AI assistant
Enea S.A. — Interim / Quarterly Report 2022
May 24, 2022
5597_rns_2022-05-24_09009b2f-63c0-4ed0-a30d-9de6b6158a75.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
The consolidated statement of cash flows should by analysed in conjunction with additional information and explanations, which
Consolidated financial statements in compliance with EU IFRS for the financial year ended 31 December 2018
(unless stated otherwise, all amounts expressed in PLN 000s)

023032+11111111111111111
constitute an integral part of the separate financial statements.
1
ENEA S.A.
ENEA Group
CONDENSED SEPARATE INTERIM FINANCIAL STATEMENTS
for the period from 1 January to 31 March 2022
in compliance with EU IFRS

TABLE OF CONTENTS
| SEPARATE STATEMENT OF COMPREHENSIVE INCOME 4 | |
|---|---|
| SEPARATE STATEMENT OF FINANCIAL POSITION 5 | |
| SEPARATE STATEMENT OF CHANGES IN EQUITY 7 | |
| SEPARATE STATEMENT OF CASH FLOWS 8 | |
| ADDITIONAL INFORMATION AND EXPLANATIONS 9 | |
| General information 9 1. General information on ENEA S.A. 9 2. Group composition 10 3. Management Board and Supervisory Board composition 11 4. Basis for preparing financial statements 12 5. Accounting rules (policy) and significant estimates and assumptions 12 6. Functional currency and presentation currency 12 |
|
| Explanatory notes to the separate statement of comprehensive income 13 7. Revenue from sales 13 8. Tax 13 |
|
| Explanatory notes to the separate statement of financial position 14 9. Property, plant and equipment 14 10. Intangible assets 14 11. Investments in subsidiaries, associates and jointly controlled entities 14 12. Inventories 16 13. Assets and liabilities arising from contracts with customers 17 14. Cash and cash equivalents 17 15. Profit allocation 17 16. Debt-related liabilities 18 17. Provisions 19 |
|
| Financial instruments and financial risk management 21 18. Financial instruments and fair value 21 19. Debt financial assets at amortised cost 23 20. Impairment of trade and other receivables 25 21. Analysis of the age structure of assets arising from contracts with customers and trade and other receivables 26 22. Other financial liabilities 26 |
|
| Other explanatory notes 27 23. Related-party transactions 27 24. Conditional liabilities, court proceedings and cases on-going before public administration organs 28 |
|
| 24.1. Sureties and guarantees 28 24.2. On-going proceedings in courts of general competence 28 24.3. Cases concerning 2012 non-balancing 29 24.4. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin |
|
| certificates for energy from renewable sources 29 25. Capital increase 31 26. Political and economic situation in Ukraine 33 |

These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.
Members of the Management Board
| President of the Management Board |
Paweł Majewski |
|---|---|
| Member of the Management Board |
Rafał Mucha |
| Member of the Management Board |
Marcin Pawlicki |
| Member of the Management Board |
Tomasz Siwak |
| Member of the Management Board |
Tomasz Szczegielniak |
| Member of the Management Board |
Lech Żak |
ENEA Centrum Sp. z o.o. Entity responsible for maintaining accounting books and preparing financial statements Ewa Nowaczyk ENEA Centrum Sp. z o.o. Pl. Władysława Andersa 7, 61-894 Poznań KRS 0000477231, NIP 777-00-02-843, REGON 630770227
Poznań, 24 May 2022

SEPARATE STATEMENT OF COMPREHENSIVE INCOME
| Period | |||
|---|---|---|---|
| Note | 3 months ended | 3 months ended | |
| 31 March 2022 (unaudited) |
31 March 2021 (unaudited) |
||
| Revenue from sales | 2 896 025 | 1 832 685 | |
| Excise duty | (13 768) | (19 396) | |
| Net revenue from sales | 7 | 2 882 257 | 1 813 289 |
| Lease income | 47 | 66 | |
| Revenue from sales and other income | 2 882 304 | 1 813 355 | |
| Other operating revenue | 1 985 | 3 336 | |
| Change in provision for onerous contracts | (50 994) | (1 080) | |
| Depreciation/amortisation | (1 596) | (1 752) | |
| Employee benefit costs | (23 290) | (22 764) | |
| Use of materials and raw materials and value of goods sold | (1 089) | (634) | |
| Purchase of electricity and gas for sales purposes | (2 872 739) | (1 681 913) | |
| Transmission and distribution services | (9 885) | (9 351) | |
| Other third-party services | (57 622) | (60 187) | |
| Taxes and fees | (3 030) | (2 964) | |
| Other operating costs | (20 003) | (17 952) | |
| Operating (loss)/profit | (155 959) | 18 094 | |
| Finance costs | (57 137) | (48 059) | |
| Finance income | 75 331 | 57 017 | |
| Change in impairment of interests in subsidiaries, associates and | |||
| jointly controlled entities | 31 131 | - | |
| Change in impairment of financial assets at amortised cost | (3 665) | (6 200) | |
| (Loss)/profit before tax | (110 299) | 20 852 | |
| Income tax | 27 221 | 24 288 | |
| Net (loss)/profit for the reporting period | (83 078) | 45 140 | |
| Other comprehensive income | |||
| Subject to reclassification to profit or loss: | |||
| - measurement of hedging instruments | 97 870 | 52 630 | |
| - income tax | (18 595) | (10 000) | |
| Not subject to reclassification to profit or loss: | |||
| - other | - | (730) | |
| Net other comprehensive income | 79 275 | 41 900 | |
| Comprehensive income for the reporting period | (3 803) | 87 040 | |
| Net (loss)/profit attributable to the Company's shareholders | (83 078) | 45 140 | |
| Weighted average number of ordinary shares | 441 442 578 | 441 442 578 | |
| Net (loss)/profit per share (in PLN per share) | (0.19) | 0.10 | |
| Diluted (loss)/profit per share (in PLN per share) | (0.19) | 0.10 |
The separate statement of comprehensive income should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF FINANCIAL POSITION
| As at | ||||
|---|---|---|---|---|
| Note | 31 March 2022 (unaudited) |
31 December 2021 |
||
| ASSETS | ||||
| Non-current assets | ||||
| Property, plant and equipment | 9 | 24 710 | 24 096 | |
| Right-of-use assets | 37 215 | 40 660 | ||
| Intangible assets | 10 | 3 169 | 3 385 | |
| Investment properties | 12 520 | 12 656 | ||
| Investments in subsidiaries, associates and jointly controlled entities | 11 | 9 556 300 | 9 531 789 | |
| Deferred income tax assets | 8 | 116 022 | 106 989 | |
| Financial assets measured at fair value | 229 800 | 164 917 | ||
| Debt financial assets at amortised cost | 19 | 5 345 725 | 5 390 289 | |
| Finance lease and sublease receivables | 246 | 284 | ||
| Costs related to the conclusion of agreements | 10 772 | 11 180 | ||
| Total non-current assets | 15 336 479 | 15 286 245 | ||
| Current assets | ||||
| Inventories | 12 | 154 102 | 135 777 | |
| Trade and other receivables | 2 166 501 | 2 009 453 | ||
| Costs related to the conclusion of agreements | 11 198 | 11 652 | ||
| Assets arising from contracts with customers | 13 | 378 838 | 300 206 | |
| Finance lease and sublease receivables | 717 | 723 | ||
| Financial assets measured at fair value | 70 296 | 28 194 | ||
| Debt financial assets at amortised cost | 19 | 1 730 987 | 1 660 454 | |
| Cash and cash equivalents | 14 | 1 068 044 | 1 005 481 | |
| Total current assets | 5 580 683 | 5 151 940 | ||
| TOTAL ASSETS | 20 917 162 | 20 438 185 |
The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF FINANCIAL POSITION
| As at | |||
|---|---|---|---|
| Note | 31 March 2022 (unaudited) |
31 December 2021 |
|
| EQUITY AND LIABILITIES | |||
| Equity | |||
| Share capital | 588 018 | 588 018 | |
| Share premium | 3 687 993 | 3 687 993 | |
| Revaluation reserve - measurement of hedging instruments | 188 552 | 109 277 | |
| Reserve capital | 5 974 031 | 5 974 031 | |
| Retailed earnings/accumulated losses | 361 348 | 444 426 | |
| Total equity | 10 799 942 | 10 803 745 | |
| LIABILITIES | |||
| Non-current liabilities | |||
| Credit facilities, loans and debt securities | 16 | 4 310 592 | 4 420 974 |
| Lease liabilities | 34 181 | 37 512 | |
| Employee benefit liabilities Provisions for other liabilities and other charges |
17 | 53 740 276 522 |
54 042 228 582 |
| Total non-current liabilities | 4 675 035 | 4 741 110 | |
| Current liabilities | |||
| Credit facilities, loans and debt securities | 16 | 2 207 168 | 2 164 492 |
| Trade and other payables | 644 971 | 828 009 | |
| Liabilities arising from contracts with customers | 13 | 53 591 | 46 108 |
| Lease liabilities | 2 147 | 2 576 | |
| Current income tax liabilities | 265 912 | 61 535 | |
| Employee benefit liabilities | 29 238 | 28 351 | |
| Liabilities concerning the equivalent for rights to free purchase of shares | 281 | 281 | |
| Other financial liabilities | 22 | 1 439 189 | 1 105 251 |
| Provisions for other liabilities and other charges | 17 | 799 688 | 656 727 |
| Total current liabilities | 5 442 185 | 4 893 330 | |
| Total liabilities | 10 117 220 | 9 634 440 | |
| TOTAL EQUITY AND LIABILITIES | 20 917 162 | 20 438 185 |
The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF CHANGES IN EQUITY
| S ha re ita l ca p ( mi l no na ) nt am ou |
Re fo se rve r lua t ion d rev a an me rg er ing t ac co un |
To l ta ha s re ita l ca p |
S ha ium re p rem |
Re lua ion t va res erv e - nt me as ure me f fi ia l o na nc ins tru nts me |
Re lua ion t va re se rve f t o - m ea su rem en he dg ing ins tru nts me |
Re se rve ita l ca p |
Re ta ine d rni ea ng s |
To l e ity ta q u |
|
|---|---|---|---|---|---|---|---|---|---|
| As 1 Ja 20 21 at nu ary |
44 1 4 43 |
14 6 5 75 |
5 8 8 01 8 |
4 6 27 67 3 |
( 17 0 3 6 ) |
( 10 5 5 34 ) |
5 97 4 0 31 |
( 9 3 9 6 8 0 ) |
10 12 7 47 2 |
| Ne fit for he ing io d t p t ort ro rep p er Ne he he ive in t o t r c om p re ns co me Ne he ive inc t co mp re ns om e nis d in he io d t |
- - - |
- - - |
- - - |
- - - |
- 17 0 3 6 17 0 3 6 |
- 42 6 3 0 42 6 3 0 |
- - - |
45 14 0 ( 17 76 6 ) 27 37 4 |
45 14 0 9 0 0 41 87 04 0 |
| rec og e p er As 31 Ma h 20 21 at rc (u d ite d ) na u |
44 1 4 43 |
14 6 5 75 |
5 8 8 01 8 |
4 6 27 67 3 |
- | ( 6 2 9 04 ) |
5 97 4 0 31 |
( 91 2 3 0 6 ) |
10 21 4 5 12 |
| S ha ita l re ca p ( mi l a ) t no na mo un |
Re fo se rve r lua ion d t rev a an ing t me rg er ac co un |
To l s ha ta re ita l ca p |
S ha ium re p rem |
Re lua ion t va res erv e - f nt me as ure me o he dg ing in str ts um en |
Re se rve ita l ca p |
Re ine d ta rni ea ng s |
To l e ity ta q u |
|
|---|---|---|---|---|---|---|---|---|
| As Ja 20 22 at 1 nu ary |
43 44 1 4 |
6 5 14 75 |
8 8 01 8 5 |
3 6 87 9 9 3 |
10 9 27 7 |
97 0 31 5 4 |
26 44 4 4 |
10 8 0 3 74 5 |
| Ne los for he ing io d t t ort s rep p er Ne he he ive in t o t r c om p re ns co me |
- - |
- - |
- - |
- - |
- 79 27 5 |
- - |
( 8 3 07 8 ) - |
( 8 3 07 8 ) 79 27 5 |
| Ne he ive inc t co mp re ns om e nis d in he io d t rec og e p er |
- | - | - | - | 79 27 5 |
- | ( 8 3 07 8 ) |
( 3 8 0 3 ) |
| As 31 Ma h 20 22 at rc (u d ite d ) na u |
43 44 1 4 |
6 5 14 75 |
8 8 01 8 5 |
3 6 87 9 9 3 |
18 8 5 2 5 |
97 4 0 31 5 |
3 61 34 8 |
10 79 9 94 2 |
The separate statement of changes in equity should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF CASH FLOWS
| Period | ||||
|---|---|---|---|---|
| Note | 3 months ended 31 March 2022 (unaudited) |
3 months ended 31 March 2021 (unaudited) |
||
| Cash flows from operating activities Net (loss)/profit for the reporting period |
(83 078) | 45 140 | ||
| Adjustments: | ||||
| Income tax in profit or loss | (27 221) | (24 288) | ||
| Depreciation/amortisation | 1 596 | 1 752 | ||
| Gain on sale of financial assets Interest income |
(8 272) (64 123) |
(4 744) (38 234) |
||
| Interest costs | 54 677 | 35 679 | ||
| Impairment of interests | (31 131) | - | ||
| Impairment of financial assets at amortised cost Total adjustments |
3 665 (70 809) |
6 200 (23 635) |
||
| Paid income tax Flows resulting from settlements within tax group |
(107 385) 154 137 |
(195 238) 228 328 |
||
| Changes in working capital: | ||||
| Inventories | (18 325) | (128 910) | ||
| Trade and other receivables | (77 681) | (45 517) | ||
| Trade and other payables | (175 561) | (37 552) | ||
| Employee benefit liabilities Provisions for other liabilities and other charges |
585 222 032 |
(645) 106 750 |
||
| Total changes in working capital | (48 950) | (105 874) | ||
| Net cash flows from operating activities | (156 085) | (51 279) | ||
| Cash flows from investing activities | ||||
| Purchase of non-current property, plant and equipment and intangible assets | (927) | - | ||
| and right-of-use assets | ||||
| Proceeds from sale of financial assets Purchase of subsidiaries |
32 561 (24 131) |
91 697 - |
||
| Purchase of associates and jointly controlled entities | (380) | - | ||
| Received interest | 4 369 | 4 860 | ||
| Net cash flows from investing activities | 11 492 | 96 557 | ||
| Cash flows from financing activities | ||||
| Repayment of credit and loans | (32 561) | (32 561) | ||
| Bond buy-back | (78 055) | (78 055) | ||
| Expenditures concerning lease payments Interest paid |
(1 191) (14 975) |
(2 044) (26 200) |
||
| Net cash flows from financing activities | (126 782) | (138 860) | ||
| Total net cash flows | (271 375) | (93 582) | ||
| Cash at the beginning of reporting period | 14 | (99 770) | 378 094 | |
| Cash at the end of reporting period | 14 | (371 145) | 284 512 |

ADDITIONAL INFORMATION AND EXPLANATIONS
General information
| 1. General information on ENEA S.A. |
||||
|---|---|---|---|---|
| Name: | ENEA Spółka Akcyjna | |||
| Legal form: | spółka akcyjna (joint-stock company) | |||
| Country of registered office: | Poland | |||
| Registered office: | Poznań | |||
| Address: | ul. Pastelowa 8, 60-198 Poznań | |||
| KRS: | 0000012483 | |||
| Telephone number: | (+48 61) 884 55 44 | |||
| Fax number: | (+48 61) 884 59 59 | |||
| E-mail: | [email protected] | |||
| Website: | www.enea.pl | |||
| REGON number: | 630139960 | |||
| NIP number: | 777-00-20-640 |
ENEA S.A. ("ENEA," "Company"), back then operating as Energetyka Poznańska S.A., was entered into the National Court Register at the District Court in Poznań on 21 May 2001, under KRS number 0000012483.
As at 31 March 2022, ENEA S.A.'s shareholding structure was as follows:
| Poland's State Treasury | Other shareholders | Total | |
|---|---|---|---|
| As at 31 March 2022 | 51.50% | 48.50% | 100.00% |
As at 31 March 2022, the Parent's highest-level controlling entity was the State Treasury.
As at 31 March 2022, ENEA S.A.'s statutory share capital amounted to PLN 441 443 thousand (PLN 588 018 thousand after restatement to EU IFRS, taking into account hyperinflation and other adjustments) and was divided into 441 442 578 shares.
The Company's duration is indefinite. Its activities are conducted on the basis of relevant concessions issued for the Company.
The Company's condensed separate interim financial statements cover the 3-month period ended 31 March 2022 and contain comparative data for the 3-month period ended 31 March 2021 and the year ended 31 December 2021.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

2. Group composition
At 31 March 2022, ENEA Group consisted of the parent - ENEA S.A., 18 subsidiaries, 9 indirect subsidiaries, 2 jointly controlled entities and 1 associate.
The main business activity of ENEA S.A. is trade of electricity.
| Company name | Activity | Registered office |
ENEA S.A.'s stake in total number of voting rights as at 31 March 2022 |
ENEA S.A.'s stake in total number of voting rights as at 31 December 2021 |
|||
|---|---|---|---|---|---|---|---|
| SUBSIDIARIES | |||||||
| 1. | ENEA Operator Sp. z o.o. | distribution | Poznań | 100% | 100% | ||
| 2. | ENEA Wytwarzanie Sp. z o.o. | generation | Świerże Górne | 100% | 100% | ||
| 3. | ENEA Elektrownia Połaniec S.A. |
generation | Połaniec | 100% | 100% | ||
| 4. | ENEA Oświetlenie Sp. z o.o. | other activity | Szczecin | 100% | 100% | ||
| 5. | ENEA Trading Sp. z o.o. | trade | Świerże Górne | 100% | 100% | ||
| 6. | ENEA Serwis Sp. z o.o. | distribution | Lipno | 100% | 100% | ||
| 7. | ENEA Centrum Sp. z o.o. | other activity | Poznań | 100% | 100% | ||
| 8. | ENEA Pomiary Sp. z o.o. | distribution | Poznań | 100% | 100% | ||
| 9. | ENERGO-TOUR Sp. z o.o. w likwidacji |
other activity | Poznań | 100%5 | 100%5 | ||
| 10. | ENEA Innowacje Sp. z o.o. | other activity | Warsaw | 100%6 | 100% | ||
| 11. | Lubelski Węgiel BOGDANKA S.A. |
mining | Bogdanka | 65.99% | 65.99% | ||
| 12. | ENEA Ciepło Sp. z o.o. | generation | Białystok | 99.94% | 99.94% | ||
| 13. | ENEA Ciepło Serwis Sp. z o.o. | generation | Białystok | 100% | 100% | ||
| 14. | Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. |
generation | Oborniki | 99.93% | 99.93% | ||
| 15. | Miejska Energetyka Cieplna Piła Sp. z o.o. |
generation | Piła | 71.11% | 71.11% | ||
| 16. | ENEA Nowa Energia Sp. z o.o. | generation | Radom | 100% | 100% | ||
| 17. | ENEA ELKOGAZ Sp. z o.o. | generation | Warsaw | 100%8 | - | ||
| 18. | ENEA Power&Gas Trading Sp. z o.o. w organizacji |
trade | Warsaw | 100%9 | - | ||
| INDIRECT SUBSIDIARIES | |||||||
| 19. | ENEA Logistyka Sp. z o.o. | distribution | Poznań | 100%3 | 100%3 | ||
| 20. | ENEA Bioenergia Sp. z o.o. | generation | Połaniec | 100%1 | 100%1 | ||
| 21. | ENEA Połaniec Serwis Sp. z o.o. |
generation | Połaniec | 100%1 | 100%1 | ||
| 22. | EkoTRANS Bogdanka Sp. z o.o. |
mining | Bogdanka | 65.99%2 | 65.99%2 | ||
| 23. | RG Bogdanka Sp. z o.o. | mining | Bogdanka | 65.99%2 | 65.99%2 | ||
| 24. | MR Bogdanka Sp. z o.o. | mining | Bogdanka | 65.99%2 | 65.99%2 | ||
| 25. | Łęczyńska Energetyka Sp. z o.o. |
mining | Bogdanka | 58.53%2 | 58.53%2 | ||
| 26. 27. |
SUN ENERGY 7 Sp. z o.o. GPK energia Sp. z o.o. |
generation generation |
Główczyce Krzęcin |
100%4 100%4 |
100%4 100%4 |
||
| JOINTLY CONTROLLED ENTITIES | |||||||
| 28. | Polska Grupa Górnicza S.A. | - | Katowice | 7.66% | 7.66% | ||
| 29. | Elektrownia Ostrołęka Sp. z o.o. |
- | Ostrołęka | 50% | 50% | ||
| ASSOCIATES | |||||||
| 30. | Polimex – Mostostal S.A. | - | Warsaw | 16,45%7 | 16,4% |
1– indirect subsidiary through stake in ENEA Elektrownia Połaniec S.A.
2 – indirect subsidiary through stake in Lubelski Węgiel BOGDANKA S.A.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

3– indirect subsidiary through stake in ENEA Operator Sp. z o.o.
4 – indirect subsidiary through stake in ENEA Nowa Energia Sp. z o.o.
5 – on 30 March 2015 the company's extraordinary general meeting adopted a resolution on the dissolution of the company following a liquidation proceeding; the resolution entered into force on 1 April 2015. An application for the company to be removed from the National Court Register was filed on 5 November 2015. At the date on which these condensed consolidated interim financial statements were prepared, procedural activities connected with removing the entity from the National Court Register were in progress.
6 – on 28 February 2022 an Extraordinary General Meeting of ENEA Innowacje Sp. z o.o. adopted a resolution regarding an increase of the company's share capital by PLN 5 000 thousand, i.e. from PLN 30 860 thousand to PLN 35 860 thousand, by issuing 50 000 new shares with a nominal value of PLN 100.00 each. All of the new-issue shares were acquired by ENEA S.A. and were paid for with a cash contribution. The share capital increase is awaiting entry in the National Court Register.
7 – on 30 March 2022 the Company submitted a demand to exercise its call option and made a bank transfer for 187 500 Polimex - Mostostal S.A. shares. The increase of Polimex Mostostal S.A.'s share capital by PLN 1 500 thousand, i.e. from PLN 475 738 thousand to PLN 477 238 thousand, admitting 750 000 series S ordinary bearer shares with a nominal value of PLN 2 each to trade, was registered on 1 April 2022. As of the date on which these condensed separate interim financial statements were prepared, ENEA S.A. holds a 16.48% stake in that company's share capital.
8 – on 16 March 2022 ENEA S.A. formed ENEA ELKOGAZ Sp. z o.o., based in Warsaw. The company's share capital amounts to PLN 19 000 thousand and is divided into 190 000 shares with a nominal value of PLN 100.00 each. ENEA S.A. took up 100% of the company's shares.
9 – on 30 March 2022 ENEA S.A. formed ENEA Power&Gas Trading Sp. z o.o. w organizacji, based in Warsaw. The company's share capital amounts to PLN 3 200 thousand and is divided into 32 000 shares with a nominal value of PLN 100.00 each. ENEA S.A. took up 100% of the company's shares.
3. Management Board and Supervisory Board composition
Management Board
| As at 31 March 2022 |
As at 31 December 2021 |
|
|---|---|---|
| President of the Management Board | Paweł Szczeszek | Paweł Szczeszek |
| Member of the Management Board, responsible for finance |
Rafał Mucha | Rafał Mucha |
| Member of the Management Board, responsible for sales | Tomasz Siwak | Tomasz Siwak |
| Member of the Management Board, responsible for corporate affairs |
Tomasz Szczegielniak | Tomasz Szczegielniak |
| Member of the Management Board, responsible for operations |
Marcin Pawlicki | Marcin Pawlicki |
| Member of the Management Board, responsible for strategy and development |
Lech Żak | Lech Żak |
Mr. Paweł Szczeszek's resignation as President of the Management Board, ENEA S.A., effective from 10 April 2022, was received on 8 April 2022.
On 8 April 2022, the Company's Supervisory Board decided to entrust the performance of the duties of the President of the Company's Management Board to Mr. Rafał Mucha - Member of the Management Board in charge of finance, starting from 11 April 2022, until the appointment of President of the Management Board, however not longer than for the term that commenced on the date of the Company's Ordinary General Meeting approving the 2018 financial statements, while performing the current duties of the Member of the Management Board in charge of finance.
On 20 April 2022, the Supervisory Board of ENEA S.A. adopted a resolution to appoint, as of 25 April 2022, Mr. Paweł Majewski as President of the Management Board, ENEA S.A., for a joint term that began on the date of the Company's Ordinary General Meeting approving the 2018 financial statements.
The following table contains the composition of ENEA S.A.'s Management Board as of the date on which these condensed separate interim financial statements:
| As at 24 May 2022 |
||
|---|---|---|
| President of the Management Board | Paweł Majewski | |
| Member of the Management Board, responsible for finance | Rafał Mucha | |
| Member of the Management Board, responsible for sales | Tomasz Siwak | |
| Member of the Management Board, responsible for corporate affairs | Tomasz Szczegielniak | |
| Member of the Management Board, responsible for operations | Marcin Pawlicki | |
| Member of the Management Board, responsible for strategy and development | Lech Żak |
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

| Supervisory Board | |||
|---|---|---|---|
| As at | As at | ||
| 31 March 2022 | Appointment | 31 December 2021 | |
| Chairperson of the Supervisory Board | Rafał Włodarski | Rafał Włodarski | |
| Deputy Chairperson of the Supervisory Board | Roman Stryjski | Roman Stryjski | |
| Secretary of the Supervisory Board | Michał Jaciubek | Michał Jaciubek | |
| Member of the Supervisory Board | Dorota Szymanek | Dorota Szymanek | |
| Member of the Supervisory Board | Maciej Mazur | Maciej Mazur | |
| Member of the Supervisory Board | Piotr Mirkowski | Piotr Mirkowski | |
| Member of the Supervisory Board | Paweł Koroblowski | Paweł Koroblowski | |
| Member of the Supervisory Board | Tomasz Lis | Tomasz Lis | |
| Member of the Supervisory Board | Mariusz Pliszka | Mariusz Pliszka | |
| Member of the Supervisory Board | Radosław Kwaśnicki | 10 March 2022 |
On 10 March 2022 the Company's Extraordinary General Meeting adopted a resolution appointing Mr. Radosław Kwaśnicki as member of ENEA S.A.'s Supervisory Board, 10th term, effective from the same date.
4. Basis for preparing financial statements
These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.
The Company's Management Board used its best knowledge as to the application of standards and interpretations as well as methods and rules for the measurement of items in ENEA S.A.'s condensed separate interim financial statements in accordance with EU IFRS as at 31 March 2022. The presented tables and explanations are prepared with due diligence. These condensed separate interim financial statements have not been reviewed by a statutory auditor. The accounting rules are applied consistently across all of the presented periods unless stated otherwise.
These condensed separate interim financial statements are prepared on a going concern basis for the foreseeable future. There are no circumstances such as would indicate a threat to the Company's going concern.
The Company prepares condensed consolidated interim financial statements for ENEA Group in accordance with IFRS EU as at and for the 3-month period ending 31 March 2022. In order to obtain full information on ENEA Group's financial situation and results, readers of ENEA S.A.'s condensed separate interim financial statements should read these in conjunction with ENEA Group's condensed consolidated interim financial statements and ENEA S.A.'s separate annual financial statements for the financial year ended on 31 December 2021.
5. Accounting rules (policy) and significant estimates and assumptions
These condensed separate interim financial statements are prepared using accounting rules that are consistent with the rules used in preparing the most recent annual separate financial statements for the financial year ended 31 December 2021.
Preparing condensed separate interim financial statements in accordance with EU IFRS requires the Management Board to adopt certain assumptions and make estimates that have an impact on the adopted accounting rules and the amounts shown in condensed separate interim financial statements and notes to financial statements. Assumptions and estimates are based on the Management Board's best knowledge regarding current and future events and activities. However, actual results may differ from forecasts. The estimates used in preparing these condensed separate interim financial statements are consistent with the estimates used in preparing the separate financial statements for the most recent financial year. The estimated values presented in previous financial years do not have a material impact on the present interim period.
6. Functional currency and presentation currency
Items in the Company's financial statements are measured in the currency of the main economic environment in which the Company operates (functional currency).
The condensed separate interim financial statements are presented in Polish zloty (PLN), which is the functional currency and presentation currency. Items in financial statements are rounded to full thousands of zlotys (PLN 000s), unless otherwise stated.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Explanatory notes to the separate statement of comprehensive income
7. Revenue from sales
Net revenue from sales
| 3-month period ended | ||
|---|---|---|
| 31 March 2022 | 31 March 2021 | |
| Revenue from the sale of electricity | 2 785 402 | 1 772 550 |
| Revenue from the sale of gas | 89 845 | 39 990 |
| Revenue from the sale of other services | 6 503 | 749 |
| Revenue from the sale of goods and materials | 507 | - |
| Total net revenue from sales | 2 882 257 | 1 813 289 |
The Company recognises revenue when an obligation to provide a consideration by the provision of a promised good or service to the customer is performed (or is being performed). Revenue is recognised on the basis of prices specified in sale agreements, less estimated rebates and other deductions.
The key groups of contracts include electricity sale contracts (including framework contracts) for retail, business, key and strategic customers. Under these contracts, service is provided in a continuous manner and the level of revenue depends on usage.
The standard payment deadline for invoices for the sale of electricity is 14 days from VAT invoice date. In the case of business, key and strategic customers, payment deadlines may be negotiated.
Presented below is revenue from sales, divided into categories that reflect how economic factors influence the amount, payment deadline and the uncertainty of revenue and cash flows.
| 3-month period ended | ||
|---|---|---|
| 31 March 2022 | 31 March 2021 | |
| Revenue from continuous services | 2 875 247 | 1 812 540 |
| Revenue from services provided at specified time | 7 010 | 749 |
| Total | 2 882 257 | 1 813 289 |
8. Tax
Deferred income tax
Changes in deferred income tax provision (after offsetting assets and provision) are as follows:
| 3-month period ended 31 March 2022 |
Year ended 31 December 2021 |
|
|---|---|---|
| As at the beginning of period | 106 989 | 101 483 |
| Change recognised in profit or loss | 27 628 | 56 437 |
| Change recognised in other comprehensive income | (18 595) | (50 931) |
| As at the end of period | 116 022 | 106 989 |
In the 3-month period ended 31 March 2022, the Company's profit before tax increased as a result of an increase in deferred income tax assets by PLN 27 628 thousand (in the 3-month period ended 31 March 2021 the increase of the Company's profit before tax as a result of an increase in deferred income tax assets amounted to PLN 13 034 thousand).
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Explanatory notes to the separate statement of financial position
9. Property, plant and equipment
In the 3-month period ending 31 March 2022 the Company purchased property, plant and equipment items for a total of PLN 932 thousand net (in the 3-month period ending 31 March 2021: PLN 0 net).
In the 3-month period ending 31 March 2022 the Company sold and/or liquidated property, plant and equipment items for a total of PLN 0 thousand net (in the 3-month period ending 31 March 2021: PLN 0 thousand net).
As at 31 March 2022, no indications for the impairment of property, plant and equipment were identified. No collateral was established on property, plant and equipment assets.
10. Intangible assets
In the 3-month period ending 31 March 2022 the Company did not purchase intangible assets (in the 3-month period ending 31 March 2021: PLN 0 thousand).
In the 3-month period ending 31 March 2022 the Company did not liquidate intangible assets (in the 3-month period ending 31 March 2021: PLN 0 thousand).
As at 31 March 2022, no indications for impairment were identified. No collateral has been established on intangible assets.
11. Investments in subsidiaries, associates and jointly controlled entities
| Change in investments in subsidiaries, associates and jointly controlled entities | ||
|---|---|---|
| 3-month period ended |
Year ended | |
| 31 March 2022 | 31 December 2021 | |
| As at the beginning of period | 9 531 789 | 9 512 925 |
| Purchase of investments | 24 511 | 36 757 |
| Sale of investments | - | (393) |
| Change in impairment | 31 131 | 175 707 |
| Other changes | (31 131) | (193 207) |
| As at the end of period | 9 556 300 | 9 531 789 |
Polimex – Mostostal S.A.
16 February 2022 The Company submitted a demand to exercise its call option and made a bank transfer for 187 500 Polimex - Mostostal S.A. shares.
ENEA Innowacje Sp. z o.o.
| 28 February 2022 | Resolution increasing share capital by PLN 5 000 thousand, from PLN 30 860 thousand to PLN 35 860 thousand, by issuing 50 000 new shares with a nominal value of PLN 100.00 each. |
Extraordinary General Meeting |
|---|---|---|
| ENEA ELKOGAZ Sp. z o.o. | ||
| 16 March 2022 | ENEA S.A. formed ENEA ELKOGAZ Sp. z o.o., based in Warsaw. The | - |
company's share capital amounts to PLN 19 000 thousand and is divided into 190 000 shares with a nominal value of PLN 100.00 each. ENEA S.A. took up 100% of the company's shares.
-
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

ENEA Power&Gas Trading Sp. z o.o. w organizacji
On 30 March 2022 ENEA S.A. formed ENEA Power&Gas Trading Sp. z o.o. w organizacji, based in Warsaw. The company's share capital amounts to PLN 3 200 thousand and is divided into 32 000 shares with a nominal value of PLN 100.00 each. ENEA S.A. took up 100% of the company's shares. -
Impairment of investments
| 3-month period ended 31 March 2022 |
Year ended 31 December 2021 |
|
|---|---|---|
| As at the beginning of period | 4 793 772 | 4 969 479 |
| Reversed | (31 131) | (175 707) |
| As at the end of period | 4 762 641 | 4 793 772 |
Implementation of project to build Elektrownia Ostrołęka C
At 31 March 2022, ENEA S.A. held 9 124 821 shares of Elektrownia Ostrołęka Sp. z o.o., with a nominal value of PLN 50 each and total nominal value of PLN 456 241 thousand.
Moreover, ENEA S.A. and ENERGA S.A. are in equal parts parties to two loan agreements concluded with Elektrownia Ostrołęka Sp. z o.o. in the amount of up to PLN 340 000 thousand of 23 December 2019 and up to PLN 58 000 thousand of 17 July 2019.
As at 31 March 2022, impairment losses on loans granted to Elektrownia Ostrołęka Sp. z o.o. totalled PLN 229 275 thousand, together with interest (the value of loans and interest was written down to zero).
On 29 April 2022, ENEA S.A. and ENERGA S.A. signed with Elektrownia Ostrołęka Sp. z o.o. annexes to the aforementioned loan agreements. In accordance with the provisions of these annexes, i.e. Annex 5 to the Loan Agreement in the amount of up to PLN 340 000 thousand of 23 December 2019 and Annex 10 to the Loan Agreement to the amount of PLN 58 000 thousand of 17 July 2019, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off repayment of the loans to ENEA S.A. in the amounts of PLN 170 000 thousand and PLN 29 000 thousand, respectively, together with due interest, by 30 December 2022.
On 13 February 2020, ENEA S.A. signed an agreement with ENERGA S.A. regarding the suspension of financing of the Ostrołęka C construction project. In the agreement, ENEA S.A. and ENERGA S.A. undertook to carry out analyses, especially with regard to technical, technological, economic and organisational parameters and further financing for the project. Conclusions from these analyses did not justify continuation of the project in its present form, i.e. as a project to build a power plant generating electricity through the firing of hard coal. At the same time, the technical analysis confirmed the possibility of implementing the variant of construction of a power plant generating electricity in the process of firing natural gas (Gas Project) at the current location of the coal unit under construction.
The following documents were signed on 22 December 2020:
- agreement between ENEA S.A., ENERGA S.A. and Elektrownia Ostrołęka Sp. z o.o. regarding cooperation on the division of Elektrownia Ostrołęka Sp. z o.o. (Division Agreement),
- agreement between the Company and ENERGA S.A. regarding cooperation on settling the coal-based project as part of Project Ostrołęka C (Settlement Agreement, Coal Project).
Both of the agreements include a statement by ENEA S.A. on withdrawal from further participation in the Gas Project.
On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. as vendor and CCGT Ostrołęka Sp. z o.o. as buyer (a wholly-owned subsidiary of ENERGA S.A.) signed a sale agreement and associated agreements regarding an SPV (excluding certain assets) intended (and used as such) to implement economic tasks covering the construction of a gas-fired power generating unit in Ostrołęka and the subsequent operation of this unit (Gas Plant). The business being sold includes generally all of the SPV's asset and non-asset components in use as of the transaction date in connection with preparations to begin an investment process consisting of the construction of the Gas Plant. The transaction is intended to facilitate the implementation of a gas project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka. The sale price for the business being sold (transaction value) is currently estimated at approx. PLN 166 million. The price is set on a preliminary basis as additional considerations will apply in determining the final price.
On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. and CCGT Ostrołęka Sp. z o.o. on the one hand and GE Power Sp. z o.o., based in Warsaw, GE Steam Power Systems S.A.S. (former name: ALSTOM Power Systems S.A.S.), based in Boulogne-Billancourt, France (Coal Project Contractor), and General Electric Global Services, GmbH, based in Baden, Switzerland (together with GE Power Sp. z o.o. - Gas Project Contractor) on the other hand signed a Contract Change Document concerning the contract of 21 July 2018 to build unit C at Elektrownia Ostrołęka, with a capacity of 1000 MW, and an Agreement on the settlement of the Coal Project. The Contract Change Document is structured in a way that facilitates implementation of the Gas Project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka, which is related, inter alia, to the fact that ENEA S.A. has confirmed its withdrawal from participating in the Gas Project. The agreement concerning the Coal Project settlement regulates the rights and obligations of Elektrownia Ostrołęka Sp. z o.o. and the Coal Project Contractor mainly in connection with the settlement of construction work completed by the Coal Project Contractor until the contract was suspended, maintenance and security activities during Contract suspension and work related to finishing the work dedicated to implementing the Coal Project. Under this agreement, the Coal Project was supposed to be settled by the end of 2021, and the entire amount that Elektrownia Ostrołęka Sp. z o.o. will be obligate to pay to the Coal Project Contractor, taking into account expenditures incurred thus far, will not exceed PLN 1.35 billion (net).
On 22 December 2021 Elektrownia Ostrołęka Sp. z o.o. executed an annex to this agreement with the Coal Project Contractor. The annex extended the settlement deadline to 25 March 2022 and results from a verified mechanism for settling the Coal Project.
ENEA S.A.'s commitment to provide funding for Elektrownia Ostrołęka Sp. z o.o. resulting from the existing agreements (especially the agreements dated 28 December 2018 and 30 April 2019 and the Settlement Agreement) that is still outstanding amounts to PLN 620 million.
On 31 January 2022 Elektrownia Ostrołęka Sp. z o.o. terminated an agreement implementing the capacity obligation contracted by the company as a result of a capacity market auction for 2023. The agreement was terminated due to the supply source being changed from coal to gas in the project to build and operate a new power plant in Ostrołęka.
On 31 March 2022 Elektrownia Ostrołęka Sp. z o.o. completed the settlement process with the General Contractor in accordance with the Agreement of 25 June 2021 referred to above. The final value of receivables resulting from the settlement amounted to PLN 958 million net and therefore the amount due to the General Contractor resulting from the difference between the above value and the amounts already paid has already been paid in full by Elektrownia Ostrołęka Sp. z o.o. The costs incurred by ENEA S.A. in connection with the settlement of the General Contractor's works amounted to 50% of the above amount, i.e. PLN 479 million net (the same amount was incurred by ENERGA S.A.).
In connection with this, in these condensed separate interim financial statements a partial release of the provision for future investment liabilities towards Elektrownia Ostrołęka Sp. z o.o., originally created in the amount of PLN 222 200 thousand, was made, amounting to PLN 31 131 thousand. This amount was recognised in the separate statement of comprehensive income in the item Change in impairment of interests in subsidiaries, associates and jointly controlled entities. The provision amounted to PLN 15 362 thousand as of 31 March 2022, which is the best possible estimate in connection with uncertainty related to final settlement amounts.
12. Inventories
Inventories
| As at | ||
|---|---|---|
| 31 March 2022 | 31 December 2021 | |
| Energy origin certificates Goods |
153 853 249 |
135 083 694 |
| Total | 154 102 | 135 777 |
No collateral is established on inventory.
Energy origin certificates
| 3-month period ended |
Year ended | |
|---|---|---|
| 31 March 2022 | 31 December 2021 | |
| Net value at the beginning of period | 135 083 | 65 489 |
| Purchase | 110 763 | 455 705 |
| Depreciation | (91 993) | (386 111) |
| Net value at the end of period | 153 853 | 135 083 |
Costs connected with redeeming energy origin certificates are presented in profit or loss in the following item: Purchase of electricity and gas for sales purposes
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

13. Assets and liabilities arising from contracts with customers
Assets and liabilities arising from contracts with customers
| Assets arising from contracts with customers |
Liabilities arising from contracts with customers |
|
|---|---|---|
| As at 1 January 2021 | 228 905 | 32 289 |
| Change in non-invoices receivables | 71 302 | - |
| Change in impairment | (1) | - |
| Adjustments, prepayments | - | 13 819 |
| As at 31 December 2021 | 300 206 | 46 108 |
| Change in non-invoices receivables | 78 653 | - |
| Change in impairment | (21) | - |
| Adjustments, prepayments | - | 7 483 |
| As at 31 March 2022 | 378 838 | 53 591 |
The balance of assets arising from contracts with customers mainly covers uninvoiced electricity sales, while the balance of liabilities arising from contracts with customers covers liabilities concerning sales adjustments related to the Act on amendment of the act on excise duty and certain other acts, as well as prepayments.
14. Cash and cash equivalents
Significant judgements and estimates
In accordance with ENEA S.A.'s credit risk assessment rules and the provisions of IFRS 9 as regards impairment tests for cash and cash equivalents as at 31 March 2022; the Company sees potential impact as negligible.
Presentation of deposits at clearinghouse IRGiT
These are funds constituting collateral for settlements with the clearing-house IRGiT, and they are analysed in terms of the possibility to free them up without incurring a substantial loss.
Cash and cash equivalents
| As at | |||
|---|---|---|---|
| 31 March 2022 | 31 December 2021 | ||
| Cash at bank account | 160 819 | 539 411 | |
| including split payment | 3 131 | 37 901 | |
| Other cash | 907 225 | 466 070 | |
| - Deposits | 901 305 | 460 397 | |
| - Other | 5 920 | 5 673 | |
| Total cash and cash equivalents | 1 068 044 | 1 005 481 | |
| Cash pooling | (1 439 189) | (1 105 251) | |
| Cash recognised in the statement of cash flows | (371 145) | (99 770) |
Restricted cash related to split payment - VAT as at 31 March 2022 was PLN 3 131 thousand (PLN 37 901 thousand as at 31 December 2021), and deposit at IRGiT as at 31 March 2022 was PLN 503 thousand (PLN 500 thousand as at 31 December 2021). No collateral is established on cash.
15. Profit allocation
A decision on how to allocate the 2021 profit will be made by shareholders at the 2022 Ordinary General Meeting. The Management Board of ENEA S.A. has proposed to allocate the profit for the financial year covering the period from 1 January 2021 to 31 December 2021 to increase reserve capital and reduce the negative value of other capitals.
On 17 June 2021, the Ordinary General Meeting of ENEA S.A. adopted resolution no. 6, resolving to cover the net loss for the financial year covering the period from 1 January 2020 to 31 December 2020, amounting to PLN 3 356 750 thousand, using retained earnings (PLN 2 417 070 thousand) and supplementary capital (PLN 939 680 thousand).
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

16. Debt-related liabilities
Credit facilities, loans and debt securities
| As at | |||
|---|---|---|---|
| 31 March 2022 | 31 December 2021 | ||
| Bank credit | 1 450 341 | 1 482 757 | |
| Bonds | 2 860 251 | 2 938 217 | |
| Long-term | 4 310 592 | 4 420 974 | |
| Bank credit | 213 567 | 207 055 | |
| Bonds | 1 993 601 | 1 957 437 | |
| Short-term | 2 207 168 | 2 164 492 | |
| Total | 6 517 760 | 6 585 466 |
In accordance with ENEA S.A.'s financing model, in order to secure funding for ENEA Group companies' on-going operations and investment needs, ENEA executes agreements with external financial institutions concerning bond issue programmes and/or credit agreements.
Credit facilities and loans
Presented below is a list of the Company's credit facilities and loans:
| No. | Company | Lender | Contract date | Total contract amount |
Debt at 31 March 2022 (principal) |
Debt at 31 December 2021 (principal) |
Interest | Final repayment deadline |
|---|---|---|---|---|---|---|---|---|
| 1. | ENEA S.A. | EIB | 18 October 2012 (A) and 19 June 2013 (B) |
1 425 000 | 880 403 | 888 130 | Fixed interest rate or WIBOR 6M + margin |
17 June 2030 |
| 2. | ENEA S.A. | EIB | 29 May 2015 (C) |
946 000 | 775 667 | 800 500 | Fixed interest rate or WIBOR 6M + margin |
15 September 2032 |
| 3. | ENEA S.A. | PKO BP S.A. | 28 January 2014, Annex 2 of 4 December 2019 |
300 000 | - | - | WIBOR 1M + margin |
31 December 2022 |
| 4. | ENEA S.A. | Bank Pekao S.A. |
28 January 2014, Annex 2 of 4 December 2019 |
150 000 | - | - | WIBOR 1M + margin |
31 December 2022 |
| 5. | ENEA S.A. | BGK | 7 September 2020 Annex 1 of 8 March 2022 |
750 000 | - | - | WIBOR 1M +margin |
28 October 2022 |
| Total | 3 571 000 | 1 656 070 | 1 688 630 | |||||
| rate | Transaction costs and effect of measurement using effective interest |
7 838 | 1 182 | |||||
| Total | 3 571 000 | 1 663 908 | 1 689 812 |
ENEA S.A. currently has credit agreements with the European Investment Bank (EIB) for a total amount of PLN 2 371 000 thousand (Agreement A PLN 950 000 thousand, Agreement B PLN 475 000 thousand and Agreement C PLN 946 000 thousand). Funds from the EIB were used to finance a multi-year investment plan aimed at modernising and expanding ENEA Operator Sp. z o.o.'s power network. Funds from Agreements A, B and C were fully used. Interest on credit facilities may be fixed or variable. In the first quarter of 2022, ENEA S.A. did not execute new long-term credit agreements.
On 8 March 2022 ENEA S.A. signed annex 1 to an overdraft facility agreement with Bank Gospodarstwa Krajowego, increasing the maximum available credit limit from PLN 250 000 thousand to 750 000 thousand and extending the final repayment deadline from 7 September 2022 to 28 October 2022.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Bond issue programs
Presented below is a list of bonds issued by ENEA S.A.:
| No. | Bond issue program name |
Program start date |
Program amount |
Value of outstanding bonds as at 31 March 2022 |
Value of outstanding bonds as at 31 December 2021 |
Interest | Buy-back deadline |
|---|---|---|---|---|---|---|---|
| 1. | Bond issue program agreement with PKO BP S.A., Bank Pekao S.A., Santander BP S.A., Citi BH S.A. |
21 June 2012 |
3 000 000 | 1 799 000 | 1 799 000 | WIBOR 6M + margin |
One-off buy-back for each series from June 2020 to June 2022 |
| 2. | Bond issue program agreement with BGK |
15 May 2014 | 1 000 000 | 600 000 | 640 000 | WIBOR 6M + margin |
Buy-back in tranches, last tranche due in December 2026 |
| 3. | Bond issue program agreement with PKO BP S.A., Bank Pekao S.A. and mBank S.A. |
30 June 2014 |
5 000 000 | 2 000 000 | 2 000 000 | WIBOR 6M + margin |
One-time buy back of each series; PLN 500 million bought back in September 2021. The remaining PLN 2 000 million - buy-back in June 2024. |
| 4. | Bond issue program agreement with BGK |
3 December 2015 |
700 000 | 418 613 | 456 669 | WIBOR 6M + margin |
Buy-back in tranches, last tranche due in September 2027 |
| Total | 9 700 000 | 4 817 613 | 4 895 669 | ||||
| Transaction costs and effect of measurement using effective interest rate |
36 239 | (15) | |||||
| Total | 9 700 000 | 4 853 852 | 4 895 654 |
In the 3-month period ended on 31 March 2022, ENEA S.A. did not execute new bond issue program agreements.
Interest rate hedges and currency hedges
In the 3-month period ending 31 March 2022 ENEA S.A. did not execute interest rate swaps. The total bond and credit exposure hedged with IRSs as at 31 March 2022 amounted to PLN 3 964 113 thousand. Moreover, ENEA S.A. has fixedrate credit agreements totalling PLN 480 745 thousand. These transactions have material impact on the predictability of expense flows and finance costs. The Company presents the measurement of these instruments in the item: Financial assets measured at fair value. Derivative instruments are treated as cash flow hedges, which is why they are recognised and accounted for using hedge accounting rules. As at 31 March 2022, financial liabilities at fair value concerning IRSs amounted to PLN 240 591 thousand (31 December 2021: PLN 135 150 thousand). The six decisions by the Monetary Policy Council raising interest rates in the period from October 2021 to March 2022 had a material impact on this amount.
In the 3-month period ending 31 March 2022, the Company did not execute new FX FORWARD transactions.
Financing terms - covenants
Financing agreements require ENEA S.A. and ENEA Group to maintain certain financial ratios. And the date on which these condensed separate interim financial statements were prepared, the Company did not breach any credit agreement provisions such as would require early re-payment of long-term debt.
17. Provisions
In the 3-month period ended 31 March 2022, provisions for other liabilities and charges increased by a net amount of PLN 190 901 thousand (in the 3-month period ended 31 March 2021, provisions for other liabilities and charges increased by PLN 106 750 thousand net).
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Change in provisions for liabilities and other charges in the period ended 31 March 2022:
| Provision for non contractual use of land |
Provision for other claims |
Provision for energy origin certificates |
Provision for onerous contracts |
Provision for settlement of investment |
Total | |
|---|---|---|---|---|---|---|
| As at 1 January 2022 | 2 171 | 232 702 | 353 840 | 250 103 | 46 493 | 885 309 |
| Increase in existing provisions | - | 13 580 | 252 093 | 53 563 | - | 319 236 |
| Use of provisions | - | (1 791) | (91 993) | (2 569) | - | (96 353) |
| Reversal of unused provision | - | (851) | - | - | (31 131) | (31 982) |
| As at 31 March 2022 | 2 171 | 243 640 | 513 940 | 301 097 | 15 362 | 1 076 210 |
| Long-term | - | - | - | 276 522 | - | 276 522 |
| Short-term | 2 171 | 243 640 | 513 940 | 24 575 | 15 362 | 799 688 |
A description of material claims and conditional liabilities is presented in 24.
Provision for other claims
In the 3-month period ending 31 March 2022 ENEA S.A. created a PLN 7 632 thousand provision for potential claims related to the termination by ENEA S.A. of agreements to purchase energy origin certificates for renewables, and the value of this provision as at 31 March 2022 was PLN 163 594 thousand (this provision is included in the table above in the column "Provision for other claims" and detailed information on this provision are presented in note 24.4).
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Financial instruments and financial risk management
18. Financial instruments and fair value
Financial instruments
The following table contains a comparison of fair values and book values:
| As 31 Ma h 20 22 at rc |
As 31 De mb 20 21 at ce er |
|||
|---|---|---|---|---|
| Bo k lue o va |
Fa ir lue va |
Bo k lue o va |
Fa ir lue va |
|
| FIN AN C IAL A S S ET S |
||||
| Lo -te ng rm |
5 5 75 77 1 |
5 5 04 15 0 |
5 5 55 49 0 |
5 5 70 24 0 |
| Fin ia l as d a fa ir v lue set t an c s m ea su re a |
22 9 8 0 0 |
22 9 8 0 0 |
16 4 9 17 |
16 4 9 17 |
| De bt fin ia l as ise d c set t a rt ost an c s a mo |
5 3 45 72 5 |
5 27 4 3 5 0 |
5 3 9 0 28 9 |
5 40 5 3 23 |
| Fin lea d s b lea iva b les an ce se an u se rec e |
24 6 |
* | 28 4 |
* |
| S ho rt-t erm |
5 01 6 0 29 |
1 8 01 28 3 |
4 5 3 6 4 43 |
1 6 8 8 64 8 |
| Fin ia l as d a fa ir v lue set t an c s m ea su re a |
70 29 6 |
70 29 6 |
28 19 4 |
28 19 4 |
| De bt fin ia l as ise d c set t a rt ost an c s a mo |
1 7 3 0 9 87 |
1 7 3 0 9 87 |
1 6 6 0 45 4 |
1 6 6 0 45 4 |
| As ris ing fro it h c set ntr act ust s a m co s w om ers |
37 8 8 3 8 |
* | 3 0 0 20 6 |
* |
| Tra de iva b les re ce |
1 7 67 14 7 |
* | 1 5 41 3 85 |
* |
| Fin lea d s b lea iva b les an ce se an se rec e u |
71 7 |
* | 72 3 |
* |
| Ca h a nd h e iva len ts s ca s q u |
1 0 6 8 0 44 |
* | 1 0 05 48 1 |
* |
| T O TA L F INA N C IAL A S S ET S |
10 5 91 8 0 0 |
7 3 05 43 3 |
10 0 91 9 3 3 |
7 2 5 8 8 8 8 |
| FIN AN C IAL LI AB ILI TIE S |
| Lo -te ng rm |
4 3 44 77 3 |
4 2 5 3 5 55 |
4 4 5 8 4 8 6 |
4 4 57 55 6 |
|---|---|---|---|---|
| Cre d it fac ilit ies loa d de bt it ies ns an sec ur , |
4 3 10 5 9 2 |
4 2 5 3 5 55 |
4 4 20 97 4 |
4 4 57 55 6 |
| Le lia b ilit ies as e |
3 4 1 8 1 |
* | 37 5 12 |
* |
| S ho rt-t erm |
4 3 31 6 8 8 |
2 2 07 16 8 |
4 1 26 42 9 |
2 1 64 49 2 |
| Cre d it fac ilit ies loa d de bt it ies ns an sec ur , |
2 2 07 16 8 |
2 2 07 16 8 |
2 1 6 4 4 9 2 |
2 1 6 4 4 9 2 |
| Le lia b ilit ies as e |
2 1 47 |
* | 2 5 76 |
* |
| Tra de d o he b les t an r p ay a |
6 29 5 9 3 |
* | 8 0 8 0 0 2 |
* |
| Lia b ilit ies is ing fro it h c ntr act ust ar m co s w om ers |
5 3 5 9 1 |
* | 46 10 8 |
* |
| Ot he r fi ia l lia b ilit ies na nc |
1 4 3 9 18 9 |
* | 1 1 05 25 1 |
* |
| T O TA L F INA N C IAL LI AB ILI TIE S |
8 67 6 4 61 |
6 4 6 0 7 23 |
8 5 84 91 5 |
6 6 22 04 8 |
(*) book value is close to fair value measured in accordance with level 2 in the following hierarchy.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Financial instruments are fair-value measured according to a hierarchy.
| As at 31 March 2022 | |||||
|---|---|---|---|---|---|
| Level 1 | Level 2 | Level 3 | Total | ||
| Financial assets measured at fair value | 23 112 | 258 134 | 18 850 | 300 096 | |
| Equity instruments at fair value through other comprehensive income |
- | - | 12 587 | 12 587 | |
| Call options (at fair value through profit or loss) | - | 17 543 | - | 17 543 | |
| Derivative instruments used in hedge accounting (e.g. interest rate swaps) |
- | 240 591 | - | 240 591 | |
| Interests at fair value through profit or loss | 23 112 | - | 6 263 | 29 375 | |
| Debt financial assets at amortised cost | - | 7 005 337 | - | 7 005 337 | |
| Total | 23 112 | 7 263 471 | 18 850 | 7 305 433 | |
| Credit facilities, loans and debt securities | - | (6 460 723) | - | (6 460 723) | |
| Total | - | (6 460 723) | - | (6 460 723) |
| As at 31 December 2021 | |||||
|---|---|---|---|---|---|
| Level 1 | Level 2 | Level 3 | Total | ||
| Financial assets measured at fair value Equity instruments at fair value through other |
22 880 - |
151 381 - |
18 850 12 587 |
193 111 12 587 |
|
| comprehensive income Call options (at fair value through profit or loss) Derivative instruments used in hedge accounting (e.g. |
- | 16 231 | - | 16 231 | |
| interest rate swaps) Interests at fair value through profit or loss |
- 22 880 |
135 150 - |
- 6 263 |
135 150 29 143 |
|
| Debt financial assets at amortised cost | - | 7 065 777 | - | 7 065 777 | |
| Total | 22 880 | 7 217 158 | 18 850 | 7 258 888 | |
| Credit facilities, loans and debt securities | - | (6 622 048) | - | (6 622 048) | |
| Total | - | (6 622 048) | - | (6 622 048) |
Financial assets and financial liabilities at fair value include:
- − shares in unrelated entities, the stake in which is below 20%; this line as of 31 March 2022 includes a stake in ElectroMobility Poland S.A., for which there is no market price quoted on an active market; having analysed the standard IFRS 9, the Company decided to qualify these interests as financial instruments through other comprehensive income; when the stake in ElectroMobility Poland S.A. was reclassified, it was measured at fair value and the measurement was recognised in the present-period financial result; in the event that interests in unrelated entities are quoted on the Warsaw Stock Exchange, their fair value is determined on the basis of stock market quotes;
- − Polimex-Mostostal S.A. call options;
- − derivative instruments, which include the measurement of interest rate swaps; the fair value of derivative instruments is established by calculating the net present value based on two yield curves, i.e. a curve to determine discount factors and a curve used to estimate future variable reference rates;
Non-current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in over one year. Fair value is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.
Current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in under one year.
The fair value of bank credit, loans and debt securities is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.
The table above contains an analysis of financial instruments at fair value, grouped into a three-level hierarchy, where:
Level 1 - fair value is based on (unadjusted) market prices quoted for identical assets or liabilities on active markets
Level 2 - fair value is determined on the basis of values observed on the market, which are not a direct market quote (e.g. they are established by direct or indirect reference to similar instruments on a market),
Level 3 - fair value is determined using various measurement techniques that are not, however, based on observable market data.
No transfers between the levels were made in the 3-month period ended 31 March 2022.
As at 31 March 2022, financial assets at fair value included call options for Polimex-Mostostal S.A. shares, among other
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

things. Pursuant to a call option agreement for Polimex-Mostostal S.A. shares of 18 January 2017, as amended, ENEA S.A. holds 23 call options from Towarzystwo Finansowe Silesia Sp. z o.o. (TFS) to purchase 6 937 500 shares, with a nominal value of PLN 2 each. The contractual share allocation date is at the end of each calendar quarter from September 2021 to December 2026. On 30 March 2022 ENEA S.A. submitted a demand to exercise call option no. 4 and made a bank transfer for 187 500 Polimex-Mostostal S.A. shares. The increase of Polimex Mostostal S.A.'s share capital by PLN 1 500 thousand, i.e. from PLN 475 738 thousand to PLN 477 238 thousand, admitting 750 000 series S ordinary bearer shares with a nominal value of PLN 2 each to trade, was registered on 1 April 2022. As of the date on which these condensed separate interim financial statements were prepared, ENEA S.A. holds a 16.48% stake in the share capital of Polimex – Mostostal S.A. A fair-value measurement of the call options was prepared using the Black-Scholes model. The book value of these options as at 31 March 2022 was PLN 17 543 thousand (at 31 December 2021: PLN 16 231 thousand).
19. Debt financial assets at amortised cost
Debt financial assets at amortised cost
| As at | |||
|---|---|---|---|
| 31 March 2022 | 31 December 2021 |
||
| Current debt financial assets at amortised cost | |||
| Intra-group bonds | 1 687 308 | 1 653 787 | |
| Loans granted | 43 679 | 6 667 | |
| Total current debt financial assets at amortised cost | 1 730 987 | 1 660 454 | |
| Non-current debt financial assets at amortised cost | |||
| Intra-group bonds | 1 450 610 | 1 495 032 | |
| Loans granted | 3 895 115 | 3 895 257 | |
| Total non-current debt financial assets at amortised cost | 5 345 725 | 5 390 289 | |
| TOTAL | 7 076 712 | 7 050 743 |
Intra-group financing
ENEA Group has adopted a model for financing investments being implemented by ENEA S.A. through intra-group financing. ENEA S.A. raises long-term capital in financial markets through credit facilities or bond issues and subsequently distributes these within the Group based on intra-group bond issue programme agreements or loan agreements. Moreover, ENEA S.A. provides financing to subsidiaries from internal funding.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Intra-group bonds
The following table presents on-going intra-group bond issue programs as at 31 March 2022 and 31 December 2021:
| No. | Bond issuer | Contract date | Amount granted |
Amount used |
Outstanding bonds as at 31 March 2022 (principal) |
Outstanding bonds as at 31 December 2021 (principal) |
Interest | Final buy back deadline |
|---|---|---|---|---|---|---|---|---|
| 1. | ENEA Nowa Energia Sp. z o.o. |
10 March 2011 | 26 000 | 26 000 | 12 000 | 12 000 | WIBOR 6M + margin |
31 March 2023 |
| 2. | ENEA Wytwarzanie Sp. z o.o. |
8 September 2012 agreement for PLN 4 000 000 thousand decreased through Annex 2 of 21 January 2015 to PLN 3 000 000 thousand |
3 000 000 | 2 650 000 | 1 449 000 | 1 449 000 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 15 June 2022 |
| 3. | ENEA Operator Sp. z o.o. |
20 June 2013 amended through Annex 1 of 9 October 2014 and Annex 2 of 7 July 2015 |
1 425 000 | 1 425 000 | 880 403 | 888 130 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 17 June 2030 |
| 4. | ENEA Operator Sp. z o.o. |
7 July 2015 amended through Annex 1 of 28 March 2017 |
946 000 | 946 000 | 775 667 | 800 500 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 15 September 2032 |
| Total | 3 117 070 | 3 149 630 | ||||||
| Transaction costs and effect of measurement using effective interest rate |
20 848 | (812) | ||||||
| Total | 3 137 918 | 3 148 818 |
In the 3-month period ending 31 March 2022 ENEA S.A. did not execute new intra-group bond issue programme agreements concerning financing for ENEA Group companies.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Loans
The following table presents loans issued by ENEA S.A. as at 31 March 2022 and 31 December 2021:
| No. | Borrower | Contract date | Total contract amount |
Debt at 31 March 2022 |
Debt at 31 December 2021 |
Interest | Final repayment deadline |
|---|---|---|---|---|---|---|---|
| 1. | Elektrownia Ostrołęka Sp. z o.o. |
30 September 2019 |
29 000 | 29 000 | 29 000 | Fixed | 29 April 2022 |
| 2. | Elektrownia Ostrołęka Sp. z o.o. |
23 December 2019 |
170 000 | 170 000 | 170 000 | Fixed | 29 April 2022 |
| 3. | ENEA Wytwarzanie Sp. z o.o. |
30 January 2020 |
2 200 000 | 1 782 034 | 1 782 034 | WIBOR 6M + margin |
30 September 2024 |
| 4. | ENEA Elektrownia Połaniec S.A. |
28 February 2020 |
500 000 | 500 000 | 500 000 | WIBOR 6M + margin |
20 December 2024 |
| 5. | ENEA Operator Sp. z o.o. |
12 March 2020 | 950 000 | 650 000 | 650 000 | WIBOR 6M + margin |
20 December 2024 |
| 6. | ENEA Operator Sp. z o.o. |
22 June 2021 | 1 090 000 | 950 000 | 950 000 | WIBOR 6M + margin |
20 December 2026 |
| 7. | Miejska Energetyka Cieplna Piła Sp. z o.o. |
24 June 2021 | 15 000 | 15 000 | 15 000 | WIBOR 6M + margin |
20 December 2031 |
| 4 096 034 | 4 096 034 | ||||||
| Transaction costs and effect of measurement using effective interest rate, along with |
72 035 | 31 500 | |||||
| impairment of loans | |||||||
| Impairment of loans | (229 275) | (225 610) | |||||
| Total | 3 938 794 | 3 901 924 |
In the 3-month period ending 31 March 2022 ENEA S.A. did not execute new loan agreements.
On 29 April 2022, ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 5 to the PLN 340 000 thousand loan agreement of 23 December 2019 and Annex 10 to the PLN 58 000 thousand loan agreement of 17 July 2019. Pursuant to the provisions of these annexes, the deadline for the one-off repayment by Elektrownia Ostrołęka Sp. z o.o. of the loans along with interest was prolonged to 30 December 2022.
Impairment of financial assets at amortised cost (concerns loans granted) as at 31 March 2022 amounted to PLN 229 275 thousand. The total impairment loss on loans issued to Elektrownia Ostrołęka Sp. z o.o. recognised in the 3-month period ended 31 March 2022 was PLN 3 665 thousand, and this amount was recognised in the separate statement of comprehensive income under "Impairment of financial assets at amortised cost."
20. Impairment of trade and other receivables
Impairment of trade and other receivables:
| 3-month period ended 31 March 2022 |
Year ended 31 December 2021 |
|
|---|---|---|
| Impairment of receivables at the beginning of period | 65 025 | 59 450 |
| Created | 3 223 | 13 307 |
| Used | (2 957) | (7 732) |
| Impairment of receivables at the end of period | 65 291 | 65 025 |
In the 3-month period ended 31 March 2022, impairment of trade and other receivables increased by PLN 266 thousand (in the 3-month period ended 31 March 2021 impairment grew by PLN 1 582 thousand). Impairment losses are mainly recognised on trade receivables. Impairment of other receivables is negligible.
For current trade receivables, expected credit losses are calculated based on historic data in a way that is described in
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Rules for creating and recording impairment losses on trade receivables and other financial items at ENEA Group companies. The impairment of receivables for 2022 is calculated on the basis of data from 2021. Therefore, the level of receivables impairment estimated as at 31 March 2022 reflects objective indications of impairment.
21. Analysis of the age structure of assets arising from contracts with customers and trade and other receivables
Age structure of assets arising from contracts with customers and trade and other receivables:
| As at 31 March 2022 | ||||
|---|---|---|---|---|
| Nominal value | Impairment | Book value | ||
| Trade and other receivables | ||||
| Current | 1 654 942 | (288) | 1 654 654 | |
| Overdue | 175 662 | (63 170) | 112 492 | |
| 0-30 days | 67 779 | (103) | 67 676 | |
| 31-90 days | 15 269 | (1 219) | 14 050 | |
| 91-180 days | 7 203 | (1 810) | 5 393 | |
| over 180 days | 85 411 | (60 038) | 25 373 | |
| Total | 1 830 604 | (63 458) | 1 767 146 | |
| Assets arising from contracts with customers |
378 952 | (114) | 378 838 |
| As at 31 December 2021 | ||||
|---|---|---|---|---|
| Nominal value | Impairment | Book value | ||
| Trade and other receivables | ||||
| Current | 1 437 846 | (273) | 1 437 573 | |
| Overdue | 166 672 | (62 859) | 103 813 | |
| 0-30 days | 62 282 | (98) | 62 184 | |
| 31-90 days | 12 553 | (886) | 11 667 | |
| 91-180 days | 4 955 | (1 238) | 3 717 | |
| over 180 days | 86 882 | (60 637) | 26 245 | |
| Total | 1 604 518 | (63 132) | 1 541 386 | |
| Assets arising from contracts with customers |
300 299 | (93) | 300 206 |
22. Other financial liabilities
Cash management at ENEA Group is carried out at ENEA S.A. level, making it possible to effectively manage cash surpluses and to limit external financing costs. The Group's cash pooling service includes selected companies from ENEA's tax group.
In this service, the balances of participants' bank accounts are zeroed at the end of each day and subsequently any cash surpluses are transferred to the managing entity's (ENEA S.A.) bank account. The next day, cash balances are reversed and returned to the companies' bank accounts.
At 31 March 2022, the balance of liabilities within cash pooling was PLN 1 439 189 thousand (PLN 1 105 251 thousand at 31 December 2021) and is presented in line: Other financial liabilities.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Other explanatory notes
23. Related-party transactions
The Company executes transactions with the following related parties:
- − transactions with ENEA Group companies
- − transactions between the Company and members of ENEA S.A.'s corporate bodies are divided into two categories:
- − resulting from being appointed as Supervisory Board members,
- − resulting from other civil-law contracts.
- − transactions with State Treasury related parties.
ENEA Group companies
| 3-month period ended | |||
|---|---|---|---|
| 31 March 2022 | 31 March 2021 | ||
| Purchase value, including: purchase of materials purchase of services other (including electricity and gas) |
3 209 750 107 592 840 2 616 803 |
2 201 017 135 563 845 1 637 037 |
|
| Sale value, including: sale of electricity sale of services other |
153 003 132 651 5 968 14 384 |
88 706 81 540 248 6 918 |
|
| Interest income, including: on bonds on loans other |
64 198 26 050 36 869 1 279 |
35 244 20 792 14 256 196 |
| As at | |||
|---|---|---|---|
| 31 March 2022 | 31 December 2021 | ||
| Receivables | 543 578 | 426 679 | |
| Liabilities | 723 413 | 733 296 | |
| Financial assets - bonds | 3 137 918 | 3 148 818 | |
| Loans granted | 3 938 794 | 3 901 924 | |
| Other financial liabilities | 1 439 189 | 1 105 251 |
These transactions with Group companies are executed on market terms, which do not differ from the terms applied in transactions with other entities.
Transactions with members of the Group's corporate authorities
| Item | Company's Management Board 3-month period ended |
Company's Supervisory Board 3-month period ended |
||
|---|---|---|---|---|
| 31 March 2022 | 31 March 2021 | 31 March 2022 | 31 March 2021 | |
| Remuneration under management contracts Remuneration under appointment to management or supervisory bodies |
1 020 - |
937* - |
- 186 |
- 201 |
| TOTAL | 1 020 | 937 | 186 | 201 |
* This remuneration includes a non-compete clause for former Management Board members, amounting to PLN 82 thousand
In the 3-month period ended 31 March 2022, no loans were made to Supervisory Board members from the Company Social Benefit Fund (PLN 0 thousand for the 3-month period ended 31 March 2021).
Other transactions resulting from civil-law contracts executed between ENEA S.A. and members of the Company's corporate authorities mainly concern the use of company cars by members of ENEA S.A.'s Management Board for private purposes.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Transactions with State Treasury related parties
ENEA S.A. also executes commercial transactions with state and local administration units and entities owned by Poland's State Treasury.
The subject of these transactions mainly is as follows:
- − purchase of electricity and property rights resulting from origin certificates for energy from renewable sources and energy produced in cogeneration with heat, from State Treasury subsidiaries and
- − sale of electricity, distribution services and other associated fees that the Company provides for both state and local administration authorities (sale to end customers) and to the State Treasury's subsidiaries (wholesale and retail sale - to final customers).
These transactions are executed on market terms, and these terms do not differ from the terms applied in transactions with other entities. The Company does not keep records that would make it possible to aggregate the amounts of all transactions executed with all state institutions and the State Treasury's subsidiaries.
In addition, the Company identified financial transactions with State Treasury's related parties, i.e. with banks serving as guarantors for bond issue programmes. These entities include: PKO BP S.A., Pekao S.A. and Bank Gospodarstwa Krajowego. Detailed information on bond issue programs is presented in note 16.
24. Conditional liabilities, court proceedings and cases on-going before public administration organs
This section of explanatory notes includes conditional liabilities and on-going proceedings in courts, arbitration bodies or public administration bodies
24.1. Sureties and guarantees
On 11 March 2022 ENEA S.A. as Guarantor executed a surety agreement with PKO BP S.A. The subject of the agreement is a surety for the future liabilities of ENEA Trading Sp. z o.o. up to a maximum amount of PLN 2 400 000 thousand concerning transactions in CO2 emission allowance trading.
The following table presents significant bank guarantees valid as of 31 March 2022 under an agreement between ENEA S.A. and Bank PKO BP S.A. and Bank PEKAO S.A. up to the limit specified in the agreement.
List of guarantees issued as at 31 March 2022
| Guarantee issue date |
Guarantee validity |
Obliged entity | Entity for which the guarantee was issued |
Bank - issuer |
Guarantee amount in PLN 000s |
|---|---|---|---|---|---|
| 30.12.2020 | 31.12.2022 | ENEA Elektrownia Połaniec | Izba Rozliczeniowa Giełd Towarowych S.A. |
PEKAO S.A. | 260 000 |
| Polskie Sieci | |||||
| 12.08.2018 | 31.12.2022 | ENEA Elektrownia Połaniec | Elektroenergetyczne | PKO BP S.A. | 60 000 |
| 17.02.2022 | 16.06.2022 | ENEA Elektrownia Połaniec | Arkan Impex General | PKO BP S.A. | 10 032 |
| Trading LLC | |||||
| 01.07.2020 | 30.06.2022 | ENEA S.A. | H. Święcicki Clinical | PKO BP S.A. | 1 281 |
| Hospital in Poznań | |||||
| 04.08.2021 | 15.07.2023 | ENEA S.A. | Vastint Poland Sp. z o.o. | PKO BP S.A. | 1 045 |
| Total bank guarantees | 332 358 |
The value of other guarantees issued by the Company as at 31 March 2022 was PLN 10 809 thousand. The total value of sureties and guarantees issued by ENEA S.A. as collateral for ENEA Group companies' liabilities at 31 March 2022 was PLN 3 790 192 thousand.
24.2. On-going proceedings in courts of general competence
Proceedings initiated by the Company
Proceedings in courts of general competence initiated by ENEA S.A. concern receivables related to electricity supplies and receivables related to other matters - illegal uptake of electricity, grid connections and other specialised services.
At 31 March 2022, a total of 18 855 cases initiated by the Company were in progress before courts of general competence, worth in aggregate PLN 61 674 thousand (31 December 2021: 17 739 cases worth PLN 59 631 thousand).
The outcome of individual cases is not significant from the viewpoint of the Company's financial result.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Proceedings against the Company
Proceedings against the Company are initiated by both natural persons and legal entities. They concern issues such as: compensation for electricity supply disruptions, compensation for the Group's use of properties on which power equipment is located as well as claims related to terminated contracts for the purchase of property rights (note 24.4).
At 31 March 2022, a total of 93 cases against the Company were in progress before courts of general competence, worth in aggregate PLN 586 720 thousand (31 December 2021: 94 cases worth PLN 587 473 thousand).
Provisions related to these court cases are presented in 17.
24.3. Cases concerning 2012 non-balancing
On 30 and 31 December 2014, ENEA S.A. submitted demands for settlement to:
| Demanded amount in PLN 000s |
|
|---|---|
| PGE Polska Grupa Energetyczna S.A. | 7 410 |
| PKP Energetyka S.A. | 1 272 |
| TAURON Polska Energia S.A. | 17 086 |
| TAURON Sprzedaż GZE Sp. z o.o. | 1 826 |
| Total | 27 594 |
The subject of these demands is claims for the payment for electricity that was incorrectly settled on the balancing market in 2012. The companies receiving these demands obtained unjustified proceeds by not allowing ENEA S.A. to issue invoices for 2012.
Given a lack of an amicable resolution in this case, ENEA S.A. brought lawsuits against:
- − TAURON Polska Energia S.A. lawsuit of 10 December 2015,
- − TAURON Sprzedaż GZE Sp. z o.o. lawsuit of 10 December 2015,
- − PKP Energetyka S.A. lawsuit of 28 December 2015,
- − PGE Polska Grupa Energetyczna S.A. lawsuit of 29 December 2015.
In the case ENEA S.A. vs. Tauron Polska Energia and others (file no. XIII GC 600/15/AM), on 23 March 2021 in its entirety and awarded the costs of proceedings in favour of the defendant and the co-defendants. The ruling along with justification in writing was delivered on 20 May 2021. On 10 June 2021, ENEA S.A. lodged an appeal to the Appeals Court in Katowice. In the case ENEA S.A. vs. TAURON Sprzedaż GZE Sp. z o.o. (file no. X GC 546/15), on 21 December 2021 the District Court in Gliwice dismissed the claim in its entirety and awarded the costs of proceedings in favour of the defendant. The ruling along with a justification in writing was delivered on 3 March 2022. On 17 March 2022 ENEA S.A. lodged an appeal to the Appeals Court in Katowice. In a case against PGE Polska Grupa Energetyczna S.A. (file no. XVI GC 525/20, previous file no. XX GC 1163/15) - through a ruling of 7 January 2021 the court suspended the proceeding at the mutual request of the parties. Through a ruling of 19 November 2021, the court resumed the previously suspended proceeding. Through a ruling of 1 March 2022, the court suspended the proceeding at the mutual request of the parties.
No amounts concerning the above cases were recognised in the separate statement of financial position.
24.4. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin certificates for energy from renewable sources
ENEA S.A. is a party to 8 court proceedings concerning agreements for the purchase of property rights arising under certificates of origin for energy from renewable sources, which includes:
- 6 proceedings for payment in which claims for remuneration, contractual penalties or damages are pursued against ENEA S.A., whereas in one proceeding there was a preliminary ruling regarding claims and recognition of ineffectiveness of contract termination;
- 1 proceeding to determine the ineffectiveness of ENEA S.A.'s termination of property rights sale agreements made on 28 October 2016;
- 1 proceeding for payment, in which ENEA S.A. seeks a claim concerning a contractual penalty.
ENEA S.A. offset a part of receivables due for these counterparties from ENEA S.A. for sold property rights with damagesrelated receivables due for ENEA S.A. from renewables producers. The damage caused to ENEA S.A. arose as a result of the counterparties' failure to fulfil a contractual obligation to participate, in good faith, in re-negotiating long-term agreements for the sale of property rights in accordance with an adaptation clause that is binding for the parties.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

On 28 October 2016, ENEA S.A. submitted statements depending on the agreement: on termination or withdrawal from long-term agreements for the purchase by the Company of property rights resulting from certificates of origin for energy from renewable sources (green certificates) (Agreements).
The Agreements were executed in 2006-2014 with the following counterparties, which own renewable generation assets ("Counterparties"):
- Farma Wiatrowa Krzęcin Sp. z o.o., based in Warsaw;
- Megawind Polska Sp. z o.o., based in Szczecin;
- PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów (currently PGE Energia Ciepła S.A.);
- PGE Energia Odnawialna S.A., based in Warsaw;
- PGE Energia Natury PEW Sp. z o.o., based in Warsaw (currently PGE Energia Odnawialna S.A., based in Warsaw);
- "PSW" Sp. z o.o., based in Warsaw;
- in.ventus Sp. z o.o. EW Śniatowo Sp. k., based in Poznań (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice);
- Golice Wind Farm Sp. z o.o., based in Warsaw.
As a rule, the Agreements were terminated by the end of November 2016. The dates on which the respective Agreements were terminated depended on contractual provisions.
The reason for terminating/withdrawing from each of the Agreements by the Company was failure to engage in renegotiations concerning adaptive clauses in each of the Agreements that would justify the adjustment of these Agreements in order to restore contractual balance and the equivalence of the parties' benefits following changes in the law.
Legal changes that occurred after the aforementioned Agreements were executed include in particular:
- ordinance of the Minister of Economy of 18 October 2012 on a detailed scope of obligations to obtain and present for redemption origin certificates, pay substitute fees, purchase electricity and industrial heat generated from renewable sources and the obligation to validate data concerning the quantity of electricity generated from renewable sources (Polish Journal of Laws of 2012, item 1229);
- Act on renewable energy sources of 20 February 2015 (Polish Journal of Laws of 2015, item 478) and associated further legal changes and announced drafts of legal changes, including especially:
- − the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 (Polish Journal of Laws of 2016, item 925); and
- − a draft of the Ordinance of the Minister of Energy concerning changes in the share of electricity resulting from redeemed origin certificates confirming production of electricity from renewable sources, which is to be issued based on an authorisation under art. 12 sec. 5 of the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 and certain other acts,
caused an objective lack of possibilities to develop reliable models to forecast the prices of green certificates.
The Agreements were terminated with the intention for the Company to avoid losses constituting the difference between contractual and market prices of green certificates. Due to the changing legal conditions after termination of the Agreements in 2017, especially arising from the Act of 20 July 2017 on amendment of the act on renewable energy sources, the estimated value of future contract liabilities would have changed. In the current legal framework, this would be significantly lower in comparison to the amount estimated when the Agreements were being terminated, i.e. approx. PLN 1 187 million. This decline reflects a change in the way in which the substitute fee is calculated, which in accordance with the content of some of the Agreements constitutes the basis for calculating the contract price and indexing it to the market price. The Company created a PLN 163 594 thousand provision for potential claims resulting from the terminated Agreements in relation to submissions made by 31 March 2022 concerning transactions to sell property rights by the counterparties; the provision is presented in 17.
In a case brought by Golice Wind Farm Sp. z o.o. against ENEA S.A., the court issued on 14 August 2020 a partial and preliminary ruling, in which it:
- 1) withdrew a claim seeking the voidance of ENEA S.A.'s termination of an agreement to sell property rights, which took place on 28 October 2016;
- 2) accepted a claim for the payment of consideration for property rights and ordered ENEA S.A. to pay PLN 6 042 thousand, together with interest;
- 3) considered the other parts of the claim for payment as justified in general.
This ruling is not final. ENEA S.A. has appealed part of the ruling, i.e. as regards points 2 and 3. Moreover, on 13 January 2021 Golice Wind Farm Sp. z o.o. appealed a part of the ruling, i.e. as regards the ruling in point 1, dismissing the action for a declaration. The appeal hearing was held on 21 January 2022, and the ruling announcement was postponed to 21 February 2022. On 21 February 2022 The Appeals Court in Poznań issued a judgement whereby it amended the appealed judgement and determined that the statement made by ENEA S.A. in Poznań in its letter of 28 October 2016

on termination of the sale agreement in its entirety did not have legal effect and the agreement remains in force in its entirety, dismissing the appeal of Golice Wind Farm Sp. z o.o. to the remaining extent and dismissing the appeal of ENEA S.A., as well as awarding the costs of the appeal proceedings to Golice Wind Farm Sp. z o.o. from ENEA S.A.
In cases brought by PGE Group companies, i.e.:
- PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1064/17) on 15 June 2021, the court resumed the previously suspended proceeding, and then through a ruling of 6 September 2021 the District Court in Poznań suspended the proceeding at the mutual request of the parties. Through a ruling of 17 February 2022, the court resumed the previously suspended proceeding, which was subsequently suspended again by a decision of 25 March 2022 on the mutual application of the parties;
- PGE Energia Ciepła S.A., based in Warsaw (file no. IX GC 555/16) through a ruling of 8 December 2021 the court decided to resume the suspended proceeding, while on 15 December 2021 the Company was served an extension of the action, in respect of which the Company took a position requesting that it be dismissed in its entirety. Through a ruling of 5 January 2022, the District Court in Poznań once again suspended the proceeding at the mutual request of the parties.
- PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1011/17) through a ruling of 16 April 2021, the court resumed the previously suspended proceeding, and through a ruling of 3 August 2021 the District Court in Poznań suspended the proceeding at the mutual request of the parties. Subsequently, the proceeding was resumed. On 7 March 2022, the Claimant filed a pleading, maintaining its previous position and requested a stay of proceedings granting the Company's potential request in this regard.
In a case brought by ENEA S.A. against PGE Górnictwo i Energetyka Konwencjonalna S.A. (file no. X GC 608/20) – on 26 October 2020, the court ruled to suspend the proceeding at the parties' mutual request. Subsequently, the proceeding was resumed. In a letter of 1 March 2022, the claimant informed of a change in the claimant's entity, indicating that as a result of a resolution adopted on 15 April 2021 by the Extraordinary Meeting of PGE Górnictwo i Energetyka Konwencjonalna S.A. and PGE Energia Ciepła S.A., part of the assets of PGE Górnictwo i Energetyka Konwencjonalna constituting an organised part of enterprise, in the form of Zespół Elektrowni Dolna Odra, was transferred to PGE Energia Ciepła S.A. Moreover, in the letter, the claimant requested that the proceedings be suspended at the mutual request of the parties, or alternatively that the letter be considered as granting a motion to suspend the proceedings that the Company may file in this respect.
In a case brought by Hamburg Commercial Bank AG against ENEA S.A., in which Hamburg Commercial Bank AG is seeking claims arising under property rights sales contract no. ENEA/WINDPARK ŚNIATOWO/PMOZE/2013 of 26 February 2014, executed between ENEA S.A. and Windpark Śniatowo Management GmbH EW Śniatowo Sp. k. (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice), claiming their purchase under a debt assignment contract, the District Court in Poznań issued on 25 February 2021 a partial ruling, ordering ENEA S.A. to pay PLN 494 thousand, with statutory late interest for the period from 16 December 2016 to the payment date. This ruling is not final. On 2 June 2021, ENEA S.A. lodged an appeal against the entire partial ruling by the District Court in Poznań of 25 February 2021. Within the remaining scope, i.e. concerning the claim extension of 17 January 2019 and claim extension of 20 August 2019, the proceeding is legally suspended under the order of the District Court in Poznań of 24 October 2019 until a final ruling is issued by this court in case no. IX GC 552/17. On 30 December 2021 Hamburg Commercial Bank AG filed an application with the District Court in Poznań for securing the claim. Through a ruling of 18 March 2022 the District Court in Poznań dismissed the claimant's application for securing the claim.
25. Capital increase
On 19 January 2022, the Management Board of ENEA S.A. adopted a resolution to initiate a process to raise the Company's share capital through the issue of at least 1 and no more than 88 288 515 ordinary bearer shares series D, with a nominal value of PLN 1.00 each ("Series D Shares"), with the aim of raising funds to finance investment projects in ENEA Group's Distribution Area (including expansion and modernisation of high and medium voltage lines, installation of remote reading meters and connection of new customers to the grid), being implemented by ENEA Operator sp. z o.o., with the exclusion of the possibility to finance coal assets. All of these projects are in alignment with ENEA Group's strategy and are intended to ensure energy security and continuous and reliable supplies of electricity in the operating area of ENEA Operator sp. z o.o. The issue will be a private subscription pursuant to art. 431 § 2 point 1 of the Polish Commercial Companies Code, conducted as a public offering exempted from the obligation to publish a prospectus in the meaning of the relevant laws or another information document and will be addressed to investors meeting specific criteria, as set in the resolution regarding the share capital increase via the issue of Series D Shares, with the right of pre-emption to all Series D Shares being waived for all of the Company's existing shareholders.
Given the above, on 19 January 2022 the Management Board called an Extraordinary General Meeting for 10 March 2022 that was intended to adopt a resolution on a share capital increase via the Series D Share issue, with pre-emption rights waived entirely.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

On 21 January 2022 ENEA S.A. submitted an application to the President of the Council of Ministers for the State Treasury to acquire Series D Shares for a total amount of not less than PLN 899 659 967.85, in exchange for a cash contribution from the re-privatisation fund referred to in art. 56 sec. 1 of the Act of 30 August 1996 on commercialisation and certain employee authorisations ("Application"). The Company requested that the State Treasury acquire not less than 45 470 725 (i.e. a proportional number of Series D Shares to the State Treasury's existing stake in the total number of the Company's shares) and not more than 88 288 515 Series D Shares (i.e. the maximum number of Series D Shares to be issued). The Application was submitted based on the Regulation of the Minister of Finance of 23 December 2021 on the detailed procedure for the acquisition or subscription of shares by the State Treasury using the Reprivatisation Fund in 2021-2022.
On 10 March 2022, ENEA S.A.'s Extraordinary General Meeting adopted a resolution pursuant to which a break in the Extraordinary General Meeting was announced until 8 April 2022.
On 8 April 2022, the Company signed an investment agreement with the State Treasury represented by the Prime Minister ("Investment Agreement") in relation to the planned issue of the Series D ordinary bearer shares with the exclusion of preemptive rights of the existing shareholders. Pursuant to the Investment Agreement, the State Treasury expressed its intention to acquire up to 88 288 515 Series D Shares for funds in the amount of up to PLN 899 659 967.85 ("New Funds") from the Reprivatisation Fund referred to in art. 56 and art. 69h of the Act of 30 August 1996 on commercialisation and certain employee authorisations.
The Company has made a commitment to the State Treasury that it would allocate the New Funds in their entirety for the implementation by the Company and its subsidiary (ENEA Operator sp. z o.o.) of the following projects: (a) Expansion and modernisation of the grid as regards high and medium voltage substations; (b) Expansion and modernisation of the grid as regards high voltage lines; (c) Expansion and modernisation of the grid as regards medium voltage grids; (d) Remote reading meters; and (e) Connections to the grid.
The Investment Agreement sets out the rules governing the use of the New Funds and the consequences of a breach of those rules, the obligations and assurances of the Company in connection with the transfer of the New Funds, the obligations relating to reporting and accounting for the New Funds and the control powers of the Treasury. In the event that the New Funds are used contrary to the Investment Agreement or if the Investment Agreement is improperly performed, the Company will be required, depending on the nature of the provision violated, to pay to the State Treasury the guarantee amounts or return all or part of the New Funds.
The Extraordinary General Meeting resumed on 8 April 2022. The Extraordinary General Meeting adopted resolution no. 5 on an increase of the Company's share capital through the issue of series D ordinary bearer shares in a private subscription, a complete exemption of the existing shareholdings of their pre-emption rights to all series D shares, amendment of the Company's articles of association, application for the admission and introduction of the series D Shares and/or rights to series D shares to trade on the regulated market operated by the Warsaw Stock Exchange and dematerialisation of the series D shares and/or rights to series D shares ("Issue Resolution"). Pursuant to the resolution:
- The Company's share capital has been increased by no less than PLN 1.00 and no more than PLN 88 288 515, i.e. to no less than PLN 441 442 579 and no more than PLN 529 731 093, by way of issuing no less than 1 and no more than 88 288 515 Series D Shares, with a nominal value of PLN 1.00 per share.
- The Series D share issue will be a private subscription (in the meaning of art. 431 § 2 point 1 of the Polish Commercial Companies Code) by way of a public offering ("Offering") addressed exclusively to selected investors on the terms specified in § 3 sec. 2 of this resolution, which will be exempted from the obligation to publish a prospectus in the meaning of the relevant laws or another information or offering document for the purposes of the Offering in accordance with art. 3 sec. 1 in connection with art. 1 sec. 4 letter a) and letter d) of Regulation (EU) 2017/1129 of the European Parliament and of the Council of 14 June 2017 on the prospectus to be published when securities are offered to the public or admitted to trading on a regulated market and repealing Directive 2003/71/EC.
- The aim of the Series D Share issue is to finance investment projects aimed at the development and modernisation of medium- and high-voltage transmission grids and the installation of remote reading meters. Proceeds from the Series D Share issue may not be used to finance coal assets within the Company's group.
Moreover, on 8 April 2022, the Company signed agreements with Pekao Investment Banking Spółka Akcyjna ("Global Coordinator" or "Pekao IB") and Bank Polska Kasa Opieki Spółka Akcyjna (jointly as "Joint Bookrunners") on the placement of shares ("Placement Agreement") and on the commencement of the book-building process by way of a private subscription of no more than 88 288 515 ordinary bearer series D shares. On 8 April 2022, the Company's Management Board also adopted a resolution to set the rules for the offering, rules for conducting the bookbuilding process and the acquisition and allocation of the Series D Shares. In the Placement Agreement, the Issues has undertaken that, inter alia, without the consent of the Global Coordinator, it will not issue, sell or offer shares in the Company within 360 days of the date of the first listing of the Series D Shares, except in accordance with standard exemptions.
A bookbuilding process for the Series D Shares was conducted on 8-13 April 2022. On 14 April 2022, once it was
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

completed, the Company's Management Board set the issue price of Series D Shares at PLN 8.50 per one Series D Share. The Company's Management Board also decided to offer a total of 88 288 515 Series D Shares to selected investors under the terms of the Issue Resolution and the subscription rules determined thereunder.
Agreements for the acquisition of the Series D Shares were signed on 19-27 April 2022. The Series D Shares were acquired by 67 entities. On 28 April 2022, in connection with the end of the Series D Shares subscription process, the Company's Management Board adopted a resolution to allocate 88 288 515 Series D Shares. Cash contributions in exchange for the Series D Shares were fully paid. The issue price for the Series D Shares was PLN 8.50 per share. The total value of the subscription, understood as the product of the number of Series D Shares covered by the Offering and the issue price, was PLN 750 452 377.50.
On 6 May 2022, the Company received statement no. 400/2022 from Krajowy Depozyt Papierów Wartościowych S.A. (National Depository for Securities - "NDS") dated 6 May 2022 ("Statement") regarding execution with the Company of an agreement concerning registration in a securities deposit of 88 288 515 rights to the Company's series D ordinary bearer shares with a nominal value of PLN 1.00 each ("Rights to Shares"). The Rights to Shares were given the ISIN code PLENEA000104. In accordance with the Statement, registration of the Rights to Shares should take place within 3 days from the receipt by the NDS of a decision to admit the Rights to Shares to regulated-market trade.
On 6 May 2022, the Management Board of Giełda Papierów Wartościowych w Warszawie S.A. (Warsaw Stock Exchange - "WSE") adopted Resolution No. 427/2022 on the admission and introduction to exchange trading on the WSE's main market of 88 288 515 rights to series D ordinary bearer shares of the Company with a nominal value of PLN 1.00 each, as of the date of registration of these rights to shares by the NDS. At the same time, the WSE's Management Board decided to introduce the above-mentioned rights to shares of the Company to stock exchange trading on the main market as of 10 May 2022, provided that the NDS registers these rights to shares and designates them with the code "PLENEA000104" no later than on 10 May 2022. Moreover, the WSE's Management Board decided to list the rights to shares of the Company in the continuous trading system under the abbreviated name "ENEA-PDA" and the designation "ENAA." On 9 May 2022, 88 288 515 series D ordinary bearer shares of the Company, with a nominal value of PLN 1.00 each, were registered with the NDS.
The first listing of the Rights to Shares took place on 10 May 2022, in accordance with the resolution of the WSE's management board
26. Political and economic situation in Ukraine
Russian troops attacked Ukraine on 24 February 2022, thus beginning a large-scale conflict. This event has a major impact on the social, political and economic situation, not only in the region, but also globally. ENEA S.A. is continually analysing the impact of the political and economic situation in Ukraine on the financial statements and the current and future financial and operating results of the Company, but it is not currently possible to accurately determine the impact.
In commodity and financial markets, there is increased risk aversion and high volatility in the prices of commodities and financial instruments. Considerable volatility in the prices of electricity and emission allowances (EUAs) may affect the need for margining on IRGIT and on foreign markets (The ICE, EEX) that organise trading in greenhouse gas emission allowance contracts, thereby increasing the need for working capital. Rising commodity prices reinforce expectations of rising interest rates (increasing inflationary pressures), which may increase the cost of debt financing. A pronounced weakening of PLN may lead to an increase in operating costs.
In connection with the introduction of the alert degree CHARLIE-CRP throughout the country, undertakings described in the regulation of the Prime Minister of 25 July 2016 on the scope of undertakings carried out in individual alert degrees and CRP alert degrees have been implemented in the Company. Restrictions on access to IT systems as a result of the maintenance of the CHARLIE-CRP alert level may cause delays to IT projects and deployments.
Higher prices of gaseous fuel electricity may affect the results of energy vendors in the current year (the need to purchase for balancing purposes) and prices for customers (in terms of customers who have not purchased energy with a guaranteed "fixed" price).
At the date on which these condensed separate interim financial statements were prepared, it is not possible to predict how the situation concerning the armed conflict in Ukraine will develop and what the potential negative effects for the Company's operating and financing activities will be in the future.
At the date on which these separate financial statements were prepared, ENEA S.A. sees no going-concern risk.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.