Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ENCOUNTER RESOURCES LIMITED Capital/Financing Update 2026

Apr 21, 2026

64856_rns_2026-04-21_7b6542e6-86b1-41f8-aaca-f7127a42c990.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement ASX Announcement

22 April 2026

==> picture [184 x 38] intentionally omitted <==

Aileron Resources Grow by Over 50% to 120Mt

Encounter Resources (ASX: ENR) (‘Encounter’ or ‘the Company’) is pleased to announce a substantial increase in the Niobium Inferred Mineral Resource Estimate (MRE) at the Aileron project (“Aileron”) in the West Arunta region of Western Australia. The updated MRE is the product of the 2025 drill program and confirms Aileron, as one of the world’s most significant undeveloped niobium deposits.

Key Highlights:

Substantial Resource Increase

  • 83% growth in Green Inferred MRE from the initial estimate reported May 2025[9] to:

  • 100Mt @ 0.71% Nb2O5 (0.25% cut-off) containing 19Mt @ 1.6% Nb2O5 (1.0% cut-off)

  • Aileron’s combined Inferred MRE has increased by 54% to:

  • 120Mt @ 0.77% Nb2O5 (0.25% cut-off) containing 26Mt @ 1.7% Nb2O5 (1.0% cut-off)

  • Field operations underway at Aileron targeting:

  • upgraded resource classification of potential high-grade starter pit locations

  • ongoing expansion of the niobium-REE resource base

Accelerating Studies

  • Resource size and grade established to underpin studies targeting a potential multidecade mining operation

  • Focus shifting to pre-development activities and studies including metallurgy, mining, environmental, geotechnical and hydrogeological work

  • Substantial upside to the MRE

  • Target-rich pipeline with ~15 regional prospects to be drill tested in 2026

  • Follow up high-grade REE intersections outside of the niobium deposits

  • Significant potential remains for high-grade, fresh-rock niobium-REE mineralisation

Executive Chairman, Will Robinson, comments:

“The 2025 drilling program has delivered a step-change in scale at Green, with the resource now exceeding 100 million tonnes and continuing to grow along strike and at depth. This scale and grade provide a strong foundation for a potential long-life, high-grade mining operation.

While advancing pre-development activities at Green, Encounter is continuing to execute its proven exploration strategy across the region, targeting further discoveries and material growth in the Aileron resource base.”

==> picture [116 x 24] intentionally omitted <==

==> picture [495 x 233] intentionally omitted <==

Figure 1 – Green and Emily MRE outline in plan view

==> picture [494 x 242] intentionally omitted <==

Figure 2 – Green Block Model in isometric view

2

==> picture [116 x 24] intentionally omitted <==

Green Mineral Resource Estimate Update

The updated independent Inferred Mineral Resource Estimate reported in accordance with the JORC Code (2012) for the Green deposit (see Figure 2) is 19Mt @ 1.6% Nb2O5 (above a 1.0% Nb2O5 cutoff) contained within 100Mt @ 0.71% Nb2O5 (above a 0.25% Nb2O5 cut-off). This represents a 48% increase in contained Nb2O5 in the high-grade portion at Green, which is the focus of Encounter’s pre-development and study activities.

The combined Inferred Mineral Resource Estimate for the Aileron Project (see Figure 1) is:

  • 26 million tonnes @ 1.7% NbO ₅ (above a 1.0% Nb ₂ O ₅ cut-off) within:

  • 120 million tonnes @ 0.77% NbO ₅ (above a 0.25% Nb ₂ O ₅ cut-off).

Encounter completed 16,026m of drilling at Green through the 2025 field season which delivered significant growth and improved the resolution of tonnes and grade. Resource growth was driven by increasing the strike of the deposit by over 2 km to the east and defining extensions to high-grade zones within the broader footprint of the deposit.

The estimate reflects updated geological interpretation of the weathered carbonatite intrusions and revised estimation inputs, including variography and Ordinary Kriging parameters. These changes have resulted in an increase in reported tonnes and contained Nb ₂ O ₅ relative to the May 2025 Mineral Resource Estimate[9] , with no material change to key reporting assumptions, including cut-off grade, conceptual open pit mining basis and high-level economic parameters, and the Mineral Resource remaining classified as Inferred. As a result of the drilling success at Green, the deposit’s contained Nb ₂ O ₅ grew by 83%, with its high-grade (1.0% Nb ₂ O ₅ cut-off) contained Nb ₂ O ₅ component growing by 48%.

Encounter engaged Snowden Optiro Pty Ltd (“Snowden Optiro”) to prepare the MRE which is reported in accordance with the JORC Code (2012 Edition).

Mineralisation was modelled within multiple weathered carbonatite intrusions, defined using geological logging and a 0.2% Nb ₂ O ₅ cut-off grade.

Mineralisation is hosted within wide, strike-extensive weathered carbonatite intrusions, along a major fault corridor. A series of coherent high-grade cores sit within a larger mineralised halo. The deposit has been drilled over 4,500m of strike and remains open to the east. Mineralisation is located beneath 20 to 60 metres of cover and extends from approximately 80 to 180 metres below surface.

During 2025, drill spacing at Green was reduced to approximately 200m × 80m (locally 40m), compared to previous section spacing of ~400m. Despite this improvement, the drill spacing remains relatively broad for detailed grade estimation. Consequently, grade interpolation in areas more distal from drilling is based on wider search parameters and a greater number of composites, resulting in smoothing of grade distribution and a potential conservative bias in higher-grade zones. Planned infill drilling is expected to reduce estimation uncertainty and improve the resolution of grade continuity.

Infill and extensional drilling at Green will commence in May 2026 to upgrade the resource classification in areas of the deposit with the potential to support high-grade starter pits.

The Company considers that the Green deposit has demonstrated that it hosts the tonnes and grade to potentially support a mining operation and is the main focus of pre-development work and studies. The Company is completing metallurgical test work focusing on Green as a priority, and will complete further environmental surveys, geotechnical drilling, water bore drilling and associated studies throughout the 2026 field season.

3

==> picture [116 x 24] intentionally omitted <==

The Company has determined an indicative site layout for the potential future mining operation and is planning to complete environmental surveys and sterilisation drilling over the area through the 2026 field season. The site layout will be determined based on shallow depth to basement, proximity to mining areas, minimisation of surface water impacts and ongoing proactive engagement with traditional owner groups.

Updated Aileron Inferred MRE

==> picture [467 x 389] intentionally omitted <==

Table 1 – Aileron Project Mineral Resource Estimate

Notes:

  • The Mineral Resource is constrained within optimised pit shells based on a price of US$45 per kilogram Nb (US$30/kg FeNb) and is reported above a 0.25% Nb2O5 cut-off grade.

  • The resource reported above a 1% Nb2O5 cut-off grade is a subset of the 0.25% Nb2O5 cut-off grade.

  • All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding.

  • 2025 MRE refers to the MRE released on 14 May 2025[9]

4

==> picture [116 x 24] intentionally omitted <==

Exploration Upside

Fresh Rock Mineralisation

Encounter’s drilling has focussed on the near-surface oxide mineralisation across the Green, Emily and Crean deposits, and the MRE does not include primary (or fresh) mineralisation.

There are currently three large-scale operating niobium mines, with two of them (Catalão II and St Honoré) mine and process niobium mineralisation hosted in the primary carbonatite while the largest mine, Araxá mines oxide material.

There is significant potential for future resource growth in fresh rock mineralisation within the extensive carbonatite complexes of the West Arunta. Significant fresh rock intersections, outside of the MRE, ending in mineralisation include[1,2,3] :

  • 19m @ 1.2% Nb2O5 within 42m @ 0.9% Nb2O5 from 126m to EOH (EAL894)

  • 27m @ 0.9% Nb2O5 from 117m to EOH (EAL911)

  • 16m @ 1.2% Nb2O5 within 26m @ 0.9% Nb2O5 from 100m to EOH (EAL942)

  • 28m @ 1.1% Nb2O5 within 39m @ 0.9% Nb2O5 from 126m to EOH (EAL1375)

Encounter has begun initial assessment of the considerable potential for fresh-rock niobium and REE mineralisation.

REE Potential

Carbonatite complexes often host niobium and rare earth element (REE) deposits in separate domains within multi-phase intrusions. While discoveries to date at Aileron have predominantly been enriched, weathered niobium-rich deposits, there is significant potential for REE-dominant carbonatite deposits.

Encounter has drilled a significant number of high-grade, REE-dominant intersections outside of the niobium-dominant MRE at Aileron. This includes 2025 diamond drilling at Green which identified REE-rich fluorocarbonates on the southern margin of the niobium deposit, and subsequent step-out aircore drilling which identified REE-dominant zones in saprolite, further along strike on Green’s southern margin. Drilling has also identified REE-dominant mineralisation on Green’s northern margin (EAL550). Significant intersections include[4] :

  • 46m @ 1.0% TREO from 43m, from 61m to end of hole (EAL1293)

  • 2m @ 3.9% TREO from 61m (EAL1294)

  • 14m @ 1.5% TREO from 40m (EAL1362)

Exploration for separate high-grade REE dominant deposits within the intrusive complexes will be completed in conjunction with niobium focused drilling at Aileron.

5

==> picture [116 x 24] intentionally omitted <==

Forward Plan

Key workstreams for the 2026 Aileron field season include:

  • Infill drilling at Green, Emily and Crean – Further infill drilling is planned to target an upgrade in resource classification at Green, and increase continuity of high-grade zones along strike. At Emily, shallow aircore holes that ended in mineralisation will be followed up with deeper drilling to test depth potential. Potential extensions along strike and at depth will be followed up at Crean.

  • Metallurgical test work – Test work is underway including beneficiation, impurity removal and final product processing, utilising multiple composites. Geometallurgical modelling is underway to inform the optimal flotation regime for the high-grade mineralisation at Green.

  • Pre-development activities – Surveys and site evaluations to be completed during the 2026 field season across geotechnical, hydrogeology and environmental to inform key design elements for mining, process engineering, site layout and logistics.

  • Diamond drilling – EIS co-funded diamond drilling will be used to test new targets at depth.

  • Regional drilling – The Company has defined a set of high-priority targets for 2026 aircore drilling, focused on structurally complex zones along the key mineralised faults within its tenure. Targets will be initially tested with cost effective aircore drilling.

6

==> picture [116 x 24] intentionally omitted <==

Table 2: Aileron Inferred Mineral Resource Estimate (JORC Code 2012)

==> picture [384 x 279] intentionally omitted <==

Notes:

  • The Mineral Resource is constrained within optimised pit shells based on a price of US$45 per kilogram Nb (US$30/kg FeNb) and is reported above a 0.25% Nb2O5 cut-off grade.

  • The resource reported above a 1% Nb2O5 cut-off grade is a subset of the 0.25% Nb2O5 cut-off grade.

  • All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding.

==> picture [453 x 246] intentionally omitted <==

Figure 3 – Aileron Grade-Tonnage Curve

7

==> picture [116 x 24] intentionally omitted <==

Technical Overview

The following is a material information summary relating to the Green, Emily and Crean Mineral Resource estimates consistent with ASX Listing Rule 5.8.1 requirements. Further details are provided in the JORC Code Table 1.

Geology and Geological Interpretation

The Aileron Project is situated within the Proterozoic West Arunta Province of Western Australia, a geologically underexplored region due to limited outcrop and historical activity. Recent work, including the 2024 GSWA report based on 2023 Encounter EIS drill cores, has identified Paleoproterozoic gneisses, metasedimentary rocks, and younger Mesoproterozoic garnet-bearing granitic gneiss, all affected by granulite facies metamorphism. These basement rocks were later intruded in the Neoproterozoic by carbonatite, lamprophyre, and aillikite-type intrusions.

The Aileron Project hosts three carbonatite-related niobium deposits—Green, Crean, and Emily— interpreted to have intruded along major structural corridors, including the Elephant Island Fault (Crean) and Weddell Fault (Emily and Green). These structures have focused intrusions and associated fenitisation of the gneissic and metasedimentary host rocks.

  • Green: Carbonatites strike ENE–WSW, curving toward E–W and then arc towards WNW-ESE strike. The dip is poorly constrained due to limited deep drilling. Sub-horizontal oxide-enriched niobium mineralisation is derived from weathered and deflated primary carbonatite.

  • Emily: The intrusion’s geometry is less defined due to limited drilling. However, sub-horizontal oxide enrichment is consistent with weathering of primary carbonatite.

  • Crean: Carbonatite strikes ENE–WSW and dips steeply north to sub-vertical. The northern extent of mineralisation remains poorly defined. Weathered oxide mineralisation is again interpreted to originate from primary carbonatite.

The nearby Luni Deposit (WA1 Resources), along strike from Green and Emily, is an analogous carbonatite-hosted, oxide-enriched niobium system. The broader West Arunta belt remains prospective for carbonatite-hosted critical minerals, IOCG-style copper, and orogenic gold.

Drilling Techniques

Drilling at Aileron has been carried out using a combination of drilling techniques. A total of 413 drillholes for 45,299 meters, comprising aircore (AC), reverse circulation (RC), and diamond drill (DD) holes have been used for mineralisation interpretation at the project. A total of 307 drillholes for 33,836 meters comprising aircore (AC), reverse circulation (RC), and diamond drill (DD) holes have been used for the Green mineralisation interpretation, including 16,026 meters completed during the 2025 field season. Drilling was undertaken during 2023, 2024 and 2025 and managed by Encounter using contractors.

RC holes were drilled at diameter of 146mm or at 143mm (using an AC/RC combination rig). AC holes were drilled at diameter of 90mm, 143mm (using an AC/RC combination rig) or 83mm (by the Wallis’ proprietary, dual tube, patented Air-Core bit (AC) drilling method).

Diamond holes were drilled using HQ3 (61mm), PQ3 (85mm) or NQ2 (51mm) equipment. Drill core was oriented using the industry standard Reflex orientation tool.

Sampling techniques

Sampling at Aileron utilised standard procedures employed across all drilling methods, with samples considered representative for the purposes of reporting.

  • RC: Samples were collected in 1–2 metre intervals directly from a rig-mounted cone splitter.

8

==> picture [116 x 24] intentionally omitted <==

  • AC: Samples were collected at 1 metre intervals. For assay purposes, 2 metre composite samples were formed using a scoop from individual 1 metre samples. Where AC drilling was conducted using a combination AC/RC rig, samples were collected at 1 metre intervals via a cone splitter mounted on the rig. Where AC drilling was conducted using Wallis’ proprietary, dual tube, patented Air-Core bit (AC) drilling method, bulk samples were collected every 1m interval downhole. The entire 1m bulk sample was submitted to the lab where it was dried, crushed (-2mm) and a representative split was obtained for analysis.

  • DD: Drill core was logged and marked up for sampling at nominal 1 metre intervals. Sampling intervals were adjusted to geological boundaries where appropriate. Entire core intervals were submitted for analysis to ensure representativity. Core was crushed and a sub-sample split was taken at the laboratory for assay.

These sampling approaches are consistent with current industry best practice for geochemical analysis and are appropriate for the style of mineralisation targeted.

Sample Preparation and Assay

All samples were submitted to ALS Laboratories in Adelaide or Perth where they were crushed and pulverised for analyses.

All samples were analysed in Perth using ALS method ME-MS81hD with overlimit determination via ME-XRF30 or ME-XRF15b, ME-MS81hD reports high grade REE elements by lithium meta-borate fusion and ICP-MS. This method produces quantitative results of all elements, including those encapsulated in resistive minerals.

Bulk Density

A total of 313 bulk density values were collected using the Volume Bulk Density Method, an advanced variation of the Caliper method, utilising a 3D-model obtained through digital scanning to determine sample volume. Primarily applied to core trays but adaptable to other containers, the process begins by weighing the tray containing the sample, ensuring all artifacts are removed, and subtracting the weight of an empty tray to isolate the sample's mass. A reference geometry is then defined, either through approximation or by scanning with the Minalyzer CS. The sample volume is calculated by comparing average heights across a raster grid between the reference and sample geometries, with the differences at each point representing localized volume contributions. Summing these values yields the total sample volume, which, combined with the measured weight, allows for accurate bulk density calculation.

Estimation Methodology

Mineral Resource estimates across all deposits were prepared using industry-standard software including Leapfrog Geo for geological and mineralisation modelling, Snowden Supervisor for geostatistical analysis, and Datamine Studio RM for drillhole validation, block modelling, grade estimation, classification, and reporting.

The mineralised zones at the Green deposit was modelled using a nominal cut-off grade of 0.20% Nb ₂ O ₅ while Emily and Crean prospects were modelled using a nominal cut-off grade of 0.25% Nb ₂ O ₅ , reflecting consistent niobium mineralisation across the project areas.

The estimation process employed Ordinary Kriging (OK) based on 2 metre downhole composites, with top cuts applied to selected domains to reduce the influence of outlier grades. This approach was deemed appropriate given the spatial continuity of mineralisation observed through detailed variogram analysis.

9

==> picture [116 x 24] intentionally omitted <==

Grade estimation was conducted into parent blocks measuring 50 metres east-west by 20 metres north-south by 5 metres vertically (RL), oriented to match the strike of mineralisation. To better honour geological volumes, sub-celling was applied down to a minimum of 5m × 5m × 1m. Drill spacing was approximately 200m × 40m for all the deposits. For domains where block grades could not be interpolated due to limited data, the average domain grade was assigned.

A three-pass estimation strategy was adopted. The first pass utilised variogram ranges and required a minimum of 6 and maximum of 12 samples. The second and third passes expanded the search distances to 1.5 and 3 times the variogram range respectively, while reducing the minimum required samples to 4. A constraint of no more than four composites per drillhole was applied to ensure spatial representation. Dynamic anisotropy was used throughout to accommodate the undulating geometry of the mineralised layers.

Hard boundaries were applied between distinct mineralisation domains for all analytes. For Nb ₂ O ₅ % and TREO%, soft boundaries were used between weathering zones, while P ₂ O ₅ % estimations applied hard boundaries throughout. Variogram analysis determined the spatial continuity of mineralisation, with major ranges of up to 428m for Green, 300m for Emily, and 600m for Crean (Nb ₂ O ₅ ).

All models were validated using visual checks, swath plots, statistical comparison of composites vs block model, and domain-by-domain volume checks.

Classification

The Mineral Resource has been classified following the guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (the JORC Code). The Mineral Resource has been classified as Inferred on the basis of confidence in geological, grade continuity and by taking into account the quality of the sampling and assay data, and confidence in estimation of niobium, based on the robustness of the grade estimate as determined from the drillhole spacing, geological confidence and grade continuity.

Cut-off Grade

A cut-off grade of 0.25% Nb ₂ O ₅ was adopted for reporting the Mineral Resource within the constraints of an optimised pit shell. This decision was based on a high-level preliminary evaluation of potential modifying factors.

Reasonable Prospects for Eventual Economic Extraction

The Mineral Resources for Green, Emily and Crean have been assessed for reasonable prospects of eventual economic extraction (RPEEE) in accordance with the JORC Code. Green, Emily and Crean have been reported as open pit resources.

For this early-stage evaluation, the following indicative parameters were considered: a ferro-niobium (FeNb) market price of approximately US$30/kg (based on a contained niobium price of US$45/kg), a metallurgical recovery to concentrate of 50%, mining costs of US$3.25 per tonne, processing costs of US$20 per tonne, and general and administrative (G&A) costs of US$3 per tonne. Based on these assumptions, a cut-off grade of 0.25% Nb ₂ O ₅ is considered to offer a reasonable basis for defining a head grade that supports the potential for economic extraction.

Mineralogy and Metallurgical Factors or Assumptions

The main niobium minerals in the Aileron deposits have been identified by thin section petrography and TIMA examination as pyrochlore and columbite. Most of the mineralogy work has been at the Green deposit. Mineralogy work completed on a metallurgical composite made from hole EAL940 demonstrates pyrochlore is the dominant niobium-bearing mineral, with columbite present in lesser

10

==> picture [116 x 24] intentionally omitted <==

quantities. This work was completed on a composite sample which had been subjected to stage grinding down to P100 1,000µm and screened into four size fractions. Pyrochlore shows excellent liberation properties in the -150µm / +38 µm fraction, with 88% of the mineral volume classified as either well liberated (>90%) or high-grade middlings (60-90%). Columbite also showed acceptable liberation at this size fraction.

Based on the identified niobium and gangue mineralogy it is anticipated that the ‘ore’ should process similarly to other niobium deposits. Metallurgical assumptions were based on publicly available data for existing niobium mines and process flowsheets, backed up with mineralogical examination of drill cores and RC samples.

Niobium production generally involves the initial concentration of niobium minerals such as pyrochlore to produce concentrates grading around 50% Nb2O5 which is then converted to ferroniobium with approximately 65% Nb. Initial concentration is typically by a combination of physical beneficiation such as magnetic separation and desliming, followed by flotation. The initial concentrate may then be treated hydrometallurgically for example by leaching to remove impurities such as phosphates. The final ferroniobium product is produced by conversion in a furnace.

Niobium Market

Niobium is a critical element, and is a vital input into aerospace, defence, automotive, construction and health technologies. Niobium’s applications in superconductors and energy storage also highlight its importance in emerging and high-growth technologies.

The core market for niobium is the high-strength low-alloy (‘HSLA’) steel market where ferroniobium is a critical input into the steel alloying process, significantly improving steel’s toughness and formability. In 2023, the total supply of niobium was estimated to be 83 kt Nb[5] , of which approximately 73 kt Nb was ferroniobium demand from the steel industry.

==> picture [231 x 183] intentionally omitted <==

Figure 4 - Key Niobium Producers and Deposits[6,7,8]

Niobium pentoxide and high-purity niobium metal alloys represent important growth markets. These include niobium-titanium (Nb-Ti) as a superconductor in MRI machines, niobium C103 (Nb-Hf-Ti) in various aerospace applications.

Niobium pentoxide and high-purity niobium metal alloys represent important growth markets. These include niobium-titanium (Nb-Ti) as a superconductor in MRI machines, niobium C103 (Nb-Hf-Ti) in various aerospace applications and niobium anodes being trialled in the battery industry for their fast charging and cycle life capabilities.

Supply is concentrated from Brazil, where approximately 87% of niobium is produced, with CBMM’s Araxá mine responsible for 76% of global production. Other supply comes from CMOC’s Catalão II mine in Brazil (11%), Magris Performance Material’s Niobec mine in Canada (8%), and minor quantities as a by-product from predominantly tantalum concentrate processing (5%).

Aileron represents an exciting new potential source of supply for the niobium industry, with multiple deposits demonstrating grades between 1.5 – 2.0% Nb2O5, similar to the world-class Araxá deposit.

11

==> picture [116 x 24] intentionally omitted <==

About Encounter

Encounter Resources Limited (ASX:ENR) is a leading Australian mineral exploration company focused on the discovery of major copper and niobium/rare earth element (REE) deposits.

The Company holds a commanding portfolio of 100%-owned projects located in some of Australia’s most prospective mineral belts, targeting copper and critical minerals. Key among these is the Aileron Project in the highly endowed West Arunta region of Western Australia, emerging as a significant frontier for critical mineral exploration.

Encounter’s strategy is centred on high-impact discovery in Tier 1 jurisdictions, leveraging strong technical capability and a proven track record of attracting leading industry partners.

==> picture [329 x 231] intentionally omitted <==

Will Robinson Paul Berson Executive Chairman Investor Relations - Corporate Storytime +61 8 9486 9455 +61 421 647 445 [email protected] [email protected]

The information in this report that relates to Exploration Results is based on information compiled by Mr Mark Brodie, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Brodie holds shares and options in and is a full time employee of Encounter Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Brodie consents to the inclusion in the report of the matters based on the information compiled by him, in the form and context in which it appears.

The information in this report which relates to Mineral Resources for Green, Emily and Crean deposits at the Aileron Project was prepared by Ms Susan Havlin and reviewed by Dr Andrew Scogings, both employees of Snowden Optiro. Ms Havlin is a Member and Chartered Professional of the Australasian Institute of Mining and Metallurgy and Dr Scogings is a Member of the Australian Institute of Geoscientists (RPGeo Industrial Minerals) and they have sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Ms Havlin and Dr Scogings consent to the inclusion of the information in the release in the form and context in which it appears.

The information in this document that relates to metallurgical test work is based on, and fairly represents, information and supporting documentation reviewed by Mr Enej Catovic, BEng. (Hons.) (Chemical Engineering), who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Catovic is a consultant who has been engaged by Encounter Resources Ltd to provide metallurgical consulting services. Mr Catovic has approved and consented to the inclusion in this document of the matters based on his information in the form and context in which it appears.

12

==> picture [116 x 24] intentionally omitted <==

The Company confirms that it is not aware of any new information or data that materially affects the information in the relevant ASX releases and the form and context of the announcement has not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements.

1 ENR ASX announcement 17 December 2025

2 ENR ASX announcement 20 November 2024

3 ENR ASX announcement 21 January 2025

4 ENR ASX announcement 27 October 2025

  • 5 CBMM: The Niobium Swing Producer, SFA Oxford (3 April 2025)

  • 6 Shikik. A: ‘A review on extractive metallurgy of tantalum and niobium’ Journal of Metallurgy. (2020)

  • 7 China Molybdenum Co., Ltd. ‘Major Transaction Acquisition of Angle America PLC’s Niobium and Phosphates Businesses’. (2016)

  • 8 IAMGOLD Corporation, NI 43-101 Technical Report, Update on Niobec Expansion. (2013)

9 ENR ASX announcement 14 May 2025

13

==> picture [116 x 24] intentionally omitted <==

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sounds, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
Assay data used in mineral resource estimation are from RC, AC
and DD drilling at Green, Emily and Crean.
All samples underwent routine pXRF analysis in the field using a
Bruker S1 TITAN to aid in logging and identifying zones of
interest.
No pXRF data has been used in mineral resource estimation.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used
All samples are considered to be representative. Industry
standard workflows for RC, AC and DD drilling have been
followed.
RC samples at Green were collected every 1 meter from the drill
rig cone splitter into pre numbered calico bags approximately 2-
3kg sample weight. Remaining downhole RC material from the
1m interval was captured in a green mining bag or a 450mm x
750mm calico bag if wet.
When splitting by cone splitter was not suitable the entire 1m
interval was sent to the lab for splitting and crushing.
RC drilling at Emily was used to obtain 2m interval samples via a
rig-mounted cone splitter, each sample captured approximately
3kg of material in a calico bag which was sent to the lab.
At Green, Wallis’ proprietary, dual tube, patented Air-Core bit (AC)
drilling method was used to obtain a bulk samples every 1m
interval downhole.
Bulk material from each 1m interval was captured in a green
mining bag or a 450mm x 750mm calico bag. The entire 1m bulk
sample was submitted to the lab where it was dried, crushed (-
2mm) and a representative split was obtained for analysis.
At Green, Emily and Crean Aircore drilling was used to obtain
samples at 1 metre intervals. 2 metre composite samples were
created using a scoop to collect a composite sample in a pre-
numbered calico. This composite sample was sent for lab
analysis.
15 AC holes at Emily were drilled and sampled at 1m intervals via
a rig-mounted cone splitter. Each sample captured approximately
3kg of material in a calico bag which was sent to the lab.
Samples from diamond drillholes were marked up at nominal
1m intervals and samples were constrained to within geological
boundaries. To ensure representivity drillcore was sampled as
whole core, which was crushed and a representative split was
taken at the lab for analysis.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
All samples were submitted to ALS Laboratories in Adelaide or
Perth where they were crushed and pulverised for analyses.
All samples were analysed in Perth using ALS method ME-
MS81hD with overlimit determination via ME-XRF30 or ME-
XRF15b. (ME-MS81hD reports high grade REE elements by
lithium meta-borate fusion and ICP-MS. This method produces

14

==> picture [116 x 24] intentionally omitted <==

In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
quantitative results of all elements, including those encapsulated
in resistive minerals.)
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
RC holes were drilled at diameter of 146mm by Strike drilling
or 143mm by Stark Drilling (using an AC/RC combination rig).
AC holes were drilled at diameter of 90mm by Bullion Drilling , at
143mm by Stark Drilling (using an AC/RC combination rig), or at
83mm by Wallis Drilling (using their proprietary, dual tube,
patented Air-Core bit (AC) drilling method).
DD holes were drilled by DDH1 using HQ3 (61mm), PQ3 (85mm)
or NQ2 (51mm) equipment. Drillcore was oriented using industry
standard Reflex ori tool.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed
All sample recoveries were estimated as a percentage and
recorded in the database by Encounter field staff.
Analysis of RC and AC bulk weights revealed good recovery in
line with hole diameter and average assumed density.
Bulk sample weight analysis of RC and AC revealed some bulk
cyclical weight fluctuations linked to rod changes during drilling.
Diamond core recoveries were recorded each drill run by drill
crews and validated by Encounter Geologists. Core recovery
averaged 95%.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples
Driller’s used appropriate measures to minimise down-hole and/or
cross-hole contamination in RC and AC drilling. Drilling
procedures are in place to reduce bulk weight fluctuation,
maximise sample recovery and ensure representivity.
During RC drilling blow-down valves are used to keep the hole dry
and dust suppression applied. Shroud tolerance was minimised to
prevent excessive loss to outside return.
Wallis AC is designed around the Reverse Circulation principle,
the sample is returned up the concentric inner tube. The Wallis
system uses a designed-in, slight vacuum at the bit face to lift
samples directly into the inner tube. There is minimal, if any
contamination.
Where isolated occurrences of contamination of the sample was
suspected this was noted by Encounter field staff as a percentage.
This was noted in 18 samples and represents a negligible
percentage of samples at Green.
HQ and PQ diamond core were drilled using triple tube to ensure
maximum core recovery.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential
loss/gain
of
fine/coarse
material.
Diamond drill holes were completed as twins to verify RC and AC
drilling results at Green and Crean.
A review of sample recoveries, grade, sampling methods and
twinned drillholes has determined that there is no relationship
between sample recovery and grade.

15

==> picture [116 x 24] intentionally omitted <==

Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Encounter geologists have completed geological logs on all holes.
All reported holes have been logged in full with lithology, alteration
and mineralisation recorded.
Geological logging has been reviewed using multi element
geochemistry to verify geological observations.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Geological logging is qualitative in nature and records interpreted
lithology, alteration, mineralisation and other geological features
of the samples.
The total length and percentage of the
relevant intersections logged
Encounter geologists have completed geological logs on all holes
reported in this announcement
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Diamond drillcore was sampled by ALS laboratories as whole
core, which was crushed and a representative split was taken for
multi element analysis
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
All samples were recorded as being dry, moist or wet in the
database by Encounter field staff.
RC samples were collected from the drill rig cone splitter into pre
numbered calico bag.
At Green remaining downhole RC material from the 1m interval
was captured in a green mining bag or a 450mm x 750mm calico
bag if wet. When wet, the entire 1m interval was sent to the lab
where it was dried, crushed (-2mm) and split.
When splitting by cone splitter was not suitable the entire 1m
interval was sent to the lab for splitting and crushing
At Green, Wallis’ proprietary, dual tube, patented Air-Core bit (AC)
drilling method was used to obtain a bulk samples every 1m
interval downhole.
Bulk material from each 1m interval was captured in a green
mining bag or a 450mm x 750mm calico bag. The 1m bulk sample
was submitted to the lab where it was dried, crushed (-2mm) and
a representative split was obtained for analysis.
At Green, Emily and Crean aircore drilling was used to obtain
samples at 1 metre intervals. 2 metre composite samples were
created using a scoop to collect a composite sample in a pre-
numbered calico. This composite sample was sent for lab
analysis.
15 AC holes at Emily were drilled and sampled at 1m intervals via
a rig-mounted cone splitter. Each sample captured approximately
3kg of material in a calico bag which was sent to the lab.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Sample preparation was completed at ALS Laboratories in
Adelaide and analysed in the Perth laboratory. Samples were
crushed and pulverised to a nominal 85% passing 75 microns to
enable a subsample for analyses. This is considered appropriate
for the analysis undertaken.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Field duplicates were taken during RC and AC drilling.

16

==> picture [116 x 24] intentionally omitted <==

Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
RC field duplicates were collected on the rig via cone splitter at a
rate of 1:20. Additional duplicates were collected through the
mineralized zone at Green at a rate of approximately 1:5
Field duplicates were taken during AC drilling and were collected
using the same sampling method as the primary sample at a rate
of 1:50.
Coarse split duplicates were taken from bulk AC samples at the
lab at a rate of approximately 1:5 through the mineralised zone.
No coarse split duplicates were taken from the diamond drillcore.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The sample sizes, sub -sampling techniques and sample
preparation are considered to be appropriate for the material
being sampled.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
All samples were submitted to ALS Laboratories in Perth for
analysis.
Assays have been reported from ALS ME-MS81hD (package of
methods ME-MS81h + MEICP06).
ALS method ME-MS81h reports high grade rare earth elements
via fusion with lithium borate flux followed by acid dissolution of
the fused bead coupled with ICP-MS analysis. It provides a
quantitative analytical approach for a broad suite of trace
elements. This method is considered a complete digestion
allowing resistive mineral phases to be liberated. Elements
reported:
Ba, Ce Cr, Cs, Dy, Er, Eu, Ga, Gd, Hf, Ho, La, Lu, Nb, Nd, Pr, Rb,
Sc, Sm, Sn, Sr, Ta, Tb, Th, Ti, Tm, U, V, W, Y, Yb, Zr.
Additionally whole rock oxides are reported by method ME-ICP06
by analysing the same digested solution by ICP-AES and include
LOI. Oxides reported:
Al2O3, BaO, CaO, Cr2O3, Fe2O3, K2O, MgO, MnO, Na2O,
P2O5, SiO2, SrO, TiO2, LOI
Niobium overlimit determination (>50,000ppm Nb) completed via
ALS method ME-XRF30 or ME-XRF15b. Assays have been
reported from MEXRF30 or ME-XRF15b when completed.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Samples underwent routine pXRF analysis at 1 metre intervals
using a Bruker S1 TITAN to aid in logging and identifying zones
of interest. All pXRF readings were taken in GeoExploration mode
with a 30 second 3 beam reading. OREAS supplied standard
reference materials were used to calibrate the pXRF instrument.
No pXRF results are being reported.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Standard field and laboratory QAQC was undertaken and
monitored.
Encounter submits an independent suite of certified reference
materials and blanks at average ratio of 1:30. In RC and Wallis
AC drilling at Green, blank samples were inserted within and at
the end of mineralised zones as determined by the site geologist
based on geological observations and pXRF readings.
QAQC review identified that assay results for CRMs were
generally accurate, though there was limited grade coverage
above 0.67% Nb₂O₅. 4 CRM swaps were detected and corrected.
Duplicate precision analysis showed that cone splitter duplicates

17

==> picture [116 x 24] intentionally omitted <==

provided more reliable results than scoop duplicates, with only
minor bias observed in high-grade samples.
Overall duplicate precision is very good and holds across several
orders of magnitude and no systematic bias is evident.
Contamination control analysis indicated that while most blank
samples fell within acceptable limits, some showed elevated
niobium levels, suggesting potential contamination issues that
need to be addressed. Quartz flushes are routinely being inserted
within and at the end of mineralised zones as determined by the
site geologist based on geological observations and pXRF
readings to check for potential contamination from laboratory
preparation processes.
ALS Laboratory QAQC involves the use of internal lab standards
using certified reference material and blanks as part of in-house
laboratory procedures.
Quality control procedures and review have shown that
acceptable levels of accuracy and precision have been
established fit for purpose for the estimation and reporting of
mineral resource classification.
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel.
Sampling and assay data have been verified and reviewed by
Encounter Principal Geologist Sarah James and Snowden Optiro
Managing Consultant Susan Havlin.
The use of twinned holes.
Diamond drillholes have been completed at Green and Crean for
the purpose of twinning and verifying RC and AC drill results and
to provide additional material for mineralogical and metallurgical
work.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Primary logging and sampling data is collected for drillholes on
toughbook computers using Maxwell Geoservice’s LogChief
software and using excel templates (physical and electronic).
Data is sent offsite by email to be loaded or direct synced to
Encounter’s SQL Database (Datashed software), which is backed
up daily.
Discuss any adjustment to assay data.
Standard stoichiometric calculations have been applied to convert
element ppm data to relevant oxides. Industry standard
calculation for TREO as follows La2O3+ CeO2+ Pr2O3+ Nd2O3+
Sm2O3+ Eu2O3+ Gd2O3+ Tb2O3+ Dy2O3+ Ho2O3+ Er2O3+
Tm2O3+ Yb2O3+ Y2O3+ Lu2O3
Conversion factors
La2O3
1.1728
CeO2
1.2284
Pr2O3
1.1703
Nd2O3
1.1664
Sm2O31.1596
Eu2O3
1.1579
Gd2O3
1.1526
Tb2O3
1.151
Dy2O3
1.1477
Ho2O3
1.1455
Er2O3
1.1435
Tm2O31.1421
Yb2O3
1.1387
Y2O3
1.2699
Lu2O3
1.1371
Nb2O5
1.4305
Location of data
points
Accuracy and quality of surveys used
to locate drill holes (collar and down-
Drill hole collar locations are recorded using a handheld GPS
which has an estimated accuracy of ± 5m.

18

==> picture [116 x 24] intentionally omitted <==

hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Down hole surveys were collected during RC drilling at Green at
approximately 30m intervals downhole.
No downhole surveys were collected during AC drilling.
Specification of the grid system used.
Horizontal Datum: Geocentric Datum of Australia1994 (GDA94)
Map Grid of Australia 1994 (MGA94) Zone 52
Quality and adequacy of topographic
control.
RLs were assigned using a DTM created during the detailed
aeromagnetic survey.
Data spacing and
distribution
Data spacing for reporting of
Exploration Results.
The drill hole spacing at Green is nominally 40-80m spaced on
section with drill traverses 200m and 400m apart.
The drill hole spacing at Crean is nominally 40m spaced on
section with drill traverses 200m apart.
The drill hole spacing at Emily is nominally 80m spaced on section
with drill traverses 200m and 400m apart.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
Drill data spacing has been determined by the Competent Person
to be sufficient in both geological and grade continuity appropriate
for the Mineral Resource estimation classification applied.
Whether sample compositing has
been applied.
2 metre composite samples were created from some Aircore
drilling using a scoop to collect a composite sample in the field.
The MS Access database supplied to Snowden Optiro for
resource estimation did not have any further sample compositing
applied.
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
Carbonatite intrusions have exploited interpreted structural
corridors including the Elephant Island and the Weddell
Faults.
The orientation of oxide-enriched mineralisation is sub-
horizontal and derives from primary fresh carbonatites by
deflationary and regolith processes.
The orientation of carbonatite intrusions at Green follow
approximate ENE-WSW strike with a gentle curve towards E-
W and then arcs towards WNW-ESE strike. The dip of the
primary carbonatites below the top of fresh rock at Green is
poorly constrained due to the limited number of drillholes that
have sufficiently tested at depth.
The orientation of the carbonatite intrusion at Crean is ENE-
WSW strike. The orientation of the primary carbonatite at
Crean is steep northerly to sub- vertical in dip. The
orientation of the northern boundary of Crean mineralisation
is less constrained due to the limited number of drillholes
that have sufficiently tested this position.
The orientation of Carbonatite at Emily is poorly constrained
due to the limited number of drillholes that have sufficiently
tested at depth or at the edges of the carbonatite.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
The relationship between drilling orientation and the orientation of
oxide-enriched mineralisation is not considered to have introduce
any sampling bias.

19

==> picture [116 x 24] intentionally omitted <==

should be assessed and reported if
material.
Sample security The measures taken to ensure sample
security.
The chain of custody is managed by Encounter. Samples were
transported by Encounter personnel and reputable freight
contractors to the assay laboratory.
Sampling techniques and procedures are regularly reviewed
internally, as is data.
The results of any audits or reviews of A QAQC review has been completed by Snowden Optiro on
Audits or reviews sampling techniques and data. Aileron drilling data.
Multi
element
geochemistry
and
geological
domaining
methodology has been reviewed by Senior Encounter geologists
and by Snowden Optiro Competent Person Andrew Scogins.

20

==> picture [116 x 24] intentionally omitted <==

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria JORC Code explanation Commentary
Mineral tenement The Aileron project is located within the tenements
and land tenure
status
Type, reference name/number, location
and ownership including agreements or
E80/5169, E80/5469, E80/5470 and E80/5522 which
are held 100% by Encounter Resources
material issues with third parties
including joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
The tenements are contained within Aboriginal Reserve
land where native title rights are held by the Parna
Ngururrpa and the Tjamu Tjamu.
national park and environmental Mineral Resources are defined at Green (E80/5469),
settings. Crean (E80/5169) and Emily (E80/5469) wholly within
Parna Ngururrpa native title determination area.
Exploration done Prior to Encounter Resources, no previous on ground
by other parties Acknowledgment and appraisal of exploration has been conducted on the tenement other
exploration by other parties. than government precompetitive data.
Geology The Aileron project is situated in the Proterozoic West
Arunta Province of Western Australia. The geology of the
area is poorly studied due to the lack of outcrop and
previous exploration.
A 2024 GSWA report (using 2023 Encounter EIS drill
cores) has documented Paleoproterozoic gneisses and
metasedimentary rocks in the region. A younger,
Mesoproterozoic garnet-bearing granitic gneiss has now
been documented in the belt. Granulite facies
metamorphism occurred soon after this Mesoproterozoic
magmatic emplacement. In the Neoproterozoic gneissic
rocks were intruded by post metamorphic, cogenetic
carbonatite,
lamprophyre
and
aillikite-type
lamprophyres.
The extensive geological history in the belt is still being
unravelled by ongoing research studies. The belt is
prospective for carbonatite-hosted critical mineral
Deposit type, geological setting and deposits, IOCG style copper deposits and orogenic gold.
style of mineralisation Green, Crean and Emily are carbonatite related niobium
deposits. Oxide-enriched mineralisation has derived
from primary niobium enriched carbonatites through
deflationary and regolith weathering processes.
The Aileron carbonatites have intruded into gneisses and
metasedimentary basement rocks along interpreted
structural corridors including the Elephant Island (at
Crean) and the Weddell Fault (at Emily and Green).
Carbonatite intrusions have intensely fenitised (altered)
surrounding basement rocks. Lamprophyre intrusions
interpreted as cogenetic with carbonatites are present,
particularly near the margins of carbonatite intrusions.
Preferential weathering of carbonatites has accelerated
oxidation and resulted in niobium enrichment at Green,
Crean and Emily.
The Luni deposit (WA1 Resources), along strike from
Green and Emily is an analogous oxide enriched
carbonatite related niobium deposit in the belt.

21

==> picture [116 x 24] intentionally omitted <==

Drill hole
information
A summary of all information material to
the understanding of the exploration
results including tabulation of the
following information for all Material drill
holes:

Easting and northing of the
drill hole collar

Elevation or RL (Reduced
Level – elevation above sea
level in meters) of the drill hole
collar

Dip and azimuth of the hole

Down hole length and
interception depth

Hole length
No new drillholes are being reported. Refer to
tabulation from previous announcements.
Data aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
All previously reported assays have been length
weighted, with a nominal 0.2% Nb2O5lower limit and a
maximum of 3m of internal dilution. Intervals greater
than 1% Nb2O5cutoff have been reported as including.
Selected intervals greater than 2% Nb2O5cut off have
been reported. No upper cutoffs have been applied.
Where aggregated intercepts
incorporate short lengths of high grade
results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and some
typical examples of such aggregations
should be shown in detail.
All previously reported assays have been length
weighted, with a nominal 0.2% Nb2O5lower limit and a
maximum of 3m of internal dilution. Intervals greater
than 1% Nb2O5cutoff have been reported as including.
Selected intervals greater than 2% Nb2O5cut off have
been reported. No upper cutoffs have been applied.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No metal equivalents have been reported.
Relationship
between
mineralization
widths and
intercept lengths
These relationships are particularly
important in the reporting of exploration
results.
If the geometry of the mineralization
with respect to the drill hole angle is
known, its nature should be reported. If
it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
All previously reported results are downhole length.
True width geometry of the mineralisation is not yet
known.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported. These should
include, but not be limited to a plane
view of drill hole collar locations and
appropriate sectional views.
Refer to body of this announcement
Balanced
Reporting
Where comprehensive reporting of all
Exploration Results is not practical,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
All previously reported results have been balanced and
transparently reported as exploration results.

22

==> picture [116 x 24] intentionally omitted <==

Other Other exploration data, if meaningful
substantive and material, should be reported
exploration data including (but not limited to): geological
observation; geophysical survey
results; geochemical survey results; All meaningful and material information has been
bulk samples – size and method of
treatment; metallurgical test results;
included in the body of the text.
bulk density, groundwater, geotechnical
and rock characteristics; potential
deleterious or contaminating
substances.
Further Work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large – scale step –
out drilling).
Diagrams clearly highlighting the areas Refer to body of this announcement.
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.

23

==> picture [116 x 24] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation
Commentary
Database integrity Measures taken to ensure that data has
not been corrupted by, for example,
transcription or keying errors, between its
initial collection and its use for Mineral
Resource estimation purposes.
Snowden Optiro received the final drillhole database
from Encounter Resources (Encounter) on 25thMarch
2026. A MS Access database was supplied.
Data validation procedures used.
Prior to undertaking resource estimation, a high-level
data review and referential checks were conducted,
including topo to collar checks, overlapping and duplicate
records. All data was found to be appropriate for Mineral
Resource Estimation.
The drillholes and all data used in the MRE is in MGA.
Collars appear to be measured with high-level of
accuracy and have decimal places.
Snowden Optiro is of the opinion that the drillhole data is
suitable for resource estimation for all of the deposits,
given the level of classification applied.
Site visits Comment on any site visits undertaken by
the Competent Person and the outcome of
those visits.
If no site visits have been undertaken
indicate why this is the case.
The Encounter CP, responsible for the data and
geological interpretation has visited site and observed
collars, drill pads and general site layout.
The Snowden Optiro CP’s have not conducted a site visit
due to the remote location of the deposit and lack of
activityduringthe estimationperiod.
Geological
interpretation
Confidence
in
(or
conversely,
the
uncertainty of) the geological interpretation
of the mineral deposit.
Green
The Green deposit comprises four sub-horizontal lodes
trending ENE-WSW with a gentle curve towards E-W.
The mineralisation horizons are restricted to the oxide
material.
Emily
The Emily deposit comprises six sub-horizontal lodes
trending E-W. Emily has niobium enrichment in both the
oxide and transported material.
Crean
The Crean deposit comprises two-sub horizontal lodes
trending E-W. The mineralisation horizons are restricted
to the oxide material.
All deposits
The geological interpretation is based on logging of
drillholes and grade.
The confidence in geological interpretation is reflected by
the assigned Mineral Resource classification

24

==> picture [116 x 24] intentionally omitted <==

Nature of the data used and of any assumptions made.

All deposits

Both assay and geological data were used for the mineralisation interpretation, with holes for each area listed below;

==> picture [170 x 229] intentionally omitted <==

Aircore drilling was used to inform the estimation and interpretation.

Geological and mineralisation continuity between drillholes and sections is adequate. Some of the mineralised lodes have limited drillholes. The modelling of these domains assumes reasonable continuity; however, additional drilling is required to confirm.

Green

The mineralised volumes were modelled at a nominal 0.20% Nb2O5 cut-off grade.

Emily and Crean

The mineralised volumes were modelled at a nominal 0.25% Nb2O5 cut-off grade

The effect, if any, of alternative interpretations on Mineral Resource estimation.

The use of geology in guiding and controlling Mineral Resource estimation.

All deposits

Alternative interpretations may be possible with further understanding from additional drilling and may affect the grade and continuity of the deposit.

All deposits

Green, Crean and Emily are carbonatite hosted niobium deposits. Oxide-enriched mineralisation has derived from primary niobium mineral rich carbonatites through deflationary and regolith weathering processes. Preferential weathering of carbonatites has accelerated the oxidation and enrichment process at Green, Crean and Emily.

The weathering boundaries have strongly influenced the modelling of mineralisation.

25

==> picture [116 x 24] intentionally omitted <==

The factors affecting continuity both of
grade and geology.
All deposits
All geological observations were used to guide the
interpretation and further control the mineralisation
trends for the Mineral Resource estimate.
The confidence in the grade and geological continuity is
reflected by the assigned Mineral Resource
classification.
Green and Emily
Green is truncated to the west along strike by current
drilling and is still open to the east. Emily partially
truncated by broad spaced drilling to the north-west and
remains open to the east.
Crean
The mineralisation is truncated to the west along strike
bycurrent drillinghowever is still open to the east.
Dimensions The extent and variability of the Mineral
Resource expressed as length (along
strike or otherwise), plan width, and depth
below surface to the upper and lower limits
of the Mineral Resource.
Green
The mineralised sub horizontal domains strike ENE-SWS
with a gentle curve to E-W. Each of the domain layers
ranges in thickness from 1 m to 74 m with the average
thickness around 22 m. The strike length is 4.6 km within
a 1.8 km wide corridor.
Emily
The mineralised sub horizontal domains strike E-W.
Each of the domain layers range in thickness from 2 m to
32 m with the average thickness around 11 m. The strike
length is 2.4 km within a 700 m wide corridor.
Crean
The mineralised sub horizontal domains strike E-W.
Each of the domain layers ranges in thickness from 4 m
to 64 m with the average thickness around 33 m. The
strike length is 1.8 km within a 200 m wide corridor.
Estimation and
modelling techniques
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions,
including
treatment
of
extreme
grade
values,
domaining,
interpolation parameters and maximum
distance of extrapolation from data points.
If a computer assisted estimation method
was chosen include a description of
computer software and parameters used.
All deposits
Software used:

Leapfrog Geo – wireframe modelling of geological
and mineralisation units

Snowden Supervisor – geostatistics, variography,
kriging neighbourhood analysis (KNA) and block
model validation

Datamine Studio RM – drillhole validation,
compositing, block modelling, grade estimation,
classification and reporting.
The Mineral Resource estimates were completed
employing ordinary block kriged (OK) grade estimation of
2 m length, topcut composites. The mineralised
interpretations defined zones of material as determined
by assay data.
Block model and estimation parameters:

Nb2O5%, P2O5% and TREO% grades were
estimated using ordinary kriging (OK). OK is
considered the most appropriate method with
respect to the observed continuity of mineralisation,
spatial analysis (variography) and dimensions of the
domains that had sufficient data. For domains with
blocks that did not estimate, the average domain
grade was applied to the unestimated blocks. For all
estimates, dynamic anisotropy (DA) was utilised to
account for the undulating nature of the mineralised

26

==> picture [116 x 24] intentionally omitted <==

  • layers.

  • Two meter downhole composited, top-cut data were estimated into parent blocks using OK.

  • Top cuts were applied to the waste domains to reduce the impact of outlier values.

  • Normal scores variogram analysis was undertaken on combined mineralised domains to determine the kriging estimation parameters used for OK estimation for the different analytes.

  • The number of samples used for block grade estimation was determined by Kriging Neighbourhood analysis (KNA)

  • Three estimation passes were used for the estimate. The first search was based upon the variogram ranges; the second search was 1.5 times the initial search and the third search was 3 times the initial search. The second and third search had reduced sample numbers required for estimation. First pass had a minimum of 6 and maximum of 12 samples. The second and third pass had a minimum of 4 and maximum of 12 samples.

  • A maximum composites per drillhole constraint of four samples was applied.

  • Hard boundaries were applied between the different mineralisation domains for all analytes. Soft boundaries were applied between weathering boundaries for Nb2O5% and TREO%.

  • Boundary conditions for the weathering and mineralisation boundaries for P2O5% are hard.

  • Green  Continuity was interpreted from variogram analysis to have a major direction range of between 350 to 428 m and a semi major range of 40 to 129 m and a minor range of 25 to 55m for Nb2O5. For P2O5 the major range is 350 to 420 m, a semi major range of 40 to 130 m and a minor range of 25 to 60 m. TREO has a major direction range of 325 to 450 m, semi major range of 55 to 95 m and a minor range of 45 to 60 m.

Emily

  • Continuity was interpreted from variogram analysis to have a major direction range of 250 m and a semi major range of 300 m and a minor range of 23 m for Nb2O5. For P2O5 the major range is 200 m, a semi major range of 500 m and a minor range of 25 m. TREO has a major direction range of 200 m, semi major range of 350 m and a minor range of 35 m.

Crean

  • Continuity was interpreted from variogram analysis to have a major direction range of 600 m and a semi major range of 125 m and a minor range of 45 m for Nb2O5. For P2O5 the major range is 450 m, a semi major range of 65 m and a minor range of 35 m. TREO has a major direction range of 500 m, semi major range of 100 m and a minor range of 50 m.

The availability of check estimates, previous estimates and/or mine production records and whether the Mineral Resource estimate takes appropriate account of such data.

All deposits

All domains were estimated using OK with DA.

Inverse distance squared (ID[2] ) for all analytes was used as a check estimate.

27

==> picture [116 x 24] intentionally omitted <==

No previous MRE has been undertaken.

The assumptions made regarding recovery
of by-products.
All deposits
No assumptions have been applied for recovery of by
products.
Estimation of deleterious elements or other
non-grade
variables
of
economic
significance (eg sulphur for acid mine
drainage characterisation).
All deposits
P2O5% has been estimated as a deleterious element,
however metallurgical testwork will also assess the
potential for a P2O5by-product.
In the case of block model interpolation,
the block size in relation to the average
sample spacing and the search employed.
All deposits
Grade estimation was into parent block size of 50 mE by
20 mN by 5 mRL oriented in line with the strike of the
mineralisation.
The nominal drill spacing of the drillholes is
approximately 200 m by 40 m.
Sub-cells to a minimum of 5 mE by 5 mN by 1 mRL were
used to represent the volume.
Any assumptions behind modelling of
selective mining units.
All deposits
Selective mining units were not modelled.
Any
assumptions
about
correlation
between variables.
All deposits
Correlation coefficients indicate a strong positive
relationship between Nb2O5and TREO and a poor
positive relationship between Nb2O5and P2O5.
Description
of
how
the
geological
interpretation was used to control the
resource estimates.
All deposits
The modelled mineralisation domains were used to
control the search ellipse direction and the major controls
on the distribution of grade.
Discussion of basis for using or not using
grade cutting or capping.
All deposits
The coded and composited sample data was used to
assess whether the grade distribution required top-
cutting to mitigate the impact of outlier grades.
The grade distribution was assessed for each individual
domain reviewing histograms, log probability plots,
statistics and CVs. Top cuts were applied to the waste
domains for Nb2O5and TREO.
The process of validation, the checking
process used, the comparison of model
data to drill hole data, and use of
reconciliation data if available.
All deposits
Validation checks of the estimate occurred by way of
global and local statistical comparison, comparison of
volumes of wireframe versus the volume of the block
model, comparison of the model average grade (and
general statistics) and the declustered sample grade by
domain, swath plots by northing, easting and elevation,
visual check of drill data versus model data and
comparison of global statistics for check estimates.
Moisture Whether the tonnages are estimated on a
dry basis or with natural moisture, and the
method of determination of the moisture
content.
All deposits
The tonnage was estimated on a dry basis

28

==> picture [116 x 24] intentionally omitted <==

Cut-off parameters The basis of the adopted cut-off grade(s) The basis of the adopted cut-off grade(s) All deposits
or quality parameters applied. Grade and tonnes have been reported within USD45/kg
niobium pit shells for open pit.
The cut-off grade has been selected by Encounter in
consultation with Snowden Optiro based on current
experience and in line with cut-off grades for reporting of
Mineral Resources elsewhere in Australia. Given the
stage of the Project and classification applied to the
Mineral Resource and the current niobium price, the cut-
off grade is considered reasonable.
The Mineral Resource has been reported above a cut-off
grade of 0.25% Nb2O5for open pit resources.
Mining factors or Assumptions made regarding possible All deposits
assumptions mining
methods,
minimum
mining
dimensions and internal (or, if applicable,
external) mining dilution. It is always
necessary as part of the process of
determining reasonable prospects for
The cover thickness of material above mineralisation
averages 49 to 70 m of waste and mineralisation extends
down a further 25m. This geometry is expected to be
suitable for potential open pit mining.
eventual economic extraction to consider Based on these assumptions, it is considered that there
potential
mining
methods,

but
the
are no mining factors which are likely to affect the
assumptions
made
regarding
mining
assumption that the deposit has reasonable prospects
methods and parameters when estimating for eventual economic extraction.
Mineral Resources may not always be
rigorous. Where this is the case, this
should be reported with an explanation of
the basis of the mining assumptions made.
The Mineral Resource has been reported using a cut-off
grade of 0.25% Nb2O5, which is considered a reasonable
cut-off grade for reporting potential open pit Mineral
Resources.
Metallurgical factors The basis for assumptions or predictions All deposits
or assumptions regarding metallurgical amenability. It is
always necessary as part of the process of
determining reasonable prospects for
eventual economic extraction to consider
potential metallurgical methods, but the
The main niobium minerals in the Aileron deposits have
been identified by thin section petrography and TIMA
examination as pyrochlore and columbite. Most of the
mineralogy work has been at the Green deposit.
assumptions
regarding
metallurgical
Mineralogy work completed on a metallurgical composite
treatment
processes
and
parameters made from hole EAL940 demonstrates pyrochlore is the
made when reporting Mineral Resources dominant niobium-bearing mineral, with columbite
may not always be rigorous. Where this is present in lesser quantities. This work was completed on
the case, this should be reported with an a composite sample which had been subjected to stage
explanation of the basis of the metallurgical grinding down to P100 1,000µm and screened into four
assumptions made. size fractions. Pyrochlore shows excellent liberation
properties in the -150µm / +38 µm fraction, with 88% of
the mineral volume classified as either well liberated
(>90%) or high-grade middlings (60-90%). Columbite
also showed acceptable liberation at this size fraction.
Based on the identified niobium and gangue mineralogy
it is anticipated that the ‘ore’ should process similarly to
other niobium deposits.
Metallurgical assumptions were based on publicly
available data for existing niobium mines and process
flowsheets, backed up with mineralogical examination of
drill cores and RC samples.
Niobium production generally involves the initial
concentration of niobium minerals such as pyrochlore to
produce concentrates grading around 50% Nb2O5which
is then converted to ferroniobium with approximately
65% Nb.
The initial concentration is typically by a combination of
physical beneficiation such as magnetic separation and

29

==> picture [116 x 24] intentionally omitted <==

desliming, followed by flotation.
The initial concentrate may then be treated
hydrometallurgically for example by leaching to remove
impurities such as phosphates. The final ferroniobium
product is produced by conversion in a furnace.
Environmental factors
or assumptions
Assumptions made regarding possible
waste and process residue disposal
options. It is always necessary as part of
the process of determining reasonable
prospects for eventual economic extraction
to consider the potential environmental
impacts of the mining and processing
operation.
While
at
this
stage
the
determination of potential environmental
impacts, particularly for a greenfields
project, may not always be well advanced,
the status of early consideration of these
potential environmental impacts should be
reported. Where these aspects have not
been considered this should be reported
with an explanation of the environmental
assumptions made.
All deposits
The Company has completed an initial scoping
assessment on relevant environmental factors for the
region in the context of a potential future project
development. This includes the requirements to gain all
requisite project approvals.
Initial environmental baseline surveys have commenced
and are ongoing in order to provide data inputs to inform
future environmental impact assessments of potential
future project development. There have been no
environmental characteristics which would materially
negatively impact potential future project development.
Heritage surveys have also been completed across
various zones within the project area and no significant
heritage sites or exclusion zones have been identified
which would negatively impact potential future project
development.
Bulk density Whether assumed or determined. If
assumed, the basis for the assumptions. If
determined, the method used, whether wet
or dry, the frequency of the measurements,
the nature, size and representativeness of
the samples.
All deposits
The Volume Bulk Density Method uses 3D scanning to
calculate a sample’s volume and density, replacing
manual measurements. The sample is weighed
(excluding tray weight), and its volume is determined by
comparing the scanned tray surface to a reference
geometry. The difference in surface heights gives the
volume, which, combined with the sample’s weight,
allows for density calculation.
313 measurements were taken over the project area.
The bulk density for bulk material must
have been measured by methods that
adequately account for void spaces (vugs,
porosity, etc), moisture and differences
between rock and alteration zones within
the deposit.
The method accounts for surface-level voids such as
vugs and rough porosity through high-resolution surface
mapping. However, internal porosity and moisture
content are not directly measured in this method.
Discuss assumptions for bulk density
estimates used in the evaluation process of
the different materials.
All deposits
Bulk density has been assigned to the block model by
lithology/weathering. Assigned values are summarised
below.

Transported – 1.5 t/m3

Moderately weathered zone – 1.6 t/m3

Weakly weathered zone – 1.8 t/m3

Fresh – 2.4 t/m3
Classification The basis for the classification of the
Mineral Resources into varying confidence
categories.
All deposits
The Green, Emily and Crean Mineral Resource has been
classified as Inferred based on drillhole spacing, drill
data quality, geological continuity and estimation quality
parameters
Inferred Mineral Resources were defined where there
was a moderate level of geological confidence in
geometry and where the drill spacing was 200 m or
greater.

30

==> picture [116 x 24] intentionally omitted <==

Whether appropriate account has been
taken of all relevant factors (ie relative
confidence in tonnage/grade estimations,
reliability of input data, confidence in
continuity of geology and metal values,
quality, quantity and distribution of the
data).
All deposits
The Mineral Resource has been classified according to
confidence in geological and grade continuity and
accounting for the quality of sampling and assay data,
the lack of data density and density measurements,
confidence in estimation of Nb2O5(from the kriging
metrics) and available metallurgy results
Whether the result appropriately reflects
the Competent Person’s view of the
deposit.
All deposits
The assigned classification of Inferred reflects the
Competent Persons’ assessment of the accuracy and
confidence level in the Mineral Resource estimate.
Audits or reviews The results of any audits or reviews of
Mineral Resource estimates.
All deposits
No external audits have been conducted on the Mineral
Resource estimates.
Snowden Optiro undertakes rigorous internal peer
reviews during the compilation of the Mineral Resource
model and reporting
Where appropriate a statement of the
relative accuracy and confidence level in
the Mineral Resource estimate using an
approach
or
procedure
deemed
appropriate by the Competent Person. For
example, the application of statistical or
geostatistical procedures to quantify the
relative accuracy of the resource within
stated confidence limits, or, if such an
approach is not deemed appropriate, a
qualitative discussion of the factors that
could affect the relative accuracy and
confidence of the estimate.
All deposits
With further drilling it is expected that there will be
variances to the tonnage, grade, and metal of the
deposit. The Competent Person expects that these
variances will not impact on the economic extraction of
the deposit.
The assigned classification of Inferred reflects the
Competent Persons’ assessment of the accuracy and
confidence levels in the Mineral Resource estimate.
It is the Competent Persons’ view that this Mineral
Resource estimate is appropriate to the type of deposit
and proposed mining style.
The statement should specify whether it
relates to global or local estimates, and, if
local, state the relevant tonnages, which
should be relevant to technical and
economic
evaluation.
Documentation
should include assumptions made and the
procedures used.
All deposits
The Mineral Resource classification is appropriate at the
global scale.
These statements of relative accuracy and
confidence of the estimate should be
compared with production data, where
available.
All deposits
No production data was available for review.