Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Enea S.A. Interim / Quarterly Report 2020

Sep 3, 2020

5597_rns_2020-09-03_78db640f-2863-4a14-b4b3-f382ebda7db4.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ENEA Group

Consolidated financial statements in compliance with EU IFRS for the financial year ended 31 December 2018

(unless stated otherwise, all amounts expressed in PLN 000s)

CONDENSED SEPARATE INTERIM FINANCIAL STATEMENTS

for the period from 1 January to 30 June 2020 in compliance with EU IFRS

The consolidated statement of cash flows should by analysed in conjunction with additional information and explanations, which

constitute an integral part of the separate financial statements.

023032+11111111111111111

1

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

TABLE OF CONTENTS

SEPARATE STATEMENT OF COMPREHENSIVE INCOME 5
SEPARATE STATEMENT OF FINANCIAL POSITION 6
SEPARATE STATEMENT OF CHANGES IN EQUITY 8
SEPARATE STATEMENT OF CASH FLOWS 9
ADDITIONAL INFORMATION AND EXPLANATIONS 10
General information 10
1. General information on ENEA S.A. 10
2. Group composition 11
3. Management Board and Supervisory Board composition12
4.
5.
Basis for preparing financial statements 13
Accounting rules (policy) and significant estimates and assumptions 13
6. Functional currency and presentation currency 14
Explanatory notes to the separate statement of comprehensive income 15
7. Revenue from sales 15
8. Tax15
Explanatory notes to the separate statement of financial position 16
9. Property, plant and equipment 16
10. Intangible assets 16
11. Investments in subsidiaries, associates and jointly controlled entities 16
Impairment test on shares of ENEA Wytwarzanie Sp. z o.o., ENEA Ciepło Sp. z o.o. and
ENEA Elektrownia Połaniec S.A. 19
12. Inventories20
13. Assets and liabilities arising from contracts with customers 20
14. Cash and cash equivalents 21
15. Profit allocation21
16.
17.
Debt-related liabilities 22
Provisions24
Financial instruments and financial risk management 25
18.
19.
Financial instruments and fair value25
Debt financial assets at amortised cost27
20. Impairment of trade and other receivables30
21. Analysis of the age structure of assets arising from contracts with customers and trade
and other receivables 31
22. Other financial liabilities31
Other explanatory notes 32
23. Related-party transactions 32
24. Conditional liabilities, court proceedings and cases on-going before public administration
organs33
24.1. Impact of tariff for electricity for tariff G customers 33
24.2. Sureties and guarantees 33
24.3. On-going proceedings in courts of general competence 34
24.4. Other court proceedings34

ENEA S.A. Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

24.5. Risk associated with legal status of properties used by ENEA S.A35
24.6. Dispute concerning prices for origin certificates for energy from renewable sources
and terminated agreements for the purchase of property rights arising under origin
certificates for energy from renewable sources 35
25. Participation in nuclear power plant build programme37
26. Impact of COVID-19 pandemic 37
27. Events after the reporting period38

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.

Members of the Management Board

President of the
Management Board
Paweł Szczeszek
Member of the
Management Board
Jarosław Ołowski
Member of the
Management Board
Tomasz Siwak
Member of the
Management Board
Tomasz Szczegielniak
ENEA Centrum Sp. z o.o.
Entity responsible for maintaining accounting
books and preparing financial statements ………………………………………
ENEA Centrum Sp. z o.o. ul. Górecka 1, 60-201 Poznań
KRS 0000477231, NIP 777-000-28-43, REGON 630770227

Poznań, 3 September 2020

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

SEPARATE STATEMENT OF COMPREHENSIVE INCOME

Period
Note 6 months ended
30 June 2020
(unaudited)
3 months ended
30 June 2020
(unaudited)
6 months ended
30 June 2019
(unaudited)
3 months ended
30 June 2019
(unaudited)
Revenue from sales
Excise duty
3 084 264
(33 003)
1 448 976
(14 987)
2 417 774
(35 967)
949 704
(15 106)
Net revenue from sales 7 3 051 261 1 433 989 2 381 807 934 598
Compensations - - 430 401 430 401
Lease income 153 86 - -
Revenue from sales and other income 3 051 414 1 434 075 2 812 208 1 364 999
Other operating revenue 6 222 2 657 4 293 3 506
Change in provision for onerous
contracts
24.1 39 305 14 958 41 004 19 448
Depreciation/amortisation (2 462) (1 267) (2 653) (1 925)
Employee benefit costs (40 343) (20 367) (36 833) (18 890)
Use of materials and raw materials and
value of goods sold
(1 329) (743) (1 001) (553)
Purchase of electricity and gas for sales
purposes
(2 957 180) (1 398 240) (2 707 899) (1 288 810)
Transmission and distribution services (4 428) (2 962) (1 216) (442)
Other third-party services (115 332) (60 758) (99 209) (50 262)
Taxes and fees (3 351) (393) (3 240) (383)
Gain on sale and liquidation of property,
plant and equipment and right-of-use
assets
106 106 432 211
Other operating costs (39 027) (17 609) (36 754) (17 791)
Operating (loss)/profit (66 405) (50 543) (30 868) 9 108
Finance costs (143 118) (59 069) (129 869) (65 704)
Finance income 125 556 60 763 122 738 60 490
Dividend income 350 036 350 036 422 408 422 408
Impairment of interests in subsidiaries,
associates and jointly controlled entities
(538 047) (537 650) - -
Impairment of financial assets at
amortised cost
(138 737) (137 695) (153) (4)
(Loss)/profit before tax (410 715) (374 158) 384 256 426 298
Income tax 37 054 (13 041) (1 375) (4 645)
Net (loss)/profit for the reporting
period
(373 661) (387 199) 382 881 421 653
Other comprehensive income
Subject to reclassification to profit or
loss:
- measurement of hedging instruments
(141 923) (42 184) (7 330) (865)
- income tax
Not subject to reclassification to profit or
loss:
26 965 8 015 1 393 165
- restatement of defined benefit plan
- income tax
(2 870)
545
(2 870)
545
1 133
(215)
1 133
(215)
Net other comprehensive income (117 283) (36 494) (5 019) 218
Comprehensive income for the
reporting period
(490 944) (423 693) 377 862 421 871
Net (loss)/profit attributable to the
Company's shareholders
(373 661) (387 199) 382 881 421 653
Weighted average number of ordinary
shares
441 442 578 441 442 578 441 442 578 441 442 578
Net profit per share (in PLN per
share)
(0.85) (0.88) 0.87 0.96
Diluted profit per share (in PLN per
share)
(0.85) (0.88) 0.87 0.96

The separate statement of comprehensive income should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

SEPARATE STATEMENT OF FINANCIAL POSITION

As at
Note 30 June
2020
31 December
(unaudited) 2019
ASSETS
Non-current assets
Property, plant and equipment 9 24 357 24 070
Right-of-use assets 31 650 33 249
Intangible assets 10 4 327 4 376
Investment properties 13 482 13 755
Investments in subsidiaries, associates and jointly controlled entities 11 12 574 704 12 892 612
Deferred income tax assets 8 122 174 95 395
Financial assets measured at fair value 38 268 38 848
Debt financial assets at amortised cost 19 5 882 505 4 567 870
Finance lease and sublease receivables 1 245 2 610
Costs related to the conclusion of agreements 13 322 12 749
Total non-current assets 18 706 034 17 685 534
Current assets
Inventories 12 270 119 217 460
Trade and other receivables 1 483 959 962 730
Costs related to the conclusion of agreements 12 377 12 646
Assets arising from contracts with customers 13 251 369 215 223
Finance lease and sublease receivables 3 175 3 083
Current income tax receivables 13 819 30 680
Debt financial assets at amortised cost 19 1 654 810 2 801 067
Cash and cash equivalents 14 1 793 957 2 768 210
Total current assets 5 483 585 7 011 099
TOTAL ASSETS 24 189 619 24 696 633

The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

SEPARATE STATEMENT OF FINANCIAL POSITION

As at
Note 30 June
2020
(unaudited)
31 December
2019
EQUITY AND LIABILITIES
Equity
Share capital 588 018 588 018
Share premium 4 627 673 4 627 673
Revaluation reserve - measurement of financial instruments (17 036) (17 036)
Revaluation reserve - measurement of hedging instruments (132 314) (17 356)
Reserve capital 5 690 700 5 690 700
Retained earnings 2 326 194 2 702 180
Total equity 13 083 235 13 574 179
LIABILITIES
Non-current liabilities
Credit facilities, loans and debt securities 16 7 232 047 7 742 980
Other liabilities - 80 123
Lease liabilities 27 099 30 970
Employee benefit liabilities 61 457 58 693
Financial liabilities measured at fair value 18 167 685 23 802
Total non-current liabilities 7 488 288 7 936 568
Current liabilities
Credit facilities, loans and debt securities 16 1 408 435 2 088 642
Trade and other payables 747 143 567 409
Liabilities arising from contracts with customers 13 5 501 12 631
Lease liabilities 6 913 5 470
Employee benefit liabilities 28 476 28 872
Liabilities concerning the equivalent for rights to free purchase of shares 281 281
Other financial liabilities 22 727 146 52 599
Provisions for other liabilities and other charges 17 694 201 429 982
Total current liabilities 3 618 096 3 185 886
Total liabilities 11 106 384 11 122 454
TOTAL EQUITY AND LIABILITIES 24 189 619 24 696 633

The separate statement of financial position should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

SEPARATE STATEMENT OF CHANGES IN EQUITY

Share
capital
(nominal
amount)
Reserve
for
revaluation
and
merger
accounting
Total
share
capital
Share
premium
Revaluation
reserve
-
measurement
of
financial
instruments
Revaluation
reserve
-
measurement
of
hedging
instruments
Reserve
capital
Retained
earnings
Total
equity
As
at
1
January
2019
441 443 146 575 588 018 4
627
673
(17
036)
(15
986)
4
963
564
3
149
613
13
295
846
Net
profit
for
the
reporting
period
- - - - - - - 382 881 382 881
Net
other
comprehensive
income
- - - - - (5
937)
- 918 (5
019)
Net
comprehensive
income
recognised
in
the
period
- - - - - (5
937)
- 383 799 377 862
Allocation
of
net
profit
-
transfer
- - - - - - 727 136 (727
136)
-
As
at
30
June
2019
(unaudited)
441 443 146 575 588 018 4
627
673
(17
036)
(21
923)
5
690
700
2
806
276
13
673
708

Share
capital
(nominal
amount)
Reserve
for
revaluation
and
merger
accounting
Total
share
capital
Share
premium
Revaluation
reserve
-
measurement
of
financial
instruments
Revaluation
reserve
-
measurement
of
hedging
instruments
Reserve
capital
Retained
earnings
Total
equity
As
at
1
January
2020
441 443 146 575 588 018 4
627
673
(17
036)
(17
356)
5
690
700
2
702
180
13
574
179
Net
loss
for
the
reporting
period
Net
other
comprehensive
income
-
-
-
-
-
-
-
-
-
-
-
(114
958)
-
-
(373
661)
(2
325)
(373
661)
(117 283)
Net
comprehensive
income
recognised
in
the
period
- - - - - (114
958)
- (375
986)
(490
944)
As
at
30
June
2020
(unaudited)
441 443 146 575 588 018 4
627
673
(17
036)
(132
314)
5
690
700
2
326
194
13
083
235

The separate statement of changes in equity should by analysed in conjunction with the additional information and explanations, which constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

SEPARATE STATEMENT OF CASH FLOWS

Period
Note 6 months ended
30 June 2020
(unaudited)
6 months ended
30 June 2019
(unaudited)
Cash flows from operating activities
Net (loss)/profit for the reporting period
Adjustments:
(373 661) 382 881
Income tax in profit or loss (37 054) 1 375
Depreciation/amortisation
Gain on sale and liquidation of property, plant and equipment
2 462
(106)
2 653
(432)
Loss on sale of financial assets 4 632 1 059
Interest income (103 148) (99 515)
Dividend income
Interest costs
(350 036)
127 816
(422 408)
115 624
Impairment of interests 538 047 -
Impairment of financial assets at amortised cost 138 737 153
Total adjustments 321 350 (401 491)
Paid income tax (9 005) (52 204)
Flows resulting from settlements within tax group
Changes in working capital:
105 306 36 173
Inventories (52 659) (47 118)
Trade and other receivables (206 795) (439 560)
Trade and other payables
Employee benefit liabilities
(39 817)
(502)
277 512
748
Provisions for other liabilities and other charges 44 819 (93 551)
Total changes in working capital (254 954) (301 969)
Net cash flows from operating activities (210 964) (336 610)
Cash flows from investing activities
Purchase of non-current property, plant and equipment and intangible assets (77) -
and right-of-use assets
Proceeds from sale of non-current property, plant and equipment and intangible
assets and right-of-use assets 106 432
Purchase of financial assets (1 804 000) (360)
Proceeds from sale of financial assets
Purchase of subsidiaries
1 584 246
-
97 129
(5 400)
Purchase of associates and jointly controlled entities (696) (181 269)
Received interest 114 011 99 739
Net cash flows from investing activities (106 410) 10 271
Cash flows from financing activities
Bond issuance - 1 000 000
Repayment of credit and loans
Bond buy-back
(81 040)
(1 106 255)
(71 040)
(78 055)
Expenditures concerning lease payments (2 741) (3 068)
Expenditures concerning future bond issues - (195)
Interest paid
Net cash flows from financing activities
(141 390)
(1 331 426)
(112 456)
735 186
Total net cash flows (1 648 800) 408 847
Cash at the beginning of reporting period
14
2 715 611 999 193
Cash at the end of reporting period
14
1 066 811 1 408 040

The separate statement of cash flows should by analysed in conjunction with the additional information and explanations, which constitute an integral part of the condensed separate interim financial statements

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

ADDITIONAL INFORMATION AND EXPLANATIONS

General information

1. General information on ENEA S.A.

Name: ENEA Spółka Akcyjna
Legal form: Spółka Akcyjna (joint-stock company)
Country of registered office: Poland
Registered office: Poznań
Address: ul. Górecka 1, 60-201 Poznań
KRS: 0000012483
Telephone number: (+48 61) 884 55 44
Fax number: (+48 61) 884 59 59
E-mail: [email protected]
Website: www.enea.pl
REGON number: 630139960
NIP number: 777-00-20-640

ENEA S.A. ("ENEA," "Company"), back then operating as Energetyka Poznańska S.A., was entered into the National Court Register at the District Court in Poznań on 21 May 2001, under KRS number 0000012483.

As at 30 June 2020, ENEA S.A.'s shareholding structure was as follows:

Poland's State Treasury Other shareholders Total
As at 30 June 2020 51.50% 48.50% 100.00%

As at 30 June 2020, the Parent's highest-level controlling entity was the State Treasury.

As at 30 June 2020, ENEA S.A.'s statutory share capital amounted to PLN 441 443 thousand (PLN 588 018 thousand after restatement to EU IFRS, taking into account hyperinflation and other adjustments) and was divided into 441 442 578 shares.

The Company's duration is indefinite. Its activities are conducted on the basis of relevant concessions issued for the Company.

The Company's condensed separate interim financial statements cover the 6-month period ended 30 June 2020 and contain comparative data for the 6-month period ended 30 June 2019 and as at 31 December 2019.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

2. Group composition

As at 30 June 2020, ENEA Group consisted of the parent - ENEA S.A., 15 subsidiaries, 9 indirect subsidiaries, 2 associates and 2 jointly controlled entities.

The main business activity of ENEA S.A. is trade of electricity.

Company name Activity Registered
office
ENEA S.A.'s stake
in total number of
voting rights
as at
30 June 2020
ENEA S.A.'s stake
in total number of
voting rights
as at
31 December 2019
SUBSIDIARIES
1. ENEA Operator Sp. z o.o. distribution Poznań 100% 100%
2. ENEA Wytwarzanie Sp. z o.o. generation Świerże Górne 100% 100%
3. ENEA Elektrownia
Połaniec S.A.
generation Połaniec 100% 100%
4. ENEA Oświetlenie Sp. z o.o. other activity Szczecin 100% 100%
5. ENEA Trading Sp. z o.o. trade Świerże Górne 100% 100%
6. ENEA Logistyka Sp. z o.o. other activity Poznań 100% 100%
7. ENEA Serwis Sp. z o.o. distribution Lipno 100% 100%
8. ENEA Centrum Sp. z o.o. other activity Poznań 100% 100%
9. ENEA Pomiary Sp. z o.o. distribution Poznań 100% 100%
10. ENERGO-TOUR Sp. z o.o.
w likwidacji
other activity Poznań 100%5 100%5
11. ENEA Innowacje Sp. z o.o. other activity Warsaw 100% 100%
12. Lubelski Węgiel
BOGDANKA S.A.
mining Bogdanka 65.99% 65.99%
13. Annacond Enterprises
Sp. z o.o. w likwidacji
distribution Warsaw 6
-
61%
14. ENEA Ciepło Sp. z o.o. generation Białystok 99.94% 99,94%
15. ENEA Ciepło Serwis Sp. z o.o. generation Białystok 100% 100%
16. ENEA Nowa Energia Sp. z o.o. generation Poznań 100% 100%
INDIRECT SUBSIDIARIES
17. ENEA Bioenergia Sp. z o.o. generation Połaniec 100%1 100%1
18. ENEA Połaniec Serwis
Sp. z o.o.
generation Połaniec 100%1 100%1
19. Przedsiębiorstwo Energetyki
Cieplnej Sp. z o.o.
generation Oborniki 99.93%2 99.93%2
20. Miejska Energetyka Cieplna
Piła Sp. z o.o.
generation Piła 71.11%2 71.11%2
21. EkoTRANS Bogdanka
Sp. z o.o.
mining Bogdanka 65.99%3 65.99%3
22. RG Bogdanka Sp. z o.o. mining Bogdanka 65.99%3 65.99%3
23. MR Bogdanka Sp. z o.o. mining Bogdanka 65.99%3 65.99%3
24. Łęczyńska Energetyka
Sp. z o.o.
mining Bogdanka 58.53%3 58.53%3
25. ENEA Badania i Rozwój
Sp. z o.o.
other activity Świerże Górne 100%4 100%4
JOINTLY CONTROLLED ENTITIES
26. Polska Grupa Górnicza S.A. - Katowice 7.66% 7.66%
27. Elektrownia Ostrołęka
Sp. z o.o.
- Ostrołęka 50% 50%
ASSOCIATES
28. Polimex – Mostostal S.A. - Warsaw 16.48% 16.48%
29. ElectroMobility Poland S.A. - Warsaw 25% 25%

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

  • 1 indirect subsidiary through stake in ENEA Elektrownia Połaniec S.A.
  • 2 indirect subsidiary through stake in ENEA Wytwarzanie Sp. z o.o.
  • 3 indirect subsidiary through stake in Lubelski Węgiel BOGDANKA S.A.
  • 4 indirect subsidiary through stake in ENEA Innowacje Sp. z o.o.

5 – on 30 March 2015 the company's extraordinary general meeting adopted a resolution on the dissolution of the company following a liquidation proceeding; the resolution entered into force on 1 April 2015. An application for the company to be removed from the National Court Register was filed on 5 November 2015. At the date on which these condensed separate interim financial statements were prepared, procedural activities connected with removing the entity from the National Court Register were in progress.

6 – on 24 February 2020 Annacond Enterprises Sp. z o.o. w likwidacji was removed from the National Court Register.

3. Management Board and Supervisory Board composition

Management Board

As at As at
30 June 2020 Appointment 31 December 2019 Resignation
President of the Management Board Paweł Szczeszek 30 June 2020 Mirosław Kowalik 5 June 2020
Member of the Management Board,
responsible for finance Jarosław Ołowski Jarosław Ołowski
Member of the Management Board,
responsible for sales Piotr Adamczak Piotr Adamczak 10 August 2020
Member of the Management Board,
responsible for corporate affairs Zbigniew Piętka Zbigniew Piętka 24 July 2020

Supervisory Board

As at As at
30 June 2020 Appointment 31 December 2019 End of term /
resignation
Chairperson of the Supervisory
Board
Izabela Felczak
Poturnicka
19 March 2020 Stanisław Hebda 6 February 2020
Deputy Chairperson of the
Supervisory Board
Roman Stryjski Mariusz Pliszka
Secretary of the Supervisory
Board
Michał Jaciubek Michał Jaciubek
Member of the Supervisory Board Maciej Mazur Maciej Mazur
Member of the Supervisory Board Piotr Mirkowski Piotr Mirkowski
Member of the Supervisory Board Paweł Koroblowski Paweł Koroblowski
Member of the Supervisory Board Ireneusz Kulka Ireneusz Kulka
Member of the Supervisory Board Mariusz Pliszka Roman Stryjski
Member of the Supervisory Board Mariusz Fistek 19 March 2020

On 27 May 2020, the Company received statements from the Minister of State Assets of the same date on exercise of his authorisation to appoint and dismiss a member of ENEA S.A.'s Supervisory Board pursuant to § 24 sec. 1 of the Company's Articles of Association. According to these statements, the Minister of State Assets dismissed Mr. Bartosz Nieścior from the Company's Supervisory Board, effective from 27 May 2020, and appointed Mr. Paweł Szczeszek to the Company's Supervisory Board, effective from the same date.

On 4 June 2020 Mr. Mirosław Kowalik tendered his resignation as President and member of ENEA S.A.'s Management Board, effective from 5 June 2020. On the same date, the Company's Supervisory Board adopted a resolution delegating Supervisory Board Member Paweł Szczeszek to temporarily serve as President of ENEA S.A.'s Management Board, effective from 6 June 2020 until a new Management Board President is appointed, however not later than three months counting from the delegation date.

In connection with Mr. Paweł Szczeszek being appointed as President of ENEA S.A.'s Management Board on 30 June 2020, Mr. Paweł Szczeszek's mandate as Member of the Company's Supervisory Board expired.

On 22 July 2020 Mr. Zbigniew Piętka tendered his resignation as Member of ENEA S.A.'s Management Board for

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Corporate Affairs, effective from 24 July 2020.

On 23 July 2020 Mr. Piotr Adamczak tendered his resignation as Member of ENEA S.A.'s Management Board for Trade, effective from 10 August 2020.

On 7 August 2020, the Company's Supervisory Board adopted a resolution appointing Mr. Tomasz Szczegielniak as Member of ENEA S.A.'s Management Board for Corporate Affairs.

On 7 August 2020, the Company's Supervisory Board adopted a resolution appointing Mr. Tomasz Siwak as Member of ENEA S.A.'s Management Board for Trade, effective from 17 August 2020.

The following table presents the composition of the Management Board as at the date on which these consolidated financial statements were prepared:

As at
3 September 2020
President of the Management Board Paweł Szczeszek
Member of the Management Board for Finance Jarosław Ołowski
Member of the Management Board for Trade Tomasz Siwak
Member of the Management Board for Corporate Affairs Tomasz Szczegielniak

4. Basis for preparing financial statements

These condensed separate interim financial statements are prepared in accordance with the requirements of IAS 34 Interim Financial Reporting, as endorsed by the European Union, and are approved by the Management Board of ENEA S.A.

The Company's Management Board used its best knowledge as to the application of standards and interpretations as well as methods and rules for the measurement of items in ENEA S.A.'s condensed separate interim financial statements in accordance with EU IFRS as at 30 June 2020. The presented tables and explanations are prepared with due diligence. These condensed separate interim financial statements have been reviewed by a statutory auditor. The accounting rules are applied consistently across all of the presented periods unless stated otherwise.

These condensed separate interim financial statements are prepared on a going concern basis for the foreseeable future. There are no circumstances such as would indicate a threat to the Company's going concern.

The Company prepares condensed consolidated interim financial statements for ENEA Group in accordance with IFRS EU as at and for the 6-month period ending 30 June 2020. In order to obtain full information on ENEA Group's financial situation and results, readers of ENEA S.A.'s condensed separate interim financial statements should read these in conjunction with ENEA Group's condensed consolidated interim financial statements and ENEA S.A.'s separate annual financial statements for the financial year ended on 31 December 2019.

5. Accounting rules (policy) and significant estimates and assumptions

These condensed separate interim financial statements are prepared using accounting rules that are consistent with the rules used in preparing the most recent annual separate financial statements for the financial year ended 31 December 2019.

Preparing condensed separate interim financial statements in accordance with EU IFRS requires the Management Board to adopt certain assumptions and make estimates that have an impact on the adopted accounting rules and the amounts shown in condensed separate interim financial statements and notes to financial statements. Assumptions and estimates are based on the Management Board's best knowledge regarding current and future events and activities. However, actual results may differ from forecasts. The estimates used in preparing these condensed separate interim financial statements are consistent with the estimates used in preparing the separate financial statements for the most recent financial year. The estimated values presented in previous financial years do not have a material impact on the present interim period.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

6. Functional currency and presentation currency

Items in the Company's financial statements are measured in the currency of the main economic environment in which the Company operates (functional currency).

The condensed separate interim financial statements are presented in Polish zloty (PLN), which is the functional currency and presentation currency. Items in financial statements are rounded to full thousands of zlotys (PLN 000s), unless otherwise stated.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Explanatory notes to the separate statement of comprehensive income

7. Revenue from sales

Net revenue from sales

6-month period ended
30 June 2020 30 June 2019
Revenue from the sale of electricity 2 980 428 2 315 324
Revenue from the sale of gas 68 456 64 783
Revenue from the sale of other services 2 377 1 700
Total net revenue from sales 3 051 261 2 381 807

The Company recognises revenue when an obligation to provide a consideration by the provision of a promised good or service to the customer is performed (or is being performed). Revenue is recognised on the basis of prices specified in sale agreements, less estimated rebates and other deductions.

The key groups of contracts include electricity sale contracts (including framework contracts) for retail, business, key and strategic customers. Under these contracts, service is provided in a continuous manner and the level of revenue depends on usage.

The standard payment deadline for invoices for the sale of electricity is 14 days from VAT invoice date. In the case of business, key and strategic customers, payment deadlines may be negotiated.

Presented below is revenue from sales, divided into categories that reflect how economic factors influence the amount, payment deadline and the uncertainty of revenue and cash flows.

6-month period ended
30 June 2020 30 June 2019
Revenue from continuous services 3 048 884 2 380 107
Revenue from services provided at specified time 2 377 1 700
Total 3 051 261 2 381 807

8. Tax

Deferred income tax

Changes in deferred income tax provision (after offsetting assets and provision) are as follows:

6-month period
ended
Year ended
30 June 2020 31 December 2019
As at the beginning of period 95 395 98 432
Adjustment due to implementation of IFRS 16 - 7 422
As at the beginning of period, adjusted 95 395 105 854
Change recognised in profit or loss (731) (11 632)
Change recognised in other comprehensive income 27 510 1 173
As at the end of period 122 174 95 395

In the 6-month period ended 30 June 2020, the Company's profit before tax was charged as a result of a decrease in net deferred income tax assets by PLN 731 thousand (in the 6-month period ended 30 June 2019 the charge to the Company's profit before tax as a result of a decrease in net deferred income tax assets amounted to PLN 1 622 thousand).

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Explanatory notes to the separate statement of financial position

9. Property, plant and equipment

In the 6-month period ending 30 June 2020 the Company purchased property, plant and equipment items for a total of PLN 678 thousand net (in the 6-month period ending 30 June 2019: PLN 33 thousand net).

In the 6-month period ending 30 June 2020 the Company purchased property, plant and equipment items for a total of PLN 0 thousand net (in the 6-month period ending 30 June 2019: PLN 0 thousand net).

As at 30 June 2020, no indications for the impairment of property, plant and equipment were identified. No collateral is established on property, plant and equipment.

10. Intangible assets

In the 6-month period ending 30 June 2020 the Company did not purchase intangible assets (in the 6-month period ending 30 June 2019: PLN 0 thousand).

In the 6-month period ending 30 June 2020 the Company did not liquidate intangible assets (in the 6-month period ending 30 June 2019: PLN 0 thousand).

As at 30 June 2020, no indications of possible impairment were identified. No collateral is established on intangible assets.

11. Investments in subsidiaries, associates and jointly controlled entities

Change in investments in subsidiaries, associates and jointly controlled entities

6-month period
ended
Year ended
30 June 2020 31 December 2019
As at the beginning of period 12 892 612 12 794 956
Purchase of investments 220 139 391 743
Sale of investments - (79)
Change in impairment (521 020) (293 621)
Other changes (17 027) (387)
As at the end of period 12 574 704 12 892 612

Impairment of investments

6-month period
ended
Year ended
30 June 2020 31 December 2019
As at the beginning of period 1 373 264 1 079 643
Created 538 047 532 384
Reversed - (238 763)
Used (17 027) -
As at the end of period 1 894 284 1 373 264

Implementation of project to build Elektrownia Ostrołęka C

At 30 June 2020, ENEA S.A. held 9 124 821 shares of Elektrownia Ostrołęka Sp. z o.o., with a nominal value of PLN 50 each and total nominal value of PLN 456 241 thousand.

On 23 December 2019, ENEA S.A. and ENERGA S.A. executed a loan agreement with Elektrownia Ostrołęka Sp. z o.o. regarding a loan from ENERGA S.A. to Elektrownia Ostrołęka Sp. z o.o. of up to PLN 340 000 thousand until 26 February 2021. The agreement entails a conditional sale to ENEA S.A. (if the circumstances indicated in point 1.8 of the Agreement

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

of 30 April 2019 between ENEA S.A. and ENERGA S.A. materialise) of half of ENERGA S.A.'s liability toward Elektrownia Ostrołęka Sp. z o.o., with a payment deadline of 31 January 2021, for a price equal to the nominal amount of the debt being sold, covering especially the principal and interest as at 31 January 2021. Under the loan agreement, ENEA S.A. will be required to pay the price for the debt being purchased on 31 January 2021. ENERGA S.A. paid out the first tranche of the loan to Elektrownia Ostrołęka Sp. z o.o., amounting to PLN 160 000 thousand, on 23 December 2019, the second tranche, amounting to PLN 17 000 thousand, on 13 January 2020, and the third tranche, amounting to PLN 163 000 thousand, on 22 April 2020. As of 30 June 2020, the condition referred to above was met for the second and third tranche of the loan (the condition for the first tranche had already been met in December 2019), amounting to PLN 180 000 thousand. In connection with this, as at 30 June 2020 ENEA S.A. recognised a future receivable concerning the two aforementioned tranches in a total amount of PLN 90 000 thousand, plus interest of PLN 1 299 thousand, and a liability toward ENERGA S.A. of the same amount.

On 30 April 2020, PKN Orlen S.A. completed the process of accounting for all transactions to purchase ENERGA S.A. shares following a tender offer to subscribe for the sale of all shares issued by ENERGA S.A., announced by PKN Orlen S.A. on 5 December 2019. As a result of the tender offer, PKN Orlen S.A. purchase 331 313 082 shares of ENERGA S.A., which constitutes approx. 80% of ENERGA S.A.'s share capital and approx. 85% of voting rights at ENERGA S.A.'s general meeting.

On 13 February 2020, ENEA S.A. executed an agreement with ENERGA S.A. suspending financing by ENERGA S.A. and ENEA S.A. for the project to build Elektrownia Ostrołęka C. In the agreement, ENEA S.A. and ENERGA S.A. undertook to carry out analyses, especially concerning the project's technical, technological, economic and organisational parameters and further financing.

ENERGA S.A. and ENEA S.A. assumed that suspending financing for the project would result in the company having to suspend its contract executed on 12 July 2018 to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW, along with a contract to convert rail infrastructure for Elektrownia Ostrołęka C of 4 October 2019.

On 14 February 2020, Elektrownia Ostrołęka Sp. z o.o. issued to the General Contractor for the contract to build Elektrownia Ostrołęka C with capacity of approx. 1000 MW of 12 July 2018 a notice to suspend all works related to that contract, effective 14 February 2020.

On 18 April 2020, an agreement was signed between PKN Orlen and the State Treasury regarding PKN Orlen's planned acquisition of ENERGA S.A. The parties to the agreement envisaged that once PKN Orlen obtains control over ENERGA S.A., ENERGA S.A.'s flagship investments will be continued. PKN Orlen declared that immediately after assuming control over ENERGA S.A. it would review the terms for continuing these investments, especially the construction of Elektrownia Ostrołęka C.

On 7 May 2020, ENERGA S.A. announced that it was extending the analysis period in project Ostrołęka C. In accordance with the current report, it was assumed that analytical work would continue for about a month.

As part of the analytical work performed under the agreement, ENEA S.A. and ENERGA S.A. worked on updating business and technical assumptions as well as assumptions concerning the financing structure within the financial model. On ENERGA S.A.'s part, the results of this work were provided to Elektrownia Ostrołęka Sp. z o.o. on 14 May 2020, when the company received calculations concerning the Project's profitability in the coal fuel variant. These results were used by the company to perform a CGU test. The CGU test carried out by the company shows that completing the Project would generate a negative value, meaning that continuing the Project would be unjustified.

On 19 May 2020, PKN Orlen S.A., which held an 80% stake in ENERGA S.A.'s share capital and an 85% stake in its voting rights, published current report 31/2020, announcing that it had issued a statement to ENERGA in response to a question submitted by ENERGA S.A. to PKN Orlen S.A. regarding its intent to directly invest in the construction of a coalbased energy-generation unit, being implemented by Elektrownia Ostrołęka Sp. z o.o., based in Ostrołęka (Investment).

PKN Orlen S.A. declared preliminary readiness to directly invest in the Investment only if the Investment's technological assumptions were to be changed to gas-based technology. PKN Orlen S.A. also declared readiness to hold discussions with the company's shareholders, i.e. ENERGA S.A. and ENEA S.A., regarding the form, extent and means of investing in the aforementioned Investment.

Furthermore, on 19 May 2020 ENERGA S.A. published current report 41/2020, announcing that on 19 May 2020 it had received from PKN Orlen S.A., majority shareholder in ENERGA S.A., a declaration of preliminary readiness to directly invest in the construction of a power-generation unit by Elektrownia Ostrołęka Sp. z o.o. The declaration constituted a response to ENERGA S.A.'s question addressed to PKN Orlen S.A. and was made only on the condition that the Investment's technological assumptions would be changed to gas fuel, which is one of the scenarios being analysed, as announced by ENERGA S.A. in current reports 8/2020 of 13 February 2020, 11/2020 of 23 February 2020 and 38/2020 of 7 May 2020.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

On 19 May 2020, ENEA S.A. received an electronic copy of Resolution no. 39/2020 of the Management Board of Elektrownia Ostrołęka Sp. z o.o. of 19 May 2020 regarding recognition of impairment losses on the book value of the Company's assets. As a result of an impairment test on non-current assets performed at Elektrownia Ostrołęka Sp. z o.o., which followed an update of business assumptions by Elektrownia Ostrołęka Sp. z o.o. regarding the construction of power plant Ostrołęka C based on coal technology, the consolidated financial statements for 2019 include ENEA S.A.'s share of the net loss generated by Elektrownia Ostrołęka Sp. z o.o. Given the fact that it was higher than the value of the stake in this company, it was reduced to zero. At 30 June 2020, ENEA S.A.'s stake in Elektrownia Ostrołęka Sp. z o.o. was worth PLN 0.

On 2 June 2020 the Management Board of ENEA S.A. accepted a final report on analyses conducted in collaboration with ENERGA S.A. regarding the project's technical, technological, economic, organisational and legal aspects and further financing. Conclusions from these analyses do not justify continuing the project in its existing form, i.e. the construction of a power plant generating electricity in a process of hard coal combustion. This evaluation is driven by the following:

1) regulatory changes at the EU level and the credit policy of certain financial institutions, which show that there is far greater access to financing for energy projects based on gas than coal;

and

2) the acquisition of control over Energa by PKN Orlen S.A., the strategy of which does not include investments in electricity generation based on coal combustion.

At the same time, technical analysis confirmed the viability of a variant in which the power plant would use gas ("Gas Project") at the current location of the coal unit being built. As a result of the above, the Management Board of ENEA S.A. decided to continue building a generating asset in Ostrołęka and change the fuel source from coal to gas.

On 2 June 2020, a three-party agreement was executed between ENEA S.A., ENERGA S.A. and PKN Orlen S.A., spelling out the following key cooperation rules for the Gas Project:

  • subject to the reservations expressed below, continue cooperation between the Company and ENERGA S.A. via the existing special-purpose vehicle, i.e. Elektrownia Ostrołęka Sp. z o.o., and settle costs related to the Project between ENEA S.A. and ENERGA S.A., along with settlements with Project contractors, in accordance with the existing rules,
  • take into account PKN Orlen S.A.'s potential role in the Gas Project as a new shareholder,
  • ENEA S.A.'s participation in the Gas Project as a minority shareholder with an investment cap, as a result of which the Company will not be an entity co-controlling Elektrownia Ostrołęka Sp. z o.o.,
  • subject to the essential corporate approvals, execute a new shareholders agreement regarding the Gas Project that incorporates the aforementioned cooperation rules,
  • undertake activities intended to secure financing for the Gas Project by ENERGA S.A. together with PKN Orlen S.A.

In connection with the above, as at 30 June 2020 the Company recognised an indication for an additional impairment of loans issued to Elektrownia Ostrołęka Sp. z o.o. (SPV):

  • resulting from an agreement of 30 September 2019 assigning rights under a loan agreement of 17 July 2019, issued to the SPV by ENERGA S.A. of PLN 29 000 thousand, an impairment loss of PLN 12 070 thousand,
  • resulting from an agreement executed on 23 December 2019 between ENERGA S.A., the SPV and ENEA S.A. of PLN 340 000 thousand, of which ENEA S.A. is required to buy half from ENERGA S.A., i.e. PLN 170 000 thousand, an impairment loss of PLN 124 583 thousand.

Impairment of loans issued to Elektrownia Ostrołęka Sp. z o.o. as at 30 June 2020 amounted to PLN 204 508 thousand, together with interest (the value of loans was written down to zero). The total impairment loss on the loans issued to Elektrownia Ostrołęka Sp. z o.o. recognised in the six-month period ended 30 June 2020 was PLN 138 737 thousand, and this amount was recognised in the consolidated statement of comprehensive income in the item "Impairment of financial assets at amortised cost."

Moreover, in connection with a settlement proposal presented by the General Contractor on 23 June regarding an investment consisting of the construction of the Ostrołęka C power plant based on coal, a provision of PLN 219 400 thousand was recognised (this amount was included in the consolidated statement of comprehensive income in the item "Share of results of associates and jointly controlled entities") for future investment liabilities toward Elektrownia Ostrołęka Sp. z o.o. and ENERGA S.A. The amount of this provision, because of a high level of uncertainty as to the final amounts of claims, is the best possible estimate, based on the General Contractors, among other things. The amount and justification for claims are currently being carefully analyses by Elektrownia Ostrołęka Sp. z o.o.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

ENEA S.A.'s commitment to provide funding for Elektrownia Ostrołęka Sp. z o.o. resulting from the existing agreements (especially the agreements dated 28 December 2018 and 30 April 2019) that is still outstanding amounts to PLN 620 million. Having regard to the above, the Company does not have sufficient information on any potential additional contributions, on top of those above, or their potential deadlines. The commitment resulting from these agreements (especially the agreements dated 28 December 2018 and 30 April 2019) can be fulfilled based on future arrangements resulting from the agreement dated 2 June 2020.

Impairment test on shares of ENEA Wytwarzanie Sp. z o.o., ENEA Ciepło Sp. z o.o. and ENEA Elektrownia Połaniec S.A.

As at 30 June 2020, based on information and analyses in our possession concerning changes in the market prices of CO2 emission allowances, electricity, energy origin certificates as well as macroeconomic forecasts related to the COVID-19 pandemic caused by the SARS-COV-2 virus, and in connection with market capitalisation being below ENEA S.A.'s equity, the Company carried out an impairment test on the shares of ENEA Wytwarzanie Sp. z o.o., ENEA Ciepło Sp. z o.o. and ENEA Elektrownia Połaniec S.A.

Recoverable value is calculated as the sum total of the useful value of each CGU being part of ENEA Wytwarzanie Sp. z o.o., ENEA Ciepło Sp. z o.o. and ENEA Elektrownia Połaniec S.A., less financial liabilities. CGUs' useful values are specified using the discounted cash flow approach for periods longer than 5 years. The projection timeframe results from a combination of the economic useful value of each CGU and the long-term impact of existing and announced legal regulations. For generation assets with periods of economic use exceeding the projection period, a residual value was specified.

Based on this methodology and assumptions, ENEA S.A. identified during a semi-annual review a decline in the recoverable value of its stake in ENEA Wytwarzanie Sp. z o.o. to PLN 4 282 531 thousand, as compared to its book value. Given the above, the necessity to recognise an impairment loss on the stake in ENEA Wytwarzanie Sp. z o.o., amounting to PLN 317 908 thousand, was identified.

The key assumptions used in the tests are the result of the Company's and its subsidiaries' best knowledge and experience in electricity generation from various sources, taking into account the specific nature of the products of each CGU as well as events that have taken place or are expected in the future at ENEA Group.

The following changes in the adopted calculation assumptions took place in comparison to the tests presented in the financial statements for 2019 (changes in price parameters are expressed in 2020 fixed prices):

  • wholesale base electricity price: lower prices for the comparative period 2021-2042 by an average of 10 PLN/MWh,
  • prices of energy origin certificates (renewables and cogeneration): the support system for renewables until 2031 was taken into account, and specific renewables plants will use support within a 15-year period; prices in the period 2021-2031 will be on average 1 PLN/MWh lower than the analyses for 2019,
  • prices of CO2 emission allowances: prices 4 EUR/t higher on average, comparing to the same period in 2021- 2042,
  • prices of biomass: during the entire period, down by an average of approx. 5.7 PLN/GJ in comparison to analyses for 2019,
  • prices of coal: an average decline of approx. 0.30 PLN/GJ in comparison to analyses for 2019 is expected,
  • nominal discount rate 5.03% [discount rate before tax is 5.81%]. The Company used a 2% premium on cost of own capital for specific risk for the analysed CGUs. The discount rate taking into account the specific risk premium was 5.59% [discount rate taking into account the specific risk premium before tax was 6.37%],

Given the substantial decrease in interest rates and thus a lower discount rate used in the current analyses in comparison to the tests for 2019, a sensitivity analysis for this parameter was deemed necessary.

The following shows the sensitivity analysis for the discount parameters on the total recoverable value (starting point) for the stake in ENEA Wytwarzanie Sp. z o.o.:

Impact of change in discount rate (starting point 5.59%)

Change in assumptions -0.5 pp Output value +0.5 pp
Change in recoverable value of ENEA Wytwarzanie 668 364 4 282 531 (566 062)

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Based on information regarding impairment tests on the non-financial non-current assets of Lubelski Węgiel Bogdanka S.A., ENEA S.A. analysed the impairment tests on its stakes. The result of this analysis shows that the recoverable value of shares remains above the balance sheet value of the shares held by ENEA S.A. as at 30 June 2020, in connection with which the Company did not recognise the results of this analysis in its accounting books in this reporting period.

12. Inventories

Inventories

As at
30 June 2020 31 December 2019
Energy origin certificates 269 174 216 449
Goods 945 1 011
Total 270 119 217 460

No collateral is established on inventory. Inventory is not subject to an impairment loss.

Energy origin certificates

6-month period
ended
Year ended
30 June 2020 31 December 2019
Net value at the beginning of period 216 449 332 360
Purchase 213 636 310 378
Depreciation (160 911) (426 289)
Net value at the end of period 269 174 216 449

Costs connected with redeeming energy origin certificates are presented in profit or loss in the following item: Purchase of electricity and gas for sales purposes

13. Assets and liabilities arising from contracts with customers

Assets and liabilities arising from contracts with customers

Assets arising from
contracts with
customers
Liabilities arising from
contracts with customers
As at 1 January 2019 227 480 -
Change in non-invoices receivables (12 259) -
Change in impairment 2 -
Other changes - 12 631
As at 31 December 2019 215 223 12 631
Change in non-invoices receivables 36 152 -
Change in impairment (6) -
Other changes - (7 130)
As at 30 June 2020 251 369 5 501

The balance of assets arising from contracts with customers mainly covers uninvoiced electricity sales, while the balance of liabilities arising from contracts with customers covers liabilities concerning sales adjustments related to the Act on amendment of the act on excise duty and certain other acts.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

14. Cash and cash equivalents

Significant judgements and estimates

In accordance with ENEA S.A.'s credit risk assessment rules and the provisions of IFRS 9 as regards impairment tests for cash and cash equivalents as at 30 June 2020; the Company sees potential impact as negligible.

Presentation of deposits at clearinghouse IRGiT

These are funds constituting collateral for settlements with the clearing-house IRGiT, and they are analysed in terms of the possibility to free them up without incurring a substantial loss.

Cash and cash equivalents

As at
30 June 2020 31 December 2019
Cash at bank account 54 374 166 604
including split payment 3 684 12 499
Other cash 1 739 583 2 601 606
- Deposits 1 608 907 2 577 963
- Cash pooling 126 594 20 446
- Other 4 082 3 197
Total cash and cash equivalents 1 793 957 2 768 210
Cash pooling (727 146) (52 599)
Cash recognised in the statement of cash flows 1 066 811 2 715 611

Restricted cash related to split payment - VAT as at 30 June 2020 was PLN 3 684 thousand (PLN 12 499 thousand as at 31 December 2019), and deposit at IRGiT as at 30 June 2020 was PLN 1 000 thousand (PLN 1 010 thousand as at 31 December 2019). No collateral is established on cash.

15. Profit allocation

On 30 July 2020, an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6 concerning the allocation of net profit for the financial year covering the period from 1 January 2019 to 31 December 2019, pursuant to which 100% of the 2019 net profit was transferred to reserve capital, intended to finance investments.

On 20 May 2019, an Ordinary General Meeting of ENEA S.A. adopted resolution no. 6 concerning the allocation of net profit for the financial year covering the period from 1 January 2018 to 31 December 2018, pursuant to which 100% of the 2018 net profit was transferred to reserve capital, intended to finance investments.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

16. Debt-related liabilities

Credit facilities, loans and debt securities

As at
30 June 2020
Bank credit 1 786 777 1 888 094
Bonds 5 445 270 5 854 886
Long-term 7 232 047 7 742 980
Bank credit 188 144 168 137
Bonds 1 220 291 1 920 505
Short-term 1 408 435 2 088 642
Total 8 640 482 9 831 622

In accordance with ENEA S.A.'s financing model, in order to secure funding for ENEA Group companies' on-going operations and investment needs, ENEA executes agreements with external financial institutions concerning bond issue programmes and/or credit agreements.

Credit facilities and loans

Presented below is a list of the Company's credit facilities and loans:

No. Company Lender Contract date Debt at 30
June 2020
(principal)
Debt at 31
December
2019
(principal)
Interest Final
repayment
deadline
1. ENEA S.A. EIB 18 October 2012
(A)
and
19 June
2013 (B)
1 425 000 1 076 250 1 138 956 Fixed interest
rate
or
WIBOR 6M
+ margin
17 June 2030
2. ENEA S.A. EIB 29 May
2015 (C)
946 000 896 833 915 167 Fixed interest
rate
or
WIBOR 6M
+ margin
15 September
2032
3. ENEA S.A. PKO BP S.A. 28 January
2014,
Annex 2 of
4 December
2019
300 000 - - WIBOR 1M
+ margin
31 December
2022
4. ENEA S.A. Bank
Pekao S.A.
28 January
2014,
Annex 2 of
4 December
2019
150 000 - - WIBOR 1M
+ margin
31 December
2022
TOTAL 2 821 000 1 973 083 2 054 123
rate Transaction costs and
effect of measurement
using effective interest
1 838 2 108
TOTAL 2 821 000 1 974 921 2 056 231

ENEA S.A. currently has credit agreements with the European Investment Bank (EIB) for a total amount of PLN 2 371 000 thousand (Agreement A PLN 950 000 thousand, Agreement B PLN 475 000 thousand and Agreement C PLN 946 000 thousand). Funds from the EIB were used to finance a multi-year investment plan aimed at modernising and expanding ENEA Operator Sp. z o.o.'s power network. Funds from Agreements A, B and C were fully used. Interest on credit facilities may be fixed or variable. In the 6-month period ended on 30 June 2020, ENEA S.A. did not execute new credit agreements.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Bond issue programmes

Presented below is a list of bonds issued by ENEA S.A.:

No. Bond issue
programme name
Programme
start date
Programme
amount
Value of
outstanding bonds
at 30 June 2020
Value of
outstanding bonds
as at 31 December
2019
Interest Buy-back
deadline
1.
2.
Bond issue
programme
agreement with PKO
BP S.A., Bank
Pekao S.A.,
Santander BP S.A.,
Citi BH S.A.
21 June
2012
3 000 000 2 850 000 3 000 000 WIBOR 6M
+ margin
One-off buy-back
for each series
from
June 2020
to
June 2022
Bond issue
programme
agreement with BGK
15 May 2014 1 000 000 760 000 800 000 WIBOR 6M
+ margin
Buy-back in
tranches, last
tranche due in
December 2026
3. Bond issue
programme
agreement with PKO
BP S.A., Bank
Pekao S.A. and
mBank S.A.
30 June
2014
5 000 000 2 500 000 3 378 200 WIBOR 6M
+ margin
One-time buy
back of each
series; PLN 878
million bought
back in February
2020, next series
in September
2021 and June
2024.
4. Bond issue
programme
agreement with BGK
3 December
2015
700 000 570 834 608 890 WIBOR 6M
+ margin
Buy-back in
tranches, last
tranche due in
September 2027
TOTAL 9 700 000 6 680 834 7 787 090
Transaction costs and
effect of measurement
(15 273)
(11 699)
using effective interest rate
TOTAL 9 700 000 6 665 561 7 775 391

In the 6-month period ended on 30 June 2020, ENEA S.A. did not execute new bond issue programme agreements.

Interest rate hedges and currency hedges

In the 6-month period ending 30 June 2020 ENEA S.A. executed an Interest Rate Swap for an exposure amounting to PLN 1 000 000 thousand. The total bond and credit exposure hedged with IRSs as at 30 June 2020 amounted to PLN 5 669 554 thousand. Moreover, ENEA S.A. has fixed-rate credit agreements totalling PLN 704 474 thousand. These transactions have material impact on the predictability of expense flows and finance costs. The Company presents the measurement of these instruments in the item: "Financial liabilities at fair value." Derivative instruments are treated as cash flow hedges, which is why they are recognised and accounted for using hedge accounting rules. As at 30 June 2020, financial liabilities at fair value concerning IRSs amounted to PLN 167 685 thousand (31 December 2019: PLN 23 802 thousand).

In the 6-month period ending 30 June 2020 the Company executed FX forward transactions for a total volume of EUR 1 071 thousand. The last transaction's settlement date is in December 2020. Measurement of these instruments as at 30 June 2020 was PLN 106 thousand (PLN 0 thousand as at 31 December 2019).

Financing terms - covenants

Financing agreements require ENEA S.A. and ENEA Group to maintain certain financial ratios. And the date on which these condensed separate interim financial statements were prepared and in the course of 2020 the Company did not breach any credit agreement provisions such as would require early re-payment of long-term debt.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

17. Provisions

In the 6-month period ended 30 June 2020, provisions for other liabilities and charges increased on a net basis by PLN 264 219 thousand (6-month period ended 30 June 2019: decrease by PLN 93 551 thousand net).

Change in provisions for other liabilities and charges in the period ended 30 June 2020
Provision for
non-contractual
use of land
Provision for
other claims
Provision for
energy origin
certificates
Provision for
onerous
contracts
Other Total
As at 1 January 2020 3 064 166 164 192 189 68 565 - 429 982
Increase in existing
provisions
- 22 200 226 707 - 219 400* 468 307
Use of provisions (39) (3 121) (160 911) (39 305) - (203 376)
Reversal of unused
provision
(605) (107) - - - (712)
As at 30 June 2020 2 420 185 136 257 985 29 260 219 400 694 201
Short-term 2 420 185 136 257 985 29 260 219 400 694 201

* Details regarding the recognition of this provision are presented in note 11.

A description of material claims and conditional liabilities is presented in note 24.

Provision for other claims

In the 6-month period ending 30 June 2020 ENEA S.A. created a PLN 10 284 thousand provision for potential claims related to the termination by ENEA S.A. of agreements to purchase energy origin certificates for renewables, and the value of this provision as at 30 June 2020 was PLN 133 316 thousand (this provision is included in the table above in the column "Provision for other claims" and detailed information on this provision are presented in note 24.6).

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Financial instruments and financial risk management

18. Financial instruments and fair value

Financial instruments

The following table contains a comparison of fair values and book values:

As
at
30
June
2020
As
at
31
December
2019
Book
value
Fair
value
Book
value
Fair
value
FINANCIAL
ASSETS
Long-term 5
922
018
6
025
703
4
609
328
4
638
079
Financial
assets
measured
at
fair
value
38 268 38 268 38 848 38 848
Debt
financial
assets
at
amortised
cost
5
882
505
5
987
435
4
567
870
4
599
231
Finance
lease
and
sublease
receivables
1 245 * 2 610 *
Short-term 5
133
761
1
654
810
6
667
275
2
801
067
Debt
financial
assets
at
amortised
cost
1
654
810
1
654
810
2
801
067
2
801
067
Assets
arising
from
contracts
with
customers
251 369 * 215 223 *
Trade
receivables
1
430
450
* 879 692 *
Finance
lease
and
sublease
receivables
3 175 * 3 083 *
Cash
and
cash
equivalents
1
793
957
* 2
768
210
*
TOTAL
FINANCIAL
ASSETS
11
055
779
7
680
513
11
276
603
7
439
146
FINANCIAL
LIABILITIES
Long-term 7
426
831
7
489
565
7
877
875
7
809
877
Credit
facilities,
loans
and
debt
securities
7
232
047
7
321
880
7
742
980
7
786
075
Lease
liabilities
27 099 * 30 970 *
Other
liabilities
- * 80 123 *
Financial
liabilities
measured
at
fair
value
167 685 167 685 23 802 23 802
Short-term 2
782
832
1
408
435
2
663
629
2
088
642
Credit
facilities,
loans
and
debt
securities
1
408
435
1
408
435
2
088
642
2
088
642
Lease
liabilities
6 913 * 5 470 *
Trade
and
other
payables
634 837 * 504 287 *
Liabilities
arising
from
contracts
with
customers
5 501 * 12 631 *
Other
financial
liabilities
727 146 * 52 599 *
TOTAL
FINANCIAL
LIABILITIES
10
209
663
8
898
000
10
541
504
9
898
519

(*) book value is close to fair value measured in accordance with level 2 in the following hierarchy.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Measurement of financial instruments at fair value by level in hierarchy.

As at 30 June 2020
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value 15 900 6 502 15 866 38 268
Equity instruments at fair value through other
comprehensive income
- - 15 866 15 866
Derivative instruments used in hedge accounting - 106 - 106
Call options (at fair value through profit or loss) - 6 396 - 6 396
Interests at fair value through profit or loss 15 900 - - 15 900
Debt financial assets at amortised cost - 7 642 245 - 7 642 245
Total 15 900 7 648 747 15 866 7 680 513
Financial liabilities measured at fair value - (167 685) - (167 685)
Derivative instruments at fair value through profit or loss - - - -
Derivative instruments used - (167 685) - (167 685)
in hedge accounting (e.g. interest rate swaps)
Credit facilities, loans and debt securities - (8 730 315) - (8 730 315)
Total - (8 898 000) - (8 898 000)
As at 31 December 2019
Level 1 Level 2 Level 3 Total
Financial assets measured at fair value
Equity instruments at fair value through other
comprehensive income
17 800
-
5 182
-
15 866
15 866
38 848
15 866
Call options (at fair value through profit or loss)
Interests at fair value through profit or loss
-
17 800
5 182
-
-
-
5 182
17 800
Debt financial assets at amortised cost - 7 400 298 - 7 400 298
Total 17 800 7 405 480 15 866 7 439 146
Financial liabilities measured at fair value
Derivative instruments at fair value through profit or loss
-
-
(23 802)
(37)
-
-
(23 802)
(37)
Derivative instruments used
in hedge accounting (e.g. interest rate swaps)
- (23 765) - (23 765)
Credit facilities, loans and debt securities - (9 874 717) - (9 874 717)
Total - (9 898 519) - (9 898 519)

Financial assets at fair value include:

  • shares in unrelated entities, the stake in which is below 20%; this line includes a stake in PGE EJ1 Sp. z o.o. worth PLN 15 866 thousand, for which there is no market price quoted on an active market and the fair value of which was determined based on ENEA S.A.'s share of the net assets of PGE EJ1 Sp. z o.o. as at 31 December 2019; having analysed the standard IFRS 9, the Company decided to qualify these interests as financial instruments through other comprehensive income; in the course of 2019, no transactions were executed that would be recognised through profit or loss; in the event that interests in unrelated entities are quoted on the Warsaw Stock Exchange, their fair value is determined on the basis of stock market quotes;
  • Polimex-Mostostal S.A. call options;
  • derivative instruments, which include the measurement of interest rate swaps; the fair value of derivative instruments is established by calculating the net present value based on two yield curves, i.e. a curve to determine discount factors and a curve used to estimate future variable reference rates;

Non-current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in over one year. Fair value is calculated for financial instruments that are based on a fixed rate of interest, based on current WIBOR.

Current debt financial assets at amortised cost cover purchased debt securities - bonds and loans maturing in under one year.

The fair value of bank credit, loans and debt securities is calculated for financial instruments that are based on a fixed rate of

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

interest, based on current WIBOR.

The table above contains an analysis of financial instruments at fair value, grouped into a three-level hierarchy, where:

Level 1 - fair value is based on (unadjusted) market prices quoted for identical assets or liabilities on active markets

Level 2 - fair value is determined on the basis of values observed on the market, which are not a direct market quote (e.g. they are established by direct or indirect reference to similar instruments on a market),

Level 3 - fair value is determined using various measurement techniques that are not, however, based on observable market data. The Company recognises its stake in PGE EJ1 in level 3 (note 25).

No transfers between the levels were made in the 6-month period ended 30 June 2020.

As at 30 June 2020, financial assets at fair value included call options for Polimex-Mostostal S.A. shares, among other things. Pursuant to a call option agreement for Polimex-Mostostal S.A. shares of 18 January 2017, ENEA S.A. purchased call options from Towarzystwo Finansowe Silesia Sp. z o.o. This agreement sees the purchase, in three tranches, of 9 125 thousand shares at a nominal value of PLN 2 per share within specified deadlines, i.e. 30 October 2020 (in accordance with an annex dated 24 July 2020), 30 July 2021 and 30 July 2022. Fair value measurement of the call options was conducted using the Black-Scholes model. The book value of these options as at 30 June 2020 was PLN 6 396 thousand (at 31 December 2019: PLN 5 182 thousand).

19. Debt financial assets at amortised cost

Debt financial assets at amortised cost

As at
30 June 2020 31 December 2019
Current debt financial assets at amortised cost
Intra-group bonds 1 645 170 2 794 586
Loans granted 9 640 6 481
Total current debt financial assets at amortised cost 1 654 810 2 801 067
Non-current debt financial assets at amortised cost
Intra-group bonds 3 228 727 3 669 222
Loans granted 2 653 778 898 648
Total non-current debt financial assets at amortised cost 5 882 505 4 567 870
TOTAL 7 537 315 7 368 937

Intra-group financing

ENEA Group has adopted a model for financing investments being implemented by ENEA S.A. through intra-group financing. ENEA S.A. raises long-term capital in financial markets through credit facilities or bond issues and subsequently distributes these within the Group based on intra-group bond issue programme agreements or loan agreements. Moreover, ENEA S.A. provides financing to subsidiaries from internal funding.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Intra-group bonds

The following table presents on-going intra-group bond issue programmes as at 30 June 2020 and 31 December 2019:

No. Bond issuer Contract date Amount
granted
Amount
used
Outstanding
bonds as at 30
June 2020
(principal)
Outstanding
bonds as at 31
December
2019
(principal)
Interest Final buy
back
deadline
1. ENEA Wytwarzanie
Sp. z o.o.
10 March 2011 26 000 26 000 18 000 18 000 WIBOR 6M
+ margin
31 March
2023
2. ENEA Wytwarzanie
Sp. z o.o.
8 September
2012 agreement
for
PLN 4 000 000
thousand
decreased
through Annex 2
of 21 January
2015 to PLN
3 000 000
thousand
3 000 000 2 650 000 2 500 000 2 650 000 Depending
on the series:
fixed interest
rate
or
WIBOR 6M
+ margin
Depending
on bond
series' issue
dates,
however no
later than by
15 June 2022
3. ENEA Operator
Sp. z o.o.
20 June 2013
amended through
Annex 1 of 9
October 2014 and
Annex 2 of 7 July
2015
1 425 000 1 425 000 1 076 250 1 138 956 Depending
on the series:
fixed interest
rate
or
WIBOR 6M
+ margin
Depending
on bond
series' issue
dates,
however no
later than by
17 June 2030
4. ENEA Wytwarzanie
Sp. z o.o.
17 November
2014
740 000 350 000 - 350 000 WIBOR 6M
+ margin
Buy-back in
March 2020
5. ENEA Wytwarzanie
Sp. z o.o.
17 February 2015
for PLN 760 000
thousand,
increased through
Annex 1 of 3 June
2015 to PLN 1
000 000
thousand.
1 000 000 1 000 000 - 1 000 000 WIBOR 6M
+ margin
buy-back
completed in
February
2020
6. ENEA Operator
Sp. z o.o.
7 July 2015
amended through
Annex 1 of 28
March 2017
946 000 946 000 896 833 915 167 Depending
on the series:
fixed interest
rate
or
WIBOR 6M
+ margin
Depending
on bond
series' issue
dates,
however no
later than by
15 December
2032
7. ENEA Ciepło
Sp. z o.o.
30 October 2015 18 000 18 000 - 1 000 WIBOR 6M
+ margin
Buy-back in
March 2020
8. ENEA Operator
Sp. z o.o.
20 July 2018 400 000 400 000 400 000 400 000 WIBOR 3M
+ margin
15 December
2020
TOTAL 4 891 083 6 473 123
Transaction costs and
effect of measurement
using effective interest rate
(17 186) (9 315)
TOTAL 4 873 897 6 463 808

In the 6-month period ending 30 June 2020 ENEA S.A. did not execute new intra-group bond issue programme agreements concerning financing for ENEA Group companies.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Loans

The following table presents loans issued by ENEA S.A. as at 30 June 2020 and 31 December 2019:

No. Borrower Contract date Total contract
amount
Debt at 30 June
2020
Debt at 31
December 2019
Interest Final repayment
deadline
1. ENEA Oświetlenie
Sp. z o.o.
19 January
2015
10 000 - 206 WIBOR 1M
+ margin
repaid
in January 2020
2. PGE EJ 1 Sp. z o.o. 8 November
2017
2 940 2 940 2 940 Fixed 8 November
2020
3. PGE EJ 1 Sp. z o.o. 2 March 2018 4 800 4 800 4 800 Fixed 2 March 2021
4. PEC Oborniki
Sp. z o.o.
9 October 2018 2 000 - 2 000 WIBOR 1M
+ margin
31 December
2019
[repaid on 2
January 2020]
5. KS "ENERGETYK" 19 May
2019
360 360 360 Fixed 31 January
2020, [the parties
intend to execute
an annex to this
agreement]
6. ENEA Operator
Sp. z o.o.
11 July
2019
425 000 425 000 425 000 WIBOR 6M
+ margin
20 December
2021
7. ENEA Centrum
Sp. z o.o.
19 July
2019
40 000 - - WIBOR 3M
+ margin
30 June
2030
8. Elektrownia
Ostrołęka Sp. z o.o.
30 September
2019
29 000 29 000 29 000 Fixed 30 September
2020
9. ENEA Operator
Sp. z o.o.
13 December
2019
425 000 425 000 425 000 WIBOR 6M
+ margin
20 December
2021
10. Elektrownia
Ostrołęka Sp. z o.o.
23 December
2019
170 000 170 000 80 000 Fixed 26 February 2021
11. ENEA Wytwarzanie
Sp. z o.o.
30 January
2020
2 200 000 1 100 000 - WIBOR 6M
+ margin
30 September
2024
12. ENEA Elektrownia
Połaniec S.A.
28 February
2020
500 000 200 000 - WIBOR 6M
+ margin
20 December
2024
13. ENEA Operator Sp.
z o.o.
12 March 2020 950 000 500 000 - WIBOR 6M
+ margin
20 December
2024
14. PGE EJ 1 Sp. z o.o. 25 June
2020
4 000 4 000 - Fixed 25 June
2023
2 861 100 969 306
Transaction costs and
effect of measurement
using effective interest
rate, along with
impairment of loans
(197 682) (64 177)
TOTAL 2 663 418 905 129

In the 6-month period ending 30 June 2020 ENEA S.A. executed four new loan agreements with ENEA Wytwarzanie Sp. z o.o. for PLN 2 200 000 thousand, with ENEA Elektrownia Połaniec S.A. for PLN 500 000 thousand and ENEA Operator Sp. z o.o. for PLN 950 000 thousand, along with a PLN 4 000 thousand loan extended to PGE EJ 1 Sp. z o.o.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

During the reporting period, the following tranches were accessed by the companies under these agreements: ENEA Wytwarzanie Sp. z o.o. - two loan tranches for a total of PLN 1 100 000 thousand, ENEA Elektrownia Połaniec S.A. - one tranche for PLN 200 000 thousand, ENEA Operator Sp. z o.o. - one tranche for PLN 500 000 thousand, and PGE EJ 1 Sp. z o.o. - the entire loan.

In the 6-month period ended 30 June, ENEA S.A. executed with ENERGA S.A. and Elektrownia Ostrołęka Sp. z o.o. three annexes to a loan agreement in the amount of PLN 29 000 thousand, extending the loan repayment deadline. The last annex, executed on 30 June 2020, extended the one-off loan repayment to 30 September 2020.

In connection with a loan agreement executed on 23 December 2019 between ENEA S.A., ENERGA S.A. and Elektrownia Ostrołęka Sp. z o.o. for PLN 340 000 thousand, ENERGA S.A. paid out to Elektrownia Ostrołęka Sp. z o.o. two loan tranches totalling PLN 180 000 thousand in the first half of 2020. The agreement entails a conditional sale to ENEA S.A. of half of ENERGA S.A.'s liability toward Elektrownia Ostrołęka Sp. z o.o. (PLN 90 000 thousand – tranches II and III in total), with a payment deadline of 31 January 2021.

Impairment of financial assets at amortised cost (concerns loans granted) as at 30 June 2020 amounted to PLN 204 807 thousand. Total impairment of loans recognised in the 6-month period ended 30 June 2020 was PLN 138 737 thousand, and this amount was recognised in the separate statement of comprehensive income in the item "Impairment of financial assets at amortised cost."

20. Impairment of trade and other receivables

Impairment of trade and other receivables:

6-month period
ended
30 June 2020
Year ended
31 December 2019
Impairment of receivables at the beginning of period 54 820 60 710
Created 5 003 2 996
Used (2 626) (8 886)
Impairment of receivables at the end of period 57 197 54 820

In the 6-month period ended 30 June 2020, impairment of trade and other receivables increased by PLN 2 377 thousand (in the 6-month period ended 30 June 2019 impairment grew by PLN 162 thousand). Impairment losses are mainly recognised on trade receivables. Impairment of other receivables is negligible.

As at 30 June 2020, the Company carried out an additional analysis of the COVID-19 pandemic's potential impact on the impairment of receivables. An individual approach was applied to a list of ENEA S.A.'s largest debtors, using assumptions for a model described in the Company's existing Methodology for determining expected credit losses for non-current debt assets and similar items. As regards the model's quantitative module - available reporting data from the debtors was used, while the qualitative module incorporated the existing (and predicted) situation in the national economy as well as the counterparty's market and financial position. Based on this overall evaluation, a rating was assigned and subsequently transposed onto the Probability of Default parameter (in accordance with the aforementioned Methodology). As regards the Loss Given Default parameter, a value equal to 10% was conservatively adopted (in reality far exceeding the actual levels of receivables losses recorded by the Company). The above analysis generated an additional expected credit loss at a negligible level from a reporting viewpoint.

For current trade receivables, expected credit losses are calculated based on historic data in a way described in Rules for creating and recording impairment losses on trade receivables and other financial items at ENEA Group companies. Due to the present situation, for receivables overdue by less than three months, an attempt was made to change the historic range from which data is obtained in order to obtain maximally credible data for future exposure periods for this type of receivables, taking into account the existing grouping criteria. As a result of the change in range, i.e. taking into account data to 30 June 2020 in the analysis, indicators for provisions matrices increased for receivables up to 3 months overdue, but this increase did not cause a material increase in expected credit losses.

Similar analyses will be performed in upcoming periods in order to monitor the materiality of potential additional impairment of receivables.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

21. Analysis of the age structure of assets arising from contracts with customers and trade and other receivables

Age structure of assets arising from contracts with customers and trade and other receivables constituting financial instruments:

As at 30 June 2020
Nominal value Impairment Book value
Trade and other receivables
Current 969 398 (411) 968 987
Overdue 166 505 (55 078) 111 427
0-30 days 59 551 (174) 59 377
31-90 days 19 766 (1 446) 18 320
91-180 days 9 570 (1 925) 7 645
over 180 days 77 618 (51 533) 26 085
Total 1 135 903 (55 489) 1 080 414
Assets arising from contracts
with customers
251 419 (50) 251 369
As at 31 December 2019
Nominal value Impairment Book value

Trade and other receivables

Current 786 936 (281) 786 655
Overdue 145 787 (52 750) 93 037
0-30 days 56 891 (75) 56 816
31-90 days 8 504 (569) 7 935
91-180 days 3 849 (900) 2 949
over 180 days 76 543 (51 206) 25 337
Total 932 723 (53 031) 879 692
Assets arising from contracts
with customers
215 267 (44) 215 223

22. Other financial liabilities

Cash management at ENEA Group is carried out at ENEA S.A. level, making it possible to effectively manage cash surpluses and to limit external financing costs. The Group's cash pooling service includes selected companies from ENEA's tax group.

In this service, the balances of participants' bank accounts are zeroed at the end of each day and subsequently any cash surpluses are transferred to the managing entity's (ENEA S.A.) bank account. The next day, cash balances are reversed and returned to the companies' bank accounts.

At 30 June 2020, the balance of liabilities within cash pooling was PLN 727 146 thousand (PLN 52 599 thousand at 31 December 2019) and is presented in line: "Other financial liabilities."

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

Other explanatory notes

23. Related-party transactions

The Company executes transactions with the following related parties:

  • transactions with ENEA Group companies
  • transactions between the Company and members of ENEA S.A.'s corporate bodies are divided into two categories:
    • resulting from being appointed as Supervisory Board members,
    • resulting from other civil-law contracts.
  • transactions with State Treasury related parties.

ENEA Group companies

6-month period ended
30 June 2020 30 June 2019
Purchase value, including:
purchase of materials
purchase of services
other
(including
electricity
and
gas)
3 771 432
212
881 998
2 889 222
3 382 934
243
808 015
2 574 676
Sale value, including:
sale of electricity
sale of services
other
173 506
157 301
1 471
14 734
179 050
154 356
6 341
18 353
Interest income, including:
on bonds
on loans
other
111 000
84 130
23 441
3 429
108 461
104 529
2 524
1 408
Dividend income 350 036 422 408

As at 30 June 2020 31 December 2019 Receivables 617 906 317 779 Liabilities 1 199 298 579 935 Financial assets - bonds 4 873 897 6 463 808 Loans granted 2 650 988 852 905 Other financial liabilities 727 146 52 599

These transactions with Group companies are executed on market terms, which do not differ from the terms applied in transactions with other entities.

Transactions with members of the Group's corporate authorities

Item Company's Management Board
6-month period ended
30 June 2020
30 June 2019
Company's Supervisory Board
6-month period ended
30 June 2020
30 June 2019
Remuneration under management contracts
and consulting contracts
2 674* 1 608** - -
Remuneration under appointment to
management or supervisory bodies
- - 386 418
TOTAL 2 674 1 608 386 418

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

** this remuneration covers bonuses for 2018 of PLN 1 294 thousand.

** this remuneration includes a non-compete clause for former Management Board members, amounting to PLN 193 thousand

In the 6-month period ended 30 June 2020, no loans were made to Supervisory Board members from the Company Social Benefit Fund (PLN 0 thousand for the 6-month period ended 30 June 2019).

Other transactions resulting from civil-law contracts executed between ENEA S.A. and members of the Company's corporate authorities mainly concern the use of company cars by members of ENEA S.A.'s Management Board for private purposes.

Transactions with State Treasury related parties.

ENEA S.A. also executes commercial transactions with state and local administration units and entities owned by Poland's State Treasury.

The subject of these transactions mainly is as follows:

  • purchase of electricity and property rights resulting from origin certificates for energy from renewable sources and energy produced in cogeneration with heat, from State Treasury subsidiaries and
  • sale of electricity, distribution services and other associated fees that the Company provides for both state and local administration authorities (sale to end customers) and to the State Treasury's subsidiaries (wholesale and retail sale - to final customers).

These transactions are executed on market terms, and these terms do not differ from the terms applied in transactions with other entities. The Company does not keep records that would make it possible to aggregate the amounts of all transactions executed with all state institutions and the State Treasury's subsidiaries.

In addition, the Company identified financial transactions with State Treasury's related parties, i.e. with banks serving as guarantors for bond issue programmes. These entities include: PKO BP S.A., Pekao S.A. and Bank Gospodarstwa Krajowego. Detailed information on bond issue programs is presented in note 16.

24. Conditional liabilities, court proceedings and cases on-going before public administration organs

This section of explanatory notes includes conditional liabilities and on-going proceedings in courts, arbitration bodies or public administration bodies

24.1. Impact of tariff for electricity for tariff G customers

On 30 December 2019 the President of the Energy Regulatory Office ("URE President") decided to approve a tariff for electricity for a set of tariff G customer groups for the period from 14 January to 31 March 2020 ("Tariff").

The URE President approved an electricity sales price for customers in tariff G groups for ENEA S.A. at an average of PLN 289.37 per MWh.

Considering the above and acting pursuant to IAS 37 Provisions, Contingent Liabilities and Contingent Assets, the Group identified the necessity to recognise as at 31 December 2019 a provision for onerous contracts amounting to PLN 68 565 thousand.

In H1 2020, the Group used the provision for onerous contracts in the amount of PLN 39 305 thousand.

24.2. Sureties and guarantees

In H1 2020, ENEA S.A. as Guarantor did not execute any surety agreements.

The following table presents significant bank guarantees valid as of 30 June 2020 under an agreement between ENEA S.A. and Bank PKO BP S.A. and Bank PEKAO S.A. up to a limit specified in the agreement.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

List of guarantees issued as at 30 June 2020

Guarantee
issue date
Guarantee
validity
Obliged entity Entity for which the
guarantee was issued
Bank -
issuer
Guarantee
amount
in PLN 000s
13.06.2019 30.05.2021 ENEA Trading Sp. z o.o. Izba Rozliczeniowa Giełd
Towarowych S.A.
PEKAO S.A. 200 000
12.08.2018 12.08.2020 ENEA Wytwarzanie Sp. z o.o. Polskie Sieci
Elektroenergetyczne
PKO BP S.A. 20 000
12.08.2018 12.08.2020 ENEA Elektrownia Połaniec Polskie Sieci
Elektroenergetyczne
PKO BP S.A. 15 000
26.06.2020 15.12.2020 ENEA Serwis Sp. z o.o. ENEA Operator Sp. z o.o. PKO BP S.A. 3 145
12.08.2018 16.05.2021 ENEA S.A. Górecka
Projekt Sp. z o.o.
PKO BP S.A. 2 109
30.06.2020 06.10.2020 ENEA S.A. Wrocław municipality PKO BP S.A. 1 300
24.05.2019 30.07.2020 ENEA S.A. City of Bydgoszcz PKO BP S.A. 1 207
Total bank guarantees

The value of other guarantees issued by the Company as at 30 June 2020 was PLN 15 090 thousand. The total value of sureties and guarantees issued by ENEA S.A. as collateral for ENEA Group companies' liabilities at 30 June 2020 was PLN 302 968 thousand.

24.3. On-going proceedings in courts of general competence

Proceedings initiated by the Company

Proceedings in courts of general competence initiated by ENEA S.A. concern receivables related to electricity supplies and receivables related to other matters - illegal uptake of electricity, grid connections and other specialised services.

At 30 June 2020, a total of 12 422 cases initiated by the Company were in progress before courts of general competence, worth in aggregate PLN 53 669 thousand (31 December 2019: 5 014 cases worth PLN 45 394 thousand).

The outcome of individual cases is not significant from the viewpoint of the Company's financial result.

Proceedings against the Company

Proceedings against the Company are initiated by both natural persons and legal entities. They concern issues such as: compensation for electricity supply disruptions, compensation for the Company's use of properties on which power equipment is located as well as claims related to terminated contracts for the purchase of property rights (note 24.6).

At 30 June 2020, a total of 134 cases against the Company were in progress before courts of general competence, worth in aggregate PLN 545 372 thousand (31 December 2019: 145 cases worth PLN 561 828 thousand).

Provisions related to these court cases are presented in note 17.

24.4. Other court proceedings

The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by the Company's shareholder, Fundacja "CLIENTEARTH Prawnicy dla ziemi," based in Warsaw, to cancel, determine the non-existence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The first hearing in the case was held on 10 April 2019, with no witnesses called to the hearing. The Court requested that the Company provide the Investment Agreement within 14 days, at least as regards points 1 to 8 (especially point 8.6), subject to the trial consequences indicated in art. 233 § 2 of the Civil Procedure Code. ENEA's attorney filed a reservation to the protocol pursuant to art. 162 of the Civil Procedure Code. On 24 April 2019, the Company provided the Investment Agreement. The Court decided to postpone the hearing to 17 July 2019. On 31 July 2019, the District Court in Poznań allowed the main claim and declared the Resolution invalid. On 17 September 2019, an attorney for ENEA S.A. submitted an appeal against the ruling of 31 July 2019. The

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

complainant submitted a response to the appeal, to which ENEA S.A.'s attorney replied. On 8 July 2020 the Appeals Court dismissed the Company's appeal against the District Court's ruling. As indicated in verbal major reasons for the ruling, the Appeals Court decided that the District Court's ruling complies with the law because the Resolution is invalid due to the fact that adopting the Resolution breached the division of competences between the organs of a commercial-law company. In consequence, on 8 July 2020 the ruling by the District Court in Poznań invalidating the Resolution became final. The Company assessed the impact of this event on the reported data as neutral.

The Management Board of ENEA S.A. filed in December 2018 a response to a lawsuit brought by Międzyzakładowy Związek Zawodowy Synergia Pracowników Grupy Kapitałowej ENEA, based in Poznań, to cancel, determine the nonexistence or repeal resolution no. 3 of the Extraordinary General Meeting of ENEA S.A. of 24 September 2018 regarding directional approval to join the Construction Stage of the Ostrołęka C project, and demanded that the lawsuit be rejected in its entirety as unjustified, along with reimbursement of court representation costs. The hearing was scheduled for 8 May 2019. That hearing, and other hearings scheduled for 30 July 2019 and 1 October 2019, did not take place. A new hearing date has not yet been set. The hearing has been suspended until a final ruling is issued in a case instigated by a shareholder of the Company - Fundacja "CLIENTEARTH Prawnicy dla ziemi."

24.5. Risk associated with legal status of properties used by ENEA S.A.

Risk associated with the legal status of properties used by the Company (currently used by ENEA Operator Sp. z o.o.) results from the fact that the Company does not have a legal title to use land for all of its facilities where its transmission grids and the associated equipment are located. In the future, the Company might be obligated to incur the costs of noncontractual use of property, which had taken place in previous years prior to the de-merger of ENEA Operator Sp. z o.o.

Unregulated legal status of properties previously used by the Company and currently in use by ENEA Operator Sp. z o.o. - grid infrastructure on such properties gives rise to a threat of claims involving a demand for payment of compensation for non-contractual use of land, establishing rent or in individual cases demands associated with a change of a facility's location (return of land to original condition).

The Company has a provision for court proceedings instigated against the Company by owners of properties on which transmission grids and associated equipment are located.

As at 30 June 2020, a provision for claims concerning non-contractual use of land amounted to PLN 2 420 thousand.

24.6. Dispute concerning prices for origin certificates for energy from renewable sources and terminated agreements for the purchase of property rights arising under origin certificates for energy from renewable sources

ENEA S.A. is a party to 8 court proceedings concerning agreements for the purchase of property rights arising under certificates of origin for energy from renewable sources, which includes:

  • 5 proceedings for payment against ENEA S.A. concerning remuneration, contractual penalties or compensation;
  • proceedings for the voidance of ENEA S.A.'s termination or withdrawal from agreements to sell property rights, which took place on 28 October 2016, including 1 proceeding in which claims for payment are being sought at the same time;
  • 1 proceeding for payment, in which ENEA S.A. seeks a claim concerning a contractual penalty.

ENEA S.A. offset a part of receivables due for these counterparties from ENEA S.A. for sold property rights with damagesrelated receivables due for ENEA S.A. from renewables producers. The damage caused to ENEA S.A. arose as a result of the counterparties' failure to fulfil a contractual obligation to participate, in good faith, in re-negotiating long-term agreements for the sale of property rights in accordance with an adaptation clause that is binding for the parties.

On 28 October 2016, ENEA S.A. submitted statements depending on the agreement: on termination or withdrawal from long-term agreements for the purchase by the Company of property rights resulting from certificates of origin for energy from renewable sources (green certificates) (Agreements).

The Agreements were executed in 2006-2014 with the following counterparties, which own renewable generation assets ("Counterparties"):

  • Farma Wiatrowa Krzęcin Sp. z o.o., based in Warsaw;
  • Megawind Polska Sp. z o.o., based in Szczecin;

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

  • PGE Górnictwo i Energetyka Konwencjonalna S.A., based in Bełchatów;
  • PGE Energia Odnawialna S.A., based in Warsaw;
  • PGE Energia Natury PEW Sp. z o.o., based in Warsaw (currently PGE Energia Odnawialna S.A., based in Warsaw);
  • "PSW" Sp. z o.o., based in Warsaw;
  • in.ventus Sp. z o.o. EW Śniatowo Sp. k., based in Poznań (currently TEC1 Sp. z o.o. EW Śniatowo Sp. k., based in Katowice);
  • Golice Wind Farm Sp. z o.o., based in Warsaw.

As a rule, the Agreements were terminated by the end of November 2016. The dates on which the respective Agreements were terminated depended on contractual provisions.

The reason for terminating/withdrawing from the Agreements by the Company was the fact that it was no longer possible to restore contractual balance and the equivalence of the parties' considerations, caused by changes in laws.

Legal changes that occurred after the aforementioned Agreements were executed include in particular:

  • ordinance of the Minister of Economy of 18 October 2012 on a detailed scope of obligations to obtain and present for redemption origin certificates, pay substitute fees, purchase electricity and industrial heat generated from renewable sources and the obligation to validate data concerning the quantity of electricity generated from renewable sources (Polish Journal of Laws of 2012, item 1229);
  • Act on renewable energy sources of 20 February 2015 (Polish Journal of Laws of 2015, item 478) and associated further legal changes and announced drafts of legal changes, including especially:
    • the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 (Polish Journal of Laws of 2016, item 925); and
    • a draft of the Ordinance of the Minister of Energy concerning changes in the share of electricity resulting from redeemed origin certificates confirming production of electricity from renewable sources, which is to be issued based on an authorisation under art. 12 sec. 5 of the Act on amendment of the act on renewable energy sources and certain other acts dated 22 June 2016 and certain other acts,

caused an objective lack of possibilities to develop reliable models to forecast the prices of green certificates.

The Agreements were terminated with the intention for the Company to avoid losses constituting the difference between contractual and market prices of green certificates. Due to the changing legal conditions after termination of the Agreements in 2017, especially arising from the Act of 20 July 2017 on amendment of the act on renewable energy sources, the estimated value of future contract liabilities would have changed. In the current legal framework, this would be significantly lower in comparison to the amount estimated when the Agreements were being terminated, i.e. approx. PLN 1 187 million. This decline reflects a change in the way in which the substitute fee is calculated, which in accordance with the content of some of the Agreements constitutes the basis for calculating the contract price and indexing it to the market price. The Company created a PLN 133 316 thousand provision for potential claims resulting from the terminated Agreements in relation to submissions made by 30 June 2020 concerning transactions to sell property rights by the counterparties; the provision is presented in note 17.

In February 2020, ENEA S.A. executed an agreement with Megawind Polska Sp. z o.o., based in Szczecin, which had initiated three court proceedings, regarding an amicable resolution of these disputes, pursuant to which:

  • in case ref. IX GC 64/17, the proceeding was validly closed due to a court settlement being reached;
  • in case ref. IX GC 996/16, the proceeding was validly closed after ENEA S.A. withdrew its appeal against the ruling of 29 November 2019;
  • case IX GC 1167/16 was dismissed after Megawind Polska Sp. z o.o. withdrew the lawsuit and relinquished the claims.

With regard to the lawsuit brought by Golice Wind Farm Sp. z o.o. against ENEA S.A., the Court on 14 August 2020 issued a partial and preliminary ruling, in which it:

dismissed a suit seeking the voidance of termination by ENEA S.A. of an agreement to sell property rights, which had taken place on 28 October 2016;

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

  • considered as warranted a claim for the payment of remuneration for property rights and ruled the payment by ENEA S.A. of PLN 6 042 thousand together with interest;
  • within the remaining scope, considered the claim for payment as generally justified.

The ruling is not final.

25. Participation in nuclear power plant build programme

On 15 April 2015 KGHM Polska Miedź S.A., PGE S.A., TAURON S.A. and ENEA S.A. executed an agreement to purchase shares in PGE EJ 1. KGHM Polska Miedź S.A., TAURON S.A. and ENEA S.A. purchased 10% stakes in PGE EJ 1 each from PGE (30% in total). ENEA paid PLN 16 million for its stake.

ENEA S.A.'s investment in the Project's preliminary phase (Development Stage) will not exceed approx. PLN 107 million. ENEA S.A.'s overall expenditures on purchasing shares and increasing the company's share capital amounted to PLN 32 544 thousand. The shareholders made loans to the company in order to provide PGE EJ 1 with funds. The amount of loans issued by ENEA S.A. to the company as at 30 June 2020 was approx. PLN 11.7 million.

As at 30 June 2020, ENEA S.A. held 263 020 shares in the capital of PGE EJ 1 Sp. z o.o., with a total nominal value of approx. PLN 37 086 thousand, representing 10% of shares/votes.

26. Impact of COVID-19 pandemic

Information on a threat caused by coronavirus SARS-Cov-2, causing the COVID-19 disease ("coronavirus"), began coming out of China towards the end of 2019. COVID-19 reached Poland in mid-March 2020, and a state of epidemic was announced in Poland on 20 March 2020. The virus and its effects as well as the effects of actions taken by the state to combat the pandemic influence the condition of the domestic and global economy. ENEA S.A.'s activities have also been affected by the situation.

At the date on which these condensed interim separate financial statements were prepared, it is difficult to predict how the situation will evolve and what the potential negative effects for the Company's operating and financing activities will be. A further spread of the virus may lead to a decline in economic activity (currently numerous restrictions apply to: hotels, restaurants, coffee shops and shopping galleries), decline in electricity demand and in consequence lower electricity output, which might impact the Company's revenue from sales. According to ENEA S.A., the receivables turnover ratio may deteriorate because of the difficult economic situation and reduced payment capacity of electricity customers. Swings in global markets have also been recently causing considerable changes in the prices of electricity, CO2 emission allowances, commodities and major swings in equity markets.

As at 30 June 2020, the Company carried out additional analysis of the potential impact of COVID-19 on the impairment of receivables. This analysis resulted in an additional expected credit loss, however its level is negligible from a reporting viewpoint. Nonetheless, the Company assesses that if restrictions related to COVID-19 are re-introduced and thus economic activity is stifled, its receivables turnover ratio may deteriorate in connection with a lower payment capacity of electricity customers.

ENEA S.A. cyclically performs credit assessments of subsidiaries (entity rating) and the recovery rates for bonds issued and intragroup loans. In accordance with ENEA Group's methodology for determining expected credit losses in respect of debt assets, no need to recognise an impairment for these subsidiaries was identified as of 30 June 2020.

The Management Board of ENEA S.A. has appointed a crisis and coordination command for ENEA Group, tasked with preventing, counteracting and combating COVID-19, and all Group companies have appointed teams that coordinate tasks related to ensuring the continuity of ENEA Group companies' operations in the context of the coronavirus threat. The Management Board of ENEA S.A. is coordinating all activities in this area through the crisis coordination command.

The precautions taken in order to prevent the spread of the coronavirus have an impact on operating costs, which together with changes in revenue will ultimately affect the consolidated net result.

At the date on which these condensed interim separate financial statements were prepared, the Company did not identify material uncertainty regarding going concern.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.

Condensed separate interim financial statements in accordance with IFRS EU for the period from 1 January to 30 June 2020 (unless stated otherwise, all amounts expressed in PLN 000s)

27. Events after the reporting period

On 26 August 2020, a Split-Up Plan was submitted to the Regional Court Lublin-Wschód in Lublin concerning ENEA Wytwarzanie sp. z o.o., based in Świerże Górne, (Split-Up Company) and ENEA Nowa Energia sp. z o.o., based in Radom, (Acquiring Company) as part of the reorganisation of ENEA Group's Renewable Energy Sources Segment. The planned split-up will take place pursuant to art. 529 par. 1 point 4 of the Polish Commercial Companies Code, i.e. by splitting-up the Renewables Segment from ENEA Wytwarzanie sp. z o.o. to ENEA Nowa Energia sp. z o.o.

The additional information and explanations presented on pages 10-38 constitute an integral part of these condensed separate interim financial statements.