Enea S.A. — Interim / Quarterly Report 2021
Sep 16, 2021
5597_rns_2021-09-16_66c2c7d8-4c57-4d13-bec0-18fca5a2c7ed.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer

023032+11111111111111111
constitute an integral part of the separate financial statements.
1
ENEA S.A.
ENEA Group
Consolidated financial statements in compliance with EU IFRS for the financial year ended 31 December 2018
(unless stated otherwise, all amounts expressed in PLN 000s)
CONDENSED SEPARATE INTERIM FINANCIAL STATEMENTS
for the period from 1 January to 30 June 2021
The consolidated statement of cash flows should by analysed in conjunction with additional information and explanations, which
in compliance with EU IFRS

TABLE OF CONTENTS
| SEPARATE STATEMENT OF COMPREHENSIVE INCOME 4 | ||
|---|---|---|
| SEPARATE STATEMENT OF FINANCIAL POSITION 5 | ||
| SEPARATE STATEMENT OF CHANGES IN EQUITY 7 | ||
| SEPARATE STATEMENT OF CASH FLOWS 8 | ||
| ADDITIONAL INFORMATION AND EXPLANATIONS 9 | ||
| 1. 2. 3. |
General information 9 General information on ENEA S.A. 9 Group composition 10 Management Board and Supervisory Board composition 11 |
|
| 4. 5. 6. |
Basis for preparing financial statements 12 Accounting rules (policy) and significant estimates and assumptions 12 Functional currency and presentation currency 12 |
|
| 7. 8. |
Explanatory notes to the separate statement of comprehensive income 13 Revenue from sales 13 Tax 13 |
|
| 9. 10. |
Explanatory notes to the separate statement of financial position 14 Property, plant and equipment 14 Intangible assets 14 |
|
| 11. 12. 13. |
Investments in subsidiaries, associates and jointly controlled entities 14 Inventories 17 Assets and liabilities arising from contracts with customers 17 |
|
| 14. 15. 16. 17. |
Cash and cash equivalents 18 Coverage of loss 18 Debt-related liabilities 18 Provisions 20 |
|
| Financial instruments and financial risk management 21 | ||
| 18. 19. 20. 21. |
Financial instruments and fair value 21 Debt financial assets at amortised cost 23 Impairment of trade and other receivables 25 Analysis of the age structure of assets arising from contracts with customers and trade and other receivables 25 |
|
| 22. | Other financial liabilities 26 | |
| 23. | Other explanatory notes 27 Related-party transactions 27 |
|
| 24. | Conditional liabilities, court proceedings and cases on-going before public administration organs 28 24.1. Sureties and guarantees 28 |
|
| 24.2. On-going proceedings in courts of general competence 29 24.3. Other court proceedings 29 24.4. Cases concerning 2012 non-balancing 30 24.5. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin certificates for energy from renewable sources 30 |
||
| 25. 26. 27. |
Participation in nuclear power plant build program 32 Impact of COVID-19 pandemic 32 Events after the reporting period 33 |

These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.
Members of the Management Board
| President of the Management Board |
Paweł Szczeszek | |
|---|---|---|
| Member of the Management Board |
Tomasz Siwak | |
| Member of the Management Board |
Tomasz Szczegielniak | |
| Member of the Management Board |
Marcin Pawlicki | |
| Member of the Management Board |
Rafał Mucha |
| ENEA Centrum Sp. z o.o. | |||||
|---|---|---|---|---|---|
| Entity responsible for maintaining accounting | |||||
| books and preparing financial statements | ……………………………………… | ||||
| ENEA Centrum Sp. z o.o. ul. Górecka 1, 60-201 Poznań | |||||
| KRS 0000477231, NIP 777-000-28-43, REGON 630770227 |
Poznań, 16 September 2021

SEPARATE STATEMENT OF COMPREHENSIVE INCOME
| 6 months ended 3 months ended 6 months ended 3 months ended Note 30 June 2021 30 June 2021 30 June 2020 30 June 2020 (unaudited) (unaudited) (unaudited) (unaudited) 3 551 947 1 719 262 3 084 264 1 448 976 Revenue from sales Excise duty (36 655) (17 259) (33 003) (14 987) Net revenue from sales 3 515 292 1 702 003 3 051 261 1 433 989 7 Lease income 126 60 153 86 Revenue from sales and other income 3 515 418 1 702 063 3 051 414 1 434 075 Other operating revenue 7 363 4 027 6 222 2 657 Change in provision for onerous (3 736) (2 656) 39 305 14 958 17 contracts Depreciation/amortisation (3 418) (1 666) (2 462) (1 267) Employee benefit costs (40 215) (17 451) (40 343) (20 367) Use of materials and raw materials and (1 122) (488) (1 329) (743) value of goods sold Purchase of electricity and gas for sales (3 272 627) (1 590 714) (2 957 180) (1 398 240) purposes Transmission and distribution services (19 397) (10 046) (4 428) (2 962) Other third-party services (118 256) (58 069) (115 332) (60 758) Taxes and fees (3 371) (407) (3 351) (393) Gain on sale and liquidation of property, plant and equipment and right-of-use - - 106 106 assets Other operating costs (32 200) (14 248) (39 027) (17 609) Operating profit/(loss) 28 439 10 345 (66 405) (50 543) Finance costs (92 551) (44 492) (143 118) (59 069) Finance income 92 271 35 254 125 556 60 763 Dividend income 305 136 305 136 350 036 350 036 Change in impairment of interests in subsidiaries, associates and jointly 114 100 114 100 (538 047) (537 650) 11 controlled entities Impairment of financial assets at (9 988) (3 788) (138 737) (137 695) 19 amortised cost Profit/(loss) before tax 437 407 416 555 (410 715) (374 158) Income tax 69 276 44 988 37 054 (13 041) Net profit/(loss) for the reporting 506 683 461 543 (373 661) (387 199) period Other comprehensive income Subject to reclassification to profit or loss: - measurement of hedging instruments 80 896 28 266 (141 923) (42 184) - income tax (15 371) (5 371) 26 965 8 015 Not subject to reclassification to profit or loss: - restatement of defined benefit plan 1 702 1 702 (2 870) (2 870) - other (1 263) (533) - - - income tax (323) (323) 545 545 Net other comprehensive income 65 641 23 741 (117 283) (36 494) Comprehensive income for the 572 324 485 284 (490 944) (423 693) reporting period Net profit/(loss) attributable to the 506 683 461 543 (373 661) (387 199) Company's shareholders Weighted average number of ordinary 441 442 578 441 442 578 441 442 578 441 442 578 shares Net profit/(loss) per share (in PLN per 1.15 1.05 (0.85) (0.88) share) Diluted profit/(loss) per share (in PLN 1.15 1.05 (0.85) (0.88) |
Period | |||||
|---|---|---|---|---|---|---|
| per share) |
The separate statement of comprehensive income should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF FINANCIAL POSITION
| As at | ||||
|---|---|---|---|---|
| Note | 30 June 2021 (unaudited) |
31 December 2020 |
||
| ASSETS | ||||
| Non-current assets | ||||
| Property, plant and equipment | 9 | 23 742 | 23 910 | |
| Right-of-use assets | 28 623 | 29 978 | ||
| Intangible assets | 10 | 3 826 | 4 180 | |
| Investment properties | 12 933 | 13 206 | ||
| Investments in subsidiaries, associates and jointly controlled entities | 11 | 9 517 425 | 9 512 925 | |
| Deferred income tax assets | 8 | 95 706 | 101 483 | |
| Financial assets measured at fair value | 39 174 | 84 848 | ||
| Debt financial assets at amortised cost | 19 | 4 560 492 | 6 082 074 | |
| Finance lease and sublease receivables | 417 | 513 | ||
| Costs related to the conclusion of agreements | 12 432 | 11 256 | ||
| Total non-current assets | 14 294 770 | 15 864 373 | ||
| Current assets | ||||
| Inventories | 12 | 224 060 | 65 700 | |
| Trade and other receivables | 1 657 660 | 1 381 371 | ||
| Costs related to the conclusion of agreements | 11 970 | 13 428 | ||
| Assets arising from contracts with customers | 13 | 286 719 | 228 905 | |
| Finance lease and sublease receivables | 1 917 | 3 274 | ||
| Current income tax receivables | 123 523 | - | ||
| Debt financial assets at amortised cost | 19 | 2 499 742 | 1 406 802 | |
| Cash and cash equivalents | 14 | 1 237 249 | 530 668 | |
| Total current assets | 6 042 840 | 3 630 148 | ||
| TOTAL ASSETS | 20 337 610 | 19 494 521 |
The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF FINANCIAL POSITION
| As at | ||||
|---|---|---|---|---|
| Note | 30 June 2021 (unaudited) |
31 December 2020 |
||
| EQUITY AND LIABILITIES | ||||
| Equity | ||||
| Share capital | 588 018 | 588 018 | ||
| Share premium | 3 687 993 | 4 627 673 | ||
| Revaluation reserve - measurement of financial instruments | - | (17 036) | ||
| Revaluation reserve - measurement of hedging instruments | (40 009) | (105 534) | ||
| Reserve capital | 5 974 031 | 5 974 031 | ||
| Retained earnings/accumulated losses | 489 763 | (939 680) | ||
| Total equity | 10 699 796 | 10 127 472 | ||
| LIABILITIES | ||||
| Non-current liabilities | ||||
| Credit facilities, loans and debt securities | 16 | 4 599 976 | 6 559 586 | |
| Lease liabilities | 25 469 | 25 884 | ||
| Employee benefit liabilities | 57 633 | 60 146 | ||
| Financial liabilities measured at fair value | 18 | 3 027 | 75 131 | |
| Total non-current liabilities | 4 686 105 | 6 720 747 | ||
| Current liabilities | ||||
| Credit facilities, loans and debt securities | 16 | 2 305 241 | 1 210 519 | |
| Trade and other payables | 742 371 | 438 241 | ||
| Liabilities arising from contracts with customers | 13 | 40 779 | 32 289 | |
| Lease liabilities | 3 492 | 5 431 | ||
| Current income tax liabilities | - | 71 385 | ||
| Employee benefit liabilities | 22 372 | 27 637 | ||
| Financial liabilities measured at fair value | 50 618 | 64 542 | ||
| Liabilities concerning the equivalent for rights to free purchase of shares | 281 | 281 | ||
| Other financial liabilities | 22 | 1 111 188 | 152 574 | |
| Provisions for other liabilities and other charges | 17 | 675 367 | 643 403 | |
| Total current liabilities | 4 951 709 | 2 646 302 | ||
| Total liabilities | 9 637 814 | 9 367 049 | ||
| TOTAL EQUITY AND LIABILITIES | 20 337 610 | 19 494 521 |
The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF CHANGES IN EQUITY
| S ha re ita l ca p ( mi l no na ) nt am ou |
Re fo se rve r lua ion d t rev a an me rg er ing t ac co un |
To l ta ha s re ita l ca p |
S ha ium re p rem |
Re lua ion t va res erv e - nt me as ure me f fi ia l o na nc ins tru nts me |
Re lua ion t va res erv e f t o - m ea su rem en he dg ing ins tru nts me |
Re se rve ita l ca p |
Re ine d ta rni ea ng s |
To l e ity ta q u |
|
|---|---|---|---|---|---|---|---|---|---|
| As Ja at 1 20 20 nu ary |
44 1 4 43 |
14 6 5 75 |
5 8 8 01 8 |
4 6 27 67 3 |
( ) 17 0 3 6 |
( ) 17 35 6 |
5 6 9 0 70 0 |
2 70 2 18 0 |
13 57 4 17 9 |
| Ne los for he ing io d t t ort s rep p er Ne he he ive in t o t r c om p re ns co me |
- - |
- - |
- - |
- - |
- - |
- ( 114 95 8 ) |
- - |
( 37 3 6 6 1) ( 2 3 25 ) |
( 37 3 6 61 ) ( 11 7 2 8 3 ) |
| Ne he ive inc t co mp re ns om e nis d in he io d t rec og e p er |
- | - | - | - | - | ( 11 4 9 5 8 ) |
- | ( 37 5 9 8 6 ) |
( 49 0 94 4) |
| As 3 0 Ju 20 20 (u d ite d ) at ne na u |
44 1 4 43 |
14 6 5 75 |
5 8 8 01 8 |
4 6 27 67 3 |
( 17 0 3 6 ) |
( 13 2 3 14 ) |
5 6 9 0 70 0 |
2 3 26 19 4 |
13 0 8 3 23 5 |
| S ha re ita l ca p ( mi l no na ) nt am ou |
Re fo se rve r lua ion d t rev a an me rg er ing t ac co un |
To l ta ha s re ita l ca p |
S ha ium re p rem |
Re lua ion t va res erv e - nt me as ure me f fi ia l o na nc ins tru nts me |
Re lua ion t va res erv e f t o - m ea su rem en he dg ing ins tru nts me |
Re se rve ita l ca p |
Re ine d ta rni ea ng s |
To l e ity ta q u |
|
|---|---|---|---|---|---|---|---|---|---|
| As Ja 20 21 at nu ary |
44 1 4 43 |
14 6 5 75 |
5 8 8 01 8 |
4 6 27 67 3 |
( 17 0 3 6 ) |
( 10 5 5 34 ) |
5 97 4 0 31 |
( 9 3 9 6 8 0 ) |
10 12 7 47 2 |
| Ne fit for he ing io d t p t ort ro rep p er |
- | - | - | - | - | - | - | 0 6 6 8 3 5 |
5 0 6 6 8 3 |
| Ne he he ive in t o t r c om p re ns co me |
- | - | - | - | 17 0 3 6 |
65 5 25 |
- | ( 16 9 20 ) |
65 64 1 |
| Ne he ive inc t co mp re ns om e nis d in he io d t rec og e p er |
- | - | - | - | 17 0 3 6 |
65 5 25 |
- | 48 9 7 6 3 |
57 2 3 24 |
| Co f n los fer et tra ve rag e o s - ns |
- | - | - | ( 9 3 9 6 8 0 ) |
- | - | - | 9 3 9 6 8 0 |
- |
| As 3 0 Ju 20 21 (u d ite d ) at ne na u |
43 44 1 4 |
6 5 14 75 |
8 8 01 8 5 |
3 6 87 9 9 3 |
- | ( 40 0 0 9 ) |
97 0 31 5 4 |
48 9 7 6 3 |
10 6 9 9 79 6 |
The separate statement of changes in equity should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

SEPARATE STATEMENT OF CASH FLOWS
| Period | ||||
|---|---|---|---|---|
| Note | 6 months ended 30 June 2021 (unaudited) |
6 months ended 30 June 2020 (unaudited) |
||
| Cash flows from operating activities | ||||
| Net profit/net loss for the reporting period Adjustments: |
506 683 | (373 661) | ||
| Income tax in profit or loss Depreciation/amortisation |
(69 276) 3 418 |
(37 054) 2 462 |
||
| Gain on sale and liquidation of property, plant and equipment and right-of-use assets |
- | (106) | ||
| (Gain)/loss on sale of financial assets Interest income Dividend income Interest costs Impairment of interests Impairment of financial assets at amortised cost Total adjustments |
(21 349) (73 627) (305 136) 88 086 (114 100) 9 988 (481 996) |
4 632 (103 148) (350 036) 127 816 538 047 138 737 321 350 |
||
| Paid income tax Flows resulting from settlements within tax group |
(196 401) 295 933 |
(9 005) 105 306 |
||
| Changes in working capital: Inventories Trade and other receivables Trade and other payables Employee benefit liabilities Provisions for other liabilities and other charges Total changes in working capital |
(158 360) (17 603) 77 475 (6 076) 146 064 41 500 |
(52 659) (206 795) (39 817) (502) 44 819 (254 954) |
||
| Net cash flows from operating activities | 165 719 | (210 964) | ||
| Cash flows from investing activities Purchase of non-current property, plant and equipment and intangible assets and right-of-use assets |
(346) | (77) | ||
| Proceeds from sale of non-current property, plant and equipment and intangible | - | 106 | ||
| assets and right-of-use assets Purchase of financial assets Proceeds from sale of financial assets Purchase of subsidiaries |
(15 000) 501 843 (4 500) |
(1 804 000) 1 584 246 - |
||
| Purchase of associates and jointly controlled entities Received interest Other expenses |
- 64 783 (533) |
(696) 114 011 - |
||
| Net cash flows from investing activities | 546 247 | (106 410) | ||
| Cash flows from financing activities Repayment of credit and loans |
(101 707) | (81 040) | ||
| Bond buy-back Expenditures concerning lease payments Interest paid |
(769 055) (3 091) (90 146) |
(1 106 255) (2 741) (141 390) |
||
| Net cash flows from financing activities | (963 999) | (1 331 426) | ||
| Total net cash flows | (252 033) | (1 648 800) | ||
| Cash at the beginning of reporting period | 14 | 378 094 | 2 715 611 | |
| Cash at the end of reporting period | 14 | 126 061 | 1 066 811 |
The separate statement of cash flows should by analysed in conjunction with the additional information and explanations, which constitute an integral part of the condensed separate interim financial statements

ADDITIONAL INFORMATION AND EXPLANATIONS
General information
| 1. General information on ENEA S.A. |
||||||
|---|---|---|---|---|---|---|
| Name: | ENEA Spółka Akcyjna | |||||
| Legal form: | spółka akcyjna (joint-stock company) | |||||
| Country of registered office: | Poland | |||||
| Registered office: | Poznań | |||||
| Address: | ul. Górecka 1, 60-201 Poznań | |||||
| KRS: | 0000012483 | |||||
| Telephone number: | (+48 61) 884 55 44 | |||||
| Fax number: | (+48 61) 884 59 59 | |||||
| E-mail: | [email protected] | |||||
| Website: | www.enea.pl | |||||
| REGON number: | 630139960 | |||||
| NIP number: | 777-00-20-640 |
ENEA S.A. ("ENEA," "Company"), back then operating as Energetyka Poznańska S.A., was entered into the National Court Register at the District Court in Poznań on 21 May 2001, under KRS number 0000012483.
As at 30 June 2021, ENEA S.A.'s shareholding structure was as follows:
| Poland's State Treasury | Other shareholders | Total | |
|---|---|---|---|
| As at 30 June 2021 | 51.50% | 48.50% | 100.00% |
As at 30 June 2021, the Company's highest-level controlling entity was the State Treasury.
As at 30 June 2021, ENEA S.A.'s statutory share capital amounted to PLN 441 443 thousand (PLN 588 018 thousand after restatement to EU IFRS, taking into account hyperinflation and other adjustments) and was divided into 441 442 578 shares.
The Company's duration is indefinite. Its activities are conducted on the basis of relevant concessions issued for the Company.
The Company's condensed separate interim financial statements cover the 6-month period ended 30 June 2021 and contain comparative data for the 6-month period ended 30 June 2020 and as at 31 December 2020.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

2. Group composition
As at 30 June 2021, ENEA Group consisted of the parent - ENEA S.A., 14 subsidiaries, 9 indirect subsidiaries, 2 associates and 2 jointly controlled entities.
The main business activity of ENEA S.A. is trade of electricity.
| Company name | Activity | Registered office |
ENEA S.A.'s stake in total number of voting rights as at 30 June 2021 |
ENEA S.A.'s stake in total number of voting rights as at 31 December 2020 |
|
|---|---|---|---|---|---|
| SUBSIDIARIES | |||||
| 1. | ENEA Operator Sp. z o.o. | distribution | Poznań | 100% | 100% |
| 2. | ENEA Wytwarzanie Sp. z o.o. | generation | Świerże Górne | 100% | 100% |
| 3. | ENEA Elektrownia Połaniec S.A. |
generation | Połaniec | 100% | 100% |
| 4. | ENEA Oświetlenie Sp. z o.o. | other activity | Szczecin | 100% | 100% |
| 5. | ENEA Trading Sp. z o.o. | trade | Świerże Górne | 100% | 100% |
| 6. | ENEA Serwis Sp. z o.o. | distribution | Lipno | 100% | 100% |
| 7. | ENEA Centrum Sp. z o.o. | other activity | Poznań | 100% | 100% |
| 8. | ENEA Pomiary Sp. z o.o. | distribution | Poznań | 100% | 100% |
| 9. | ENERGO-TOUR Sp. z o.o. w likwidacji |
other activity | Poznań | 100%6 | 100%6 |
| 10. | ENEA Innowacje Sp. z o.o. | other activity | Warsaw | 100%7,8 | 100% |
| 11. | Lubelski Węgiel BOGDANKA S.A. |
mining | Bogdanka | 65.99% | 65.99% |
| 12. | ENEA Ciepło Sp. z o.o. | generation | Białystok | 99.94% | 99,94% |
| 13. | ENEA Ciepło Serwis Sp. z o.o. | generation | Białystok | 100% | 100% |
| 14. | ENEA Nowa Energia Sp. z o.o. | generation | Radom | 100% | 100% |
| INDIRECT SUBSIDIARIES | |||||
| 15. | ENEA Logistyka Sp. z o.o. | distribution | Poznań | 100%5 | 100%5 |
| 16. | ENEA Bioenergia Sp. z o.o. | generation | Połaniec | 100%1 | 100%1 |
| 17. | ENEA Połaniec Serwis Sp. z o.o. |
generation | Połaniec | 100%1 | 100%1 |
| 18. | Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. |
generation | Oborniki | 99.93%2 | 99.93%2 |
| 19. | Miejska Energetyka Cieplna Piła Sp. z o.o. |
generation | Piła | 71.11%2 | 71.11%2 |
| 20. | EkoTRANS Bogdanka Sp. z o.o. |
mining | Bogdanka | 65.99%3 | 65.99%3 |
| 21. | RG Bogdanka Sp. z o.o. | mining | Bogdanka | 65.99%3 | 65.99%3 |
| 22. | MR Bogdanka Sp. z o.o. | mining | Bogdanka | 65.99%3 | 65.99%3 |
| 23. | Łęczyńska Energetyka Sp. z o.o. |
mining | Bogdanka | 58.53%3 | 58.53%3 |
| 24. | ENEA Badania i Rozwój Sp. z o.o. |
other activity | Warsaw | 4,8 - |
100%4 |
| JOINTLY CONTROLLED ENTITIES | |||||
| 25. | Polska Grupa Górnicza S.A. | - | Katowice | 7.66% | 7.66% |
| 26. | Elektrownia Ostrołęka Sp. z o.o. |
- | Ostrołęka | 50% | 50% |
| ASSOCIATES | |||||
| 27. | Polimex – Mostostal S.A. | - | Warsaw | 16.48% | 16.48% |
| 28. | ElectroMobility Poland S.A. | - | Warsaw | 25% | 25% |
1– indirect subsidiary through stake in ENEA Elektrownia Połaniec S.A.
2 – indirect subsidiary through stake in ENEA Wytwarzanie Sp. z o.o.
3 – indirect subsidiary through stake in Lubelski Węgiel BOGDANKA S.A.
4 – indirect subsidiary through stake in ENEA Innowacje Sp. z o.o.
5 – indirect subsidiary through stake in ENEA Operator Sp. z o.o.

6 – on 30 March 2015 the company's extraordinary general meeting adopted a resolution on the dissolution of the company following a liquidation proceeding; the resolution entered into force on 1 April 2015. An application for the company to be removed from the National Court Register was filed on 5 November 2015. At the date on which these condensed consolidated interim financial statements were prepared, procedural activities connected with removing the entity from the National Court Register were in progress.
7 – on 7 May 2021 an Extraordinary General Meeting of ENEA Innowacje Sp. z o.o. adopted a resolution regarding an increase of the company's share capital by PLN 4 500 thousand, i.e. from PLN 26 360 thousand to PLN 30 860 thousand, by issuing 45 000 new shares with a nominal value of PLN 100.00 each. All of the new-issue shares were acquired by ENEA S.A. and were paid for with a cash contribution. The share capital increase was registered at the National Court Register on 1 July 2021.
8 – on 12 April 2021 an Extraordinary General Meeting of ENEA Badania i Rozwój Sp. z o.o. adopted a resolution on a merger with ENEA Innowacje Sp. z o.o. through the acquisition of ENEA Badania i Rozwój Sp. z o.o. by ENEA Innowacje Sp. z o.o.
The merger of ENEA Innowacje Sp. z o.o. and ENEA Badania i Rozwój Sp. z o.o. was entered in the National Court Register on 1 June 2021.
3. Management Board and Supervisory Board composition
Management Board
| As at 30 June 2021 |
As at 31 December 2020 |
|
|---|---|---|
| President of the Management Board | Paweł Szczeszek | Paweł Szczeszek |
| Member of the Management Board, responsible for finance |
Rafał Mucha | Rafał Mucha |
| Member of the Management Board, responsible for sales | Tomasz Siwak | Tomasz Siwak |
| Member of the Management Board, responsible for corporate affairs |
Tomasz Szczegielniak | Tomasz Szczegielniak |
| Member of the Management Board, responsible for operations |
Marcin Pawlicki | Marcin Pawlicki |
Supervisory Board
| As at | As at | |||
|---|---|---|---|---|
| 30 June 2021 | Appointment | 31 December 2020 | End of term / resignation |
|
| Chairperson of the Supervisory Board |
Rafał Włodarski | 7 January 2021 | Izabela Felczak Poturnicka |
5 January 2021 |
| Deputy Chairperson of the Supervisory Board |
Roman Stryjski | Roman Stryjski | ||
| Secretary of the Supervisory Board |
Michał Jaciubek | Michał Jaciubek | ||
| Member of the Supervisory Board |
Dorota Szymanek | 7 January 2021 | Rafał Włodarski | |
| Member of the Supervisory Board |
Maciej Mazur | Maciej Mazur | ||
| Member of the Supervisory Board |
Piotr Mirkowski | Piotr Mirkowski | ||
| Member of the Supervisory Board |
Paweł Koroblowski | Paweł Koroblowski | ||
| Member of the Supervisory Board |
Ireneusz Kulka | Ireneusz Kulka | ||
| Member of the Supervisory Board |
Mariusz Pliszka | Mariusz Pliszka | ||
| Member of the Supervisory Board |
Mariusz Fistek | Mariusz Fistek |
On 4 January 2021, the Company received a letter of resignation from Mrs. Izabela Felczak-Poturnicka as Chairperson of the Supervisory Board and as Supervisory Board member, effective from 5 January 2021.
On 7 January 2021, an Extraordinary General Meeting of ENEA S.A. appointed Mr. Rafał Włodarski as Chairperson of ENEA S.A.'s Supervisory Board.
On 7 January 2021, the Company's Extraordinary General Meeting adopted a resolution appointing Mrs. Dorota Szymanek as member of ENEA S.A.'s Supervisory Board, 10th term, effective from the same date.
On 15 September 2021, the Company received a statement from Mr. Ireneusz Kulka on his resignation as member of the Supervisory Board of ENEA S.A. and Chairperson of the Audit Committee, effective 16 September 2021.

4. Basis for preparing financial statements
These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.
The Company's Management Board used its best knowledge as to the application of standards and interpretations as well as methods and rules for the measurement of items in ENEA S.A.'s condensed separate interim financial statements in accordance with EU IFRS as at 30 June 2021. The presented tables and explanations are prepared with due diligence. These condensed separate interim financial statements have been reviewed by a statutory auditor. The accounting rules are applied consistently across all of the presented periods unless stated otherwise.
These condensed separate interim financial statements are prepared on a going concern basis for the foreseeable future. There are no circumstances such as would indicate a threat to the Company's going concern.
The Company prepares condensed consolidated interim financial statements for ENEA Group in accordance with IFRS EU as at and for the 6-month period ending 30 June 2021. In order to obtain full information on ENEA Group's financial situation and results, readers of ENEA S.A.'s condensed separate interim financial statements should read these in conjunction with ENEA Group's condensed consolidated interim financial statements and ENEA S.A.'s separate annual financial statements for the financial year ended on 31 December 2020.
5. Accounting rules (policy) and significant estimates and assumptions
These condensed separate interim financial statements are prepared using accounting rules that are consistent with the rules used in preparing the most recent annual separate financial statements for the financial year ended 31 December 2020.
Preparing condensed separate interim financial statements in accordance with EU IFRS requires the Management Board to adopt certain assumptions and make estimates that have an impact on the adopted accounting rules and the amounts shown in condensed separate interim financial statements and notes to financial statements. Assumptions and estimates are based on the Management Board's best knowledge regarding current and future events and activities. However, actual results may differ from forecasts. The estimates used in preparing these condensed separate interim financial statements are consistent with the estimates used in preparing the separate financial statements for the most recent financial year. The estimated values presented in previous financial years do not have a material impact on the present interim period.
6. Functional currency and presentation currency
Items in the Company's financial statements are measured in the currency of the main economic environment in which the Company operates (functional currency).
The condensed separate interim financial statements are presented in Polish zloty (PLN), which is the functional currency and presentation currency. Items in financial statements are rounded to full thousands of zlotys (PLN 000s), unless otherwise stated.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Explanatory notes to the separate statement of comprehensive income
7. Revenue from sales
Net revenue from sales
| 6-month period ended | ||
|---|---|---|
| 30 June 2021 | 30 June 2020 | |
| Revenue from the sale of electricity Revenue from the sale of gas Revenue from the sale of other services |
3 439 994 73 796 1 502 |
2 980 428 68 456 2 377 |
| Total net revenue from sales | 3 515 292 | 3 051 261 |
The Company recognises revenue when an obligation to provide a consideration by the provision of a promised good or service to the customer is performed (or is being performed). Revenue is recognised on the basis of prices specified in sale agreements, less estimated rebates and other deductions.
The key groups of contracts include electricity sale contracts (including framework contracts) for retail, business, key and strategic customers. Under these contracts, service is provided in a continuous manner and the level of revenue depends on usage.
The standard payment deadline for invoices for the sale of electricity is 14 days from VAT invoice date. In the case of business, key and strategic customers, payment deadlines may be negotiated.
Presented below is revenue from sales, divided into categories that reflect how economic factors influence the amount, payment deadline and the uncertainty of revenue and cash flows.
| 6-month period ended | |||
|---|---|---|---|
| 30 June 2021 | 30 June 2020 | ||
| Revenue from continuous services | 3 513 790 | 3 048 884 | |
| Revenue from services provided at specified time | 1 502 | 2 377 | |
| Total | 3 515 292 | 3 051 261 |
8. Tax
Deferred income tax
Changes in deferred income tax provision (after offsetting assets and provision) are as follows:
| 6-month period ended 30 June 2021 |
Year ended 31 December 2020 |
|
|---|---|---|
| As at the beginning of period | 101 483 | 95 395 |
| Change recognised in profit or loss | 9 917 | (15 013) |
| Change recognised in other comprehensive income | (15 694) | 21 101 |
| As at the end of period | 95 706 | 101 483 |
In the 6-month period ended 30 June 2021, the Company's profit before tax increased as a result of an increase in deferred income tax assets by PLN 9 917 thousand (in the 6-month period ended 30 June 2020 the charge to the Company's profit before tax as a result of a decrease in deferred income tax assets amounted to PLN 731 thousand).
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Explanatory notes to the separate statement of financial position
9. Property, plant and equipment
In the 6-month period ended 30 June 2021 the Company purchased property, plant and equipment items for a total of PLN 322 thousand net (in the 6-month period ending 30 June 2020: PLN 678 thousand net).
In the 6-month period ended 30 June 2021 the Company sold and/or liquidated property, plant and equipment items for a total of PLN 0 thousand net (in the 6-month period ending 30 June 2020: PLN 0 thousand net).
As at 30 June 2021, no indications for the impairment of property, plant and equipment were identified. No collateral was established on property, plant and equipment assets.
10. Intangible assets
In the 6-month period ended 30 June 2021 the Company purchased intangible assets for a total of PLN 90 thousand net (in the 6-month period ending 30 June 2020: PLN 0 thousand net).
In the 6-month period ended 30 June 2021 the Company did not liquidate intangible assets (in the 6-month period ending 30 June 2020: PLN 0 thousand).
As at 30 June 2021, no indications for impairment were identified. No collateral has been established on intangible assets.
11. Investments in subsidiaries, associates and jointly controlled entities
Change in investments in subsidiaries, associates and jointly controlled entities
| 6-month period ended |
Year ended | |
|---|---|---|
| 30 June 2021 | 31 December 2020 | |
| As at the beginning of period | 9 512 925 | 12 892 612 |
| Purchase of investments | 4 500 | 245 922 |
| Sale of investments | - | (12 367) |
| Change in impairment | 114 100 | (3 596 215) |
| Other changes | (114 100) | (17 027) |
| As at the end of period | 9 517 425 | 9 512 925 |
ENEA Innowacje Sp. z o. o.
7 May 2021 Resolution on a PLN 4 500 thousand share capital increase, from PLN 26 360 thousand to PLN 30 860 thousand, through the issue of 45 000 new shares, with a nominal value of PLN 100.00 each.
Extraordinary General Meeting
Impairment of investments
| 6-month period ended 30 June 2021 |
Year ended 31 December 2020 |
|
|---|---|---|
| As at the beginning of period | 4 969 479 | 1 373 264 |
| Created | - | 3 613 242 |
| Reversed | (114 100) | (17 027) |
| As at the end of period | 4 855 379 | 4 969 479 |
Implementation of project to build Elektrownia Ostrołęka C
At 30 June 2021, ENEA S.A. held 9 124 821 shares of Elektrownia Ostrołęka Sp. z o.o., with a nominal value of PLN 50 each and total nominal value of PLN 456 241 thousand.
On 13 February 2020, ENEA S.A. executed an agreement with ENERGA S.A. suspending financing by ENERGA S.A. and ENEA S.A. for the project to build Elektrownia Ostrołęka C. In the agreement, ENEA S.A. and ENERGA S.A. undertook to carry out analyses, especially concerning the project's technical, technological, economic and organisational parameters and further financing.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

ENERGA S.A. and ENEA S.A. assumed that suspending financing for the project would result in the company having to suspend its contract executed on 12 July 2018 to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW, along with a contract to convert rail infrastructure for Elektrownia Ostrołęka C of 4 October 2019.
On 14 February 2020, Elektrownia Ostrołęka Sp. z o.o. issued to the General Contractor for the contract to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW of 12 July 2018 a notice to suspend all works related to that contract, effective 14 February 2020.
As part of the analytical work performed under the agreement, ENEA S.A. and ENERGA S.A. worked on updating business and technical assumptions as well as assumptions concerning the financing structure within the financial model. On ENERGA S.A.'s part, the results of this work were provided to Elektrownia Ostrołęka Sp. z o.o. on 14 May 2020, when the company received calculations concerning the Project's profitability in the coal fuel variant. These results was used by the company to perform a CGU test. The CGU test carried out at Elektrownia Ostrołęka Sp. z o.o. shows that completing the Project would generate a negative value, meaning that continuing the Project would be unjustified.
On 19 May 2020, ENEA S.A. received an electronic copy of Resolution no. 39/2020 of the Management Board of Elektrownia Ostrołęka Sp. z o.o. of 19 May 2020 regarding recognition of impairment losses on the book value of the Company's assets. As a result of an impairment test on non-current assets performed at Elektrownia Ostrołęka Sp. z o.o., which followed an update of business assumptions by Elektrownia Ostrołęka Sp. z o.o. regarding the construction of power plant Ostrołęka C based on coal technology, the Group's consolidated financial statements for 2019 include ENEA S.A.'s share of the net loss generated by Elektrownia Ostrołęka Sp. z o.o. Given the fact that it was higher than the value of the stake in this company, it was reduced to zero. At 30 June 2021, ENEA S.A.'s stake in Elektrownia Ostrołęka Sp. z o.o. was worth PLN 0.
On 2 June 2020 the Management Board of ENEA S.A. accepted a final report on analyses conducted in collaboration with ENERGA S.A. regarding the project's technical, technological, economic, organisational and legal aspects and further financing.
Conclusions from these analyses do not justify continuing the project in its existing form, i.e. the construction of a power plant generating electricity in a process of hard coal combustion. This evaluation was driven by the following:
- 1) regulatory changes at the EU level and the credit policy of certain financial institutions, which show that there is far greater access to financing for energy projects based on gas than coal; and
- 2) the acquisition of control over Energa by PKN Orlen S.A., the strategy of which does not include investments in electricity generation based on coal combustion.
At the same time, technical analysis confirmed the viability of a variant in which the power plant would use gas ("Gas Project") at the current location of the coal-unit being built. As a result of the above, ENEA S.A.'s Management Board decided to continue building a generating asset in Ostrołęka and change the fuel source from coal to gas.
On 2 June 2020, a three-party agreement was executed between ENEA S.A., ENERGA S.A. and PKN Orlen S.A., spelling out the following key cooperation rules for the Gas Project:
- subject to the reservations expressed below, continue cooperation between ENEA S.A. and ENERGA S.A. via the existing special-purpose vehicle, i.e. Elektrownia Ostrołęka Sp. z o.o., and settle costs related to the Project between ENEA S.A. and ENERGA S.A., along with settlements with Project contractors, in accordance with the existing rules,
- take into account PKN Orlen S.A.'s potential role in the Gas Project as a new shareholder,
- ENEA S.A.'s participation in the Gas Project as a minority shareholder with an investment cap, as a result of which the Company will not be an entity co-controlling Elektrownia Ostrołęka Sp. z o.o.,
- subject to the essential corporate approvals, execute a new shareholders agreement regarding the Gas Project that incorporates the aforementioned cooperation rules,
- undertake activities intended to secure financing for the Gas Project by ENERGA S.A. together with PKN Orlen S.A.
From 2 June 2020, the parties to this agreement had been holding talks regarding a new investment agreement specifying rules for the further implementation of the Gas Project, including investment by each of the parties. At the same time, ENEA S.A. on its own evaluated the prospect of participating in the project.
On 22 December 2020 at the request of ENEA S.A.'s Management Board, ENEA S.A.'s Supervisory Board approved the following:
- ENEA S.A.'s withdrawal from investing in the construction of a gas-based unit as part of project Ostrołęka C, and
- arrangements with ENERGA regarding the settlement of costs pertaining to the project to build a coal-based unit as part of project Ostrołęka C.
In connection with the above, ENEA S.A. and the other parties involved in Project Ostrołęka C agreed that an organised part of enterprise related to the gas project will be spun off from Project Ostrołęka C (in accounting and organisational terms). From the spin-off date, investment costs related to settling the gas project will not be incurred by ENEA S.A.
Further, the following documents were signed on 22 December 2020:
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

- agreement between ENEA S.A., ENERGA S.A. and Elektrownia Ostrołęka Sp. z o.o. regarding cooperation on the division of Elektrownia Ostrołęka Sp. z o.o. (Division Agreement),
- agreement between the Company and ENERGA S.A. regarding cooperation on settling the coal-based project as part of Project Ostrołęka C (Settlement Agreement, Coal Project).
These agreements were signed in connection with a decision to change the source of power for the Elektrownia Ostrołęka C power plant being constructed with capacity of approx. 1000 MW from coal to gas, and ENEA S.A.'s decision to not participate in the Gas Project.
Both of the agreements include a statement by ENEA S.A. on withdrawal from further participation in the Gas Project. The reasons for withdrawing from further investment in the construction of the gas unit are especially related to ENEA Group's intention to intensify investing activity in the area of renewable energy sources as well as to invest in the conversion of coal-based sources to gas-based across ENEA S.A.'s existing generating assets that are fully owned by ENEA S.A.
Reaching these agreements also serves to confirm that in light of ENEA S.A.'s withdrawal from the Gas Project the remaining parties will not be seeking any claims from ENEA S.A. based on this decision.
In accordance with the Division Agreement, Elektrownia Ostrołęka Sp. z o.o. would be divided through a spin-off (in the meaning of the Polish Commercial Companies Code) of the assets and liabilities (rights and obligations) and other elements that make up the Gas Project.
The Settlement Agreement is essential to the performance of the Division Agreement, which requires cooperation by the shareholders of Elektrownia Ostrołęka Sp. z o.o., including the settlement of costs related to the Coal Project. In accordance with the Settlement Agreement, costs related to the Coal Project will be settled based on the existing arrangements between the company and ENERGA S.A. and ENEA S.A.
On 31 December 2020, in accordance with the Settlement Agreement (which amended the loan agreement of 23 December 2019 in this regard), ENEA S.A. bought from ENERGA S.A. half of ENERGA S.A.'s receivables due from Elektrownia Ostrołęka Sp. z o.o. for a price equal to the nominal value of the receivables being sold, i.e. PLN 170 000 thousand, plus interest accrued from 31 December 2020, amounting to PLN 11 617 thousand.
Impairment of loans issued to Elektrownia Ostrołęka Sp. z o.o. as at 30 June 2021 amounted to PLN 219 772 thousand, together with interest (the value of these loans was written off to zero).
On 26 February 2021 ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 1 to the PLN 340 million loan agreement of 23 December 2019 and Annex 6 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of the aforementioned annexes, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off loan repayment to ENEA S.A. of PLN 170 million and PLN 29 million, respectively, together with interest, by 30 June 2021. Next, on 30 June 2021, ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 2 to the PLN 340 million loan agreement of 23 December 2019 and Annex 7 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of the aforementioned annexes, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off loan repayment to ENEA S.A. of PLN 170 million and PLN 29 million, respectively, together with interest, by 30 September 2021.
On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. as vendor and CCGT Ostrołęka Sp. z o.o. as buyer (a wholly-owned subsidiary of ENERGA S.A.) signed a sale agreement and associated agreements regarding an SPV (excluding certain assets) intended (and used as such) to implement economic tasks covering the construction of a gas-fired power generating unit in Ostrołęka and the subsequent operation of this unit (Gas Plant). The business being sold includes generally all of the SPV's asset and non-asset components in use as of the transaction date in connection with preparations to begin an investment process consisting of the construction of the Gas Plant. The transaction is intended to facilitate the implementation of a gas project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka. The sale price for the business being sold (transaction value) is currently estimated at approx. PLN 166 million. The price is set on a preliminary basis as additional considerations will apply in determining the final price.
On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. and CCGT Ostrołęka Sp. z o.o. on the one hand and GE Power Sp. z o.o., based in Warsaw, GE Steam Power Systems S.A.S. (former name: ALSTOM Power Systems S.A.S.), based in Boulogne-Billancourt, France (Coal Project Contractor), and General Electric Global Services, GmbH, based in Baden, Switzerland (together with GE Power sp. z o.o. - Gas Project Contractor) on the other hand signed a Contract Change Document concerning the contract of 21 July 2018 to build unit C at Elektrownia Ostrołęka, with a capacity of 1000 MW, and an Agreement on settlement of the Coal Project. The Contract Change Document is structured in a way that facilitates implementation of the Gas Project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka, which is related, inter alia, to the fact that ENEA S.A. has confirmed its withdrawal from the Gas Project. The agreement concerning the Coal Project settlement regulates the rights and obligations of Elektrownia Ostrołęka Sp. z o.o. and the Coal Project Contractor mainly in connection with the settlement of construction work that had been completed by the Coal Project Contractor before the contract was suspended, maintenance and security activities during Contract suspension and tasks related to finishing the work dedicated to implementing the Coal Project. Under this agreement, the Coal Project will be settled by the end of 2021, and the entire
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

amount that Elektrownia Ostrołęka Sp. z o.o. will be obligated to pay to the Coal Project Contractor, taking into account the expenditures incurred thus far, will not exceed PLN 1.35 billion (net).
In connection with this agreement being signed and based on the status of settlements between Elektrownia Ostrołęka Sp. z o.o. and the Coal Project Contractor, a provision for future investment liabilities toward Elektrownia Ostrołęka Sp. z o.o., amounting to PLN 222 200 thousand, was partially released in these condensed separate interim financial statements, with the amount released being PLN 114 100 thousand. This amount is recognised in the separate statement of comprehensive income in the item "Change in impairment of interests in subsidiaries, associates and jointly controlled entities." The amount of this provision as at 30 June 2021 is PLN 108 100 thousand and constitutes the best possible estimate due to uncertainty over the final settlement amounts.
ENEA S.A.'s commitment to provide funding for Elektrownia Ostrołęka Sp. z o.o. resulting from the existing agreements (especially the agreements dated 28 December 2018 and 30 April 2019 and the Settlement Agreement) that is still outstanding amounts to PLN 620 million. ENEA S.A. does not have sufficient information on any potential additional contributions or their potential deadlines, aside from those above.
12. Inventories
Inventories
| As at | ||
|---|---|---|
| 30 June 2021 | 31 December 2020 | |
| Energy origin certificates | 223 897 | 65 489 |
| Goods | 163 | 211 |
| Total | 224 060 | 65 700 |
No collateral is established on inventory.
Energy origin certificates
| 6-month period ended 30 June 2021 |
Year ended 31 December 2020 |
|
|---|---|---|
| Net value at the beginning of period | 65 489 | 216 449 |
| Purchase | 271 398 | 339 953 |
| Depreciation | (112 990) | (490 913) |
| Net value at the end of period | 223 897 | 65 489 |
Costs connected with redeeming energy origin certificates are presented in profit or loss in the following item: Purchase of electricity and gas for sales purposes
13. Assets and liabilities arising from contracts with customers
Assets and liabilities arising from contracts with customers
| Assets arising from contracts with customers |
Liabilities arising from contracts with customers |
|
|---|---|---|
| As at 1 January 2020 | 215 223 | 12 631 |
| Change in non-invoices receivables | 13 731 | - |
| Change in impairment | (49) | - |
| Adjustments, prepayments | - | 19 658 |
| As at 31 December 2020 | 228 905 | 32 289 |
| Change in non-invoices receivables | 57 837 | - |
| Change in impairment | (23) | - |
| Adjustments, prepayments | - | 8 490 |
| As at 30 June 2021 | 286 719 | 40 779 |
The balance of assets arising from contracts with customers mainly covers uninvoiced electricity sales, while the balance of liabilities arising from contracts with customers covers liabilities concerning sales adjustments related to the Act on amendment of the act on excise duty and certain other acts, as well as prepayments.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

14. Cash and cash equivalents
Significant judgements and estimates
In accordance with ENEA S.A.'s credit risk assessment rules and the provisions of IFRS 9 as regards impairment tests for cash and cash equivalents as at 30 June 2021; the Company sees potential impact as negligible.
Presentation of deposits at clearinghouse IRGiT
These are funds constituting collateral for settlements with the clearing-house IRGiT, and they are analysed in terms of the possibility to free them up without incurring a substantial loss.
Cash and cash equivalents
| As at | ||
|---|---|---|
| 30 June 2021 | 31 December 2020 | |
| Cash at bank account | 54 193 | 70 580 |
| including split payment | 9 601 | 30 035 |
| Other cash | 1 183 056 | 460 088 |
| - Deposits | 1 180 032 | 450 013 |
| - Other | 3 024 | 10 075 |
| Total cash and cash equivalents | 1 237 249 | 530 668 |
| Cash pooling | (1 111 188) | (152 574) |
| Cash recognised in the statement of cash flows | 126 061 | 378 094 |
Restricted cash related to split payment - VAT as at 30 June 2021 was PLN 9 601 thousand (PLN 30 035 thousand as at 31 December 2020), and deposit at IRGiT as at 30 June 2021 was PLN 500 thousand (PLN 6 500 thousand as at 31 December 2020). No collateral is established on cash.
15. Coverage of loss
On 17 June 2021, an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6, resolving to cover the net loss for the financial year covering the period from 1 January 2020 to 31 December 2020, amounting to PLN 3 356 750 thousand, using retained earnings PLN 2 417 700 thousand and supplementary capital PLN 939 680 thousand.
On 30 July 2020 an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6 concerning the allocation of net profit for the financial year covering the period from 1 January 2019 to 31 December 2019, pursuant to which 100% of the 2019 net profit was transferred to reserve capital, intended to finance investments.
16. Debt-related liabilities
Credit facilities, loans and debt securities
| As at | ||
|---|---|---|
| 30 June 2021 | 31 December 2020 | |
| Bank credit | 1 584 096 | 1 685 532 |
| Bonds | 3 015 880 | 4 874 054 |
| Long-term | 4 599 976 | 6 559 586 |
| Bank credit | 206 370 | 206 520 |
| Bonds | 2 098 871 | 1 003 999 |
| Short-term | 2 305 241 | 1 210 519 |
| Total | 6 905 217 | 7 770 105 |
In accordance with ENEA S.A.'s financing model, in order to secure funding for ENEA Group companies' on-going operations and investment needs, ENEA executes agreements with external financial institutions concerning bond issue programmes and/or credit agreements.

Credit facilities and loans
Presented below is a list of the Company's credit facilities and loans:
| No. | Company | Lender | Contract date | Total contract amount |
Debt at 30 June 2021 (principal) |
Debt at 31 December 2020 (principal) |
Interest | Final repayment deadline |
|---|---|---|---|---|---|---|---|---|
| 1. | ENEA S.A. | EIB | 18 October 2012 (A) and 19 June 2013 (B) |
1 425 000 | 950 837 | 1 013 543 | Fixed interest rate or WIBOR 6M + margin |
17 June 2030 |
| 2. | ENEA S.A. | EIB | 29 May 2015 (C) |
946 000 | 839 500 | 878 500 | Fixed interest rate or WIBOR 6M + margin |
15 September 2032 |
| 3. | ENEA S.A. | PKO BP S.A. | 28 January 2014, Annex 2 of 4 December 2019 |
300 000 | - | - | WIBOR 1M + margin |
31 December 2022 |
| 4. | ENEA S.A. | Bank Pekao S.A. |
28 January 2014, Annex 2 of 4 December 2019 |
150 000 | - | - | WIBOR 1M + margin |
31 December 2022 |
| 5. | ENEA S.A. | BGK | 7 September 2020 |
250 000 | - | - | WIBOR 1M +margin |
7 September 2022 |
| Total | 3 071 000 | 1 790 337 | 1 892 043 | |||||
| Transaction costs and effect of measurement using effective interest rate |
129 | 9 | ||||||
| Total | 3 071 000 | 1 790 466 | 1 892 052 |
ENEA S.A. currently has credit agreements with the European Investment Bank (EIB) for a total amount of PLN 2 371 000 thousand (Agreement A PLN 950 000 thousand, Agreement B PLN 475 000 thousand and Agreement C PLN 946 000 thousand). Funds from the EIB were used to finance a multi-year investment plan aimed at modernising and expanding ENEA Operator Sp. z o.o.'s power network. Funds from Agreements A, B and C were fully used. Interest on credit facilities may be fixed or variable. In the 6-month period ended on 30 June 2021, ENEA S.A. did not execute new credit agreements.
Bond issue programs
Presented below is a list of bonds issued by ENEA S.A.:
| No. | Bond issue program name |
Program start date |
Program amount |
Value of outstanding bonds as at 30 June 2021 |
Value of outstanding bonds as at 31 December 2020 |
Interest | Buy-back deadline |
|---|---|---|---|---|---|---|---|
| 1. | Bond issue program agreement with PKO BP S.A., Bank Pekao S.A., Santander BP S.A., Citi BH S.A. |
21 June 2012 |
3 000 000 | 1 799 000 | 2 140 000 | WIBOR 6M + margin |
One-off buy-back for each series from June 2020 to June 2022 |
| 2. | Bond issue program agreement with BGK |
15 May 2014 | 1 000 000 | 680 000 | 720 000 | WIBOR 6M + margin |
Buy-back in tranches, last tranche due in December 2026 |
| 3. | Bond issue programme agreement with PKO BP S.A., Bank Pekao S.A. and mBank S.A. |
30 June 2014 |
5 000 000 | 2 150 000 | 2 500 000 | WIBOR 6M + margin |
One-time buy back of each series; PLN 878 million bought back in February 2020, next series in September 2021 and June 2024. |

| Bond issue program 4. agreement with BGK |
3 December 2015 |
700 000 | 494 724 | 532 779 | WIBOR 6M + margin |
Buy-back in tranches, last tranche due in September 2027 |
|---|---|---|---|---|---|---|
| Total | 9 700 000 | 5 123 724 | 5 892 779 | |||
| Transaction costs and effect of measurement using effective interest rate |
(8 973) | (14 726) | ||||
| Total | 9 700 000 | 5 114 751 | 5 878 053 |
In the 6-month period ended on 30 June 2021, ENEA S.A. did not execute new bond issue program agreements.
On 11 May 2021 the Management Board of ENEA S.A. decided to partially buy back series ENEA0921 bonds before maturity in order to redeem them, with principal amounting to PLN 350 000 thousand, plus interest due and bonus for the bondholders. Series ENEA0921 bonds were issued in the amount of PLN 500 000 thousand on 16 September 2015 as part of the "Programme Agreement regarding a bond issue program up to PLN 5 000 000 thousand of 30 June 2014" as amended. The outstanding part of series ENEA0921 bonds, with a nominal value of PLN 150 000 thousand, is held by the bondholders until maturity, i.e. 16 September 2021.
Interest rate hedges and currency hedges
In the 6-month period ended 30 June 2021 ENEA S.A. did not execute new interest rate swaps. The total bond and credit exposure hedged with IRSs as at 30 June 2021 amounted to PLN 3 451 564 thousand. Moreover, ENEA S.A. has fixedrate credit agreements totalling PLN 630 221 thousand. These transactions have material impact on the predictability of expense flows and finance costs. The Company presents the measurement of these instruments in the item: Financial liabilities measured at fair value Derivative instruments are treated as cash flow hedges, which is why they are recognised and accounted for using hedge accounting rules. As at 30 June 2021, financial liabilities at fair value concerning IRSs amounted to PLN 53 582 thousand (31 December 2020: PLN 139 673 thousand).
In the 6-month period ended 30 June 2021 the Company executed FX forward transactions for a total volume of EUR 1 116 thousand. The last transaction's settlement date is in December 2021. As at 30 June 2021, financial liabilities at fair value concerning the measurement of forward instruments amounted to PLN 63 thousand (31 December 2020: PLN 0).
Financing terms - covenants
Financing agreements require ENEA S.A. and ENEA Group to maintain certain financial ratios. And the date on which these condensed separate interim financial statements were prepared, the Company did not breach any credit agreement provisions such as would require early re-payment of long-term debt.
17. Provisions
In the 6-month period ended 30 June 2021, provisions for other liabilities and charges increased on a net basis by PLN 31 964 thousand (6-month period ended 30 June 2020: increase by PLN 264 219 thousand net).
| Provision for non contractual use of land |
Provision for other claims |
Provision for energy origin certificates |
Provision for onerous contracts |
Other | Total | |
|---|---|---|---|---|---|---|
| As at January 2021 | 2 275 | 200 095 | 168 012 | 50 821 | 222 200 | 643 403 |
| Increase in existing provisions | 231 | 16 168 | 281 719 | 11 906 | - | 310 024 |
| Use of provisions | - | (80) | (155 218) | (8 170) | - | (163 468) |
| Reversal of unused provision | (59) | (433) | - | - | (114 100) | (114 592) |
| As at 30 June 2021 | 2 447 | 215 750 | 294 513 | 54 557 | 108 100 | 675 367 |
| Short-term | 2 447 | 215 750 | 294 513 | 54 557 | 108 100 | 675 367 |
Change in provisions for other liabilities and charges in the period ended 30 June 2021:
A description of material claims and conditional liabilities is presented in 24.
Provision for other claims
In the 6-month period ended 30 June 2021 ENEA S.A. created a PLN 9 773 thousand provision for potential claims related to the termination by ENEA S.A. of agreements to purchase energy origin certificates for renewables, and the value of this provision as at 30 June 2021 was PLN 149 238 thousand (this provision is included in the table above in the column "Provision for other claims" and detailed information on this provision is presented in note 24.5).

Financial instruments and financial risk management
18. Financial instruments and fair value
Financial instruments
The following table contains a comparison of fair values and book values:
| As 3 0 Ju 20 21 at ne |
As 31 De mb 20 20 at ce er |
|||
|---|---|---|---|---|
| Bo k lue o va |
Fa ir lue va |
Bo k lue o va |
Fa ir lue va |
|
| FIN AN C IAL A S S ET S |
||||
| Lo -te ng rm |
4 6 0 0 0 8 3 |
4 6 45 8 29 |
6 1 67 43 5 |
6 24 1 2 5 9 |
| Fin ia l as d a fa ir v lue set t an c s m ea su re a |
3 9 174 |
3 9 174 |
8 4 8 48 |
8 4 8 48 |
| De bt fin ia l as ise d c set t a rt ost an c s a mo |
4 5 6 0 49 2 |
4 6 0 6 65 5 |
6 0 8 2 0 74 |
6 15 6 41 1 |
| Fin lea d s b lea iva b les an ce se an u se rec e |
41 7 |
* | 5 13 |
* |
| S ho rt-t erm |
61 8 22 6 5 |
2 4 9 9 7 42 |
3 3 0 2 4 6 5 |
0 6 8 0 2 1 4 |
| De bt fin ia l as ise d c set t a rt ost an c s a mo |
2 4 9 9 7 42 |
2 4 9 9 7 42 |
1 4 0 6 8 0 2 |
1 4 0 6 8 0 2 |
| As ris ing fro it h c set ntr act ust s a m co s w om ers |
28 6 7 19 |
* | 22 8 9 05 |
* |
| Tra de iva b les re ce |
1 5 9 2 5 9 9 |
* | 1 1 3 2 8 07 |
* |
| Fin lea d s b lea iva b les an ce se an u se rec e |
1 9 17 |
* | 3 27 4 |
* |
| Ca h a nd h e iva len ts s ca s q u |
1 2 37 24 9 |
* | 3 0 6 6 8 5 |
* |
| T O TA L F INA N C IAL A S S ET S |
10 21 8 3 0 9 |
7 1 45 57 1 |
9 4 6 9 8 91 |
7 6 48 0 61 |
| FIN AN C IAL LI AB ILI TIE S |
||||
| Lo -te ng rm |
4 6 28 47 2 |
4 6 74 79 1 |
6 6 6 0 6 01 |
6 7 01 3 6 8 |
| Cre d it fac ilit ies loa d de bt it ies ns an sec ur , |
4 5 9 9 97 6 |
4 6 71 76 4 |
6 5 5 9 5 8 6 |
6 6 26 23 7 |
| Le lia b ilit ies as e |
25 46 9 |
* | 25 8 8 4 |
* |
| Fin ia l lia b ilit ies d a fa ir v lue t an c m ea su re a |
3 0 27 |
3 0 27 |
13 1 75 |
13 1 75 |
| S ho rt-t erm |
4 0 41 70 6 |
2 3 55 85 9 |
1 8 14 35 9 |
1 2 75 0 61 |
| Cre d it fac ilit ies loa d de bt it ies ns an sec ur , |
2 3 05 24 1 |
2 3 05 24 1 |
1 2 10 5 19 |
1 2 10 5 19 |
| Le lia b ilit ies as e |
3 49 2 |
* | 5 43 1 |
* |
| Tra de d o he b les t an r p ay a |
3 0 3 8 8 5 |
* | 3 49 0 0 4 |
* |
| Lia b ilit ies is ing fro it h c ntr act ust ar m co s w om ers |
40 77 9 |
* | 3 2 2 8 9 |
* |
| Fin ia l lia b ilit ies d a fa ir v lue t an c m ea su re a |
5 0 6 18 |
5 0 6 18 |
6 4 5 42 |
6 4 5 42 |
| Ot he r fi ia l lia b ilit ies na nc |
1 1 11 18 8 |
* | 15 2 5 74 |
* |
| T O TA L F INA N C IAL LI AB ILI TIE S |
8 67 0 1 78 |
7 0 3 0 65 0 |
8 4 9 6 0 74 |
7 9 76 42 9 |
(*) book value is close to fair value measured in accordance with level 2 in the following hierarchy.

Financial instruments are fair-value measured according to a hierarchy.
| As at 30 June 2021 | |||||
|---|---|---|---|---|---|
| Level 1 | Level 2 | Level 3 | Total | ||
| Financial assets measured at fair value | 19 250 | 19 924 | - | 39 174 | |
| Call options (at fair value through profit or loss) | - | 19 924 | - | 19 924 | |
| Interests at fair value through profit or loss | 19 250 | - | - | 19 250 | |
| Debt financial assets at amortised cost | - | 7 145 571 | - | 7 145 571 | |
| Total | 19 250 | 7 165 495 | - | 7 184 745 | |
| Financial liabilities measured at fair value | - | (53 645) | - | (53 645) | |
| Derivative instruments used in hedge accounting (e.g. interest rate swaps) |
- | (53 582) | - | (53 582) | |
| Derivative instruments at fair value through profit or loss | - | (63) | - | (63) | |
| Credit facilities, loans and debt securities | - | (6 948 509) | - | (6 948 509) | |
| Total | - | (7 002 154) | - | (7 002 154) |
| As at 31 December 2020 | ||||
|---|---|---|---|---|
| Level 1 | Level 2 | Level 3 | Total | |
| Financial assets measured at fair value | 15 000 | 15 982 | 53 866 | 84 848 |
| Equity instruments at fair value through other comprehensive income |
- | - | 53 866 | 53 866 |
| Call options (at fair value through profit or loss) | - | 15 982 | - | 15 982 |
| Interests at fair value through profit or loss | 15 000 | - | - | 15 000 |
| Debt financial assets at amortised cost | - | 7 563 213 | - | 7 563 213 |
| Total | 15 000 | 7 579 195 | 53 866 | 7 648 061 |
| Financial liabilities measured at fair value | - | (139 673) | - | (139 673) |
| Derivative instruments used in hedge accounting (e.g. interest rate swaps) |
- | (139 673) | - | (139 673) |
| Credit facilities, loans and debt securities | - | (7 836 756) | - | (7 836 756) |
| Total | - | (7 976 429) | - | (7 976 429) |
Financial assets and financial liabilities at fair value include:
- − shares and interests in unrelated entities where the stake is below 20%; If interests in unrelated entities are listed on the Warsaw Stock Exchange, then their fair value is based on quoted prices;
- − Polimex-Mostostal S.A. call options;
- − derivative instruments, which include the measurement of interest rate swaps; the fair value of derivative instruments is established by calculating the net present value based on two yield curves, i.e. a curve to determine discount factors and a curve used to estimate future variable reference rates;
Non-current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in over one year. Fair value is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.
Current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in under one year.
The fair value of bank credit, loans and debt securities is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.
The table above contains an analysis of financial instruments at fair value, grouped into a three-level hierarchy, where:
Level 1 - fair value is based on (unadjusted) market prices quoted for identical assets or liabilities on active markets
Level 2 - fair value is determined on the basis of values observed on the market, which are not a direct market quote (e.g. they are established by direct or indirect reference to similar instruments on a market),
Level 3 - fair value is determined using various measurement techniques that are not, however, based on observable market data.
No transfers between the levels were made in the 6-month period ended 30 June 2021.
As at 30 June 2021, financial assets at fair value included call options for Polimex-Mostostal S.A. shares, among other things. Pursuant to a call option agreement for Polimex-Mostostal S.A. shares of 18 January 2017, as amended, ENEA S.A. holds 22 call options from Towarzystwo Finansowe Silesia Sp. z o.o. to purchase 6 937 500 shares, with a nominal value of PLN 2 each. The contractual share allocation date is at the end of each calendar quarter from September 2021 to December 2026. Fair value measurement of the call options was conducted using the Black-Scholes model. The book value of these options as at 30 June 2021 was PLN 19 924 thousand (at 31 December 2020: PLN 15 982 thousand).

19. Debt financial assets at amortised cost
Debt financial assets at amortised cost
| As at | |||
|---|---|---|---|
| 30 June 2021 | 31 December 2020 |
||
| Current debt financial assets at amortised cost | |||
| Intra-group bonds | 1 647 229 | 554 896 | |
| Loans granted | 852 513 | 851 906 | |
| Total current debt financial assets at amortised cost | 2 499 742 | 1 406 802 | |
| Non-current debt financial assets at amortised cost | |||
| Intra-group bonds | 1 596 425 | 3 132 273 | |
| Loans granted | 2 964 067 | 2 949 801 | |
| Total non-current debt financial assets at amortised cost | 4 560 492 | 6 082 074 | |
| TOTAL | 7 060 234 | 7 488 876 |
Intra-group financing
ENEA Group has adopted a model for financing investments being implemented by ENEA S.A. through intra-group financing. ENEA S.A. raises long-term capital in financial markets through credit facilities or bond issues and subsequently distributes these within the Group based on intra-group bond issue programme agreements or loan agreements. Moreover, ENEA S.A. provides financing to subsidiaries from internal funding.
Intra-group bonds
The following table presents on-going intra-group bond issue programmes as at 30 June 2021 and 31 December 2020:
| No. | Bond issuer | Contract date | Amount granted |
Amount used |
Outstanding bonds as at 30 June 2021 (principal) |
Outstanding bonds as at 31 December 2020 (principal) |
Interest | Final buy back deadline |
|---|---|---|---|---|---|---|---|---|
| 1. | ENEA Nowa Energia Sp. z o.o. |
10 March 2011 | 26 000 | 26 000 | 12 000 | 18 000 | WIBOR 6M + margin |
31 March 2023 |
| 2. | ENEA Wytwarzanie Sp. z o.o. |
8 September 2012 agreement for PLN 4 000 000 thousand decreased through Annex 2 of 21 January 2015 to PLN 3 000 000 thousand |
3 000 000 | 2 650 000 | 1 449 000 | 1 790 000 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 15 June 2022 |
| 3. | ENEA Operator Sp. z o.o. |
20 June 2013 amended through Annex 1 of 9 October 2014 and Annex 2 of 7 July 2015 |
1 425 000 | 1 425 000 | 950 837 | 1 013 543 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 17 June 2030 |
| 4. | ENEA Operator Sp. z o.o. |
7 July 2015 amended through Annex 1 of 28 March 2017 |
946 000 | 946 000 | 839 500 | 878 500 | Depending on the series: fixed interest rate or WIBOR 6M + margin |
Depending on bond series' issue dates, however no later than by 15 December 2032 |
| Total | 3 251 337 | 3 700 043 | ||||||
| Transaction costs and effect of measurement using effective interest rate |
(7 683) | (12 874) | ||||||
| Total | 3 243 654 | 3 687 169 |

In the 6-month period ended 30 June 2021 ENEA S.A. did not execute new intra-group bond issue programme agreements concerning financing for ENEA Group companies.
Loans
The following table presents loans issued by ENEA S.A. as at 30 June 2021 and 31 December 2020:
| No. | Borrower | Contract date | Total contract amount |
Debt at 30 June 2021 |
Debt at 31 December 2020 |
Interest | Final repayment deadline |
|---|---|---|---|---|---|---|---|
| 1. | KS "ENERGETYK" | 19 May 2019 |
360 | 360 | 360 | Fixed | 31 January 2020, [the parties intend to execute an annex to this agreement] |
| 2. | ENEA Operator Sp. z o.o. |
11 July 2019 |
425 000 | 425 000 | 425 000 | WIBOR 6M + margin |
20 December 2021 |
| 3. | Elektrownia Ostrołęka Sp. z o.o. |
30 September 2019 |
29 000 | 29 000 | 29 000 | Fixed | 30 September 2021 |
| 4. | ENEA Operator Sp. z o.o. |
13 December 2019 |
425 000 | 425 000 | 425 000 | WIBOR 6M + margin |
20 December 2021 |
| 5. | Elektrownia Ostrołęka Sp. z o.o. |
23 December 2019 |
170 000 | 170 000 | 170 000 | Fixed | 30 September 2021 |
| 6. | ENEA Wytwarzanie Sp. z o.o. |
30 January 2020 |
2 200 000 | 1 800 000 | 1 800 000 | WIBOR 6M + margin |
30 September 2024 |
| 7. | ENEA Elektrownia Połaniec S.A. |
28 February 2020 |
500 000 | 500 000 | 500 000 | WIBOR 6M + margin |
20 December 2024 |
| 8. | ENEA Operator Sp. z o.o. |
12 March 2020 | 950 000 | 650 000 | 650 000 | WIBOR 6M + margin |
20 December 2024 |
| 9. | ENEA Operator Sp. z o.o. |
22 June 2021 | 1 090 000 | - | - | WIBOR 6M + margin |
20 December 2026 |
| 10 | Miejska Energetyka Cieplna Piła Sp. z o.o. |
24 June 2021 | 15 000 | 15 000 | - | WIBOR 6M + margin |
31 December 2031 |
| 4 014 360 | 3 999 360 | ||||||
| Transaction costs and effect of measurement using effective interest rate, along with impairment of loans |
(197 780) | (197 653) | |||||
| Total | 3 816 580 | 3 801 707 |
In the 6-month period ended 30 June 2021 ENEA S.A. executed two new intra-group loan agreements.
On 26 February 2021 ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 1 to the PLN 340 million loan agreement of 23 December 2019 and Annex 6 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of the aforementioned annexes, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off loan repayment to ENEA S.A. of PLN 170 million and PLN 29 million, respectively, together with interest, by 30 June 2021.
On 22 June 2021, ENEA S.A. and ENEA Centrum Sp. z o.o. executed a loan agreement of up to PLN 1 090 000 thousand intended to finance the borrower's expenses planned for 2021. The loan availability period ends on 31 December 2021.
On 24 June 2021, ENEA S.A. executed a loan agreement with Miejska Energetyka Cieplna Piła Sp. z o.o. of up to PLN 15 000 thousand, intended to finance the borrower's planned expenses. The loan was fully disbursed.
On 30 June 2021, ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 2 to the PLN 340 million loan agreement of 23 December 2019 and Annex 7 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of these annexes, the deadline for the one-off repayment by Elektrownia Ostrołęka Sp. z o.o. of the loans along with interest was prolonged to 30 September 2021.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Impairment of financial assets at amortised cost (concerns loans granted) as at 30 June 2021 amounted to PLN 220 072 thousand. The total impairment loss on loans issued to Elektrownia Ostrołęka Sp. z o.o. recognised in the 6-month period ended 30 June 2021 was PLN 9 988 thousand, and this amount was recognised in the separate statement of comprehensive income under "Impairment of financial assets at amortised cost."
20. Impairment of trade and other receivables
Impairment of trade and other receivables:
| 6-month period ended 30 June 2021 |
Year ended 31 December 2020 |
|
|---|---|---|
| Impairment of receivables at the beginning of period | 59 450 | 54 820 |
| Created Used |
7 452 (2 823) |
12 647 (8 017) |
| Impairment of receivables at the end of period | 64 079 | 59 450 |
In the 6-month period ended 30 June 2021, impairment of trade and other receivables increased by PLN 4 629 thousand (in the 6-month period ended 30 June 2020 impairment grew by PLN 2 377 thousand). Impairment losses are mainly recognised on trade receivables. Impairment of other receivables is negligible.
As at 30 June 2021, the Company carried out an additional analysis of the COVID-19 pandemic's potential impact on receivables impairment. An individual approach was applied to a list of ENEA S.A.'s largest debtors, using assumptions for a model described in the Company's existing Methodology for determining expected credit losses for non-current debt assets and similar items. As regards the model's quantitative module - available reporting data from the debtors was used, while the qualitative module incorporated the existing (and predicted) situation in the national economy as well as the counterparty's market and financial position. Based on this overall evaluation, a rating was assigned and subsequently transposed onto the Probability of Default parameter (in accordance with the aforementioned Methodology). As regards the Loss Given Default parameter, a value equal to 10% was conservatively adopted (in reality far exceeding the actual levels of receivables losses recorded by the Company). The above analysis generated an additional expected credit loss at a negligible level from the viewpoint of reporting.
For current trade receivables, expected credit losses are calculated based on historic data in a way that is described in Rules for creating and recording impairment losses on trade receivables and other financial items at ENEA Group companies. The impairment of receivables for 2021 is calculated on the basis of data from 2020. Therefore, the level of receivables impairment estimated as at 30 June 2021 reflects objective indications of impairment resulting from the situation and regulations arising from the COVID-19 pandemic.
21. Analysis of the age structure of assets arising from contracts with customers and trade and other receivables
| As at 30 June 2021 | |||||
|---|---|---|---|---|---|
| Nominal value | Impairment | Book value | |||
| Trade and other receivables | |||||
| Current | 1 181 743 | (509) | 1 181 234 | ||
| Overdue | 167 527 | (61 298) | 106 229 | ||
| 0-30 days | 61 137 | (109) | 61 028 | ||
| 31-90 days | 16 222 | (2 164) | 14 058 | ||
| 91-180 days | 7 913 | (2 853) | 5 060 | ||
| over 180 days | 82 255 | (56 172) | 26 083 | ||
| Total | 1 349 270 | (61 807) | 1 287 463 | ||
| Assets arising from contracts with customers |
286 834 | (115) | 286 719 |
Age structure of assets arising from contracts with customers and trade receivables:
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

| As at 31 December 2020 | |||
|---|---|---|---|
| Nominal value | Impairment | Book value | |
| Trade and other receivables | |||
| Current | 1 029 742 | (638) | 1 029 104 |
| Overdue | 160 198 | (56 495) | 103 703 |
| 0-30 days | 63 118 | (75) | 63 043 |
| 31-90 days | 11 645 | (936) | 10 709 |
| 91-180 days | 6 583 | (1 761) | 4 822 |
| over 180 days | 78 852 | (53 723) | 25 129 |
| Total | 1 189 940 | (57 133) | 1 132 807 |
| Assets arising from contracts with customers |
228 995 | (90) | 228 905 |
22. Other financial liabilities
Cash management at ENEA Group is carried out at ENEA S.A. level, making it possible to effectively manage cash surpluses and to limit external financing costs. The Group's cash pooling service includes selected companies from ENEA's tax group.
In this service, the balances of participants' bank accounts are zeroed at the end of each day and subsequently any cash surpluses are transferred to the managing entity's (ENEA S.A.) bank account. The next day, cash balances are reversed and returned to the companies' bank accounts.
At 30 June 2021, the balance of liabilities in cash pooling was PLN 1 111 188 thousand (PLN 152 574 thousand at 31 December 2020) and is presented in line: Other financial liabilities.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Other explanatory notes
23. Related-party transactions
The Company executes transactions with the following related parties:
- − transactions with ENEA Group companies
- − transactions between the Company and members of ENEA S.A.'s corporate bodies are divided into two categories:
- − resulting from being appointed as Supervisory Board members,
- − resulting from other civil-law contracts.
- − transactions with State Treasury related parties.
ENEA Group companies
| 6-month period ended | |||
|---|---|---|---|
| 30 June 2021 | 30 June 2020 | ||
| Purchase value, including: purchase of materials purchase of services other (including electricity and gas) |
4 173 209 269 1 079 814 3 093 126 |
3 771 432 212 881 998 2 889 222 |
|
| Sale value, including: sale of electricity sale of services other |
176 310 163 540 492 12 278 |
173 506 157 301 1 471 14 734 |
|
| Interest income, including: on bonds on loans other |
70 142 41 178 28 717 247 |
111 000 84 130 23 441 3 429 |
| As at | |||
|---|---|---|---|
| 30 June 2021 | 31 December 2020 | ||
| Receivables | 381 175 | 413 082 | |
| Liabilities | 529 880 | 415 751 | |
| Financial assets - bonds | 3 243 654 | 3 687 169 | |
| Loans granted | 3 816 518 | 3 801 646 | |
| Other financial liabilities | 1 111 188 | 152 574 |
These transactions with Group companies are executed on market terms, which do not differ from the terms applied in transactions with other entities.
Transactions with members of the Group's corporate authorities
| Item | Company's Management Board 6-month period ended |
Company's Supervisory Board 6-month period ended |
||
|---|---|---|---|---|
| 30 June 2021 | 30 June 2020 | 30 June 2021 | 30 June 2020 | |
| Remuneration under management contracts | 1 848* | 2 674** | - | - |
| Remuneration under appointment to management or supervisory bodies |
- | - | 401 | 386 |
| TOTAL | 1 848 | 2 674 | 401 | 386 |
* This remuneration includes a non-compete clause for former Management Board members, amounting to PLN 138 thousand ** This remuneration covers bonuses for 2018 of PLN 1 294 thousand.
In the 6-month period ended 30 June 2021, no loans were made to Supervisory Board members from the Company Social Benefit Fund (PLN 0 thousand for the 6-month period ended 30 June 2020).
Other transactions resulting from civil-law contracts executed between ENEA S.A. and members of the Company's corporate authorities mainly concern the use of company cars by members of ENEA S.A.'s Management Board for private purposes.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

Transactions with State Treasury related parties
ENEA S.A. also executes commercial transactions with state and local administration units and entities owned by Poland's State Treasury.
The subject of these transactions mainly is as follows:
- − purchase of electricity and property rights resulting from origin certificates for energy from renewable sources and energy produced in cogeneration with heat, from State Treasury subsidiaries and
- − sale of electricity, distribution services and other associated fees that the Company provides for both state and local administration authorities (sale to end customers) and to the State Treasury's subsidiaries (wholesale and retail sale - to final customers).
These transactions are executed on market terms, and these terms do not differ from the terms applied in transactions with other entities. The Company does not keep records that would make it possible to aggregate the amounts of all transactions executed with all state institutions and the State Treasury's subsidiaries.
In addition, the Company identified financial transactions with State Treasury's related parties, i.e. with banks serving as guarantors for bond issue programmes. These entities include: PKO BP S.A., Pekao S.A. and Bank Gospodarstwa Krajowego. Detailed information on bond issue programs is presented in note 16.
24. Conditional liabilities, court proceedings and cases on-going before public administration organs
This section of explanatory notes includes conditional liabilities and on-going proceedings in courts, arbitration bodies or public administration bodies
24.1. Sureties and guarantees
In the 6-month period ended 30 June 2021 ENEA S.A. as Guarantor did not execute any surety agreements.
The following table presents significant bank guarantees valid as of 30 June 2021 under an agreement between ENEA S.A. and Bank PKO BP S.A. and Bank PEKAO S.A. up to a limit specified in the agreement.
List of guarantees issued as at 30 June 2021
| Guarantee issue date |
Guarantee validity |
Obliged entity | Entity for which the guarantee was issued |
Bank - issuer |
Guarantee amount in PLN 000s |
|---|---|---|---|---|---|
| 30.12.2020 | 31.12.2022 | ENEA Elektrownia Połaniec | Izba Rozliczeniowa Giełd Towarowych S.A. |
PEKAO S.A. | 490 000 |
| 12.08.2018 | 30.06.2022 | ENEA Elektrownia Połaniec | Polskie Sieci Elektroenergetyczne |
PKO BP S.A. | 20 000 |
| 26.06.2020 | 15.03.2022 | ENEA Serwis Sp. z o.o. | ENEA Operator Sp. z o.o. | PKO BP S.A. | 3 145 |
| 12.08.2018 | 15.02.2022 | ENEA S.A. | Górecka Projekt Sp. z o.o. |
PKO BP S.A. | 2 109 |
| 01.07.2020 | 30.06.2022 | ENEA S.A. | H. Święcicki Clinical Hospital in Poznań |
PKO BP S.A. | 1 281 |
| Total bank guarantees | 516 535 |
The value of other guarantees issued by the Company as at 30 June 2021 was PLN 6 626 thousand. The total value of sureties and guarantees issued by ENEA S.A. as collateral for ENEA Group companies' liabilities at 30 June 2021 was PLN 558 292 thousand.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

24.2. On-going proceedings in courts of general competence
Proceedings initiated by the Company
Proceedings in courts of general competence initiated by ENEA S.A. concern receivables related to electricity supplies and receivables related to other matters - illegal uptake of electricity, grid connections and other specialised services.
At 30 June 2021, a total of 16 351 cases initiated by the Company were in progress before courts of general competence, worth in aggregate PLN 55 769 thousand (31 December 2020: 12 237 cases worth PLN 55 724 thousand).
The outcome of individual cases is not significant from the viewpoint of the Company's financial result.
Proceedings against the Company
Proceedings against the Company are initiated by both natural persons and legal entities. They concern issues such as: compensation for electricity supply disruptions, compensation for the Group's use of properties on which power equipment is located as well as claims related to terminated contracts for the purchase of property rights (note 24.5).
At 30 June 2021, a total of 105 cases against the Company were in progress before courts of general competence, worth in aggregate PLN 563 208 thousand (31 December 2020: 128 cases worth PLN 563 866 thousand).
Provisions related to these court cases are presented in 17.
24.3. Other court proceedings
The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by the Company's shareholder, Fundacja "CLIENTEARTH Prawnicy dla ziemi," based in Warsaw, to cancel, determine the non-existence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The first hearing in the case was held on 10 April 2019, with no witnesses called to the hearing. The Court requested that the Company provide the Investment Agreement within 14 days, at least as regards points 1 to 8 (especially point 8.6), subject to the trial consequences indicated in art. 233 § 2 of the Civil Procedure Code. ENEA's attorney filed a reservation to the protocol pursuant to art. 162 of the Civil Procedure Code. On 24 April 2019, the Company provided the Investment Agreement. The Court decided to postpone the hearing to 17 July 2019. On 31 July 2019, the District Court in Poznań allowed the main claim and declared the Resolution invalid. On 17 September 2019, an attorney for ENEA S.A. submitted an appeal against the ruling of 31 July 2019. The complainant submitted a response to the appeal, to which ENEA S.A.'s attorney replied. On 8 July 2020 the Appeals Court dismissed the Company's appeal against the District Court's ruling. As indicated in verbal major reasons for the ruling, the Appeals Court decided that the District Court's ruling complies with the law because the Resolution is invalid due to the fact that adopting the Resolution breached the division of competences between the organs of a commercial-law company. In consequence, the ruling by the District Court in Poznań invalidating the Resolution became final. The Company has assessed the impact of this event as neutral for the reported data.
The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by Międzyzakładowy Związek Zawodowy Synergia Pracowników Grupy Kapitałowej ENEA, based in Poznań, to cancel, determine the nonexistence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The hearing was scheduled for 8 May 2019. That hearing, and others scheduled for 30 July 2019 and 1 October 2019, did not take place. The hearing has been suspended until a final ruling is issued in a case instigated by a shareholder of the Company - Fundacja "CLIENTEARTH Prawnicy dla ziemi." Through a decision of 26 May 2021, the District Court in Poznań dismissed the case.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

24.4. Cases concerning 2012 non-balancing
On 30 and 31 December 2014, ENEA S.A. submitted demands for settlement to:
| Demanded amount in PLN 000s |
|
|---|---|
| PGE Polska Grupa Energetyczna S.A. | 7 410 |
| PKP Energetyka S.A. | 1 272 |
| TAURON Polska Energia S.A. | 17 086 |
| TAURON Sprzedaż GZE Sp. z o.o. | 1 826 |
| Total | 27 594 |
The subject of these demands is claims for the payment for electricity that was incorrectly settled on the balancing market in 2012. The companies receiving these demands obtained unjustified proceeds by not allowing ENEA S.A. to issue invoices for 2012.
Given a lack of an amicable resolution in this case, ENEA S.A. brought lawsuits against:
- − TAURON Polska Energia S.A. lawsuit of 10 December 2015,
- − TAURON Sprzedaż GZE Sp. z o.o. lawsuit of 10 December 2015,
- − PKP Energetyka S.A. lawsuit of 28 December 2015,
- − PGE Polska Grupa Energetyczna S.A. lawsuit of 29 December 2015.
Three of the aforementioned disputes are not yet resolved in first-instance courts. In the case ENEA S.A. v. Tauron Polska Energia S.A. and others (file no. XIII GC 600/15/AM), on 23 March 2021 the District Court in Katowice ruled to reject the claim in its entirety and awarded the costs of proceedings in favour of the defendant and the co-defendants. The ruling along with justification in writing was delivered on 20 May 2021. On 10 June 2021, ENEA S.A. lodged an appeal to the Appeals Court in Katowice. In a case against PGE Polska Grupa Energetyczna S.A. (file no. XVI GC 525/20, previous file no. XX GC 1163/15) - through a ruling of 7 January 2021 the court suspended the proceeding at the mutual request of the parties.
No amounts concerning the above cases were recognised in the separate statement of financial position.
24.5. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin certificates for energy from renewable sources
ENEA S.A. is a party to 8 court proceedings concerning agreements for the purchase of property rights arising under certificates of origin for energy from renewable sources, which includes:
- 5 proceedings for payment against ENEA S.A. concerning remuneration, contractual penalties or compensation;
- 2 proceedings for the voidance of ENEA S.A.'s termination or withdrawal from agreements to sell property rights, which took place on 28 October 2016, including 1 proceeding in which claims for payment are being sought at the same time;
- 1 proceeding for payment, in which ENEA S.A. seeks a claim concerning a contractual penalty.
ENEA S.A. offset a part of receivables due for these counterparties from ENEA S.A. for sold property rights with damagesrelated receivables due for ENEA S.A. from renewables producers. The damage caused to ENEA S.A. arose as a result of the counterparties' failure to fulfil a contractual obligation to participate, in good faith, in re-negotiating long-term agreements for the sale of property rights in accordance with an adaptation clause that is binding for the parties.
On 28 October 2016, ENEA S.A. submitted statements depending on the agreement: on termination or withdrawal from long-term agreements for the purchase by the Company of property rights resulting from certificates of origin for energy from renewable sources (green certificates) (Agreements).
The Agreements were executed in 2006-2014 with the following counterparties, which own renewable generation assets ("Counterparties"):
- Farma Wiatrowa Krzęcin Sp. z o.o., based in Warsaw;
- Megawind Polska Sp. z o.o., based in Szczecin;
- PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów;
- PGE Energia Odnawialna S.A., based in Warsaw;
- PGE Energia Natury PEW Sp. z o.o., based in Warsaw (currently PGE Energia Odnawialna S.A., based in Warsaw);
- "PSW" Sp. z o.o., based in Warsaw;
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

- in.ventus Sp. z o.o. EW Śniatowo Sp. k., based in Poznań (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice);
- Golice Wind Farm Sp. z o.o., based in Warsaw.
As a rule, the Agreements were terminated by the end of November 2016. The dates on which the respective Agreements were terminated depended on contractual provisions.
The reason for terminating/withdrawing from each of the Agreements by the Company was failure to engage in renegotiations concerning adaptive clauses in each of the Agreements that would justify the adjustment of these Agreements in order to restore contractual balance and the equivalence of the parties' benefits following changes in the law.
Legal changes that occurred after the aforementioned Agreements were executed include in particular:
- ordinance of the Minister of Economy of 18 October 2012 on a detailed scope of obligations to obtain and present for redemption origin certificates, pay substitute fees, purchase electricity and industrial heat generated from renewable sources and the obligation to validate data concerning the quantity of electricity generated from renewable sources (Polish Journal of Laws of 2012, item 1229);
- Act on renewable energy sources of 20 February 2015 (Polish Journal of Laws of 2015, item 478) and associated further legal changes and announced drafts of legal changes, including especially:
- − the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 (Polish Journal of Laws of 2016, item 925); and
- − a draft of the Ordinance of the Minister of Energy concerning changes in the share of electricity resulting from redeemed origin certificates confirming production of electricity from renewable sources, which is to be issued based on an authorisation under art. 12 sec. 5 of the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 and certain other acts,
caused an objective lack of possibilities to develop reliable models to forecast the prices of green certificates.
The Agreements were terminated with the intention for the Company to avoid losses constituting the difference between contractual and market prices of green certificates. Due to the changing legal conditions after termination of the Agreements in 2017, especially arising from the Act of 20 July 2017 on amendment of the act on renewable energy sources, the estimated value of future contract liabilities would have changed. In the current legal framework, this would be significantly lower in comparison to the amount estimated when the Agreements were being terminated, i.e. approx. PLN 1 187 million. This decline reflects a change in the way in which the substitute fee is calculated, which in accordance with the content of some of the Agreements constitutes the basis for calculating the contract price and indexing it to the market price. The Company created a PLN 149 238 thousand provision for potential claims resulting from the terminated Agreements in relation to submissions made by 30 June 2021 concerning transactions to sell property rights by the counterparties; the provision is presented in 17.
In a case brought by Golice Wind Farm Sp. z o.o. against ENEA S.A., the court issued on 14 August a partial and preliminary ruling, in which it:
- 1) withdrew a claim seeking the voidance of ENEA S.A.'s termination of an agreement to sell property rights, which took place on 28 October 2016;
- 2) accepted a claim for the payment of consideration for property rights and ordered ENEA S.A. to pay PLN 6 042 thousand, together with interest;
- 3) considered the other parts of the claim for payment as justified in general.
This ruling is not final. ENEA S.A. has appealed part of the ruling, i.e. as regards points 2 and 3. Moreover, on 13 January 2021 Golice Wind Farm Sp. z o.o. appealed a part of the ruling, i.e. as regards the ruling in point 1, dismissing the action for a declaration.
In cases brought by PGE Group companies, i.e.:
- PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1064/17) on 15 June 2021, the court resumed the previously suspended proceeding;
- PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów (file no. IX GC 555/16) through a ruling of 29 June 2021, the court suspended the proceeding at the parties' mutual request;
- PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1011/17) through a ruling of 16 April 2021, the court had resumed the previously suspended proceeding, and in a ruling dated 3 August 2021 the District Court in Poznań suspended the proceeding at the parties' mutual request.
In a case brought by PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1011/17), on 19 July 2021 the Company received a PLN 17 706 thousand claim expansion, as a result of which the total claims being sought in the proceeding amount to PLN 51 019 thousand.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

In a case brought by ENEA S.A. against PGE Górnictwo i Energetyka Konwencjonalna S.A. (file no. X GC 608/20) – on 26 October 2020, the court ruled to suspend the proceeding at the parties' mutual request. The ruling is final.
In a case brought by Hamburg Commercial Bank AG against ENEA S.A., in which Hamburg Commercial Bank AG is seeking claims arising under property rights sales contract no. ENEA/WINDPARK ŚNIATOWO/PMOZE/2013 of 26 February 2014, executed between ENEA S.A. and Windpark Śniatowo Management GmbH EW Śniatowo Sp. k. (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice), claiming their purchase under a debt assignment contract, the District Court in Poznań issued on 25 February 2021 a partial ruling, ordering ENEA S.A. to pay PLN 494 thousand, with statutory late interest for the period from 16 December 2016 to the payment date. This ruling is not final. On 2 June 2021, ENEA S.A. lodged an appeal against the entire partial ruling by the District Court in Poznań of 25 February 2021. Within the remaining scope, i.e. concerning the claim extension of 17 January 2019 and claim extension of 20 August 2019, the proceeding is legally suspended under the order of the District Court in Poznań of 24 October 2019 until a final ruling is issued by this court in case no. IX GC 552/17.
25. Participation in nuclear power plant build program
On 15 April 2015 KGHM Polska Miedź S.A., PGE S.A., TAURON S.A. and ENEA S.A. executed an agreement to purchase shares in PGE EJ 1. KGHM Polska Miedź S.A., TAURON S.A. and ENEA S.A. purchased 10% stakes in PGE EJ 1 each from PGE (30% in total). ENEA paid PLN 16 million for its stake. ENEA S.A.'s overall expenditures on purchasing shares and increasing the company's share capital amounted to PLN 70 902 thousand.
On 1 October 2020, ENEA S.A., PGE S.A., KGHM Polska Miedź S.A. and TAURON S.A. signed a letter of intent with the State Treasury regarding purchase by the State Treasury of a 100% stake in PGE EJ 1. The letter of intent did not commit the parties to the transaction. The decision on the transaction depended on the outcome of negotiations and compliance with other conditions specified in the provisions of law or corporate documents.
On 26 March 2021 ENEA S.A., PGE S.A., TAURON S.A. and KGHM Polska Miedź S.A. executed an agreement with the State Treasury to sell 100% of shares in PGE EJ 1 to the State Treasury (Share Sale Agreement). Pursuant to the Share Sale Agreement, ownership of the PGE EJ 1 shares was transferred on 31 March 2021. ENEA sold 532 523 shares in PGE EJ 1, constituting 10% of its share capital and representing 10% of votes at its general meeting, to the State Treasury. The sale price for the 100% stake was PLN 531 362 thousand, of which ENEA received PLN 53 136 thousand.
Furthermore, on 26 March 2021, the shareholders executed an Annex to an Agreement of 15 April 2015 with PGE EJ 1 regarding PGE EJ 1's dispute with the WorleyParsons consortium (Agreement). Pursuant to the Annex, the shareholders' liability toward PGE EJ 1 arising from the Agreement as a result of the dispute with the WorleyParsons consortium is now amount-limited, and if the dispute is resolved in PGE EJ 1's favour, the shareholders are eligible to receive appropriate consideration from PGE EJ 1. Information on the dispute between PGE EJ 1 and the WorleyParsons consortium were disclosed by PGE in relevant current reports.
Pursuant to the Share Sale Agreement of 26 March 2021, the difference between the valuation of PGE EJ 1 as of 31 December 2020 (valuation for transaction purposes) and an updated valuation as of 31 March 2021 (valuation on share transfer date) should be returned by the selling companies to the State Treasury ("Price Adjustment"). Given the above, on 2 June 2021, ENEA S.A. settled the Price Adjustment concerning the sale of its stake in PGE EJ 1, i.e. paid PLN 533 thousand to the State Treasury.
26. Impact of COVID-19 pandemic
A state of epidemic caused by the SARS-Cov-2 coronavirus is in effect in Poland since 20 March 2020. The virus and its effects as well as the effects of actions taken by the state to combat the pandemic have influence over the condition of the domestic economy. For this reason, ENEA S.A.'s activities have also been affected by the situation.
The total electricity sales volume went up in the first half of 2021 by 1 500 GWh, or 15.3%, in comparison with the same period of 2020. The volume of gas fuel sales also increased on a year-to-year basis (by 171 GWh, or 25.1%). Revenue from electricity and gas sales increased in the first half of 2021 by PLN 410 million, or 13.4%. Revenue increased in in both the business and household customers segments.
At the date on which these separate condensed separate interim financial statements were prepared, it is difficult to predict how the situation will develop in 2021 and what the potential negative effects for the Company's operating and financing activities will be. A further spread of the virus may lead to further restrictions and a decline in economic activity (currently numerous restrictions apply to: hotels, restaurants, coffee shops and shopping galleries), decline in electricity demand and in consequence lower electricity output, which might impact the Company's revenue from sales. It also cannot be ruled out that a significantly larger number of Covid cases at the Company will affect risks related to the Company's business continuity. Potential interruptions in operations could have a negative impact on revenue from sales. The Company is taking preventive action to reduce this type of risk.
From the onset of the pandemic, the Company has been carrying out additional analyses of the COVID-19 pandemic's potential impact on receivables impairment. Expected losses are verified on the basis of these analyses. The size of this
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.

additional impairment - since these analyses began - is negligible from a reporting viewpoint. Nonetheless, the Company assesses that if restrictions related to the COVID-19 pandemic are maintained and thus economic activity is further reduced, the receivables turnover ratio might deteriorate given a reduced payment capacity on the part of electricity customers.
ENEA S.A. cyclically reviews the credit ratings of its subsidiaries and the recoverability of intra-group bonds and loans. In accordance with ENEA Group's methodology for determining expected credit losses for debt assets, no need was identified as of 30 June 2021 for recognising this in respect of subsidiaries.
A crisis and coordination command, appointed by the Management Board, is operating at ENEA S.A., and all Group companies have appointed teams that coordinate tasks related to ensuring the continuity of ENEA Group companies' operations in the context of the coronavirus threat. The Management Board of ENEA S.A. is coordinating all activities in this area through the crisis coordination command. The command and teams engage in activities intended to protect the health of employees by providing personal protective equipment (face masks, anti-microbial gels, gloves), implementing safe work rules (including introducing, wherever possible, remote work, limited direct meetings in the workplace, disinfection of rooms, introducing a limit on the number of employees in a room, maintaining safe distances between employees). The precautions taken in order to prevent the spread of the coronavirus have an impact on operating costs, which together with changes in revenue will ultimately affect the net result.
At the date on which these condensed separate interim financial statements were prepared, the Company did not identify material uncertainty over its going concern.
27. Events after the reporting period
On 23 July 2021, ENEA S.A., PGE Polska Grupa Energetyczna S.A., TAURON Polska Energia S.A., ENERGA S.A. (together the "Energy Companies") and the State Treasury (together the "Parties") signed an agreement concerning cooperation on the spin-off of coal assets and their integration within the National Energy Security Agency ("Agreement"). In a document entitled "Energy sector transformation in Poland. Spin-off of coal assets from companies with a State Treasury shareholding ("Transformation")," published by the Ministry of State Assets, a concept was developed to spin off assets related to the generation of electricity in conventional coal units ("Coal Assets") from the Energy Companies. The Transformation includes, inter alia, the integration of these Coal Assets within one entity, i.e. PGE Górnictwo i Energetyka Konwencjonalna S.A. - a subsidiary of PGE Polska Grupa Energetyczna S.A., which will eventually operate under the name National Energy Security Agency ("NABE").
Given the above, the Parties to the Agreement acknowledge the need to coordinate cooperation in the process of spinningoff the Coal Assets and integrating them within NABE. Under the Agreement, the Parties declare to mutually exchange essential information, including organisational structures, processes being implemented and the direction of the Transformation, provided that this exchange does not violate the law. The Agreement will facilitate a smooth and effective process intended to establish NABE.
On 19 August 2021, an Extraordinary General Meeting of ElectroMobility Poland S.A. adopted a resolution to decrease its share capital by PLN 17 700 thousand, by reducing the nominal value of all of its shares, from PLN 7 000.00 each to a new nominal value of PLN 5 230.05 each. The objective of the share capital decrease was to transfer share capital to supplementary capital. The general meeting also adopted a resolution to increase share capital by PLN 249 996 thousand to PLN 302 297 thousand, with the total issue price being PLN 250 000 thousand, which will be paid for entirely with a cash contribution. The new shares were issued by way of a private subscription. All of the new-issue shares are ordinary registered shares. The share premium will be transferred to supplementary capital. The new shares were offered to the State Treasury, with which ElectroMobility Poland S.A. signed a share purchase agreement. Once all activities related to the share capital increase are completed, ENEA S.A. will hold a 4.325% stake.
The additional information and explanations presented on pages 9-33 constitute an integral part of these condensed separate interim financial statements.