AI assistant
EMMERSON RESOURCES LIMITED — Investor Presentation 2024
Nov 13, 2024
64876_rns_2024-11-13_9f48e76d-579b-4a15-a691-39789a544bdd.pdf
Investor Presentation
Open in viewerOpens in your device viewer
Mike Dunbar – Managing Director
==> picture [347 x 540] intentionally omitted <==
Important Notice & Disclaimer
Forward-Looking Statements
This document may include forward-looking statements, opinions and projections, all preliminary in nature, prepared by the Company on the basis of information developed by itself in relation to its projects . Forward-looking statements include, but are not limited to, statements concerning Emmerson Resources Limited’s anticipated future events, including future resources and exploration results, and other statements that are not historical facts. When used in this document, the words such as “could”, “estimate”, "plan," "expect," "intend," "may”, "potential," "should," “believe”, “anticipates”, “predict”, “goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would” or “should” or, in each case, their negative or other variations or similar expressions are forward-looking statements. By their nature, such statements involve risks, assumptions, uncertainties, and other important factors, many of which are beyond the control of the Company, and which may cause actual results, performance, or achievements to differ materially from those expressed or implied by such statements.
Forward-looking statements speak only as at the date of this document and the Company does not undertake any obligation to update forward-looking statements even if circumstances or management’s estimates or opinions should change. Forward-looking statements are provided as a general guide only and should not be relied on as an indication or guarantee of future performance. No representation is made that any of these statements or projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements may be based are reasonable. Given these uncertainties, investors should not place undue reliance on forward-looking statements. The Company cautions investors against using this announcement solely as a basis for investment decisions without regard for this disclaimer.
Regulatory Information
The Company does not suggest that economic mineralisation is contained in the untested areas, the information contained relating to historical drilling records have been compiled, reviewed and verified as best as the Company was able. As outlined in this presentation the Company is planning further drilling programs to understand the geology, structure and potential of the untested areas. The Company cautions investors against using this announcement solely as a basis for investment decisions without regard for this disclaimer.
Competent Person Statement
The information in this presentation that relates to Exploration Results is based on information compiled by Mr Mike Dunbar. Mike Dunbar is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Mike Dunbar is a full-time employee of the Company and consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.
Information in this report that relates to Exploration Results has been extracted from the following Company ASX announcements:
-
ASX: 8 December 2021 – Stunning 117m at 3.38% copper drill hit at the Hermitage Project in Tennant Creek ends in mineralisation
-
ASX: 28 March 2022 – Follow up drilling of 116m at 3.4% copper and 0.88g/t gold at Tennant Creek set to commence
-
ASX: 17 August 2022 - Further high-grade copper-gold and cobalt-bismuth intersected at Hermitage
-
ASX: 17 November 2022 – High Grade Gold and Bismuth at Golden Forty Project in Tennant Creek
-
ASX: 12 December 2022 – Bonanza Gold from an emerging new ore zone at Tennant Creek
-
ASX: 21 March 2023 – Further High-Grade Precious and Base metal mineralisation at Tennant Creek
The Company confirms that it is not aware of any new information or data that materially affects the information that relates to Exploration Results included in previous market announcements. The Company confirms that the form and context in which the Competent Person’s findings area presented have not been materially modified from the original market announcements.
Information in this report that relates to the Mineral Resources or Ore Reserves has been extracted from the following Company ASX announcements:
-
ASX: 6 April 2022 - High Grade Gold Resource for Mauretania at Tennant Creek
-
ASX: 22 December 2021 – Chariot high grade gold resource increased by 40%
-
ASX: 19 March 2024 – Initial Ore Reserve for Chariot, Mauretania and Black Snake JV Deposits
-
ASX: 6 May 2024 – Maiden High-Grade Golden Forty Mineral Resource Estimate
-
ASX: 12 June 2024 – Maiden High-Grade Eldorado Mineral Resource
-
AIM: PAF 5 November 2024 – Pan African acquires TCMG
The Company confirms that it is not aware of any new information or data that materially affects the information included in previous market announcements and, in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings area presented have not been materially modified from the original market announcements.
The above announcements are available to view on the Company’s website at www.emmersonresources.com.au
Authorised for release by the Managing Director and Chief Executive Officer, Mike Dunbar.
==> picture [74 x 41] intentionally omitted <==
2 |
What Makes Emmerson Different?
-
Commanding Land Position in one of Australia’s HighestGrade Goldfields with Compelling Copper Opportunities
-
• JV Partner - Tennant Mining HAS COMMENCED CONSTRUCTION of a CIL Processing Facility
-
Joint Venture sees the Company FUNDED to cashflow from uncapped 6% Gross Production Royalty
-
Additional Strategic Copper and Gold Alliance with other Tennant Creek explorers / developers
==> picture [69 x 38] intentionally omitted <==
3 |
Capital Structure
==> picture [264 x 268] intentionally omitted <==
----- Start of picture text -----
31%
53%
5%
9%
2%
----- End of picture text -----
Institutions 31% Transasia Private Capital 5% Evolution Mining 9% Directors & Mgmt 2% Other Investors 53%
| Corporate Snapshot | |
|---|---|
| ASX Code | ERM |
| Ordinary Shares | 544.7 million |
| Unlisted Options¹ | 41.0 million |
| Market Capitalisation | $33.3 million |
| ($0.06/share – 11/11/24) | |
| Cash (30/09/24) | $3.3 million |
| Enterprise Value (18/09/24) | $30 million |
| Directors & Management |
Mr. Andrew McIlwain – Non-Executive Chairman Mr. Michael Dunbar – Managing Director and CEO Dr. Allan Trench – Non-Executive Director Mr Alan Tate – Non-Executive Director Mr Rob Bills – Non-Executive Director Mr. Rod Wheatley – Company Secretary & CFO
==> picture [74 x 41] intentionally omitted <==
- Exercise price range from $0.095 to $0.20 • 4 |
Highlights
==> picture [47 x 34] intentionally omitted <==
==> picture [47 x 34] intentionally omitted <==
High-Grade Mineral Resource
• 2.27Mt @ 5.2g/t gold for 376,600oz
Initial Ore Reserve
- 540,000t @ 4.7g/t Gold for 79,140oz
An emerging gold royalty business
Centralised CIL mill in Tennant Creek Under Construction
Emmerson to receive a free carried 6% gold royalty from each JV mine
==> picture [43 x 43] intentionally omitted <==
==> picture [38 x 38] intentionally omitted <==
The right address
Tennant Creek, NT – one of Australia’s richest mineral fields
Macquarie Arc, NSW – hosts large deposits and attracting exploration investment by majors
Growth pathway
~$6M of exploration funding available for projects
Potential to introduce a farm-in partner into the NSW assets
$
Funded Exploration
Exploration and mining JVs in place for majority of Tennant Creek
Emmerson retains 100% of the area containing Hermitage, Jasper Hills and Edna Beryl
A Strategic Copper and Gold Alliance
Collaborative approach to investigating a single multi-user copper and gold processing facility in Tennant Creek
==> picture [69 x 38] intentionally omitted <==
5 |
Emmerson is Focused on Two Main Regions
==> picture [418 x 392] intentionally omitted <==
Tennant Creek (Au + Cu) NSW Projects (Au + Cu)
==> picture [69 x 38] intentionally omitted <==
6 |
Emmerson holds ~500km² in Macquarie Arc in NSW
==> picture [455 x 434] intentionally omitted <==
----- Start of picture text -----
Dubbo
Tomingley EL8463
1.1Moz Au
Wellington
EL8766
Kadungle / Fifield Northparkes Copper Hill
2.8Moz Au & 0.9Moz Au &
2.7Mt Cu 0.3Mt Cu
Parkes
Cowal Orange
9.6Moz Au
Cadia
36Moz Au & 8.1Mt Cu
Marsden
1.1Moz Au & 0.40Mt Cu
Cowra
McPhillamys
2.02Moz Au
EL8590
Kiola
----- End of picture text -----
==> picture [226 x 212] intentionally omitted <==
NSW Projects (Au + Cu)
==> picture [53 x 243] intentionally omitted <==
EMMERSON RESOURCES LTD
NEWMONT LIMITED EVOLUTION MINING (COWAL) PTY LTD NEWMONT EXPLORATION PTY LTD EVOLUTION MINING (NORTHPARKES) PTY LTD FMG RESOURCES PTY LTD SANDFIRE RESOURCES LIMITED ALKANE RESOURCES LTD GOLD AND COPPER RESOURCES PTY LTD
MAGMATIC RESOURCES
REGIS RESOURCES LIMITED IMPACT MINERALS
RIMFIRE PACIFIC MINING LIMITED
GODOLPHIN TENEMENTS PTY LTD CLIMAX AUSTRALIA PTY LIMITED
==> picture [74 x 41] intentionally omitted <==
KINCORA COPPER AUSTRALIA PTY LTD; RAREX LIMITED
7 |
Tennant Creek in the Northern Territory
An exploration hotspot Rio, BHP, Newmont, South 32, + many juniors - Emmerson has been in Tennant Creek since 2007 and holds the best ground (~1,800km[2] )
==> picture [822 x 384] intentionally omitted <==
----- Start of picture text -----
Under Cover Exploration =
-
High Risk Exploration
----- End of picture text -----
==> picture [74 x 41] intentionally omitted <==
Map of exploration licences and application in the Barkly Tableland, showing the distribution of tenure. Most licenses in the Georgina Basin were applied for since 2019.
8 |
The Challenge and Opportunity of Tennant Creek
==> picture [54 x 10] intentionally omitted <==
----- Start of picture text -----
DEPOSIT
----- End of picture text -----
==> picture [74 x 18] intentionally omitted <==
----- Start of picture text -----
Warrego
----- End of picture text -----
Nobles Nob
Gecko
White Devil
Juno
==> picture [478 x 136] intentionally omitted <==
----- Start of picture text -----
CROSS Historical Production
PLAN SECTION
6.9Mt @
200m 200m
----- End of picture text -----
6.9Mt @ 8.7 g/t Au + 2.0% Cu 1.46 Moz Au and 172.5 Kt Cu
==> picture [193 x 272] intentionally omitted <==
- 1.14 Moz Au 2.14Mt @ 16.1 g/t Au
3.0Mt @ 1.2 g/t Au + 4.0% Cu 257 Koz Au and 320 Kt Cu
-
761 Koz Au 1.7Mt @ 14.6 g/t Au
-
864 Koz Au 0.46Mt @ 57.0 g/t Au
==> picture [74 x 41] intentionally omitted <==
9 |
Quoted production from major historical deposits after Ahmad, M. and Munson, T.J. (2013). Geology and mineral resources of the Northern Territory, Special Publication 5
Emmerson holds 1,800km² in the Tennant Creek
==> picture [590 x 419] intentionally omitted <==
Tennant Mining* & Emmerson Joint Venture includes:
-
Exploration JV – Tennant funds $10.5 million of exploration ( ~$3.0m remaining )
-
• Mining and Processing JV where Emmerson receives an uncapped 6% gross production royalty plus
-
• Minimum Production Hurdles
Our JV partner has,
-
Permitted and financed the project and
-
COMMENCED CONSTRUCTION of an 840Ktpa CIL Processing Facility (~55% complete)
-
Tennant Mining currently being takeover by Pan African Resources an AIM Listed ~$1.2B ~200,000oz gold producer
==> picture [74 x 41] intentionally omitted <==
10 |
11 |
Initial Ore Reserve & Royalties - Just the Start
-
Ore Reserve of 79,140oz is currently worth ~$19 million in Royalties
-
Resource base is rapidly growing + 200,000oz added in the last 6 months
-
Golden Forty Deposit – 935Kt @ 4.5 g/t gold for 133,900oz of Gold
- Including 77Koz @ 9.3 g/t from one recently identified zone
-
Eldorado Deposit – 445Kt @ 4.9 g/t for 69,800 oz of Gold
- Including 34.5Koz @ 67.1 g/t from two zones below the historical workings
-
200,000oz of gold @ 4.6 g/t in Resource added in last 6 months, with 168,800 oz of gold @ 5.3g/t classified as Indicated
-
These High-Grade Resources are yet to be incorporated into the Ore Reserves and initial royalty valuation
==> picture [239 x 212] intentionally omitted <==
==> picture [239 x 178] intentionally omitted <==
==> picture [74 x 41] intentionally omitted <==
12 |
How is Construction Progressing?
==> picture [515 x 368] intentionally omitted <==
==> picture [393 x 287] intentionally omitted <==
==> picture [74 x 41] intentionally omitted <==
==> picture [19 x 9] intentionally omitted <==
----- Start of picture text -----
13 |
----- End of picture text -----
When will the JV Deposits be Mined and Royalties Received?
==> picture [520 x 418] intentionally omitted <==
| Current Mining and Milling | Current Mining and Milling | Current Mining and Milling | Current Mining and Milling | |||
|---|---|---|---|---|---|---|
| Schedule years 1 to | 5 | |||||
| Source | Month | Month | ||||
| (Start) | (End) | |||||
| Crown Pillar Stockpile | 1 | 29 | ||||
| Smaller open pit areas | ||||||
| (Rising Sun, Nobles, Weabers Find, Black |
4 | 13 | ||||
| Snake and Eldorado) | ||||||
| Eldorado Underground | 16 | 25 | ||||
| Juno Underground | 17 | 53 | ||||
| Golden Forty Underground |
30 | 57 | ||||
| Chariot Underground | 39 | 66 | ||||
| Nobles North Tailings | 29 | 39 | ||||
| Source: PAN AIM Release 5 Nov 2024 | ||||||
| ERM Deposits | ||||||
| 14 |
Source: PAN AIM Release 5 Nov 2024
Exploration and Resource Upside Remains
-
Significant exploration potential remains untapped within Tennent Creek Mineral Field (TCMF)
-
Deposits in the TCMF generally start small and grow over time AFTER mining commences
-
White Devil Mine
-
started with limited Reserves (40,000t) and produced over 760,000oz at ~15g/t gold before closing in 1999.
-
Mineralization remains open at depth.
-
US$ Gold Price has increased 10-fold since closure
-
-
Numerous historical mines in the field have not been evaluated in the last 20 years
==> picture [405 x 260] intentionally omitted <==
==> picture [74 x 41] intentionally omitted <==
15 |
Emmerson holds 1,800km² in the Tennant Creek
==> picture [677 x 481] intentionally omitted <==
==> picture [74 x 41] intentionally omitted <==
16 |
White Devil – Significant Upside Remains
• Shallow extension to the east was never tested due to infrastructure constraints and operational limitations
• 350m long extension remains poorly tested from surface to ~100m,
-
Drilling to commence in the next two weeks
-
Resource estimation underway – expected to be completed late November
350 m
| 100 m | Drill Target Zone MINE PRODUCTION 1.6Mt @ ~15g/t Au for 760,000oz |
Long section - looking South | ||
|---|---|---|---|---|
==> picture [74 x 41] intentionally omitted <==
17 |
White Devil – Significant Upside Remains
==> picture [644 x 429] intentionally omitted <==
Photo of White Devil during operations looking NW – highlighting infrastructure to the east of the pit
==> picture [74 x 41] intentionally omitted <==
18 |
Strategic Copper and Gold Alliance
==> picture [553 x 383] intentionally omitted <==
Alliance with Tennant Minerals, CuFe and Emmerson provides a collaborative approach to development of our Copper and Gold Projects in Tennant Creek. The alliance aims to:
Assess the development options including the viability of a single multi-user processing facility in the high-grade Tennant Creek region including:
-
The optimal processing plant configuration and location
-
Mine scheduling
-
Final products to be produced
-
Infrastructure requirements including workforce, travel, power, water, accommodation, transportation, logistics, services and supply of reagents
-
Environmental requirements and considerations including permits and approvals
-
• General logistics
Scoping Study underway – PFS to follow
==> picture [74 x 41] intentionally omitted <==
19 |
Hermitage Project (100% ERM) | A High-Grade Cu & Au Opportunity
==> picture [553 x 441] intentionally omitted <==
----- Start of picture text -----
WSW ENE
Ironstone
outcrop
Surface 119m @ 3.30% Cu & 0.87g/t
• Incl. 33m @ 6.77% Cu & 2.84g/t Au
94.4m @ 2.74% Cu & 5.58g/t Au
• Incl. 21.6m @ 4.11% Cu & 25.91g/t Au
19m @ 1.42% Cu
30m @ 0.8% Cu
24m @ 1.03% Cu • Incl. 9m @ 1.4% Cu
51.1m @ 0.8% Cu
• Incl. 20m @ 1.1% Cu
11m @ 4.1 g/t Au
4m @ 1.8% Cu
OPEN 20m @ 1.5% Cu & 0.6 g/t Au
• Incl. 7m @ 2.2% Cu & 1.0 g/t Au
52.5m @ 1.03% Cu & 1.36g/t Au
• Incl. 29m @ 1.72% Cu & 1.45g/t Au
34.8m @ 1.0% Cu
10m @ 1.62g/t Au & 0.65% Cu
15m @ 0.48% Cu (below fault)
39m @ 1.03% Cu & 0.29g/t
Au & 25m @ 4.72g/t Au 29m @ 3.86g/t Au & 3.33% Cu
?
9.6m @ 1.2% Cu, 0.9 g/t Au 9m @ 2.6g/t Au & 0.17% Cu (below fault)
• Incl. 3.9m @ 2.1% Cu, 2.2 g/t Au 9m @ 12.78g/t Au
(below fault) 100m
----- End of picture text -----
-
High-grade copper, gold, cobalt and bismuth deposit
-
Typical Tennant Creek ironstone-hosted deposit
-
Significant drill intersections include:
-
119m @ 3.30% copper and 0.87g/t gold
-
94.4m @ 2.74% copper and 5.58g/t gold
-
29m @ 3.33% copper and 3.86g/t gold
-
20m @ 1.50% copper and 0.6g/t gold
-
52.5m @ 1.03% copper and 1.36g/t gold
-
Deposit remains open laterally and at depth below a late-stage low angle fault
-
Follow-up drilling planned for FY 2025
-
Will form part of the Strategic Alliance development plans 20 |
Summary
==> picture [65 x 65] intentionally omitted <==
==> picture [65 x 64] intentionally omitted <==
==> picture [65 x 65] intentionally omitted <==
Unlocking value of High-Grade Copper and Gold deposits in Tennant Creek via Exploration and Mining JVs
Multiple exploration targets across JV and 100% owned projects
Minimum Production payment of $14.4 million by May 2026 at the current gold price
==> picture [65 x 65] intentionally omitted <==
==> picture [65 x 64] intentionally omitted <==
==> picture [65 x 65] intentionally omitted <==
Emerging royalty business – 6% Gross Production Royalty on Gold produced from Mining JV
Well-funded with ~$6m in exploration funding available (before Royalties)
A Strategic Copper and Gold Alliance working Collaboratively investigating multi-user copper and gold processing facility
21 |
==> picture [526 x 540] intentionally omitted <==
----- Start of picture text -----
Contact
Mike Dunbar
Managing Director & CEO
Emmerson Resources Limited
+61 8 9381 7838
[email protected]
www.emmersonresources.com.au
ASX: ERM
----- End of picture text -----
==> picture [116 x 63] intentionally omitted <==
22 |
Mineral Resources
| Deposit | Indicated Resources | Indicated Resources | Indicated Resources | Inferred Resources | Inferred Resources | Inferred Resources | Total Resources | Total Resources | Total Resources |
|---|---|---|---|---|---|---|---|---|---|
| Tonnes (t) |
Gold Grade (g/t) |
Ounces | Tonnes (t) |
Gold Grade (g/t) |
Ounces | Tonnes (t) |
Gold Grade (g/t) |
Ounces | |
| Chariot(OP) | 64,500 | 18.1 | 37,600 | 8,200 | 14.4 | 4,000 | 72,700 | 17.7 | 41,400 |
| Chariot(UG) | 344,600 | 7.0 | 77,000 | 138,900 | 4.6 | 20,400 | 483,500 | 6.3 | 97,400 |
| Mauretania | 159,000 | 4.8 | 25,000 | 97,000 | 1.4 | 4,000 | 256,000 | 3.5 | 29,000 |
| Black Snake | 50,900 | 2.1 | 3,500 | 29,000 | 1.1 | 1,000 | 79,900 | 1.7 | 4,500 |
| Golden Forty | 706,000 | 5.0 | 113,200 | 229,000 | 2.8 | 20,700 | 935,000 | 4.5 | 133,900 |
| Eldorado | 277,500 | 6.2 | 55,600 | 167,200 | 2.6 | 14,200 | 444,700 | 4.9 | 69,800 |
| TOTAL | 1,602,800 | 6.1 | 312,000 | 669,200 | 3.0 | 64,600 | 2,272,000 | 5.2 | 376,600 |
==> picture [69 x 38] intentionally omitted <==
23 |
Ore Reserves
| Deposit | Proved Ore Reserves | Proved Ore Reserves | Proved Ore Reserves | Probable Ore Reserves | Probable Ore Reserves | Probable Ore Reserves | Total Reserves | Total Reserves | Total Reserves |
|---|---|---|---|---|---|---|---|---|---|
| Tonnes (t) |
Gold Grade (g/t) |
Ounces | Tonnes (t) |
Gold Grade (g/t) |
Ounces | Tonnes (t) |
Gold Grade (g/t) |
Ounces | |
| Chariot | - | - | - | 420,000 | 4.1 | 55,000 | 420,000 | 4.1 | 55,000 |
| Mauretania | - | - | - | 67,300 | 9.9 | 21,400 | 67,300 | 9.9 | 21,400 |
| Black Snake | - | - | - | 36,900 | 2.3 | 2,740 | 36,900 | 2.3 | 2,740 |
| TOTAL | - | - | - | 524,000 | 4.7 | 79,140 | 524,000 | 4.7 | 79,140 |