstances after the date hereof.
-
By its very nature exploration and development of oil and gas is high risk and is not suitable for certain investors. FAR shares are a speculative investment. There are a number of risks, both specific to FAR and of a general nature which may affect the future operating and financial performance of FAR and the value of an investment in FAR including and not limited to economic conditions, stock market fluctuations, oil and gas demand and price movements, regional infrastructure constraints, securing drilling rigs, timing of approvals from relevant authorities, regulatory risks, operational risks, reliance on key personnel, foreign currency fluctuations, and regional geopolitical risks.
-
This presentation does not purport to be all inclusive or to contain all information which you may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation, perform your own analysis, and seek your own advice from your professional adviser before making any investment decision.
-
Cautionary Statement for Prospective Resource Estimates – With respect to the Prospective Resource estimates contained within this report, it should be noted that the estimated quantities of Petroleum that may potentially be recovered by the future application of a development project may relate to undiscovered accumulations. These estimates have an associated risk of discovery and risk of development. Further exploration and appraisal is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
-
Information in this report relating to hydrocarbon resource estimates has been compiled by Peter Nicholls, the FAR exploration manager. Mr Nicholls has over 30 years of experience in petroleum geophysics and geology and is a member of the American Association of Petroleum Geology, the Society of Exploration Geophysicists and the Petroleum Exploration Society of Australia. Mr Nicholls consents to the inclusion of the information in this report relating to hydrocarbon Prospective Resources in the form and context in which it appears. The Prospective Resource estimates contained in this report are in accordance with the standard definitions set out by the Society of Petroleum Engineers, Petroleum Resource Management System.
17