Telfer Style Cu-Au System Established at Lamil

  • Diamond drilling has established two, depth extensive mineralised reef horizons at the Dune prospect at Lamil, Paterson Province, with over 200m of strike and open in all directions:

  • Upper Reef Horizon in interbedded siltstones - analogous to Telfer’s Upper Malu/Telfer formation which hosts the M Reefs; and

  • Lower Reef Horizon within a quartzite package - analogous to Telfer’s middle-lower Malu formation which hosts the A Reefs and vertical stockwork corridor.

  • Upper Reef Horizon

  • ETG0227 intersected:

    • 132m @ 0.31g/t Au and 0.11% Cu from 87m to end of hole of RC pre-collar including 22m @ 0.51g/t Au and 0.24% Cu from 181m
  • ETG0243 was drilled 200m north-west of ETG0227 and also intersected this horizon which contains a thick package of stacked, narrow copper-gold reefs from 134m to 347m including:

    • 0.10m @ 1.04g/t Au and 0.84% Cu from 134.2m

    • 0.35m @ 0.35g/t Au and 1.27% Cu from 137.6m

    • 1.28m @ 1.94g/t Au and 1.83% Cu from 150.7m

    • 0.65m @ 1.81g/t Au and 1.91% Cu from 167.0m

    • 0.10m @ 1.06g/t Au and 1.97% Cu from 171.2m

    • 0.25m @ 1.60g/t Au and 0.34% Cu from 269.3m

    • 0.26m @ 1.20g/t Au and 0.91% Cu from 271.6m

    • 0.30m @ 2.50g/t Au and 2.35% Cu from 272.4m

    • 0.23m @ 4.70g/t Au and 1.54% Cu from 280.5m

    • 0.50m @ 0.50g/t Au and 2.70% Cu from 346.8m

  • Lower Reef Horizon

  • Intersected in the diamond tail of ETG0226 (located on the same section 80m southwest of ETG0227):

    • 1.5m @ 19.1% Cu from 409.1m sitting directly above 3.9m @ 1.6g/t Au from 410.6m
  • Intersected also towards the bottom of ETG0243:

    • 0.25m @ 5.08g/t Au and 0.03% Cu from 556.05m; and

    • 0.50m @ 0.29g/t Au and 2.62% Cu from 557.3m

  • The diamond drill program at Dune has clarified the two Telfer analogous stratigraphic horizons that contain copper-gold mineralisation

  • These horizons remain open in all directions with only three diamond drill holes (ETG0226, ETG0227 and ETG0243) piercing these horizons to date

  • A detailed gravity survey will commence in the coming weeks to assist with the design of the next phase of drilling

P +61 8 9486 9455 E [email protected] www.enrl.com.au

Encounter Resources Limited Suite 2, 1 Alvan Street Subiaco WA 6008

==> picture [122 x 25] intentionally omitted <==

Commenting on the drilling at Lamil, Encounter Managing Director, Will Robinson said:

“Previous RC drilling at Dune defined an expansive copper-gold system over 1km of strike. The seven hole diamond drill program completed in September 2021 has clarified the stratigraphic context for the copper-gold mineralisation at Dune. Two mineralised stratigraphic horizons have been identified analogous to the Telfer deposit located 25km to the east. These horizons have been intersected over 200m of strike and remain open in all directions. The horizons contain:

  • multiple, stacked, narrow copper-gold reefs in a mineralised prospective host package that is over 200m thick; and

  • high grade, chalcocite dominant copper mineralisation.

The increased frequency of mineralised ‘reef style’ intervals within ETG0243 infers a strengthening of the mineralised system to the north-west. The system remains open on section and down plunge and a detailed gravity survey will be completed in the coming weeks to inform the design of the follow up drill program”.

The directors of Encounter Resources Ltd (“Encounter”) are pleased to provide further assay results from the September 2021 diamond drill program at Lamil in the Paterson Province of WA.

Background

Lamil covers an area of ~61km[2] and is located 25km northwest of the major gold-copper mine at Telfer, owned by Newcrest Mining Ltd (ASX:NCM). Lamil is adjacent to a major regional gravity lineament which marks the location of a significant structure and deformation zone that would have acted as a pathway for ore forming fluids during the formation of the Proterozoic aged deposits.

Dune sits in the northwest of the Lamil project area and consists of a laterally-extensive gold-copper system, outlined by broad spaced RC drilling over 1km of strike (Figure 1). The mineralisation at Dune is hosted in metasedimentary rocks of the Proterozoic Lamil group which also host the Telfer, Havieron and Winu Au-Cu deposits. Dune is situated close to the interpreted fold axis in the northern part of the Lamil Dome. The RC drill program completed in February 2021 at Dune intersected strong copper-gold intersections including (ETG0227):

132m @ 0.31g/t Au and 0.11% Cu from 87m[ 1]

o including 22m @ 0.51g/t Au and 0.24% Cu from 181m

Seven diamond holes were completed in the September 2021 program, including three diamond tails on existing RC holes and four new diamond holes from the surface. Three separate target areas were drilled at Dune as well as a previously untested magnetic anomaly located north of the main Dune corridor.

The diamond tail of ETG0226 (located on the same section 80m south-west of ETG0227) intersected a thick zone of quartzite with minor silts (middle-lower Malu equivalent) containing zones of intense alteration, silica flooding, veining and brecciation. ETG0226 includes a 1.5m intersection of semi-massive pyrite and chalcocite from 409.1m (see photos 1-3) that returned:

  • 1.5m @ 19.1% Cu from 409.1m sitting directly above;

o 3.9m @ 1.6g/t Au from 410.6m[5] .

Encounter Resources Limited 2

==> picture [122 x 25] intentionally omitted <==

==> picture [427 x 313] intentionally omitted <==

Figure 1 – Dune prospect plan showing only holes that have tested the Telfer analogous stratigraphic package and the outline of the stacked reef mineralisation intersected in drilling to date.

ETG0243 – Testing the mineralised corridor 200m along strike of ETG0226 and ETG0227

ETG0243 was targeted to test down plunge of the altered and oxidized siltstone-quartzite units intersected in the RC pre collar of ETG0227, which included 132m @ 0.31g/t Au and 0.11% Cu from 87m[1] .

ETG0243 intersected the intended interbedded altered siltstones and sandstones from 134m. Within this unit multiple, narrow quartz carbonate pyrite-chalcopyrite copper-gold reefs were intersected which are generally bedding concordant (Photo 4). This unit is interpreted as analogous to Telfer’s Upper Malu/Telfer formation which host to the bulk of Telfer’s reef style mineralisation. This unit contained multiple, stacked, narrow copper-gold reefs (Upper Reef Horizon) within Telfer analogous host units from 134m to 347m including:

  • 0.10m @ 1.04g/t Au and 0.84% Cu from 134.2m

  • 0.35m @ 0.35g/t Au and 1.27% Cu from 137.6m

  • 1.28m @ 1.94g/t Au and 1.83% Cu from 150.7m

  • 0.65m @ 1.81g/t Au and 1.91% Cu from 167.0m

  • 0.10m @ 1.06g/t Au and 1.97% Cu from 171.2m

  • 0.25m @ 1.60g/t Au and 0.34% Cu from 269.3m

  • 0.26m @ 1.20g/t Au and 0.91% Cu from 271.6m

  • 0.30m @ 2.50g/t Au and 2.35% Cu from 272.4m

  • 0.23m @ 4.70g/t Au and 1.54% Cu from 280.5m

  • 0.50m @ 0.50g/t Au and 2.70% Cu from 346.8m

3

Encounter Resources Limited

==> picture [122 x 25] intentionally omitted <==

Stratigraphically below this unit, ETG0243 entered the quartzite package intersected in the diamond tails of ETG0226 and ETG0227. This unit contains a mixture of narrow, bedding concordant quartz-carbonate veins (associated with interbedded silts) together with minor stockwork-brecciation within quartzites consisting of pyrite with chalcopyrite (Photo 5). This unit is interpreted as analogous to the middle-lower Malu formation which hosts the A reefs and vertical stockwork corridor at Telfer (Figure 2,3 and 4). This unit contained further copper-gold mineralisation (Lower Reef Horizon) within the zone of quartzite including:

  • 0.25m @ 5.08g/t Au and 0.03% Cu from 556.05m

  • • 0.50m @ 0.29g/t Au and 2.62% Cu from 557.30m

==> picture [427 x 421] intentionally omitted <==

Figure 2- Schematic Dune Cross Section for ETG0243. The Telfer analogous stratigraphy and Upper and Lower Reef horizons are shown with multiple narrow Cu-Au reefs which are generally sub parallel to stratigraphy.

4

Encounter Resources Limited

==> picture [122 x 25] intentionally omitted <==

==> picture [452 x 302] intentionally omitted <==

Figure 3- Schematic long section of Dune showing the interbedded siltstone unit dipping below previous drilling at Dune. This leaves the prospective unit untested down plunge of the Lamil dome away from ETG0243 where drilling has intersected an increase in frequency of Cu-Au reefs.

==> picture [461 x 299] intentionally omitted <==

Figure 4 – Schematic oblique section through the Telfer deposit with analogous stratigraphy including upper M Reefs and lower A Reefs (source SEG Special Publication no 23, chapter 11, The Telfer Copper Gold Deposit, Paterson Province, WA (Wilson et al. 2020))

Encounter Resources Limited

5

==> picture [122 x 25] intentionally omitted <==

High grade copper-gold mineralisation has now been intersected in two diamond drill sections spaced 200m apart at Dune. The increased frequency of mineralised ‘reef style’ intervals within ETG0243 infers a strengthening of the mineralised system to the north-west where the system remains open on section and down plunge.

ETG0241 - Testing a large magnetic anomaly north of Dune

ETG0241 was the first hole drilled into a new target located to the north of the Dune corridor. The hole was designed to test a +1km long, east-west trending magnetic anomaly. ETG0241 tested the modelled anomaly and intersected a ~25m wide zone of pyrrhotite-dominant quartz-sulphide breccia that contains disseminations and blebs of chalcopyrite from 310m.

Assay results from ETG0241 contained only moderate copper-gold anomalism and this magnetic target has been downgraded.

Summary and Next Steps

The seven hole diamond drill program has provided significantly increased understanding of the prospective geological units at Lamil. The program has clarified the Telfer analogous stratigraphic horizons that contain copper-gold mineralisation. These horizons remain open with only three diamond drill holes (ETG0226, ETG0227 and ETG0243) piercing these horizons to date.

The intersection of multiple, stacked, narrow copper-gold reefs in ETG0243 within a thick prospective package analogous to the Telfer’s Upper Malu formation is an important step forward for the project.

The intersection of high-grade copper contained in chalcocite and additional copper-gold reefs in the quartzite package analogous to the middle-lower Malu formation provides further evidence of a depth extensive mineral system at Dune.

Encounter plans to complete a gravity survey over Dune to identify structures and map changes in stratigraphy where the prospective horizons plunge beneath Encounter’s current drilling. The results of this survey along with further interpretation of lithogeochemistry results will guide plans for a detailed drilling campaign at Dune during the 2022 field season.

1 refer ASX release 21 April 2021

2 refer ASX release 19 January 2017

3 refer ASX release 18 December 2020

4 refer ASX release 26 April 2017

5 refer ASX release 6 September 2021

6

Encounter Resources Limited

==> picture [122 x 25] intentionally omitted <==

==> picture [137 x 210] intentionally omitted <==

==> picture [139 x 211] intentionally omitted <==

==> picture [139 x 212] intentionally omitted <==

Photos 1 to 3

Examples of semi-massive pyrite – chalcocite mineralisation drilled from 409.1 to 410.6m in ETG0226

==> picture [257 x 342] intentionally omitted <==

==> picture [224 x 341] intentionally omitted <==

Photo 4 - Example of altered and veined siltstone Photo 5 - Example of semi-massive pyrite/chalcopyrite in containing quartz carbonate-pyrite with quartzite unit ~ 347m in ETG0243 chalcopyrite veining ~280.5m in ETG0243

Encounter Resources Limited

7

==> picture [122 x 25] intentionally omitted <==

Hole_ID Hole_Type MGA_Grid_ID MGA_East
MGA_North

MGA_RL
Azimuth
Dip
EOH Depth
ETG0205 RC / Diamond
MGA94_51
387604 7613663 265 40 -75 439.1
ETG0226 RC / Diamond
MGA94_51
388411 7613032 270 40 -75 710.8
ETG0227 RC / Diamond
MGA94_51
388461 7613090 270 40 -75 457
ETG0239 RC / Diamond
MGA94_51
387764 7613506 265 220 -75 448.6
ETG0241 Diamond MGA94_51 387193 7614048 265 40 -60 437.7
ETG0242 Diamond MGA94_51 387760 7614074 265 40 -60 405.7
ETG0243 Diamond MGA94_51 388264 7613201 265 40 -75 646.2

Table 1: Collar locations and drill hole information of completed RC diamond tails and new diamond holes in current program.

HoleID from (m) to (m) interval (m) Au g/t Cu %
ETG0243 75 76 1 0.17 0.03
and 79.9 80.8 0.9 0.13 0.002
and 127.4 128.4 1 0.14 0.07
and 134.24 134.34 0.1 1.04 0.84
and 137.6 137.95 0.35 0.85 1.27
and 147.96 152 4.04 0.67 0.61
inc 150.72 152 1.28 1.94 1.83
and 153 153.7 0.7 0.15 0.27
and 158.25 158.5 0.25 0.9 0.08
and 166 171.87 5.87 0.24 0.16
inc 167 167.65 0.65 1.81 0.91
inc 171.2 171.3 0.1 1.06 1.97
and 208 209 1 0.16 0.04
and 219 219.7 0.7 0.48 0.44
and 222.04 222.87 0.83 0.2 0.09
and 224.84 226.62 1.78 0.17 0.09
and 259 259.6 0.6 0.18 0.06
and 265 273.53 8.53 0.27 0.17
inc 269.05 269.3 0.25 1.6 0.34
inc 271.6 272.7 1.1 1.4 1.05
and 280.5 282.5 2 0.94 0.24
inc 280.5 280.73 0.23 4.7 1.54
and 292.1 292.42 0.32 0.69 0.07
and 298.24 298.55 0.31 0.16 0.14
and 306.95 308 1.05 0.33 0.02
and 312 312.58 0.58 0.1 0.01
and 325.72 326.02 0.3 0.15 0.06

Encounter Resources Limited 8

==> picture [122 x 25] intentionally omitted <==

and 327.54 328.1 0.56 0.54 0.43
and 329.4 329.65 0.25 0.11 0.05
and 335.76 336.08 0.32 0.19 0.007
and 340 340.3 0.3 0.16 0.003
and 346.8 347.3 0.5 2.7 2.33
and 467.6 468.1 0.5 0.22 0.3
and 480.4 480.8 0.4 0.26 0.007
and 486.35 487.05 0.7 0.39 0.12
and 492.45 493.05 0.6 0.14 0.03
and 521.65 523 1.35 0.25 0.04
and 527.3 529.7 2.4 0.25 0.15
and 540 544 4 0.23 0.08
and 552.5 552.8 0.3 0.27 0.04
and 554.5 555.2 0.7 0.37 0.01
and 556.05 557.8 1.75 0.82 0.76
inc 556.05 556.3 0.25 5.08 0.03
inc 557.3 557.8 0.5 0.29 2.62
and 562.1 562.2 0.1 0.26 0.48
and 565 565.85 0.85 0.28 0.01
and 577.5 577.65 0.15 0.17 0.02
and 592.1 592.5 0.4 0.52 0.67
and 615.2 615.4 0.2 0.16 0.06
ETG0239 159 161.1 2.1 3.27 0.07
ETG0227 222.48 222.6 0.12 0.28 0.11
and 227.87 228.06 0.19 2.17 1.56
and 231.36 231.67 0.31 0.21 0.02
and 233.17 234 0.83 0.16 0.03
and 286.09 287.09 1 0.13 0.0006
and 299.89 300.13 0.24 0.17 0.005
and 303.03 303.17 0.14 0.87 0.04
and 309.64 309.88 0.24 0.15 0.01
ETG0226 284.8 285.7 0.9 0.43 0.1
and 304 305.7 1.7 0.63 0.003
and 319.9 320.35 0.45 0.18 0.01
and 425.05 0.45 0.25 0.04

Table 2: RC drill hole gold and copper assay results from holes ETG0226, ETG0227 and ETG0228 (+0.1g/t Au cutoff). Intervals above 1 g/t Au and/or 1% Cu reported separately. *end of priority assay interval – remaining results pending

Encounter Resources Limited 9

==> picture [122 x 25] intentionally omitted <==

==> picture [414 x 345] intentionally omitted <==

About Encounter

Encounter is one of Australia’s leading mineral exploration companies listed on the ASX. Encounter’s primary focus is on discovering major gold and copper deposits in Australia. Encounter’s assets include:

  • A large project portfolio in the Paterson Province of WA where it is exploring for copper-gold deposits at its 100% owned Lamil Project and for copper-cobalt deposits at the Yeneena project with IGO Limited (ASX:IGO);

  • A series of camp scale, first mover copper opportunities in the Northern Territory. This includes the Elliott copper project which is being advanced in partnership with BHP via a $25m earn-in and joint venture; and

  • The Aileron IOCG project in the West Arunta region of WA.

For further information, please contact:

Will Robinson Michael Vaughan Managing Director Fivemark Partners +61 8 9486 9455 +61 422 602 720 [email protected] [email protected]

The information in this report that relates to Exploration Results is based on information compiled by Mr. Peter Bewick who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Bewick holds shares and options in and is a full time employee of Encounter Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Bewick consents to the inclusion in the report of the matters based on the information compiled by him, in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information in the relevant ASX releases and the form and context of the announcement has not materially changed. This announcement has been authorised for release by the Board of Encounter Resources Limited.

Encounter Resources Limited 10

==> picture [122 x 25] intentionally omitted <==

SECTION 1 SAMPLING TECHNIQUES AND DATA

SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sounds, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
The Dune project was sampled by Encounter using diamond
drilling. A 7-hole diamond drilling program has been
completed at Dune. Drilling includes 3 diamond tails on
existing RC holes and four new Diamond holes for a total of
2,866m of diamond drilling. 3 of the diamond holes ETG0205
(diamond tail from existing RC hole), ETG0241 and
ETG0242 were drilled to test discrete magnetic anomalies.
ETG0239 was drilled to test an EM anomaly. Two diamond
tails were drilled from existing RC drillholes, ETG0226 and
ETG0227, to test the extents of mineralisation. ETG0243 was
drilled 200m to the NW of ETG0226 and ETG0227.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used
Drill hole collar locations were recorded by handheld GPS,
which has an estimated accuracy of +/- 5m.
Aspects of the determination of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information
RC sections of holes ETG0226 and ETG0227 were reported
in ASX announcement dated 21 April 2021. ETG0205 RC
section reported in ASX announcement dated 18thDecember
2020.
Diamond drill core samples were half core samples of HQ
and NQ sized core. The samples from the drilling were sent
to Bureau Veritas Minerals Pty Ltd Laboratories in Perth,
where they were dried, crushed, pulverised and split to
produce a sub – sample for ICP (OES) (MS) 4 Mixed Acid
Digest and Fire Assay.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
ETG0227 was RC drilled to a depth of 219m then diamond
tailed to 457m. ETG0226 was RC drilled to 225m and has
been diamond drilled to 710.3m. ETG0205 was RC drilled to
a depth of 207m and diamond drilled to 439.1m.
All other holes were drilled with mud rotary from surface
through cover sediments with diamond drilling commencing
at the cover-oxidized sediment boundary as HQ3 to reduce
core loss before switching to HQ and NQ coring once ground
conditions allowed.
All core was oriented using Relfex Act III system.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed
Sections of lost core where minimal and were noted by the
diamond drillers.
Measures taken to maximise sample
recovery and ensure representative nature of
the samples
New drillholes were drilled with mud rotary through the cover
sequence. HQ3 was used in areas of broken or soft ground
to reduce the chances of core loss. The remainder of the
holes being HQ/NQ diamond drilled with core recovery
+95%.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
To date, no detailed analysis to determine the relationship
between sample recovery and/or and grade has been
undertaken for this drill program.

Encounter Resources Limited 11

==> picture [122 x 25] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
All drillholes have been fully logged by Encounter
Geologists with lithology, alteration, mineralisation,
structure and veining recorded.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
Geological logging is qualitative in nature and records
interpreted lithology, alteration, mineralisation, structure,
veining and other features of the samples and core.
The total length and percentage of the relevant
intersections logged
All drillholes have been logged in full by Encounter
geologists
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
Samples submitted from the diamond drill holes were half
core. Minor lithology samples from unmineralized zones
have been taken as composite samples with the first 25cm
of each meter combined into a 4m composite sample.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
Not applicable as all drilling was core drilling
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Sample preparation was completed at Bureau Veritas
Minerals Pty Ltd Laboratories in Perth. Samples were
dried, crushed, pulverised (90% passing at a ≤75µM size
fraction) and split into a sub – sample that was analysed
using fire assay.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Field QC procedures involve the use of commercial
certified reference materials (CRMs) and in house blanks.
The insertion rate of these will be at an average of 1:33.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
No sampling of the second half of the drill core has been
completed.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The sample sizes are considered appropriate to give an
accurate indication of the mineralisation at Dune.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
The samples have been analysed by ICP using a 4 mixed
acid digest including Hydrofluoric, Nitric, Hydrochloric and
Perchloric Acids. This extended digest approaches a total
digest for many elements however some refractory
minerals are not completely attacked. Assays have been
determined by Inductively Coupled Plasma (ICP) Optical
Emission Spectrometry (OES)(Al, Ca, Cr, Cu, Fe, K, Mg,
Mn, Na, Ni, P, S, Sc, Ti, V, Zn) and ICP – Mass
Spectrometry(MS) (Ag, As, Bi, Cd, Co, Ga, Hf, In, La, Mo,
Nb, Pb, Rb, Sb, Sn, Sr, Ta, Te, Th, Tl, U, W, Y, Zr). Au, Pt
and Pd were determined via Fire Assay.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Routine pXRF analysis has been completed down hole but
this information does not form part of this report.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have
been established.
Laboratory QAQC involves the use of internal lab standards
using certified reference material and blanks as part of in-
house procedures. Encounter also submitted an independent
suite of CRMs and blanks (see above). A formal review of
this data is completed on a periodic basis.

Encounter Resources Limited 12

==> picture [122 x 25] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The intersections included in this report have been
verified by Mark Brodie (Senior Exploration Geologist)
The use of twinned holes.
No twinned holes have been drilled.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary data is collected for Dune on toughbook
computers using Excel templates and Maxwell
Geoservice’s LogChief software. Data collected was
sent offsite to Encounter’s Database (Datashed
software), which is backed up daily.
Discuss any adjustment to assay data.
No adjustments have been made to the assay data.
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collar locations are determined using a
handheld GPS.
Down hole surveys were collected during this drilling
program at approx. 30m intervals downhole.
Specification of the grid system used.
The grid system used is MGA_GDA94, zone 51.
Quality and adequacy of topographic control.
Estimated RLs were assigned during drilling and are
to be corrected at a later stage using a DTM created
during the aeromagnetic survey.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
The drilling at the Dune prospect has been completed
on 200m to 400m spaced sections with holes spacing
ranging from 40m to 80m
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Mineralisation has not yet demonstrated to be
sufficient in both geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications to be
applied.
Whether sample compositing has been applied.
Intervals have been composited using a length
weighted methodology
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
N/A – this is early stage drilling and the orientation of
the hole with respect to key structures is not is not fully
understood however the drilling has intersected the
strata at an appropriate angle not to significantly bias
samples
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
This is early stage drilling and the orientation of
sampling to the mineralisation is not fully understood.
Early indications suggest that mineralisation in the
Dune area is mostly strata parallel and was
intersected by drilling at an appropriately high angle to
the core axis and has not introduced a significant
sampling bias.
Sample security The measures taken to ensure sample security.
The chain of custody is managed by Encounter.
Samples were delivered by Encounter personnel to
the Camp Dome laydown and then transported to the
assay laboratory via DDH-1 Drilling contractors.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
Sampling techniques and procedures are regularly
reviewed internally, as is data. To date, no external
audits have been completed on Dune data.

13

Encounter Resources Limited

==> picture [122 x 25] intentionally omitted <==

SECTION 2 REPORTING OF EXPLORATION RESULTS SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria JORC Code explanation Commentary
Mineral tenement The Lamil project is located within the tenement
and land tenure E45/4613 which is 100% held by Encounter. The
status prospect area is subject to a production royalty of A$1
Type, reference name/number, location and per dry metric tonne of ore mined.
ownership including agreements or material issues
with third parties including joint ventures, This tenement is contained completely within land
partnerships, overriding royalties, native title where the Martu People have been determined to hold
interests, historical sites, wilderness or national park native title rights.
and environmental settings.
No historical or environmentally sensitive sites have
been identified in the work area.
Exploration done The majority of historical exploration activity at Lamil
by other parties was completed during a Newmont / BHP / WMC joint
venture in the mid-1980s with Newmont as operator.
In 1989 Newmont completed a six hole diamond
program at Lamil (LHS 89 1-6) for a total of 563m with
Acknowledgment and appraisal of exploration by
other parties.
one hole targeting the Northern Magnetic anomaly (now
called Dune).
In 1990/91, a program of RAB holes (LHB series) were
drilled on the Northern Magnetic Anomaly along the
interpreted fold axis for a total of 1734m. Drilling was
hampered by ground water resulting in the program
being largely ineffective.
Geology The Lamil project is situated in the Proterozoic
Paterson Province of Western Australia. A simplified
geological interpretation comprises a domal feature with
Deposit type, geological setting and style of
mineralisation
Isdell Formation in the core overlain by Malu Formation
and the Puntapunta Formation forms the uppermost
unit. The Dune project is considered prospective for
sediment – hosted ‘Telfer style’ gold-copper
mineralisation and skarn style mineralisation.
Drill hole A summary of all information material to the
information understanding of the exploration results including
tabulation of the following information for all Material
drill holes:

Easting and northing of the drill hole collar

Elevation or RL (Reduced Level –
elevation above sea level in meters) of the
drill hole collar

Dip and azimuth of the hole

Down hole length and interception depth

Hole length
Refer to tabulation in the body of this announcement.

14

Encounter Resources Limited

==> picture [122 x 25] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
Reporting
Other
substantive
exploration data
Further Work
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
All reported assays have been length weighted, with a
nominal 0.1g/t Au and/or 0.1% Cu lower cut-off. No
upper cuts-offs have been applied. Where core loss has
been encountered within a mineralized interval the
average grade of the samples directly above and below
has been applied to the zone of core loss.
Where aggregated intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
Intervals greater than 1g/t Au and 1% Cu have been
reported as separate intervals
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No metal equivalents have been reported in this
announcement.
These relationships are particularly important in the
reporting of exploration results.
If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported. If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true
width not known’).
The geometry of the mineralisation is not yet known
due to insufficient drilling in the targeted area.
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plane view of drill
hole collar locations and appropriate sectional
views.
Refer to body of this announcement
Where comprehensive reporting of all Exploration
Results is not practical, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
All significant intervals are reported with a 0.1g/t Au
and/or 0.1%Cu lower cut-off
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observation; geophysical survey results;
geochemical survey results; bulk samples – size
and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
All meaningful and material information has been
included in the body of the text. No metallurgical or
mineralogical assessments have been completed.
The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large – scale step – out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
The next phase of work will be designed following
interpretation of assays from the current program and
results of the ground gravity survey.

Encounter Resources Limited 15