Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Enea S.A. Interim / Quarterly Report 2021

Nov 25, 2021

5597_rns_2021-11-25_51d3ee45-ed23-45ce-9804-997a4e455e4e.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ENEA GROUP CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS

for the period from 1 January to 30 September 2021

Rysunek 1

in compliance with EU IFRS

TABLE OF CONTENTS

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME 4
CONSOLIDATED STATEMENT OF FINANCIAL POSITION 5
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY 7
CONSOLIDATED STATEMENT OF CASH FLOWS 8
ADDITIONAL INFORMATION AND EXPLANATIONS 9
General information 9
1. General information on the Parent9
2.
3.
Group composition 9
Changes in composition of the Parent's Management Board and Supervisory Board11
4. Basis for preparing financial statements 12
5. Accounting rules (policy) and significant estimates and assumptions 12
6. Functional currency and presentation currency 12
Operating segments 13
Explanatory notes to the consolidated statement of comprehensive income 20
7. Revenue from sales 20
8. Tax21
Explanatory notes to the consolidated statement of financial position 22
9. Property, plant and equipment 22
10.
11.
Intangible assets 22
Investments in associates and jointly controlled entities23
12. Inventories27
13. Energy origin certificates28
14. Assets and liabilities arising from contracts with customers 28
15. Restricted cash28
16.
17.
Coverage of loss 28
Debt-related liabilities 29
18. Provisions32
19. Accounting for subsidies and road lighting modernisation services 33
Financial instruments 34
20. Financial instruments and fair value34
21. Debt financial assets at amortised cost36
22.
23.
Impairment of trade and other receivables37
Analysis of the age structure of assets arising from contracts with customers and trade
and other receivables 37
Other explanatory notes 39
24. Related-party transactions 39
25. Conditional liabilities, court proceedings and cases on-going before public administration
organs 39
25.1. Sureties and guarantees 39
25.2. On-going proceedings in courts of general competence 40
25.3. Other court proceedings40
25.4. Risk associated with legal status of properties used by the Group 41
25.5. Cases concerning 2012 non-balancing42
25.6. Dispute concerning prices for origin certificates for energy from renewable sources
and terminated agreements for the purchase of property rights arising under origin
certificates for energy from renewable sources 42
26. Participation in nuclear power plant build program 44
27. Impact of COVID-19 pandemic 44

These condensed consolidated interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.

Members of the Management Board

President of the Management Board Paweł Szczeszek
Member of the Management Board Rafał Mucha
Member of the Management Board Tomasz Siwak
Member of the Management Board Tomasz Szczegielniak
Member of the Management Board Marcin Pawlicki

Prepared by: Robert Kiereta

Head of Consolidated Reporting

Poznań, 25 November 2021

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

For the 9-
month period
For the 3-
month period
For the 9-
month period
For the 3-
month period
ended ended ended ended
Note 30 September
2021
30 September
2021
30 September
2020
30 September
2020
(unaudited) (unaudited) (unaudited) (unaudited)
Revenue from sales 7 15 335 718 5 482 552 13 502 346 4 527 432
Excise duty (54 356) (17 659) (48 626) (15 569)
Net revenue from sales 15 281 362 5 464 893 13 453 720 4 511 863
Revenue from operating leases and subleases 9 131 2 262 10 178 2 580
Revenue from sales and other income 15 290 493 5 467 155 13 463 898 4 514 443
Other operating revenue
Change in provision for onerous contracts
145 683
(11 066)
65 824
(7 330)
182 284
53 432
46 793
14 127
Depreciation/amortisation (1 143 749) (394 168) (1 189 814) (418 846)
Employee benefit costs (1 564 250) (521 937) (1 454 779) (473 840)
Use of materials and raw materials and value of goods sold (3 375 160) (1 277 198) (2 642 122) (979 061)
Purchase of electricity and gas for sales purposes (6 180 123) (2 063 161) (5 469 283) (1 786 374)
Transmission services (329 480) (112 295) (355 046) (118 151)
Other third-party services
Taxes and fees
(673 547)
(351 519)
(233 931)
(115 677)
(650 428)
(335 387)
(249 712)
(114 160)
Loss on change, sale and liquidation of property, plant and
equipment and right-of-use assets (32 118) (8 527) (28 053) (10 858)
Impairment losses on non-financial non-current assets (3 445) (81) (521 984) (212)
Other operating costs (145 906) (72 051) (129 409) (29 798)
Operating profit 1 625 813 726 623 923 309 394 351
Finance costs (165 875) (48 964) (260 021) (86 313)
Finance income 47 943 12 243 31 353 8 017
Dividend income 217 98 275 123
Impairment of financial assets at amortised cost (13 762) (3 774) (141 470) (2 733)
Share of results of associates and jointly controlled entities 11 126 054 4 850 (333 826) (83 488)
Impairment of investments in associates and jointly controlled
entities
(129 208) (129 208)
Profit before tax 1 620 390 691 076 90 412 100 749
Income tax 8 (288 043) (94 759) (134 116) (62 810)
Net profit/(loss) for the reporting period 1 332 347 596 317 (43 704) 37 939
Other comprehensive income
Subject to reclassification to profit or loss:
- measurement of hedging instruments 112 994 32 224 (131 580) 10 225
- income tax 8 (21 470) (6 123) 25 015 (1 950)
Not subject to reclassification to profit or loss:
- restatement of defined benefit plan 25 035 (46 504)
- other (1 263)
- income tax 8 (4 757) 8 836
Net other comprehensive income 110 539 26 101 (144 233) 8 275
Comprehensive income for the reporting period 1 442 886 622 418 (187 937) 46 214
Including net profit/(loss):
attributable to shareholders of the Parent 1 269 493 570 113 (62 417) 36 801
attributable to non-controlling interests 62 854 26 204 18 713 1 138
Including comprehensive income:
attributable to shareholders of the Parent 1 380 275 596 214 (205 919) 45 076
attributable to non-controlling interests 62 611 26 204 17 982 1 138
Net profit/(loss) attributable to shareholders of the Parent 1 269 493 570 113 (62 417) 36 801
Weighted average number of ordinary shares 441 442 578 441 442 578 441 442 578 441 442 578
Net profit/(loss) attributable to the Parent's shareholders,
per share (in PLN per share) 2.88 1.29 (0.14) 0.08
Diluted profit/(loss) per share (in PLN per share) 2.88 1.29 (0.14) 0.08

The consolidated statement of comprehensive income should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed consolidated interim financial statements.

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

As at
Note 30 September 2021
(unaudited)
31 December 2020
ASSETS
Non-current assets
Property, plant and equipment
9
18 862 207 18 903 722
Right-of-use assets 745 410 730 078
Intangible assets
10
341 311 359 365
Investment properties 20 507 21 239
Investments in associates and jointly controlled entities
11
132 508 133 647
Deferred income tax assets
8
1 308 053 1 296 061
Financial assets measured at fair value
20
152 042 97 957
Trade and other receivables 428 725 72 381
Costs related to the conclusion of agreements 12 183 11 256
Finance lease and sublease receivables 677 513
Funds in the Mine Decommissioning Fund 141 226 141 591
Total non-current assets 22 144 849 21 767 810
Current assets
CO2 emission allowances 1 103 209 2 529 059
Inventories
12
1 290 731 1 129 975
Trade and other receivables 2 451 206 2 132 191
Costs related to the conclusion of agreements 11 348 13 428
Assets arising from contracts with customers
14
421 800 322 446
Finance lease and sublease receivables 933 975
Current income tax receivables 460 10 470
Financial assets measured at fair value
20
95 045 41 894
Debt financial assets at amortised cost
21
61
Other short-term investments 31 607
Cash and cash equivalents
15
6 035 690 1 941 554
Total current assets 11 442 029 8 122 053
Total assets 33 586 878 29 889 863

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

Note As at
30 September 2021
(unaudited)
31 December 2020
EQUITY AND LIABILITIES
Equity
Equity attributable to shareholders of the parent
Share capital 588 018 588 018
Share premium 2 692 784 3 632 464
Revaluation reserve - measurement of financial instruments (16 295)
Revaluation reserve - measurement of hedging instruments (14 010) (105 534)
Retained earnings 10 150 298 7 938 162
Total equity attributable to shareholders of the parent 13 417 090 12 036 815
Non-controlling interests 1 120 063 1 057 538
Total equity 14 537 153 13 094 353
LIABILITIES
Non-current liabilities
Credit facilities, loans and debt securities 17 4 527 985 6 607 756
Trade and other payables 1 275 129 132 793
Liabilities arising from contracts with customers 14 18 951 10 833
Lease liabilities 543 219 529 140
Accounting for subsidies and road lighting modernisation services 19 306 112 261 162
Deferred income tax provision 8 443 896 445 094
Employee benefit liabilities
Financial liabilities measured at fair value
1 086 739
12 027
1 097 643
75 131
Provisions for other liabilities and other charges 18 846 734 849 990
Total non-current liabilities 9 060 792 10 009 542
Current liabilities
Credit facilities, loans and debt securities 17 2 181 655 1 224 061
Trade and other payables
Liabilities arising from contracts with customers
14 3 766 784
428 253
2 037 926
246 629
Lease liabilities 24 302 25 172
Accounting for subsidies and road lighting modernisation services 19 21 337 13 308
Current income tax liabilities 101 533 73 500
Employee benefit liabilities 479 585 497 483
Liabilities concerning the equivalent for rights to free purchase of shares 281 281
Financial liabilities measured at fair value 100 438 70 987
Provisions for other liabilities and other charges 18 2 884 765 2 596 621
Total current liabilities 9 988 933 6 785 968
Total liabilities 19 049 725 16 795 510
TOTAL EQUITY AND LIABILITIES 33 586 878 29 889 863

The consolidated statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of the condensed consolidated interim financial statements.

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

(a) Q3 2021 (unaudited)

Equity
attributable
to
shareholders
of
the
parent
Share
capital
(nominal
amount)
Reserve
for
revaluation
and
merger
accounting
Total
share
capital
Share
premium
Revaluation
reserve
-
measurement
of
financial
instruments
Revaluation
reserve
-
measurement
of
hedging
instruments
Retained
earnings
Non-controlling
interests
Total
equity
As
at
January
2021
441 443 146 575 588 018 3 632 464 (16
295)
(105
534)
7
938
162
1 057 538 13
094
353
Net
profit
for
the
reporting
period
- - - - - - 1 269 493 62 854 1 332 347
Net
other
comprehensive
income
- - - - 17 036 91 524 2 222 (243) 110 539
Net
comprehensive
income
recognised
in
the
period
- - - - 17 036 91 524 1 271 715 62 611 1 442 886
Dividends - - - - - - - (86) (86)
Coverage
of
net
loss
-
transfer
- - - (939
680)
- - 939 680 - -
Other - - - - (741) - 741 - -
As
at
30
September
2021
441 443 146 575 588 018 2
692
784
- (14
010)
10
150
298
1
120
063
14
537
153

(b) Q3 2020 (unaudited)

Equity
attributable
to
shareholders
of
the
parent
Share
capital
(nominal
amount)
Reserve
for
revaluation
and
merger
accounting
Total
share
capital
Share
premium
Revaluation
reserve
-
measurement
of
financial
instruments
Revaluation
reserve
-
measurement
of
hedging
instruments
Retained
earnings
Non-controlling
interests
Total
equity
As
at
1
January
2020
441 443 146 575 588 018 3 632 464 (16
295)
(17
356)
10
268
882
1 024 058 15
479
771
Net
profit
for
the
reporting
period
- - - - - - (62
417)
18 713 (43
704)
Net
other
comprehensive
income
- - - - - (106
565)
(36
937)
(731) (144
233)
Net
comprehensive
income
recognised
in
the
period
- - - - - (106
565)
(99
354)
17 982 (187
937)
Other - - - - 24 - - - 24
As
at
30
September
2020
441 443 146 575 588 018 3 632 464 (16
271)
(123
921)
10
169
528
1 042 040 15
291
858

CONSOLIDATED STATEMENT OF CASH FLOWS

Note For the nine-month period ended
30 September 2021
(unaudited)
30 September 2020
(unaudited)
Cash flows from operating activities
Net profit/(loss) for the reporting period
Adjustments:
1 332 347 (43 704)
Income tax in profit or loss 8 288 043 134 116
Depreciation/amortisation 1 143 749 1 189 814
Loss on change, sale and liquidation of property, plant and equipment and right
of-use assets
32 118 28 053
Impairment losses on non-financial non-current assets 3 445 521 984
Loss on sale of financial assets 2 805 40 261
Interest income
Dividend income
(13 705)
(217)
(11 844)
(275)
Interest costs 113 120 154 895
Gain on measurement of financial instruments (60 693) (74 850)
Impairment of financial assets at amortised cost
Share of profit of associates and jointly controlled entities
13 762
(126 054)
141 470
333 826
Impairment of investments in associates and jointly controlled entities 129 208
Other adjustments (16 418) (16 295)
Total adjustments 1 379 955 2 570 363
Paid income tax
Changes in working capital:
(298 772) (135 401)
CO2 emission allowances 1 425 850 1 227 044
Inventories (153 157) 51 769
Trade and other receivables
Trade and other payables
(492 551)
3 026 760
18 862
(50 814)
Employee benefit liabilities (3 767) 25 741
Accounting for subsidies and road lighting modernisation services 52 775 13 501
Provisions for other liabilities and charges 400 454 316 721
Total changes in working capital
Net cash flows from operating activities
4 256 364
6 669 894
1 602 824
3 994 082
Cash flows from investing activities
Purchase of non-current tangible and intangible assets and right-of-use assets
(1 314 070) (1 687 983)
Proceeds from sale of non-current tangible and intangible assets and right-of-use
assets 2 098 8 694
Purchase of financial assets (31 607) (7 800)
Proceeds from sale of financial assets
Purchase of associates and jointly controlled entities
53 136
(375)
476
(1 629)
Sale of associates and jointly controlled entities 982
Received dividends 97 275
Inflows/(outflows) concerning funds held at Mine Decommissioning Fund bank account
Received interest
365
23
(984)
2 533
Other (outflows)/inflows from investing activities (329) 1 075
Net cash flows from investing activities (1 289 680) (1 685 343)
Cash flows from financing activities
Credit and loans received 2 308
Repayment of credit and loans (144 391) (103 848)
Bond buy-back
Dividends paid
(997 110)
(104)
(1 184 310)
Repayment of lease liabilities (31 945) (21 054)
Interest paid (108 434) (178 864)
Other outflows under financing activities (4 094) (3 810)
Net cash flows from financing activities (1 286 078) (1 489 578)
Total net cash flows 4 094 136 819 161
Cash at the beginning of reporting period 1 941 554 3 761 947
Cash at the end of reporting period 6 035 690 4 581 108
including restricted cash 333 529 290 486

ADDITIONAL INFORMATION AND EXPLANATIONS

General information

1. General information on the Parent

Name: ENEA Spółka Akcyjna
Legal form: spółka akcyjna (joint-stock company)
Country of registration: Poland
Registered office: Poznań, Poland
Address: ul. Górecka 1, 60-201 Poznań
Location of business: Poland
KRS: 0000012483
Telephone number: (+48 61) 884 55 44
Fax number: (+48 61) 884 59 59
E-mail: [email protected]
Website: www.enea.pl
REGON number: 630139960
NIP number: 777-00-20-640

ENEA S.A. ("Company," "Parent") is the parent entity for ENEA Group ("Group").

As at 30 September 2021, the Parent's shareholding structure was as follows:

Poland's State Treasury Other shareholders Total
As at 30 September 2021 51.50% 48.50% 100.00%

As at 30 September 2021, the Parent's highest-level controlling entity was the State Treasury.

As at 30 September 2021, ENEA S.A.'s statutory share capital amounted to PLN 441 443 thousand (PLN 588 018 thousand after restatement to EU IFRS, taking into account hyperinflation and other adjustments) and was divided into 441 442 578 shares.

The Parent's duration is indefinite.

Its activities are conducted on the basis of relevant concessions issued for the Parent and for specific Group companies.

The Group's condensed consolidated interim financial statements cover the nine-month period ended 30 September 2021 and contain comparative data for the nine-month period ended 30 September 2020 and the year ended 31 December 2020.

2. Group composition

As at 30 September 2021, ENEA Group consisted of the parent - ENEA S.A., 14 subsidiaries, 9 indirect subsidiaries, 2 jointly controlled entities and 1 associate.

ENEA Group's principal business activities are as follows:

  • production of electric and thermal energy (ENEA Wytwarzanie Sp. z o.o., ENEA Elektrownia Połaniec S.A., Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. w Obornikach, Miejska Energetyka Cieplna Piła Sp. z o.o., ENEA Ciepło Sp. z o.o., ENEA Nowa Energia Sp. z o.o.);
  • trade of electricity (ENEA S.A., ENEA Trading Sp. z o.o.);
  • distribution of electricity (ENEA Operator Sp. z o.o.);
  • distribution of heat (Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. w Obornikach, Miejska Energetyka Cieplna

Piła Sp. z o.o., ENEA Ciepło Sp. z o.o.);

mining and enriching of hard coal (LW Bogdanka S.A.)

Company name Activity Registered office ENEA S.A.'s stake
in total number of
voting rights
as at
30 September 2021
ENEA S.A.'s stake
in total number of
voting rights
as at
31 December 2020
SUBSIDIARIES
1. ENEA Operator Sp. z o.o. distribution Poznań 100% 100%
2. ENEA Wytwarzanie Sp. z o.o. generation Świerże Górne 100% 100%
3. ENEA Elektrownia
Połaniec S.A.
generation Połaniec 100% 100%
4. ENEA Oświetlenie Sp. z o.o. other activity Szczecin 100% 100%
5. ENEA Trading Sp. z o.o. trade Świerże Górne 100% 100%
6. ENEA Serwis Sp. z o.o. distribution Lipno 100% 100%
7. ENEA Centrum Sp. z o.o. other activity Poznań 100% 100%
8. ENEA Pomiary Sp. z o.o. distribution Poznań 100% 100%
9. ENERGO-TOUR Sp. z o.o.
w likwidacji
other activity Poznań 100%6 100%6
10. ENEA Innowacje Sp. z o.o. other activity Warsaw 100%7,8 100%
11. Lubelski Węgiel
BOGDANKA S.A.
mining Bogdanka 65.99% 65.99%
12. ENEA Ciepło Sp. z o.o. generation Białystok 99.94% 99,94%
13. ENEA Ciepło Serwis Sp. z o.o. generation Białystok 100% 100%
14. ENEA Nowa Energia Sp. z o.o. generation Radom 100% 100%
INDIRECT SUBSIDIARIES
15. ENEA Logistyka Sp. z o.o. distribution Poznań 100%5 100%5
16. ENEA Bioenergia Sp. z o.o. generation Połaniec 100%1 100%1
17. ENEA Połaniec Serwis
Sp. z o.o.
generation Połaniec 100%1 100%1
18. Przedsiębiorstwo Energetyki
Cieplnej Sp. z o.o.
generation Oborniki 99.93%2 99.93%2
19. Miejska Energetyka Cieplna
Piła Sp. z o.o.
generation Piła 71.11%2 71.11%2
20. EkoTRANS Bogdanka
Sp. z o.o.
mining Bogdanka 65.99%3 65.99%3
21. RG Bogdanka Sp. z o.o. mining Bogdanka 65.99%3 65.99%3
22. MR Bogdanka Sp. z o.o. mining Bogdanka 65.99%3 65.99%3
23. Łęczyńska Energetyka
Sp. z o.o.
mining Bogdanka 58.53%3 58.53%3
24. ENEA Badania i Rozwój
Sp. z o.o.
other activity Warsaw 4,8
-
100%4
JOINTLY CONTROLLED ENTITIES
25. Polska Grupa Górnicza S.A. - Katowice 7.66% 7.66%
26. Elektrownia Ostrołęka
Sp. z o.o.
- Ostrołęka 50% 50%
ASSOCIATES
27. Polimex – Mostostal S.A. - Warsaw 16,4%10 16.48%
28. ElectroMobility Poland S.A. - Warsaw 9
-
25%

1 – indirect subsidiary through stake in ENEA Elektrownia Połaniec S.A.

2 – indirect subsidiary through stake in ENEA Wytwarzanie Sp. z o.o.

3 – indirect subsidiary through stake in Lubelski Węgiel BOGDANKA S.A.

4 – indirect subsidiary through stake in ENEA Innowacje Sp. z o.o.

5 – indirect subsidiary through stake in ENEA Operator Sp. z o.o.

6 – on 30 March 2015 the company's extraordinary general meeting adopted a resolution on the dissolution of the company following a liquidation proceeding; the resolution entered into force on 1 April 2015. An application for the company to be removed from the National Court Register was filed on 5 November 2015. At the date on which these condensed consolidated interim financial statements were prepared, procedural activities connected with removing the entity from the

National Court Register were in progress.

7 – on 7 May 2021 an Extraordinary General Meeting of ENEA Innowacje Sp. z o.o. adopted a resolution regarding an increase of the company's share capital by PLN 4 500 thousand, i.e. from PLN 26 360 thousand to PLN 30 860 thousand, by issuing 45 000 new shares with a nominal value of PLN 100.00 each. All of the new-issue shares were acquired by ENEA S.A. and were paid for with a cash contribution. The share capital increase was registered at the National Court Register on 1 July 2021.

8 – on 12 April 2021 an Extraordinary General Meeting of ENEA Badania i Rozwój Sp. z o.o. adopted a resolution on a merger with ENEA Innowacje Sp. z o.o. through the acquisition of ENEA Badania i Rozwój Sp. z o.o. by ENEA Innowacje Sp. z o.o.

The merger of ENEA Innowacje Sp. z o.o. and ENEA Badania i Rozwój Sp. z o.o. was entered in the National Court Register on 1 June 2021.

9– on 19 August 2021, an Extraordinary General Meeting of ElectroMobility Poland S.A. adopted a resolution to reduce share capital by PLN 17 700 thousand, by decreasing the nominal value of all shares, from the existing amount of PLN 7 000.00 each to a new nominal value of PLN 5 230.05 each. The aim of this share capital reduction was to transfer funds from share capital to supplementary capital. The general meeting also adopted a resolution to increase share capital by PLN 249 996 thousand, to PLN 302 297 thousand, for a total issue price of PLN 250 000 thousand, which was paid for by the State Treasury with a monetary contribution. The new share issue was carried out as a private subscription. All of the new shares are ordinary registered shares. The share premium was transferred to supplementary capital. The new shares were taken up and paid for by the State Treasury. The share capital increase was registered by the register court on 30 September 2021. ENEA S.A. currently holds a 4.325% stake in share capital. ElectroMobility Poland S.A. shares are presented in the consolidated statement of financial position in the item: Financial assets measured at fair value.

10 – in September 2021 the sale of 187 500 Polimex – Mostostal S.A. shares that had previously been held by ENEA S.A. was finalised, thus decreasing ENEA S.A.'s stake in that company's share capital from 16.48% to 16.40%. On 30 August 2021, the Company submitted a demand to exercise its call option and made a bank transfer for 187 500 Polimex - Mostostal S.A. shares. Following the exercise of the call option, ENEA will hold a 16.43% stake in that company's share capital.

3. Changes in composition of the Parent's Management Board and Supervisory Board

Management Board

As at
30 September 2021
As at
31 December 2020
President of the Management Board Paweł Szczeszek Paweł Szczeszek
Member of the Management Board, responsible
for finance
Rafał Mucha Rafał Mucha
Member of the Management Board, responsible for sales Tomasz Siwak Tomasz Siwak
Member of the Management Board, responsible
for corporate affairs
Tomasz Szczegielniak Tomasz Szczegielniak
Member of the Management Board, responsible
for operations
Marcin Pawlicki Marcin Pawlicki

Supervisory Board

As at As at
30 September 2021 Appointment 31 December 2020 Resignation
Chairperson of the Supervisory
Board
Rafał Włodarski 7 January 2021 Izabela Felczak
Poturnicka
5 January 2021
Deputy Chairperson of the
Supervisory Board
Roman Stryjski Roman Stryjski
Secretary of the Supervisory
Board
Michał Jaciubek Michał Jaciubek
Member of the Supervisory Board Dorota Szymanek 7 January 2021 Rafał Włodarski
Member of the Supervisory Board Maciej Mazur Maciej Mazur
Member of the Supervisory Board Piotr Mirkowski Piotr Mirkowski
Member of the Supervisory Board Paweł Koroblowski Paweł Koroblowski
Member of the Supervisory Board Ireneusz Kulka 16 September 2021
Member of the Supervisory Board Mariusz Pliszka Mariusz Pliszka
Member of the Supervisory Board Mariusz Fistek Mariusz Fistek

On 4 January 2021, the Company received a letter of resignation from Mrs. Izabela Felczak-Poturnicka as Chairperson of the Supervisory Board and as Supervisory Board member, effective from 5 January 2021.

On 7 January 2021, an Extraordinary General Meeting of ENEA S.A. appointed Mr. Rafał Włodarski as Chairperson of ENEA S.A.'s Supervisory Board.

On 7 January 2021, the Company's Extraordinary General Meeting adopted a resolution appointing Mrs. Dorota Szymanek as member of ENEA S.A.'s Supervisory Board, 10th term, effective from the same date.

On 15 September 2021 the Company received a statement from Mr. Ireneusz Kulka stating that he is resigning as member of ENEA S.A.'s Supervisory Board and Chairperson of the Audit Committee as of 16 September 2021.

On 18 November 2021, the Company's Extraordinary General Meeting adopted a resolution pursuant to which Mr. Tomasz Lis was appointed to ENEA S.A.'s Supervisory Board, Xth term, as of the same date.

4. Basis for preparing financial statements

These condensed consolidated interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and have been approved by the Management Board of ENEA S.A.

The Parent's Management Board used its best knowledge as to the application of standards and interpretations as well as methods and rules for the measurement of items in ENEA Group's condensed consolidated interim financial statements in accordance with EU IFRS as at 30 September 2021. The presented tables and explanations are prepared with due diligence. These condensed consolidated interim financial statements have not been reviewed by a statutory auditor. The accounting rules below are applied consistently across all of the presented periods unless stated otherwise.

These condensed consolidated interim financial statements are prepared on a going concern basis for the foreseeable future. There are no circumstances such as would indicate a threat to the Group's going concern.

These condensed consolidated interim financial statements should be read in conjunction with ENEA Group's consolidated financial statements for the financial year ended 31 December 2020.

5. Accounting rules (policy) and significant estimates and assumptions

These condensed consolidated interim financial statements are prepared in accordance with accounting rules that are consistent with those applied in preparing the most recent annual consolidated financial statements, for the financial year ended 31 December 2020.

Drafting condensed consolidated interim financial statements in accordance with IAS 34 requires the Management Board to adopt certain assumptions and make estimates that have an impact on the application of accounting rules and on amounts being presented in the condensed consolidated interim financial statements and explanatory notes to these statements. Such assumptions and estimates are based on the Management Board's best knowledge regarding current and future events and activities. However, actual results may differ from forecasts. The estimates used in preparing these condensed consolidated interim financial statements are consistent with the estimates used in preparing the consolidated financial statements for the most recent financial year. The estimated values presented in previous financial years do not have a material impact on the present interim period.

6. Functional currency and presentation currency

Items in the financial statements of individual Group entities are measured in the main currency of the economic setting in which the entity operates (in the functional currency).

The condensed consolidated interim financial statements are presented in PLN, which is the functional and presentation currency for all of the Group's entities. Items in financial statements are rounded to full thousands of zlotys (PLN 000s), unless otherwise stated.

Operating segments

The Group presents segment information in accordance with IFRS 8 Operating Segments. Operating segments correspond to the reporting segments and are not aggregated. The Group's activities are managed in operating segments that are distinct in terms of products and services. ENEA Group reports four operating segments and other activity, as shown below.

Segment revenue is revenue generated from sales to external customers and transactions with other segments that can be directly attributed to the given segment. Segment costs include the cost of sales to external customers and costs of transactions with other segments within the Group that result from the operating activities of a given segment and can be directly attributed to the given segment. Market prices are applied to inter-segment transactions, which makes it possible for units to generate margins sufficient to independently operate on the market.

In analysing segment results, the Group especially focuses on EBITDA. EBITDA is defined as operating profit (calculated as result before tax adjusted by the share of results of associates and jointly controlled entities, impairment of financial assets at amortised cost, impairment of investments in associates and jointly controlled entities, finance income, dividend income and finance costs) plus amortisation and impairment of non-financial non-current assets.

Rules for determining segment results and segment assets and liabilities are in compliance with the accounting rules used in preparing consolidated financial statements.

Segment results for the period from 1 January to 30 September 2021 are as follows:

TRADE DISTRIBUTION GENERATION MINING OTHER
ACTIVITY
EXCLUSIONS TOTAL
Net
revenue
from
sales
Inter-segment
sales
5
841
699
1
280
001
2
412
794
25
822
6
655
730
549
962
286
391
1
375
910
84
748
297
506

(3
529
201)
15
281
362
Total
net
revenue
from
sales
7
121
700
2
438
616
7
205
692
1
662
301
382
254
(3
529
201)
15
281
362
Revenue
from
operating
leases
and
subleases
652 6
181
2
345
(47) 9
131
Revenue
from
sales
and
other
income
7
121
700
2
438
616
7
206
344
1
668
482
384
599
(3
529
248)
15
290
493
Total
costs
(6
947
718)
(1
908
879)
(6
468
129)
(1
433
425)
(342
634)
3
491
933
(13
608
852)
Segment
result
173
982
529
737
738
215
235
057
41
965
(37
315)
1
681
641
Depreciation/amortisation
Impairment
losses
on
non-financial
non-current
assets
(2
272)
(501
411)
(303
239)
(295
298)
(87)
(54
514)
(3
358)
Segment
result
-
EBITDA
176
254
1
031
148
1
041
454
530
442
99
837
%
of
revenue
from
sales
and
other
income
Unallocated
costs
at
Group
level
(administration
expenses)
2.5% 42.3% 14.5% 31.8% 26.0% (55
828)
Operating
profit
1
625
813
Finance
costs
Finance
income
Dividend
income
Impairment
of
financial
assets
at
amortised
cost
Share
of
results
of
associates
and
jointly
controlled
entities
Income
tax
(165
875)
47
943
217
(13
762)
126
054
(288
043)
Net
profit
1
332
347
Share
of
profit
attributable
to
non-controlling
interests
62
854

Segment results for the period from 1 July to 30 September 2021 are as follows:

TRADE DISTRIBUTION GENERATION MINING OTHER
ACTIVITY
EXCLUSIONS TOTAL
Net
revenue
from
sales
Inter-segment
sales
1
985
516
489
862
802
251
7
777
2
536
280
205
867
111
655
508
230
29
191
104
675

(1
316
411)
5
464
893
Total
net
revenue
from
sales
2
475
378
810
028
2
742
147
619
885
133
866
(1
316
411)
5
464
893
Revenue
from
operating
leases
and
subleases
202 2
002
69 (11) 2
262
Revenue
from
sales
and
other
income
2
475
378
810
028
2
742
349
621
887
133
935
(1
316
422)
5
467
155
Total
costs
(2
308
707)
(635
682)
(2
458
321)
(518
234)
(112
223)
1
311
976
(4
721
191)
Segment
result
166
671
174
346
284
028
103
653
21
712
(4
446)
745
964
Depreciation/amortisation
Impairment
losses
on
non-financial
non-current
assets
(673)
(169
345)
(102
101)
(108
375)
(81)
(17
871)
Segment
result
-
EBITDA
167
344
343
691
386
129
212
109
39
583
%
of
revenue
from
sales
and
other
income
Unallocated
costs
at
Group
level
(administration
expenses)
6.8% 42.4% 14.1% 34.1% 29.6% (19
341)
Operating
profit
726
623
Finance
costs
Finance
income
Dividend
income
Impairment
of
financial
assets
at
amortised
cost
Share
of
results
of
associates
and
jointly
controlled
entities
Income
tax
(48
964)
12
243
98
(3
774)
4
850
(94
759)
Net
profit
596
317
Share
of
profit
attributable
to
non-controlling
interests
26
204

The additional information and explanations presented on pages 9-45 constitute an integral part of these condensed consolidated interim financial statements.

Segment results for the period from 1 January to 30 September 2020 are as follows:

TRADE DISTRIBUTION GENERATION MINING OTHER
ACTIVITY
EXCLUSIONS TOTAL
Net
revenue
from
sales
Inter-segment
sales
4
956
747
914
797
2
374
588
23
115
5
858
019
412
558
183
960
1
162
479
80
406
281
506

(2
794
455)
13
453
720
Total
net
revenue
from
sales
5
871
544
2
397
703
6
270
577
1
346
439
361
912
(2
794
455)
13
453
720
Revenue
from
operating
leases
and
subleases
474 7
095
2
646
(37) 10
178
Revenue
from
sales
and
other
income
5
871
544
2
397
703
6
271
051
1
353
534
364
558
(2
794
492)
13
463
898
Total
costs
(5
813
717)
(1
872
281)
(6
012
750)
(1
278
206)
(333
754)
2
821
482
(12
489
226)
Segment
result
57
827
525
422
258
301
75
328
30
804
26
990
974
672
Depreciation/amortisation
(Impairment
loss)/reversal
of
impairment
loss
on
non-financial
non-current
assets
(1
031)
(468
605)
(427
879)
(522
822)
(250
439)
838
(53
171)
Segment
result
-
EBITDA
58
858
994
027
1
209
002
324
929
83
975
%
of
revenue
from
sales
and
other
income
Unallocated
costs
at
Group
level
(administration
expenses)
1.0% 41.5% 19.3% 24.0% 23.0% (51
363)
Operating
profit
923
309
Finance
costs
Finance
income
Dividend
income
Impairment
of
financial
assets
at
amortised
cost
Share
of
results
of
associates
and
jointly
controlled
entities
(260
021)
31
353
275
(141
470)
(333
826)
Impairment
of
investments
in
associates
and
jointly
controlled
entities
(129
208)
Income
tax
(134
116)
Net
loss
(43
704)
Share
of
profit
attributable
to
non-controlling
interests
18
713

Segment results for the period from 1 July to 30 September 2020 are as follows:

TRADE GENERATION MINING OTHER
ACTIVITY
EXCLUSIONS TOTAL
1
618
094
254
288
767 163
8
222
2
047
419
117
625
51
644
450
599
27 543
97
455

(928
189)
4
511
863
1
872
382
775
385
2
165
044
502
243
124
998
(928
189)
4
511
863
201 2
279
112 (12) 2
580
1
872
382
775
385
2
165
245
504
522
125
110
(928
201)
4
514
443
(1
854
202)
(619
506)
(1
971
877)
(495
216)
(111
501)
946
387
(4
105
915)
18
180
155
879
193
368
9
306
13
609
18
186
408
528
(368)
(159
649)
(143
555)
(101
097)
(212)
(17
937)
18
548
315
528
336
923
110
615
31
546
1.0% 40.7% 15.6% 21.9% 25.2% (14
177)
394
351
(86
313)
8
017
123
(2
733)
(83
488)
(129
208)
(62
810)
37
939
1
138
DISTRIBUTION

Other information concerning segments as at 30 September 2021 and for the nine-month period ended on that date is as follows:

Trade Distribution Generation Mining Other
activity
Exclusions Total
Property,
plant
and
equipment
14
950
10
007
554
5
986
761
3
020
401
348
020
(524
975)
18
852
711
Trade
and
other
receivables
Costs
related
to
the
conclusion
of
agreements
2
164
976
23
531
358
726
-
1
110
120
-
324
765
-
364
479
-
(1
445
487)
-
2
877
579
23
531
Assets
arising
from
contracts
with
customers
187
190
248
056
24 - 272 (13
742)
421
800
Total 2
390
647
10
614
336
7
096
905
3
345
166
712
771
(1
984
204)
22
175
621
ASSETS
excluded
from
segments
-
including
property,
plant
and
equipment
-
including
trade
and
other
receivables
11
411
257
9
496
2
352
TOTAL
ASSETS
33
586
878
Trade
and
other
payables
350
709
456
186
1
048
747
229
701
208
101
(737
510)
1
555
934
Liabilities
arising
from
contracts
with
customers
755
825
395
323
- 17
775
- (721
719)
447
204
Total 1
106
534
851
509
1
048
747
247
476
208
101
(1
459
229)
2
003
138
Equity
and
liabilities
excluded
from
segments
-
including
trade
and
other
payables
31
583
740
3
485
979
TOTAL
EQUITY
AND
LIABILITIES
33
586
878
for
the
9-month
period
ending
30
September
2021
Investment
expenditures
on
property,
plant
and
equipment
and
intangible
assets
Investment
expenditures
on
property,
plant
and
equipment
769 555
481
287
828
210
353
10
597
(23
991)
1
041
037
and
intangible
assets
excluded
from
segments
Depreciation/amortisation
2
272
501
411
303
239
295
298
54
514
(15
341)
1
141
393
Amortisation
excluded
from
segments
2
356
Recognition/(reversal/use)
of
impairment
losses
on
receivables
Recognition
of
impairment
losses
on
non-financial
non-current
assets
5
171
-
2
943
-
(14
419)
-
2
516
87
15
3
358
-
-
(3
774)
3
445

Other information concerning segments as at 31 December 2020 and for the nine-month period ended on 30 September 2020 is as follows:

Trade Distribution Generation Mining Other
activity
Exclusions Total
Property,
plant
and
equipment
14
392
9
889
504
5
978
596
3
158
735
368
500
(515
537)
18
894
190
Trade
and
other
receivables
1
421
069
313
950
735
455
268
999
93
293
(630
881)
2
201
885
Costs
related
to
the
conclusion
of
agreements
24
684
- - - - - 24
684
Assets
arising
from
contracts
with
customers
127
988
206
426
18 - 311 (12
297)
322
446
Total 1
588
133
10
409
880
6
714
069
3
427
734
462
104
(1
158
715)
21
443
205
ASSETS
excluded
from
segments
-
including
property,
plant
and
equipment
-
including
trade
and
other
receivables
8
446
658
9
532
2
687
TOTAL
ASSETS
29
889
863
Trade
and
other
payables
338
466
526
855
625
379
244
462
204
054
(351
012)
1
588
204
Liabilities
arising
from
contracts
with
customers
324
455
222
155
- 1
329
1
689
(292
166)
257
462
Total 662
921
749
010
625
379
245
791
205
743
(643
178)
1
845
666
Equity
and
liabilities
excluded
from
segments
-
including
trade
and
other
payables
28
044
197
582
515
TOTAL
EQUITY
AND
LIABILITIES
29
889
863
for
the
9-month
period
ending
30
September
2020
Investment
expenditures
on
property,
plant
and
equipment
and
intangible
assets
Investment
expenditures
on
property,
plant
and
equipment
and
intangible
assets
excluded
from
segments
615 751
006
342
874
495
696
28
564
(30
702)
1
588
053
Depreciation/amortisation
Amortisation
excluded
from
segments
1
031
468
605
427
879
250
439
53
171
(13
026)
1
188
099
1
715
Recognition/(reversal/use)
of
impairment
losses
on
receivables
2
542
(9
386)
(9
825)
(1
671)
(94) - (18
434)
Recognition/(reversal)
of
impairment
losses
on
non-financial
non-current
assets
- - 522
822
(838) - - 521
984

Explanatory notes to the consolidated statement of comprehensive income

7. Revenue from sales

Net revenue from sales

For the nine-month period ended
30 September 2021 30 September 2020
Revenue from the sale of electricity 11 217 400 10 338 327
Revenue from the sale of distribution services 2 338 031 2 309 758
Revenue from the sale of goods and materials 101 866 72 042
Revenue from the sale of other products and services 124 797 122 631
Revenue from origin certificates 1 744 8 629
Revenue from the sale of industrial heat 298 155 239 307
Revenue from the sale of coal 258 060 160 830
Revenue from the sale of gas 288 358 202 196
Revenue from Capacity Market 652 951 -
Total net revenue from sales 15 281 362 13 453 720

The Group mainly classifies revenue by type of product/service. The key revenue groups are revenue from the sale of electricity (ENEA S.A., ENEA Wytwarzanie, ENEA Trading and ENEA Elektrownia Połaniec) and revenue from the sale of distribution services (ENEA Operator).

Sale of electricity: The Group recognises revenue when an obligation to provide a consideration by providing a promised good or service to the customer is performed (or is being performed). Revenue is recognised on the basis of prices specified in sale agreements, less estimated rebates and other deductions. The key groups of contracts include electricity sale contracts (including framework contracts) for retail, business, key and strategic customers. Under these contracts, service is provided in a continuous manner and the level of revenue depends on usage. Sales to the clearing-house Izba Rozliczeniowa Giełd Towarowych S.A. and the TGE power exchange also take place.

The standard payment deadline for invoices for the sale of electricity at ENEA S.A. is 14 days from VAT invoice date. In the case of business, key and strategic customers, payment deadlines may be negotiated.

Payment deadlines for invoices concerning electricity sales to IRGiT are 1-3 days from delivery and invoice issue. For sales to TGE, payment deadlines are governed by TGE's regulations.

Sale of distribution services: In the case of distribution services sales, ENEA Operator charges a fee that contains separate components: grid fee (variable component), quality fee, grid fee (fixed component), instalment fee, transition fee and renewables fee.

In the case of the quality fee, transition fee and renewables fee, ENEA Operator serves, as a rule, as entity collecting fees and providing this consideration to other market participants, e.g. to Polskie Sieci Elektroenergetyczne S.A. (PSE). These fees (quality fee, transition fee, renewables fee) constitute quasi-taxes collected on behalf of other entities. ENEA Operator acts as agent collecting fees for other energy market participants, including PSE. In consequence, revenue from the sale of distribution services is decreased by the amount of renewables fee, quality fee and transition fee collected. Costs related to the procurement of transmission services and costs related to invoices for renewables support and support for producers are subject to adjustment.

Revenue from the Capacity Market constitutes revenue from the performance of capacity contracts (obligations) executed as a result of the 2021 Auction. The Capacity Market is a market mechanism intended to ensure a stable supply of electricity to households and industry over the long term. At the end of each month, ENEA Group companies are entitled to remuneration from PSE S.A. for fulfilling a capacity obligation. In connection with this obligation, Group companies that are suppliers of capacity for PSE S.A. recognise revenue from Capacity Market transactions each month.

Presented below is revenue from sales, divided into categories that reflect how economic factors influence the amount, payment deadline and the uncertainty of revenue and cash flows.

For the nine-month period ended
30 September 2021 30 September 2020
Revenue from continuous services 14 496 740 12 850 281
Revenue from services provided at specified time 784 622 603 439
Total 15 281 362 13 453 720

8. Tax

Deferred income tax

Changes in deferred income tax assets and provision (after offsetting assets and provision) are as follows:

As at
30 September 2021 31 December 2020
Net deferred income tax assets at the beginning of period, including: 850 967 155 977
- deferred income tax assets at the beginning of period 1 296 061 569 369
- deferred income tax provision at the beginning of period 445 094 413 392
(Charge)/addition to profit or loss 39 417 659 551
(Charge)/addition to other comprehensive income (26 227) 35 439
Net deferred income tax assets at the end of period, including: 864 157 850 967
- deferred income tax assets at the end of period 1 308 053 1 296 061
- deferred income tax provision at the end of period 443 896 445 094

In the 9-month period ended 30 September 2021, the Group's profit before tax was credited as a result of an increase in net deferred income tax assets by PLN 39 417 (in the 9-month period ended 30 September 2020 the Group's profit before tax was credited as a result of an increase in net deferred income tax assets by PLN 90 300 thousand).

Explanatory notes to the consolidated statement of financial position

9. Property, plant and equipment

In the 9-month period ending 30 September 2021 the Group purchased property, plant and equipment items for a total of PLN 1 027 635 thousand (in the 9-month period ending 30 September 2020: PLN 1 950 025 thousand). These amounts mainly concern the generation segment (PLN 287 446 thousand), mining (PLN 210 109 thousand) and distribution (PLN 511 078 thousand).

In the 9-month period ending 30 September 2021 the Group sold and liquidated property, plant and equipment items with total net book value of PLN 35 551 thousand (in the 9 months ended 30 September 2020: PLN 31 687 thousand).

In the 9-month period ended 30 September 2021, impairment losses on property, plant and equipment decreased by PLN 5 215 thousand on a net basis (in the 9-month period ended 30 September 2020 impairment of property, plant and equipment increased by PLN 518 618 thousand on a net basis).

As at 30 September 2021, total impairment of property, plant and equipment amounted to PLN 4 841 552 thousand (as at 31 December 2020: PLN 4 846 767 thousand).

Future contract liabilities related to the purchase of property, plant and equipment incurred as at the reporting date but not yet recognised in the statement of financial position reached PLN 1 490 686 thousand as at 30 September 2021 (as at 31 December 2020: PLN 1 067 174 thousand).

10. Intangible assets

In the 9-month period ending 30 September 2021 the Group purchased intangible assets worth PLN 13 402 thousand (in the 9-month period ended 30 September 2020 the Group purchased intangible assets worth PLN 26 550 thousand).

In the 9-month period ending 30 September 2021 the Group did not conduct significant sales or liquidations of intangible assets (in the 9-month period ended 30 September 2020 the Group also did not conduct significant sales or liquidations of intangible assets).

Future contract liabilities related to the purchase of intangible assets incurred as at the reporting date but not yet recognised in the statement of financial position reached PLN 64 372 thousand as at 30 September 2021 (as at 31 December 2020: PLN 29 173 thousand).

11. Investments in associates and jointly controlled entities

As
at
30
September
2021
Elektrownia
Ostrołęka
Sp.
z
o.o.
Polimex
-
Mostostal
S.A.
Polska
Grupa
Górnicza
S.A.
Total
Stake 50.00% 16,40% 7.66%
Current
assets
94 214 1 518 079 1
657
604
3
269
897
Non-current
assets
65 599 664
753
8
193
946
8
924
298
Total
assets
159 813 2
182
832
9
851
550
12
194
195
Current
liabilities
695 464 1 203 013 7
096
713
8
995
190
Non-current
liabilities
- 226 169 2
890
947
3
117
116
Total
liabilities
695 464 1 429 182 9
987
660
12
112
306
Net
assets
(535
651)
753 650 (136
110)
81 889
Share
in
net
assets
- 123 599 - 123 599
Goodwill 7
080
15 954 52 697 75 731
Impairment
of
goodwill
(7
080)
- (52
697)
(59
777)
Elimination
of
unrealised
gains/losses
- (7
045)
- (7
045)
Book
value
of
equity-accounted
investments
at
30
September
2021
- 132 508 - 132 508

The following table shows key financial data concerning associates and jointly controlled entities consolidated using the equity approach:

The Group made a consolidation adjustment concerning margins on sales in transactions between the Group and Polimex - Mostostal S.A. ElectroMobility Poland S.A. shares were reclassified into the item: Financial assets measured at fair value. A detailed description is presented in note 2.

As
at
31
December
2020
Elektrownia
Ostrołęka
Sp.
z
o.o.
Polimex
-
Mostostal
S.A.
Polska
Grupa
Górnicza
S.A.
ElectroMobility
Poland
S.A.
Total
Stake 50.00% 16.48% 7.66% 25%
Current
assets
Non-current
assets
38
172
95
229
1
390
029
673
930
1
799
476
9
080
500
17
537
39
274
3
245
214
9
888
933
Total
assets
133
401
2
063
959
10
879
976
56
811
13
134
147
Current
liabilities
912
443
1
175
007
6
568
576
2
901
8
658
927
Non-current
liabilities
213
913
2
733
135
17 2
947
065
Total
liabilities
912
443
1
388
920
9
301
711
2
918
11
605
992
Net
assets
(779
042)
675
039
1
578
265
53
893
1
528
155
Share
in
net
assets
111
246
120
895
13
473
245
614
Goodwill 7
080
15
954
52
697
75
731
Impairment
of
goodwill
(7
080)
(52
697)
(59
777)
Impairment
of
investments
(129
208)
(129
208)
Elimination
of
unrealised
gains/losses
(7
026)
8
313
1
287
Book
value
of
equity-accounted
investments
at
31
December
2020
120
174
13
473
133
647

Change in investments in subsidiaries, associates and jointly controlled entities

As at
30 September 2021 31 December 2020
As at the beginning of period 133 647 373 016
Change in the change in net assets 11 954 (110 161)
Purchase of investments 375 -
Sale of investments (393) -
Other changes (13 075) -
Impairment of investments in jointly controlled entities - (129 208)
As at the reporting date 132 508 133 647

Implementation of project to build Elektrownia Ostrołęka C

At 30 September 2021, ENEA S.A. held 9 124 821 shares of Elektrownia Ostrołęka Sp. z o.o., with a nominal value of PLN 50 each and total nominal value of PLN 456 241 thousand.

On 13 February 2020, ENEA S.A. executed an agreement with ENERGA S.A. suspending financing by ENERGA S.A. and ENEA S.A. for the project to build Elektrownia Ostrołęka C. In the agreement, ENEA S.A. and ENERGA S.A. undertook to carry out analyses, especially concerning the project's technical, technological, economic and organisational parameters and further financing.

ENERGA S.A. and ENEA S.A. assumed that suspending financing for the project would result in the company having to suspend its contract executed on 12 July 2018 to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW, along with a contract to convert rail infrastructure for Elektrownia Ostrołęka C of 4 October 2019.

On 14 February 2020, Elektrownia Ostrołęka Sp. z o.o. issued to the General Contractor for the contract to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW of 12 July 2018 a notice to suspend all works related to that contract, effective 14 February 2020.

As part of the analytical work performed under the agreement, ENEA S.A. and ENERGA S.A. worked on updating business and technical assumptions as well as assumptions concerning the financing structure within the financial model. On ENERGA S.A.'s part, the results of this work were provided to Elektrownia Ostrołęka Sp. z o.o. on 14 May 2020, when the company received calculations concerning the Project's profitability in the coal fuel variant. These results were used by the company to perform a CGU test. The CGU test carried out at Elektrownia Ostrołęka Sp. z o.o. shows that completing the Project would generate a negative value, meaning that continuing the Project would be unjustified.

On 19 May 2020, ENEA S.A. received an electronic copy of Resolution no. 39/2020 of the Management Board of Elektrownia Ostrołęka Sp. z o.o. of 19 May 2020 regarding recognition of impairment losses on the book value of the Company's assets. As a result of an impairment test on non-current assets performed at Elektrownia Ostrołęka Sp. z o.o., which followed an update of business assumptions by Elektrownia Ostrołęka Sp. z o.o. regarding the construction of power plant Ostrołęka C based on coal technology, the Group's consolidated financial statements for 2019 include ENEA S.A.'s share of the net loss generated by Elektrownia Ostrołęka Sp. z o.o. Given the fact that it was higher than the value of the stake in this company, it was reduced to zero. Also as at 30 September 2021, ENEA S.A.'s stake in Elektrownia Ostrołęka Sp. z o.o. was worth PLN 0.

On 2 June 2020 the Management Board of ENEA S.A. accepted a final report on analyses conducted in collaboration with ENERGA S.A. regarding the project's technical, technological, economic, organisational and legal aspects and further financing.

Conclusions from these analyses do not justify continuing the project in its existing form, i.e. the construction of a power plant generating electricity in a process of hard coal combustion. This evaluation was driven by the following:

  • 1) regulatory changes at the EU level and the credit policy of certain financial institutions, which show that there is far greater access to financing for energy projects based on gas than coal; and
  • 2) the acquisition of control over Energa by PKN Orlen S.A., the strategy of which does not include investments in electricity generation based on coal combustion.

At the same time, technical analysis confirmed the viability of a variant in which the power plant would use gas ("Gas Project") at the current location of the coal-unit being built. As a result of the above, ENEA S.A.'s Management Board decided to continue building a generating asset in Ostrołęka and change the fuel source from coal to gas.

On 2 June 2020, a three-party agreement was executed between ENEA S.A., ENERGA S.A. and PKN Orlen S.A., spelling out the following key cooperation rules for the Gas Project:

  • subject to the reservations expressed below, continue cooperation between ENEA S.A. and ENERGA S.A. via the existing special-purpose vehicle, i.e. Elektrownia Ostrołęka Sp. z o.o., and settle costs related to the Project between ENEA S.A. and ENERGA S.A., along with settlements with Project contractors, in accordance with the existing rules,
  • take into account PKN Orlen S.A.'s potential role in the Gas Project as a new shareholder,

The additional information and explanations presented on pages 9-45 constitute an integral part of these condensed consolidated interim financial statements.

  • ENEA S.A.'s participation in the Gas Project as a minority shareholder with an investment cap, as a result of which the Company will not be an entity co-controlling Elektrownia Ostrołęka Sp. z o.o.,
  • subject to the essential corporate approvals, execute a new shareholders agreement regarding the Gas Project that incorporates the aforementioned cooperation rules,
  • undertake activities intended to secure financing for the Gas Project by ENERGA S.A. together with PKN Orlen S.A.

From 2 June 2020, the parties to this agreement had been holding talks regarding a new investment agreement specifying rules for the further implementation of the Gas Project, including investment by each of the parties. At the same time, ENEA S.A. on its own evaluated the prospect of participating in the project.

On 22 December 2020 at the request of ENEA S.A.'s Management Board, ENEA S.A.'s Supervisory Board approved the following:

  • ENEA S.A.'s withdrawal from investing in the construction of a gas-based unit as part of project Ostrołęka C, and
  • arrangements with ENERGA regarding the settlement of costs pertaining to the project to build a coal-based unit as part of project Ostrołęka C.

In connection with the above, ENEA S.A. and the other parties involved in Project Ostrołęka C agreed that an organised part of enterprise related to the gas project will be spun off from Project Ostrołęka C (in accounting and organisational terms). From the spin-off date, investment costs related to settling the gas project will not be incurred by ENEA S.A.

Further, the following documents were signed on 22 December 2020:

  • agreement between ENEA S.A., ENERGA S.A. and Elektrownia Ostrołęka Sp. z o.o. regarding cooperation on the division of Elektrownia Ostrołęka Sp. z o.o. (Division Agreement),
  • agreement between the Company and ENERGA S.A. regarding cooperation on settling the coal-based project as part of Project Ostrołęka C (Settlement Agreement, Coal Project).

These agreements were signed in connection with a decision to change the source of power for the Elektrownia Ostrołęka C power plant being constructed with capacity of approx. 1000 MW from coal to gas, and ENEA S.A.'s decision to not participate in the Gas Project.

Both of the agreements include a statement by ENEA S.A. on withdrawal from further participation in the Gas Project. The reasons for withdrawing from further investment in the construction of the gas unit are especially related to ENEA Group's intention to intensify investing activity in the area of renewable energy sources as well as to invest in the conversion of coal-based sources to gas-based across ENEA S.A.'s existing generating assets that are fully owned by ENEA S.A.

Reaching these agreements also serves to confirm that in light of ENEA S.A.'s withdrawal from the Gas Project the remaining parties will not be seeking any claims from ENEA S.A. based on this decision.

In accordance with the Division Agreement, Elektrownia Ostrołęka Sp. z o.o. would be divided through a spin-off (in the meaning of the Polish Commercial Companies Code) of the assets and liabilities (rights and obligations) and other elements that comprise the Gas Project.

The Settlement Agreement is essential to the performance of the Division Agreement, which requires cooperation by the shareholders of Elektrownia Ostrołęka Sp. z o.o., including the settlement of costs related to the Coal Project. In accordance with the Settlement Agreement, costs related to the Coal Project will be settled based on the existing arrangements between the company and ENERGA S.A. and ENEA S.A.

On 31 December 2020, in accordance with the Settlement Agreement (which amended the loan agreement of 23 December 2019 in this regard), ENEA S.A. bought from ENERGA S.A. half of ENERGA S.A.'s receivables due from Elektrownia Ostrołęka Sp. z o.o. for a price equal to the nominal value of the receivables being sold, i.e. PLN 170 000 thousand, plus interest accrued from 31 December 2020, amounting to PLN 11 617 thousand.

Impairment of loans issued to Elektrownia Ostrołęka Sp. z o.o. as at 30 September 2021 amounted to PLN 223 547 thousand, together with interest (the value of these loans was written off to zero).

On 26 February 2021 ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 1 to the PLN 340 million loan agreement of 23 December 2019 and Annex 6 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of the aforementioned annexes, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off loan repayment to ENEA S.A. of PLN 170 million and PLN 29 million, respectively, together with interest, by 30 June 2021. Next, on 30 June 2021, ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 2 to the PLN 340 million loan agreement of 23 December 2019 and Annex 7 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of the aforementioned annexes, Elektrownia Ostrołęka Sp. z o.o. undertook to make a one-off loan repayment to ENEA S.A. of PLN 170 million and PLN 29 million, respectively, together with interest, by 30 September 2021.

On 30 September 2021 ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 3 to the PLN 340 million loan agreement of 23 December 2019 and Annex 8 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of these annexes, the deadline for the one-off repayment by Elektrownia Ostrołęka Sp. z o.o. of the loans along with interest was prolonged to 29 October 2021. On 29 October 2021, ENEA S.A. and ENERGA S.A. executed with Elektrownia Ostrołęka Sp. z o.o. Annex 4 to the PLN 340 million loan agreement of 23 December 2019

and Annex 9 to the PLN 58 million loan agreement of 17 July 2019. Pursuant to the provisions of these annexes, the deadline for the one-off repayment by Elektrownia Ostrołęka Sp. z o.o. of the loans along with interest was extended to 29 April 2022.

On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. as vendor and CCGT Ostrołęka Sp. z o.o. as buyer (a wholly-owned subsidiary of Energa S.A.) signed a sale agreement and associated agreements regarding an SPV (excluding certain assets) intended (and used as such) to implement economic tasks covering the construction of a gas-fired power generating unit in Ostrołęka and the subsequent operation of this unit (Gas Plant). The business being sold includes generally all of the SPV's asset and non-asset components in use as of the transaction date in connection with preparations to begin an investment process consisting of the construction of the Gas Plant. The transaction is intended to facilitate the implementation of a gas project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka. The sale price for the business being sold (transaction value) is currently estimated at approx. PLN 166 million. The price is set on a preliminary basis as additional considerations will apply in determining the final price.

On 25 June 2021, Elektrownia Ostrołęka Sp. z o.o. and CCGT Ostrołęka Sp. z o.o. on the one hand and GE Power sp. z o.o., based in Warsaw, GE Steam Power Systems S.A.S. (former name: ALSTOM Power Systems S.A.S.), based in Boulogne-Billancourt, France (Coal Project Contractor), and General Electric Global Services, GmbH, based in Baden, Switzerland (together with GE Power sp. z o.o. - Gas Project Contractor) on the other hand signed a Contract Change Document concerning the contract of 21 July 2018 to build unit C at Elektrownia Ostrołęka, with a capacity of 1000 MW, and an Agreement on the settlement of the Coal Project. The Contract Change Document is structured in a way that facilitates implementation of the Gas Project by CCGT Ostrołęka Sp. z o.o. as a company that will replace Elektrownia Ostrołęka Sp. z o.o. in implementing the investment in Ostrołęka, which is related, inter alia, to the fact that ENEA S.A. has confirmed its withdrawal from participating in the Gas Project. The agreement concerning the Coal Project settlement regulates the rights and obligations of Elektrownia Ostrołęka Sp. z o.o. and the Coal Project Contractor mainly in connection with the settlement of construction work completed by the Coal Project Contractor until the contract was suspended, maintenance and security activities during Contract suspension and work related to finishing the work dedicated to implementing the Coal Project. Under this agreement, the Coal Project will be settled by the end of 2021, and the entire amount that Elektrownia Ostrołęka Sp. z o.o. will be obligate to pay to the Coal Project Contractor, taking into account expenditures incurred thus far, will not exceed PLN 1.35 billion (net).

In connection with this agreement being signed and based on the status of settlements between Elektrownia Ostrołęka Sp. z o.o. and the Coal Project Contractor, a provision for future investment liabilities toward Elektrownia Ostrołęka Sp. z o.o., amounting to PLN 222 200 thousand, was partially released in these condensed consolidated interim financial statements, with the amount released being PLN 114 100 thousand. This amount was recognised in the consolidated statement of comprehensive income in the item "Share of the results of associates and jointly-controlled entities." The provisions amounted to PLN 108 100 thousand as of 30 September 2021, which is the best possible estimate in connection with uncertainty related to final settlement amounts.

ENEA S.A.'s commitment to provide funding for Elektrownia Ostrołęka Sp. z o.o. resulting from the existing agreements (especially the agreements dated 28 December 2018 and 30 April 2019 and the Settlement Agreement) that is still outstanding amounts to PLN 620 million. ENEA S.A. does not have sufficient information on any potential additional contributions or their potential deadlines, aside from those above.

12. Inventories

Inventories

As at
30 September 2021 31 December 2020
Materials 723 355 785 407
Semi-finished products and production in progress 2 503 1 237
Finished products 68 528 28 144
Energy origin certificates 512 682 350 664
Goods 23 554 10 230
Gross value of inventory 1 330 622 1 175 682
Impairment of inventory (39 891) (45 707)
Net value of inventory 1 290 731 1 129 975

In the 9-month period ended 30 September 2021, impairment of inventory decreased by PLN 5 816 thousand on a net basis (in the 9-month period ended 30 September 2020 impairment of inventory decreased by PLN 17 149 thousand).

13. Energy origin certificates

Energy origin certificates

As at
30 September 2021
Net value at the beginning of period 345 776 430 571
Internal manufacture 268 903 282 693
Purchase 23 460 130 752
Depreciation (118 114) (491 718)
Sale (12 231) (7 788)
Change in impairment - 1 266
Net value at the reporting date 507 794 345 776

14. Assets and liabilities arising from contracts with customers

Assets and liabilities arising from contracts with customers

Assets arising from contracts
with customers
Liabilities arising from
contracts with customers
As at 1 January 2020 330 447 115 701
Transfer from contract assets to receivables (8 018) -
Increase due to prepayments - 150 064
Liabilities resulting from sales adjustments - (8 303)
Impairment 17 -
As at 31 December 2020 322 446 257 462
Change in non-invoices receivables 99 411 -
Increase due to prepayments - 190 951
Liabilities resulting from sales adjustments - (1 209)
Impairment (57) -
As at 30 September 2021 421 800 447 204

The balance of assets arising from contracts with customers mainly covers uninvoiced electricity sales, while the balance of liabilities arising from contracts with customers mainly covers advances received from connection fees.

15. Restricted cash

As at 30 September 2021, the Group's restricted cash amounted to PLN 333 529 thousand (as at 31 December 2020: PLN 754 321 thousand). This mainly included cash for deposits for electricity and CO2 emission allowance transactions (mainly cash for collateral in settlements with clearinghouse IRGiT), funds in a VAT account (split payment), collateral paid to suppliers and cash withholding as collateral for proper performance of work.

16. Coverage of loss

On 17 June 2021, an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6, resolving to cover the net loss for the financial year covering the period from 1 January 2020 to 31 December 2020, amounting to PLN 3 356 750 thousand, using retained earnings (PLN 2 417 700 thousand) and supplementary capital (PLN 939 680 thousand).

On 30 July 2020 an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6 concerning the allocation of net profit for the financial year covering the period from 1 January 2019 to 31 December 2019, pursuant to which 100% of the 2019 net profit was transferred to reserve capital, intended to finance investments.

17. Debt-related liabilities

Credit facilities, loans and debt securities

As at
30 September 2021 31 December 2020
Bank credit 1 551 806 1 686 985
Loans 38 138 46 717
Bonds 2 938 041 4 874 054
Long-term 4 527 985 6 607 756
Bank credit 209 783 208 339
Loans 11 519 11 723
Bonds 1 960 353 1 003 999
Short-term 2 181 655 1 224 061
Total 6 709 640 7 831 817

In the 9-month period ended 30 September 2021, the book value of credit facilities, loans and debt securities decreased by PLN 1 122 177 thousand on a net basis (9-month period ended 30 September 2020: down by PLN 1 282 362 thousand).

In accordance with ENEA S.A.'s financing model, in order to secure funding for ENEA Group companies' on-going operations and investment needs, ENEA executes agreements with external financial institutions concerning bond issue programs and/or credit agreements.

Credit facilities and loans

Presented below is a list of the Group's credit facilities and loans:

No. Company Lender Contract date Total
contract
amount
Debt at 30
September
2021
Debt at 31
December
2020
Interest Contract
period
1. ENEA S.A. EIB 18 October 2012 (A)
and 19 June 2013
(B)
1 425 000 943 109 1 013 543 Fixed interest
rate
or WIBOR
6M + margin
17 June 2030
2. ENEA S.A. EIB 29 May 2015 (C) 946 000 814 667 878 500 Fixed interest
rate
or WIBOR
6M + margin
15 September
2032
3. ENEA S.A. PKO BP 28 January
2014,
Annex 2 of
4 December
2019
300 000 - - WIBOR 1M
+ margin
31 December
2022
4. ENEA S.A. Pekao S.A. 28 January
2014,
Annex 2 of 4
December 2019
150 000 - - WIBOR 1M
+ margin
31 December
2022
5. ENEA S.A. BGK 7 September 2020 250 000 - - WIBOR 1M
+margin
7 September
2022
6. ENEA Ciepło Sp.
z o.o.
National
Fund for
Environment
al Protection
and Water
Management
(NFOŚiGW)
22 December
2015
60 075 36 111 41 327 Interest
based on
WIBOR 3M,
no less than
2%
20 December
2026
7. Other - - - 15 454 20 385 - -
TOTAL 3 131 075 1 809 341 1 953 755
rate Transaction costs and
effect of measurement
using effective interest
1 905 9
TOTAL 3 131 075 1 811 246 1 953 764

The additional information and explanations presented on pages 9-45 constitute an integral part of these condensed consolidated interim financial statements.

Presented below is a short description of ENEA Group's significant credit and loan agreements:

ENEA S.A.

ENEA S.A. currently has credit agreements with the European Investment Bank (EIB) for a total amount of PLN 2 371 000 thousand (Agreement A PLN 950 000 thousand, Agreement B PLN 475 000 thousand and Agreement C PLN 946 000 thousand). Funds from the EIB were used to finance a multi-year investment plan aimed at modernising and expanding ENEA Operator Sp. z o.o.'s power network. Funds from Agreements A, B and C were fully used. Interest on credit facilities may be fixed or variable. In the 9-month period ended on 30 September 2021, ENEA S.A. did not execute new credit agreements.

ENEA Ciepło Sp. z o.o.

Loan from NFOŚiGW - agreement executed on 22 December 2015 for the period from 1 April 2016 to 20 December 2026, with a PLN 60 075 thousand limit. The loan has annual interest based on WIBOR 3M of no less than 2%. The loan was transferred (together with an organised part of enterprise) from ENEA Wytwarzanie Sp. z o.o. to ENEA Ciepło Sp. z o.o. on 30 November 2018.

The total loan-related debt of ENEA Ciepło Sp. z o.o. as at 30 September 2021 amounted to PLN 36 111 thousand (at 31 December 2020: PLN 41 327 thousand).

Bond issue programs

Presented below is a list of bonds issued by ENEA S.A.

No. Bond issue
program name
Program
start date
Program
amount
Value of outstanding
bonds
as at 30 September
2021
Value of outstanding
bonds
as at 31 December
2020
Interest Buy-back
deadline
1. Bond issue program
agreement with PKO
BP S.A., Bank
PEKAO S.A.,
Santander BP S.A.,
Citi BH S.A.
21 June 2012 3 000 000 1 799 000 2 140 000 WIBOR 6M
+ margin
One-off buy-back
for each series
from June 2020
to June 2022
2. Bond issue program
agreement with BGK
15 May 2014 1 000 000 640 000 720 000 WIBOR 6M
+ margin
Buy-back in
tranches, last
tranche due in
December 2026
3. Bond issue program
agreement with PKO
BP S.A., Bank
PEKAO S.A. and
mBank S.A.
30 June 2014 5 000 000 2 000 000 2 500 000 WIBOR 6M
+ margin
One-time buy
back of each
series; PLN 878
million bought
back in February
2020, next series
in September
2021 and June
2024
4. Bond issue program
agreement with BGK
3 December
2015
700 000 456 669 532 779 WIBOR 6M
+ margin
Buy-back in
tranches, last
tranche due in
September 2027
TOTAL 9 700 000 4 895 669 5 892 779
Transaction costs and
effect of measurement
using effective interest rate
2 725 (14 726)
TOTAL 9 700 000 4 898 394 5 878 053

In the 9-month period ended on 30 September 2021, ENEA S.A. did not execute new bond issue program agreements.

On 11 May 2021 the Management Board of ENEA S.A. decided to partially buy back series ENEA0921 bonds before maturity in order to redeem them, with principal amounting to PLN 350 000 thousand, plus interest due and bonus for the bondholders. Series ENEA0921 bonds were issued in the amount of PLN 500 000 thousand on 16 September 2015 as part of the "Program Agreement regarding a bond issue program up to PLN 5 000 000 thousand of 30 June 2014" as amended. The outstanding part of series ENEA0921 bonds, with a nominal value of PLN 150 000 thousand, is held by the bondholders until maturity, i.e. 16 September 2021

Interest rate hedges and currency hedges

In the 9-month period ending 30 September 2021 ENEA S.A. did not execute interest rate swaps. The total bond and credit exposure hedged with IRS transactions as at 30 September 2021 amounted to PLN 3 421 009 thousand. Moreover, ENEA S.A. has fixed-rate credit agreements totalling PLN 618 327 thousand. These transactions have material impact on the predictability of expense flows and finance costs. The Company presents the measurement of these instruments in the item: Financial liabilities measured at fair value Derivative instruments are treated as cash flow hedges, which is why they are recognised and accounted for using hedge accounting rules. As at 30 September 2021, financial liabilities at fair value concerning IRSs amounted to PLN 31 524 thousand (31 December 2020: PLN 139 673 thousand).

In the 9-month period ending 30 September 2021 the Company executed FX forward transactions for a total volume of EUR 1 116 thousand. The last transaction's settlement date is in December 2021. As at 30 September 2021, financial assets at fair value concerning the measurement of forward instruments amounted to PLN 5 thousand (31 December 2020: PLN 0).

Financing terms - covenants

Financing agreements require ENEA S.A. and ENEA Group to maintain certain financial ratios. As at 30 September 2021 and the date on which these condensed consolidated interim financial statements were prepared and in the course of 2021 the Group did not breach any credit agreement provisions such as would require early re-payment of long-term debt.

18. Provisions

In the 9-month period ended 30 September 2021, provisions for other liabilities and charges increased by a net amount of PLN 284 888 thousand (in the 9-month period ended 30 September 2020, provisions for other liabilities and charges increased by PLN 555 846 thousand).

Change in provisions for other liabilities and charges in the period ended 30 September 2021

Provision
for
non-contractual
use
of
land
Provision
for
other
claims
Provision
for
landfill
site
reclamation
Provision
for
energy
origin
certificates
Provision
for
CO2
emission
allowance
purchases
Mine
liquidation
Other Total
As
at
January
2021
239 833 262 221 116 898 175 429 1
895
156
201 463 555 611 3
446
611
Reversal
of
discount
and
change
of
discount
rate
3 520 - (7
547)
- - 2 266 - (1 761)
Increase
in
existing
provisions
231 32 944 1 630 422 336 2 034 297 - 51 415 2 542 853
Use
of
provisions
(10 744) (518) - (159
596)
(1
912
933)
- (28
226)
(2
112
017)
Reversal
of
unused
provision
(572) (1 285) (31) (47) - (15
955)
(126
297)
(144
187)
As
at
30
September
2021
232 268 293 362 110 950 438 122 2
016
520
187 774 452 503 3
731
499
Long-term 846 734
Short-term 2
884
765

Change in provisions for other liabilities and charges in the period ended 31 December 2020

Provision
for
non
contractual
use
of
land
Provision
for
other
claims
Provision
for
landfill
site
reclamation
Provision
for
energy
origin
certificates
Provision
for
CO2
emission
allowance
purchases
Mine
liquidation
Other Total
As
at
1
January
2020
210
087
230
706
91
280
197
555
1
233
325
162
972
364
528
2
490
453
Reversal
of
discount
and
change
of
discount
rate
(7
199)
- 186 -
-
3
504
(3
509)
Increase
in
existing
provisions
41
380
44
912
25
649
136
556
1
933
376
34
987
321
343
2
538
203
Use
of
provisions
(3
615)
(10
930)
- (158
524)
(1
271
545)
- (129
984)
(1
574
598)
Reversal
of
unused
provision
(820) (2
467)
(217) (158) - - (276) (3
938)
As
at
31
December
2020
239
833
262
221
116
898
175
429
1
895
156
201
463
555
611
3
446
611
Long-term
Short-term
849
990
2
596
621

A description of material claims and conditional liabilities is presented in note 25.

Provision for other claims

In the 9-month period ending 30 September 2021 ENEA S.A. created a PLN 13 951 thousand provision for potential claims related to the termination by ENEA S.A. of agreements to purchase energy origin certificates for renewables, and the value of this provision as at 30 September 2021 was PLN 153 415 thousand (this provision is included in the table above in the column "Provision for other claims" and detailed information on this provision are presented in note 25.6).

Other provisions mainly concern:

  • potential liabilities related to grid assets resulting from differences in the interpretation of regulations PLN 184 369 thousand (as at 31 December 2020: PLN 178 172 thousand); it is difficult to determine when this provision will be performed, however in these financial statements it is assumed that it will not happen within 12 months,
  • costs to use forest land managed by State Forests PLN 58 877 thousand (as at 31 December 2020: PLN 64 421 thousand); it is difficult to determine when this provision will be performed, however in these financial statements it is assumed that it will not happen within 12 months,
  • future investment liabilities toward Elektrownia Ostrołęka Sp. z o.o. PLN 108 100 thousand (PLN 222 200 thousand as at 31 December 2020), detailed information on this provision is available in note 11,
  • onerous contracts PLN 61 887 thousand (as at 31 December 2020: PLN 50 821 thousand); this provision will be performed in 2021.

19. Accounting for subsidies and road lighting modernisation services

Accounting for income from subsidies and road lighting modernisation services

As at
30 September 2021 31 December 2020
Long-term
Accounting for deferred revenue - subsidies 208 139 168 473
Accounting for deferred revenue - road lighting modernisation services 97 973 92 689
Total non-current deferred revenue 306 112 261 162
Short-term
Accounting for deferred revenue - subsidies 17 087 9 326
Accounting for deferred revenue - road lighting modernisation services 4 250 3 982
Total current deferred revenue 21 337 13 308

Schedule for accounting for deferred revenue

As at
30 September 2021 31 December 2020
Up to one year 21 337 13 308
From one to five years 61 496 52 448
Over five years 244 616 208 714
Total deferred revenue 327 449 274 470

In the 9-month period ended 30 September 2021, the book value of accounting for grants and road lighting modernisation services increased by PLN 52 979 thousand on a net basis (in the 9-month period ended 30 September 2020, the book value of accounting for grants and road lighting modernisation services increased by a net amount of PLN 14 408 thousand).

The item 'deferred revenue concerning subsidies' includes mainly EU subsidies and subsidies from the NFOŚiGW for the development of electricity and heating infrastructure.

Road lighting modernisation services, i.e. improving the quality and efficiency of road lighting, are services provided on an on-going basis. Revenue from improving the quality and efficiency of road lighting is recognised proportionally over the economic period of use for the tangible assets created.

Financial instruments

20. Financial instruments and fair value

The following table contains a comparison of fair values and book values:

As
at
30
September
2021
As
at
31
December
2020
Book
value
Fair
value
Book
value
Fair
value
FINANCIAL
ASSETS
Long-term 717 124 152 042 308 797 97 957
Financial
assets
measured
at
fair
value
152 042 152 042 97 957 97 957
Trade
and
other
receivables
423 179 (*) 68 736 (*)
Finance
lease
and
sublease
receivables
677 (*) 513 (*)
Funds
in
the
Mine
Decommissioning
Fund
141 226 (*) 141 591 (*)
Short-term 8
738
349
95 045 3
886
756
41 894
Financial
assets
measured
at
fair
value
95 045 95 045 41 894 41 894
Debt
financial
assets
at
amortised
cost
- (*) 61 (*)
Assets
arising
from
contracts
with
customers
421 800 (*) 322 446 (*)
Other
short-term
investments
31 607 (*) - (*)
Trade
and
other
receivables
2
153
274
(*) 1
579
826
(*)
Finance
lease
and
sublease
receivables
933 (*) 975 (*)
Cash
and
cash
equivalents
6
035
690
(*) 1
941
554
(*)
TOTAL
FINANCIAL
ASSETS
9
455
473
247 087 4
195
553
139 851

FINANCIAL LIABILITIES

Long-term 6
358
360
4
579
760
7
344
820
6
749
538
Credit
facilities,
loans
and
debt
securities
4
527
985
4
567
733
6
607
756
6
674
407
Lease
liabilities
543 219 (*) 529 140 (*)
Trade
and
other
payables
1 275 129 (*) 132 793 (*)
Financial
liabilities
measured
at
fair
value
12 027 12 027 75
131
75
131
Short-term 5
743
628
2
282
093
2
900
566
1
295
048
Credit
facilities,
loans
and
debt
securities
2
181
655
2
181
655
1
224
061
1
224
061
Lease
liabilities
24 302 (*) 25 172 (*)
Trade
and
other
payables
3
403
126
(*) 1
548
057
(*)
Liabilities
arising
from
contracts
with
customers
34 107 (*) 32 289 (*)
Financial
liabilities
measured
at
fair
value
100 438 100 438 70 987 70 987
TOTAL
FINANCIAL
LIABILITIES
12
101
988
6
861
853
10
245
386
8
044
586

(*) book value is close to fair value measured in accordance with level 2 in the following hierarchy.

Financial instruments are fair-value measured according to a hierarchy.

As at 30 September 2021
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value 24 100 209 325 13 662 247 087
Derivative instruments used in hedge accounting - 15 - 15
Equity instruments at fair value through other
comprehensive income
Call options (at fair value through profit or loss)
Other derivative instruments at fair value through profit
or loss
- - 12 587 12 587
- 20 236 - 20 236
- 189 074 - 189 074
Interests at fair value through profit or loss 24 100 - 1 075 25 175
Total 24 100 209 325 13 662 247 087
Financial liabilities measured at fair value - (112 465) - (112 465)
Derivative instruments at fair value through profit or loss - (80 941) - (80 941)
Derivative instruments used - (31 524) - (31 524)
in hedge accounting (e.g. interest rate swaps)
Credit facilities, loans and debt securities - (6 749 388) - (6 749 388)
Total - (6 861 853) - (6 861 853)
As at 31 December 2020
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value 15 000 69 910 54 941 139 851
Equity instruments at fair value through other comprehensive
income
53 866 53 866
Call options (at fair value through profit or loss) 15 982 15 982
Other derivative instruments at fair value through profit
or loss
53 928 53 928
Interests at fair value through profit or loss 15 000 1 075 16 075
Total 15 000 69 910 54 941 139 851
Financial liabilities measured at fair value (146 118) (146 118)
Derivative instruments at fair value through profit or loss (6 445) (6 445)
Derivative instruments used (139 673) (139 673)
in hedge accounting (e.g. interest rate swaps)
Credit facilities, loans and debt securities (7 898 468) (7 898 468)
Total (8 044 586) (8 044 586)

Financial assets and financial liabilities at fair value include:

  • shares in unrelated entities, the stake in which is below 20%; this line includes a stake in ElectroMobility Poland S.A., for which there is no market price quoted on an active market; having analysed the standard IFRS 9, the Group decided to qualify these interests as financial instruments through other comprehensive income; when the stake in ElectroMobility Poland S.A. was reclassified, it was measured at fair value and the measurement was recognised in the present-period financial result; in the event that interests in unrelated entities are quoted on the Warsaw Stock Exchange, their fair value is determined on the basis of stock market quotes;
  • Polimex-Mostostal S.A. call options;
  • derivative instruments, which include the measurement of interest rate swaps; the fair value of derivative instruments is established by calculating the net present value based on two yield curves, i.e. a curve to determine discount factors and a curve used to estimate future variable reference rates;
  • forward contracts for the purchase of electricity and gas and property rights

Non-current debt financial assets at amortised cost cover loans maturing in over one year. Current debt financial assets at amortised cost cover loans maturing in under one year. The item other short-term investments includes deposits with maturity over 3 months.

The fair value of bank credit, loans and debt securities is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.

The table above contains an analysis of financial instruments at fair value, grouped into a three-level hierarchy, where:

Level 1 - fair value is based on (unadjusted) market prices quoted for identical assets or liabilities on active markets

Level 2 - fair value is determined on the basis of values observed on the market, which are not a direct market quote (e.g. they are established by direct or indirect reference to similar instruments on a market),

Level 3 - fair value is determined using various measurement techniques that are not, however, based on observable market data.

No transfers between the levels were made in the nine-month period ended 30 September 2021.

As at 30 September 2021, financial assets at fair value included call options for Polimex-Mostostal S.A. shares, among other things. Pursuant to a call option agreement for Polimex-Mostostal S.A. shares of 18 January 2017, as amended, ENEA S.A. holds 22 call options from Towarzystwo Finansowe Silesia Sp. z o.o. to purchase 6 937 500 shares, with a nominal value of PLN 2 each. The contractual share allocation date is at the end of each calendar quarter from September 2021 to December 2026. On 30 August 2021, the Company submitted a demand to exercise its call option and made a bank transfer for 187 500 Polimex - Mostostal S.A. shares. The fair-value measurement of the call option was carried out using the Black-Scholes model. The book value of these options as at 30 September 2021 was PLN 20 236 thousand (at 31 December 2020: PLN 15 982 thousand).

Moreover, the Group's financial assets at fair value include the measurement of derivative contracts for the purchase of electricity and gas and concerning property rights not used for the Group's own purposes worth PLN 189 074 thousand (as at 31 December 2020: PLN 53 928 thousand). The nominal value of contracts for the purchase and sale of electricity, gas and property rights maturing in 2021-2023, presented as financial assets and liabilities at fair value, amounts to PLN 1 616 146 thousand (PLN 711 009 thousand concerns procurement contracts and PLN 905 137 thousand concerns sales contracts).

21. Debt financial assets at amortised cost

Debt financial assets at amortised cost

As at
30 September 2021 31 December 2020
Current debt financial assets at amortised cost
Loans granted - 61
Total current debt financial assets at amortised cost - 61
Non-current debt financial assets at amortised cost
Loans granted - -
Total non-current debt financial assets at amortised cost - -
TOTAL - 61

Impairment of financial assets at amortised cost (concerns loans granted) as at 30 September 2021 amounted to PLN 223 547 thousand. The total impairment loss on loans issued and recognised in the nine-month period ended 30 September 2021 was PLN 13 762 thousand, and this amount was recognised in the consolidated statement of comprehensive income under "Impairment of financial assets at amortised cost."

22. Impairment of trade and other receivables

Impairment of trade and other receivables

As at
30 September 2021
31 December 2020
Impairment at the beginning of period 139 595 157 844
Created 18 025 18 633
Reversed (16 368) (26 424)
Used (5 431) (10 458)
Impairment at the reporting date 135 821 139 595

In the 9-month period ended 30 September 2021, impairment of trade and other receivables decreased by PLN 3 774 thousand (in the 9-month period ended 30 September 2020 impairment declined by PLN 18 434 thousand).

Impairment losses are mainly recognised on trade receivables. Impairment of other receivables is negligible.

As at 30 September 2021, the Company carried out an additional analysis of the COVID-19 pandemic's potential impact on receivables impairment. An individual approach was applied to a list of ENEA S.A.'s largest debtors, using assumptions for a model described in the Company's existing Methodology for determining expected credit losses for non-current debt assets and similar items. As regards the model's quantitative module - available reporting data from the debtors was used, while the qualitative module incorporated the existing (and predicted) situation in the national economy as well as the counterparty's market and financial position. Based on this overall evaluation, a rating was assigned and subsequently transposed onto the Probability of Default parameter (in accordance with the aforementioned Methodology). As regards the Loss Given Default parameter, a value equal to 10% was conservatively adopted (in reality far exceeding the actual levels of receivables losses recorded by the Company/Group). The above analysis generated an additional expected credit loss at a negligible level from the viewpoint of reporting.

For current trade receivables, expected credit losses are calculated based on historic data in a way that is described in Rules for creating and recording impairment losses on trade receivables and other financial items at ENEA Group companies. The impairment of receivables for 2021 is calculated on the basis of data from 2020. Therefore, the level of receivables impairment estimated as at 30 September 2021 reflects objective indications of impairment resulting from the situation and regulations arising from the COVID-19 pandemic.

23. Analysis of the age structure of assets arising from contracts with customers and trade and other receivables

Age structure of assets arising from contracts with customers and trade and other receivables constituting financial instruments:

As at 30 September 2021
Nominal value Impairment Book value
Trade and other receivables
Current 2 422 209 (9 119) 2 413 090
Overdue 290 065 (126 702) 163 363
0-30 days 98 470 (205) 98 265
31-90 days 16 003 (1 588) 14 415
91-180 days 13 076 (4 548) 8 528
over 180 days 162 516 (120 361) 42 155
Total 2 712 274 (135 821) 2 576 453
Assets arising from contracts
with customers
422 068 (268) 421 800

As at 31 December 2020
Nominal value Impairment Book value
Trade and other receivables
Current 1 498 136 (8 817) 1 489 319
Overdue 290 021 (130 778) 159 243
0-30 days 100 033 (262) 99 771
31-90 days 15 417 (1 359) 14 058
91-180 days 9 215 (2 676) 6 539
over 180 days 165 356 (126 481) 38 875
Total 1 788 157 (139 595) 1 648 562
Assets arising from contracts with customers 322 657 (211) 322 446

Other explanatory notes

24. Related-party transactions

Group companies execute transactions with the following related parties:

  • Group companies these transactions are eliminated at the consolidation stage;
  • Transactions between the Group and members of the Group's corporate authorities, which are divided into two categories:
    • resulting from being appointed as Supervisory Board members,
    • resulting from other civil-law contracts.
  • transactions with State Treasury related parties.

Transactions with members of the Group's corporate authorities:

For the nine-month period ended
Item Company's Management Board Company's Supervisory Board
30 September 30 September 30 September 30 September
2021 2020 2021 2020
Remuneration under management contracts 4 334* 3 777** - -
Remuneration under appointment to
management or supervisory bodies
- - 599 570
TOTAL 4 334 3 777 599 570

* This remuneration includes bonuses for current and former Management Board Members for 2020, amounting to PLN 1 632 thousand, and a non-compete clause for former Management Board Members, amounting to PLN 138 thousand.

** This remuneration includes bonuses for 2018, amounting to PLN 1 294 thousand, and a non-compete clause for former Management Board Members, amounting to PLN 443 thousand.

In the 9-month period ended 30 September 2021, no loans were made to Supervisory Board members from the Company Social Benefit Fund (PLN 0 thousand for the 9-month period ended 30 September 2020).

Other transactions resulting from civil-law contracts executed between the Parent and members of the Parent's corporate authorities mainly concern the use of company cars by members of ENEA S.A.'s Management Board for private purposes.

Transactions with State Treasury related parties.

The Group also executes commercial transactions with state and local administration units and entities owned by Poland's State Treasury.

The subject of these transactions mainly is as follows:

  • purchases of coal, electricity, property rights resulting from energy origin certificates as regards renewable energy and energy produced in cogeneration with heat, transmission and distribution services that the Group provides to the State Treasury's subsidiaries,
  • sale of electricity, distribution services, connection to the grid and other associated fees, as well as coal, that the Group provides for both state and local administration authorities (sale to end customers) and to the State Treasury's subsidiaries (wholesale and retail sale - to end customers).

These transactions are executed on market terms, and these terms do not differ from the terms applied in transactions with other entities. The Group does not keep records that would make it possible to aggregate the amounts of all transactions executed with all state institutions and the State Treasury's subsidiaries.

In addition, the Group identified financial transactions with State Treasury's related parties, i.e. with banks serving as guarantors for bond issue programmes. These entities include: PKO BP S.A., Pekao S.A. and Bank Gospodarstwa Krajowego. Detailed information on bond issue programs is presented in note 17.

25. Conditional liabilities, court proceedings and cases on-going before public administration organs

This section of explanatory notes includes conditional liabilities and on-going proceedings in courts, arbitration bodies or public administration bodies.

25.1. Sureties and guarantees

The following table presents significant bank guarantees valid as of 30 September 2021 under an agreement between ENEA S.A. and PKO BP S.A. up to a limit specified in the agreement.

The additional information and explanations presented on pages 9-45 constitute an integral part of these condensed consolidated interim financial statements.

List of guarantees issued as at 30 September 2021

Guarantee issue
date
Guarantee validity Entity for which the
guarantee was issued
Bank - issuer Guarantee amount
in PLN 000s
4 August 2021 15 July 2023 Vastint Poland sp. z o.o. PKO BP S.A. 1 045
4 August 2021 15 February 2022 Unikoff sp. z o.o. PKO BP S.A. 2 600
1 July 2020 30 June 2022 H. Święcicki Clinical Hospital
in Poznań
PKO BP S.A. 1 281
Total bank guarantees 4 926

The value of other guarantees issued by the Group as at 30 September 2021 was PLN 7 803 thousand.

25.2. On-going proceedings in courts of general competence

Proceedings initiated by the Group

Proceedings in courts of general competence initiated by ENEA S.A. and ENEA Operator Sp. z o.o. concern receivables related to electricity supplies (electricity cases) and receivables related to other matters - illegal uptake of electricity, grid connections and other specialised services (non-electricity cases).

Proceedings in courts of general competences initiated by ENEA Wytwarzanie Sp. z o.o. mainly concern compensation for damages and contractual penalties from the company's counterparties.

At 30 September 2021, a total of 19 388 cases initiated by the Group were in progress before courts of general competence, worth in aggregate PLN 166 438 thousand (31 December 2020: 13 046 cases worth PLN 173 165 thousand).

The outcome of individual cases is not significant from the viewpoint of the Group's financial result.

Proceedings against the Group

Proceedings against the Group are initiated by both natural persons and legal entities. They concern issues such as: compensation for electricity supply disruptions, illegal uptake of electricity and compensation for the Group's use of properties on which power equipment is located. The Group considers cases related to non-contractual use of properties that are not owned by the Group as especially significant.

There are also claims concerning terminated agreements for the purchase of property rights (note 25.6).

Court proceedings against ENEA Wytwarzanie Sp. z o.o. concern compensation for damages and contractual penalties.

At 30 September 2021, a total of 3 354 cases against the Group were in progress before courts of general competence, worth in aggregate PLN 1 205 014 thousand (31 December 2020: 2 499 cases worth PLN 936 828 thousand). The outcome of individual cases is not significant from the viewpoint of the Group's financial result.

Provisions related to these court cases are presented in note 18.

25.3. Other court proceedings

Proceedings on-going before public administration courts involving Lubelski Węgiel Bogdanka S.A. mainly concern disputes with local government units regarding property tax. This stems from the fact that in preparing property tax declarations LWB (like other mining companies in Poland) did not take into account the value of underground mining excavations or the value of equipment located therein. These cases concern refunds of overpayments and the way in which property tax base is calculated.

In order to protect the Group from any potential consequences in the form of late interest on property tax - provided that the municipalities' decisions that include equipment and support structures located inside mining excavations are eventually upheld - LWB in mid-2019 decided to include the value of underground excavations and equipment in calculations regarding this tax (given the majority of case law involving tax on elements of mining excavations).

The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by the Company's shareholder, Fundacja "CLIENTEARTH Prawnicy dla ziemi," based in Warsaw, to cancel, determine the non-existence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The first hearing in the case was held on 10 April 2019, with no witnesses called to the hearing. The Court requested that the Company provide the Investment Agreement within 14 days, at least as regards points 1 to 8 (especially point 8.6), subject to the trial consequences indicated in art. 233 § 2 of the Civil Procedure Code. ENEA's attorney filed a reservation to the protocol pursuant to art. 162 of the Civil Procedure Code. On 24 April 2019, the Company provided the Investment Agreement. The Court decided to postpone the hearing to 17 July 2019. On 31 July 2019, the District Court in Poznań allowed the main claim and declared

the Resolution invalid. On 17 September 2018, an attorney for ENEA S.A. submitted an appeal against the ruling of 31 July 2019. The complainant submitted a response to the appeal, to which ENEA S.A.'s attorney replied. On 8 July 2020 the Appeals Court dismissed the Company's appeal against the District Court's ruling. As indicated in verbal major reasons for the ruling, the Appeals Court decided that the District Court's ruling complies with the law because the Resolution is invalid due to the fact that adopting the Resolution breached the division of competences between the organs of a commercial-law company. In consequence, the ruling by the District Court in Poznań invalidating the Resolution became final. The Group has assessed the impact of this event as neutral for the reported data.

The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by Międzyzakładowy Związek Zawodowy Synergia Pracowników Grupy Kapitałowej ENEA, based in Poznań, to cancel, determine the nonexistence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The hearing was scheduled for 8 May 2019. That hearing, and others scheduled for 30 July 2019 and 1 October 2019, did not take place. The hearing has been suspended until a final ruling is issued in a case instigated by a shareholder of the Company - Fundacja "CLIENTEARTH Prawnicy dla ziemi." Through a decision of 26 May 2021, the District Court in Poznań dismissed the case.

On 23 June 2021, the management board of ENEA Elektrownia Połaniec S.A. ("EEP") received information from the Minister of Climate and Environment on an administrative proceeding being instigated ex officio regarding public aid received by EEP in the form of CO2 emission allowances for 2016 for the modernisation of power generating units in 2013- 2016 (tasks included in the National Investment Plan). EEP's management board notes that the proceeding concerns a period in which EEP was owned by ENGIE (ENGIE International Holdings B.V.).

The estimated value of the public aid received back then, understood as the sum total of allowances prices as of the date on which each of the tranches was awarded in the aforementioned years, is approx. PLN 170 million, plus potential penalty interest. To the best knowledge of EEP's management board, the ecological effect of these investments was achieved, and the ecological effect for these investments was also confirmed by an external, independent auditor in 2016 and 2017.

On 21 July 2021, EEP's management board submitted explanations to the Ministry of Climate and Environment, confirming the ecological effect for these investments, along with an expanded opinion by an independent auditor. In its response to the notice, the management board also requested that the Minister of Climate and Environment dismiss this administrative proceeding.

On 9 August 2021 EEP's Management Board received a decision from the Minister of Climate and Environment on the dismissal of the entire proceeding.

25.4. Risk associated with legal status of properties used by the Group

Risk associated with the legal status of properties used by the Group results from the fact that the Group does not have a legal title to use land for all of its facilities where its transmission grids and the associated equipment are located. In the future, the Group might be obligated to incur the costs of non-contractual use of property.

Rulings in these cases are significant because they have a considerable impact on the Group's approach to people raising pre-trial claims concerning equipment located on their properties in the past as well as the way in which the legal status of such equipment is addressed in the case of new investments.

The loss of assets in this case is highly unlikely. Having an unclear legal status for properties where power equipment is located does not constitute a risk for the Group of losing such assets, rather it gives rise to the threat of additional costs related to demands for compensation for the non-contractual use of land, rent, costs related to transmission easements and, exceptionally, in individual cases, demands related to a change in the object's location (return of land to original condition). The Group recognises adequate provisions.

The provision also applies to compensation for the non-contractual use by the Group of properties on which the Group's grid assets (power lines) are located, in connection with transmission corridors or transmission easements being established for the Group.

As at 30 September 2021, the Group recognised a provision for claims concerning non-contractual use of land amounting to PLN 232 268 thousand.

25.5. Cases concerning 2012 non-balancing

On 30 and 31 December 2014, ENEA S.A. submitted demands for settlement to:

Demanded amount in PLN 000s
PGE Polska Grupa Energetyczna S.A. 7 410
PKP Energetyka S.A. 1 272
TAURON Polska Energia S.A. 17 086
TAURON Sprzedaż GZE Sp. z o.o. 1 826
Total 27 594

The subject of these demands is claims for the payment for electricity that was incorrectly settled on the balancing market in 2012. The companies receiving these demands obtained unjustified proceeds by not allowing ENEA S.A. to issue invoices for 2012.

Given a lack of an amicable resolution in this case, ENEA S.A. brought lawsuits against:

  • TAURON Polska Energia S.A. lawsuit of 10 December 2015,
  • TAURON Sprzedaż GZE Sp. z o.o. lawsuit of 10 December 2015,
  • PKP Energetyka S.A. lawsuit of 28 December 2015,
  • PGE Polska Grupa Energetyczna S.A. lawsuit of 29 December 2015.

Three of the aforementioned disputes are not yet resolved in first-instance courts. In the case ENEA S.A. v. Tauron Polska Energia S.A. and others (file no. XIII GC 600/15/AM), on 23 March 2021 the District Court in Katowice ruled to reject the claim in its entirety and awarded the costs of proceedings in favour of the defendant and the co-defendants. The ruling along with justification in writing was delivered on 20 May 2021. On 10 June 2021, ENEA S.A. lodged an appeal to the Appeals Court in Katowice. In a case against PGE Polska Grupa Energetyczna S.A. (file no. XVI GC 525/20, previous file no. XX GC 1163/15) - through a ruling of 7 January 2021 the court suspended the proceeding at the mutual request of the parties.

No amounts concerning the above cases were recognised in the consolidated statement of financial position.

25.6. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin certificates for energy from renewable sources

ENEA S.A. is a party to 8 court proceedings concerning agreements for the purchase of property rights arising under certificates of origin for energy from renewable sources, which includes:

  • 5 proceedings for payment against ENEA S.A. concerning remuneration, contractual penalties or compensation;
  • 2 proceedings for the voidance of ENEA S.A.'s termination or withdrawal from agreements to sell property rights, which took place on 28 October 2016, including 1 proceeding in which claims for payment are being sought at the same time;
  • 1 proceeding for payment, in which ENEA S.A. seeks a claim concerning a contractual penalty.

ENEA S.A. offset a part of receivables due for these counterparties from ENEA S.A. for sold property rights with damagesrelated receivables due for ENEA S.A. from renewables producers. The damage caused to ENEA S.A. arose as a result of the counterparties' failure to fulfil a contractual obligation to participate, in good faith, in re-negotiating long-term agreements for the sale of property rights in accordance with an adaptation clause that is binding for the parties.

On 28 October 2016, ENEA S.A. submitted statements depending on the agreement: on termination or withdrawal from long-term agreements for the purchase by the Company of property rights resulting from certificates of origin for energy from renewable sources (green certificates) (Agreements).

The Agreements were executed in 2006-2014 with the following counterparties, which own renewable generation assets ("Counterparties"):

  • Farma Wiatrowa Krzęcin Sp. z o.o., based in Warsaw;
  • Megawind Polska Sp. z o.o., based in Szczecin;
  • PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów;
  • PGE Energia Odnawialna S.A., based in Warsaw;
  • PGE Energia Natury PEW Sp. z o.o., based in Warsaw (currently PGE Energia Odnawialna S.A., based in Warsaw);
  • "PSW" Sp. z o.o., based in Warsaw;
  • in.ventus Sp. z o.o. EW Śniatowo Sp. k., based in Poznań (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice);
  • Golice Wind Farm Sp. z o.o., based in Warsaw.

As a rule, the Agreements were terminated by the end of November 2016. The dates on which the respective Agreements were terminated depended on contractual provisions.

The reason for terminating/withdrawing from each of the Agreements by the Company was failure to engage in re-negotiations concerning adaptive clauses in each of the Agreements that would justify the adjustment of these Agreements in order to restore contractual balance and the equivalence of the parties' benefits following changes in the law.

Legal changes that occurred after the aforementioned Agreements were executed include in particular:

  • ordinance of the Minister of Economy of 18 October 2012 on a detailed scope of obligations to obtain and present for redemption origin certificates, pay substitute fees, purchase electricity and industrial heat generated from renewable sources and the obligation to validate data concerning the quantity of electricity generated from renewable sources (Polish Journal of Laws of 2012, item 1229);
  • Act on renewable energy sources of 20 February 2015 (Polish Journal of Laws of 2015, item 478) and associated further legal changes and announced drafts of legal changes, including especially:
    • the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 (Polish Journal of Laws of 2016, item 925); and
    • a draft of the Ordinance of the Minister of Energy concerning changes in the share of electricity resulting from redeemed origin certificates confirming production of electricity from renewable sources, which is to be issued based on an authorisation under art. 12 sec. 5 of the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 and certain other acts,

caused an objective lack of possibilities to develop reliable models to forecast the prices of green certificates.

The Agreements were terminated with the intention for the Company to avoid losses constituting the difference between contractual and market prices of green certificates. Due to the changing legal conditions after termination of the Agreements in 2017, especially arising from the Act of 20 July 2017 on amendment of the act on renewable energy sources, the estimated value of future contract liabilities would have changed. In the current legal framework, this would be significantly lower in comparison to the amount estimated when the Agreements were being terminated, i.e. approx. PLN 1 187 million. This decline reflects a change in the way in which the substitute fee is calculated, which in accordance with the content of some of the Agreements constitutes the basis for calculating the contract price and indexing it to the market price. The Company created a PLN 153 415 thousand provision for potential claims resulting from the terminated Agreements in relation to submissions made by 30 September 2021 concerning transactions to sell property rights by the counterparties; the provision is presented in note 18.

In a case brought by Golice Wind Farm Sp. z o.o. against ENEA S.A., the court issued on 14 August a partial and preliminary ruling, in which it:

  • 1) withdrew a claim seeking the voidance of ENEA S.A.'s termination of an agreement to sell property rights, which took place on 28 October 2016;
  • 2) accepted a claim for the payment of consideration for property rights and ordered ENEA S.A. to pay PLN 6 042 thousand, together with interest;
  • 3) considered the other parts of the claim for payment as justified in general.

This ruling is not final. ENEA S.A. has appealed part of the ruling, i.e. as regards points 2 and 3. Moreover, on 13 January 2021 Golice Wind Farm Sp. z o.o. appealed a part of the ruling, i.e. as regards the ruling in point 1, dismissing the action for a declaration.

In cases brought by PGE Group companies, i.e.:

  • PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1064/17) on 15 June 2021, the court resumed the previously suspended proceeding, and then through a ruling of 6 September 2021 the District Court in Poznań suspended the proceeding at the mutual request of the parties;
  • PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów (file no. IX GC 555/16) through a ruling of 29 June 2021, the court suspended the proceeding at the parties' mutual request;
  • PGE Energia Odnawialna S.A., based in Warsaw (file no. IX GC 1011/17) through a ruling of 16 April 2021, the court resumed the previously suspended proceeding, and through a ruling of 3 August 2021 the District Court in Poznań suspended the proceeding at the mutual request of the parties.

In a case brought by ENEA S.A. against PGE Górnictwo i Energetyka Konwencjonalna S.A. (file no. X GC 608/20) – on 26 October 2020, the court ruled to suspend the proceeding at the parties' mutual request. The ruling is final.

In a case brought by Hamburg Commercial Bank AG against ENEA S.A., in which Hamburg Commercial Bank AG is seeking claims arising under property rights sales contract no. ENEA/WINDPARK ŚNIATOWO/PMOZE/2013 of 26 February 2014, executed between ENEA S.A. and Windpark Śniatowo Management GmbH EW Śniatowo Sp. k. (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice), claiming their purchase under a debt assignment contract, the District Court in Poznań issued on 25 February 2021 a partial ruling, ordering ENEA S.A. to pay PLN 494 thousand, with statutory late interest for the period from 16 December 2016 to the payment date. This ruling is not final. ENEA S.A. submitted a request for a written justification for the ruling. On 2 June 2021, ENEA S.A. lodged an appeal against the entire partial ruling by the District Court in Poznań of 25 February 2021. Within the remaining scope, i.e. concerning the claim extension of 17 January 2019 and claim extension of 20 August 2019, the proceeding is legally

The additional information and explanations presented on pages 9-45 constitute an integral part of these condensed consolidated interim financial statements.

suspended under the order of the District Court in Poznań of 24 October 2019 until a final ruling is issued by this court in case no. IX GC 552/17.

26. Participation in nuclear power plant build program

On 15 April 2015 KGHM Polska Miedź S.A., PGE S.A., TAURON S.A. and ENEA S.A. executed an agreement to purchase shares in PGE EJ 1. KGHM Polska Miedź S.A., TAURON S.A. and ENEA S.A. purchased 10% stakes in PGE EJ 1 each from PGE (30% in total). ENEA paid PLN 16 million for its stake. ENEA S.A.'s overall expenditures on purchasing shares and increasing the company's share capital amounted to PLN 70 902 thousand.

On 1 October 2020, ENEA S.A., PGE S.A., KGHM Polska Miedź S.A. and TAURON S.A. signed a letter of intent with the State Treasury regarding purchase by the State Treasury of a 100% stake in PGE EJ 1. The letter of intent did not commit the parties to the transaction. The decision on the transaction depended on the outcome of negotiations and compliance with other conditions specified in the provisions of law or corporate documents.

On 26 March 2021 ENEA S.A., PGE S.A., TAURON S.A. and KGHM Polska Miedź S.A. executed an agreement with the State Treasury to sell 100% of shares in PGE EJ 1 to the State Treasury (Share Sale Agreement). Pursuant to the Share Sale Agreement, ownership of the PGE EJ 1 shares was transferred on 31 March 2021. ENEA sold 532 523 shares in PGE EJ 1, constituting 10% of its share capital and representing 10% of votes at its general meeting, to the State Treasury, and ceased being a shareholder of PGE EJ1. The sale price for the 100% stake was PLN 531 362 thousand, of which ENEA received PLN 53 136 thousand.

Furthermore, on 26 March 2021, the shareholders executed an Annex to an Agreement of 15 April 2015 with PGE EJ 1 regarding PGE EJ 1's dispute with the WorleyParsons consortium (Agreement). Pursuant to the Annex, the shareholders' liability toward PGE EJ 1 arising from the Agreement as a result of the dispute with the WorleyParsons consortium is now amount-limited, and if the dispute is resolved in PGE EJ 1's favour, the shareholders are eligible to receive appropriate consideration from PGE EJ 1. Information on the dispute between PGE EJ 1 and the WorleyParsons consortium were disclosed by PGE in relevant current reports.

In connection with the State Treasury's purchase of a 100% stake in PGE EJ 1, the shareholders terminated the Shareholder Agreement of 3 September 2014, effective from 26 March 2021.

Pursuant to the Share Sale Agreement of 26 March 2021, the difference between the valuation of PGE EJ 1 as of 31 December 2020 (valuation for transaction purposes) and an updated valuation as of 31 March 2021 (valuation on share transfer date) should be returned by the selling companies to the State Treasury ("Price Adjustment"). Given the above, on 2 June 2021, ENEA S.A. settled the Price Adjustment concerning the sale of its stake in PGE EJ 1, i.e. paid PLN 533 thousand to the State Treasury.

27. Impact of COVID-19 pandemic

A state of epidemic caused by the SARS-Cov-2 coronavirus was introduced in Poland in March 2020. The virus and its effects as well as the effects of actions taken by the state to combat the pandemic have had influence over the condition of the domestic economy. Following the end of another wave of Covid and the implementation of a mass vaccination program, most of the economic restrictions were lifted, which resulted in a clear rebound in macroeconomic indicators. The effects of this affected ENEA Group in the following ways:

  • Higher demand for coal is visible in the Mining segment (approx. 36% in comparison with the same period of 2020).
  • In the Trade segment, the total electricity sales volume went up in the first three quarters of 2021 by 2 562 GWh, or 16%, in comparison with the same period of 2020. This growth was mainly driven by electricity sales in the business customer segment. In the business customer segment, the volume of electricity sales went up by 2 234 GWh, i.e. 20%, and was caused by a higher contracting level for 2021 than in the preceding year. Electricity sales volume in the household segment grew by 104 GWh, i.e. 3%. The volume of gas fuel sales also increased from the same period last year, by 224 GWh, i.e. by 24%. Total revenue from the sale of electricity and gas fuel in the first three quarters of 2021 increased by PLN 693 million, or 15%, in comparison with the same period of 2020. Revenue increased in both the business and household customers segments (by 17% and 10%, respectively).
  • Electricity output in the Generation segment in the first three quarters of 2021 was 16% higher than in the same period of 2020. This translates into higher revenue in this segment (by approx. 15% y/y).
  • In the Distribution segment, the Group recorded higher sales of distribution services to end customers in the first three quarters of 2021 by 6% on a y/y basis, mainly driven by higher sales in tariff groups B and G.
  • From the onset of the pandemic, the Company has been regularly carrying out additional analyses of the COVID-19 pandemic's potential impact on receivables impairment. Expected losses are verified on the basis of these analyses. The level of this additional impairment loss - from the start of these analyses - is negligible from a reporting viewpoint, nonetheless the Group assesses that if restrictions related to the COVID-19 pandemic are maintained and thus economic activity is further reduced, the receivables turnover ratio might deteriorate given a reduced payment capacity on the part of electricity customers.

Due to work being re-organised and because of enhanced safety measures mandated by the state of epidemic and a temporary unavailability of contractors, the Group sees a risk of delays in completing scheduled repairs and modernisations of generation assets, including adaptations to BAT conclusions. The effects of this risk materialising would be visible over time and depend on the current market conditions, among other factors.

At the date on which these condensed consolidated interim financial statements were prepared, it is difficult to predict how the situation will develop in 2021 and the following year and what the potential negative effects for the Parent's and the Group's operating and financing activities will be in the future. Another wave of the virus may cause restrictions to be reinstated and economic activity to slow down. The Group is taking preventive action to reduce this type of risk.

A crisis and coordination command, appointed by the Management Board, is operating at ENEA S.A., and all Group companies have appointed teams that coordinate tasks related to ensuring the continuity of ENEA Group companies' operations in the context of the coronavirus threat. The Management Board of ENEA S.A. is coordinating all activities in this area through the crisis coordination command. The command and teams engage in activities intended to protect the health of employees by providing personal protective equipment (face masks, anti-microbial gels, gloves), implementing safe work rules (including introducing, wherever possible, remote work, limited direct meetings in the workplace, disinfection of rooms, introducing a limit on the number of employees in a room, maintaining safe distances between employees). The precautions taken in order to prevent the spread of the coronavirus have an impact on operating costs, which together with changes in revenue will ultimately affect the consolidated net result.

The COVID-19 pandemic did not have as much impact on LWB's activities in the first three quarters of 2021 as it did in 2020. Additionally, thanks to the crew's intensive efforts and the optimisation of longwall structuring and scheduling, aimed at the optimal use of production capacities, during a period of higher demand for coal, it was possible to achieve very good production results, which translated into improved financial results in the first three quarters of 2021.

Nonetheless, having regard to COVID-19 risks, LWB continues to apply appropriate measures and precautions to safeguard against the negative impact of COVID-19 on its activities and financial results. These especially include personal protective equipment, maintaining distance, appropriate work scheduling and use of shift-based work and remote work wherever possible, as well as appropriate technical measures for prevention purposes.

At the date on which these condensed consolidated interim financial statements were prepared, the Group sees no goingconcern risk.