Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ELEVRA LITHIUM LIMITED Interim / Quarterly Report 2018

Jan 30, 2018

64838_rns_2018-01-30_225e2a6b-deab-4fc5-a676-7f8ce09fdb8d.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [595 x 29] intentionally omitted <==

==> picture [595 x 30] intentionally omitted <==

==> picture [595 x 30] intentionally omitted <==

==> picture [595 x 29] intentionally omitted <==

==> picture [595 x 30] intentionally omitted <==

31 JANUARY 2018

DECEMBER 2017 QUARTERLY REPORT

Highlights

  • Authier JORC Mineral Resources and Ore Reserves upgraded

  • Optimised PFS Completed - Pre-tax NPV8 of C$221m (AUD$227m), Pre-Tax IRR of 56% and capital payback 2.5 years

  • MOU signed with Changyuan for potential Authier off-take and downstream processing

  • Authier permitting and environmental studies advancing towards completion in 2018

  • Authier Definitive Feasibility Study and Phase 3 drilling program commences

  • $4.9 million renounceable rights offering successfully completed

Sayona Mining Limited (ASX: SYA) ("Sayona" or the "Company") is pleased to announce the activities report for the quarter, including:

  • Authier, Canada – major focus on completion of the optimisation programs for the Authier Optimised Pre-Feasibility Study and commencement of the Definitive Feasibility Study;

  • Western Australian Lithium, Australia – rock chip and soil sampling programs completed at Mallina and Deep Well; and

  • Capital raising – a $4.9 million capital raising to fund completion of the Authier Definitive Feasibility Study, Authier pilot metallurgical testing program and corporate costs was completed.

Authier

The Company’s primary strategy is to focus on completing the studies required to commence the development of the project, including the Definitive Feasibility Study. Authier is a near-term development project and cash-flow generation opportunity. The Company believes it will create significant share value-uplift potential for shareholders as the project is advanced towards development.

==> picture [595 x 73] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

MOU Signed for Authier Off-Take and Downstream Value Adding Opportunities

During the quarter, the Company signed a non-binding Memorandum of Understanding (“MOU”) with leading China based battery manufacturer, Huan Changyuan Lico Co Ltd (“Changyuan”).

Changyuan, a subsidiary of the Fortune 500 Company, China Minmetals Group, is a battery research, development, and production company. In 2016, the company produced more than 16,000 tonnes of battery cathode materials and is expanding its production capacity to 36,000 tonnes in 2018. The main products produced include, lithium cobalt oxide and lithium manganese oxide batteries, and ternary composite lithium-ion cathode materials.

The MOU paves the way for advancing discussions to facilitate a development alliance exploring marketing, technical and financial opportunities for the Authier project, including:

  • Changyuan purchasing up to 100,000 tonnes of spodumene concentrate per annum;

  • Development partnerships for the value-adding of the concentrates into lithium carbonate and/or lithium hydroxide in either China or Canada; and

  • Funding and investment opportunities for Sayona and the Authier project.

JORC Mineral Resources Upgrade

In June 2017, the Company reported a JORC 2012 compliant Mineral Resource following the Phase 2 drilling program[1] . During the quarter, the Mineral Resource was updated to include the Northern Pegmatite which was not previously incorporated in the Mineral Resource. In addition, the Authier Main pegmatite has been increased due to refinement of the lithium solids model for the main pegmatite. The Authier deposit has 20,183 metres of diamond drilling in 150 holes.

Table 1 – Authier JORC Mineral Resources Table 1 – Authier JORC Mineral Resources Estimate(0.45% Li20 cut-offgrade)
Category Tonnes(Mt) **Grades %Li20 ** **Contained Li20 **
Measured 5.86 1.01% 59,186
Indicated 10.19 1.03% 104,957
Inferred 2.30 0.99% 22,810
Total 18.35 1.02% 186,953

Authier Optimised Pre-Feasibility Study

During the quarter, the Company completed the Optimised Pre-Feasibility Study (“PFS”). The PFS incorporates the new expanded JORC Mineral Resource, results from

1 See ASX release, “Authier JORC Resource Increased, 14 June 2017

________________ Page 2 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

a number of technical optimisation programs, and realignment of pricing to reflect a concentrate grade of 6% Li2O and more recent industry forecasts. The PFS confirms the technical and financial viability of constructing a simple, low-strip ratio, open-cut mining operation and processing facility producing spodumene concentrate. The positive PFS demonstrates the opportunity to create substantial long-term sustainable shareholder value at a low capital cost.

Key findings of the PFS, include:

  • Pre-tax NPV8 of C$221 million and IRR 56% (real terms at 8% discount rate);

  • Annual average concentrate production of 96,000 tonnes at 6% Li20;

  • Average annual revenue of C$73 million and EBITDA of C$35 million;

  • Mine gate cash costs of C$370/t and FOB Port cash costs of C$430/t (US$327/t); and

  • Initial capital expenditure of C$64 million and C$110 million over the life-ofmine.

The February 2017 PFS has been updated to incorporate the following new information:

  • JORC Resource upgrade following the Phase 2 drilling program;

  • Geotechnical and dilution studies;

  • Improved metallurgical outcomes from the latest testing programs;

  • Realignment of spodumene pricing to reflect current industry forecasts; and

  • Review of operating and capital costs.

Based on the results of the new information, a new Proven and Probable Ore Reserve estimate of 11.66Mt @ 1.03% Li20 at a 0.45% Li20 cut-off grade (Table1) has been defined.

Table 2– Authier JORC Ore Reserve Estimate (0.45% Li20 cut-off grade)
Category
Tonnes (Mt)
Grades (%Li20)
**Contained Li20 **
Proven Reserve
5.59
0.99
55,341
Probable Reserve
6.07
1.06
64,363
Total Reserves
11.66
1.03
120,098
Note: The Ore Reserve estimate is based on the details published in a separate ASX release
“Authier JORC Ore Reserve”, 11 December 2017. The Ore Reserve Estimate is inclusive of 2%
dilution and 5% ore loss

________________ Page 3 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Summary PFS financial and operating highlights are summarised in Table 3 and 4. respectively.

Table 3– Authier Lithium Project PFS Highlights Table 3– Authier Lithium Project PFS Highlights
Description CAD$ US$ AUD$
Average Spodumene Price 807 614 831
Initial Development Capital Costs 64 48 65
Total Life of Mine Capital Costs 110 84 113
Total Net Revenue (real terms) 1,322 1,004 1,361
Total Project EBITDA (real terms) 624 474 642
Average Life of Mine Cash Costs (Mine-gate) 370 281 381
Average Life of Mine Cash Costs (Montreal Port FOB
basis)
430 326 442
Net Present Value (real terms @ 8% discount rate) 221 167 227
Pre-Tax Internal Rate of Return 56
Project Payback Period 2.5
Notes: CAD$:US$ 0.76 and CAD$:AUD$ 1.03
Table 4– Authier Lithium Project PFS Operating Highlights
Description Unit Results
Description Unit Results
Average Annual Ore Feed to the Plant tonnes 686,000
Annual Average Spodumene Production tonnes 96,000
Life-of-Mine years 17
Life-of-Mine Strip Ratio waste to ore 6.95:1

Authier Definitive Feasibility Study

The Company awarded the main components of Authier Definitive Feasibility Study (“DFS”) including, the mining, processing and infrastructure to BBA.

BBA is an independent Canadian consulting engineering firm operating internationally. Its team is composed of highly-qualified experts in several engineering disciplines including electrical, civil, mechanical, industrial data processing, mining, metallurgical processes, automation, and construction management. BBA have extensive experience in the Canadian mining industry and have been actively involved in Feasibility Studies for Quebec lithium projects including, Nemaska and the North American Lithium project.

A number of other DFS work programs including geotechnical, transport and environmental have been outsourced to specialist contractors are underway.

________________ Page 4 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

The company is targeting completion of the DFS in the second quarter calendar 2018.

Authier Phase 3 Drilling Program

The Company commenced a Phase 3 drilling program at Authier to collect a bulk sample for a pilot metallurgical program, and further expansion and optimisation of the resource.

Pilot Plant Sample

The initial phase of the program was aimed at collecting 5 tonnes of drill core for a pilot metallurgical testing program. The pilot program data will be used for inputs into the process plant design in the DFS. The sample was successfully collected by the end of December.

Resource expansion

Subsequent to the end of the quarter, the drilling program re-commenced in early January 2018. The objective of the diamond drilling is to expand and optimise, the resource and reserve position for incorporation into the DFS, including:

  • Drilling at depth and within the eastern and western sectors at shallow levels to provide better definition and potential expansion of the orebody - see Figure 2;

  • Potential expansion of the northern pegmatite zone where a small JORC Mineral Resources was defined as part of the Optimised Pre-Feasibility Study (see ASX release, Authier JORC Mineral Resource Update, 11[th] December 2017) – see Figure 3;

  • Infill definition drilling within the main resource zone where the mineralisation is not as well defined and is currently treated as waste for the Ore Reserve estimation; and

  • Converting inferred resources into a higher resource classifications by further higher density drilling (resource areas shown in blue in Figure 2).

The Company has successfully increased the size of the resource and reserve through previous drilling programs. Any further increases have the potential to enhance the positive economics demonstrated in the recently announced Optimised Pre-Feasibility Study. The new drilling data will be incorporated into the resource models for the DFS which is expected to be completed in the second quarter of 2018.

The Company will also be looking to drill extensions of the major structural east-west trend which is highlighted from historical geophysics - see Figure 3. The focus of the drilling is to target new pegmatite systems not outcropping on the surface. During the Phase 2 drilling program, the Company discovery of the Northern Pegmatite which doesn’t outcrop at the surface. The areas in the west have not been extensively explored and the Company believes there is potential to identify new systems.

The Company will also complete some condemnation drilling to sterilise areas required for the process plant, and combined waste and tailings storage areas.

________________ Page 5 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [485 x 318] intentionally omitted <==

Figure 1: Potential areas to expand the Authier resource


Page 6 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [487 x 406] intentionally omitted <==

Figure 2: Main Authier deposit (left) and Authier North (right) lithium solids model at 0.45% Li20


Page 7 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [496 x 103] intentionally omitted <==

==> picture [496 x 104] intentionally omitted <==

==> picture [496 x 103] intentionally omitted <==

Figure 3: Main structural trend highlighted by historical geophysics

Environmental and Permitting Work Programs

Hydrogeological Survey

A ten-hole drilling program for the hydrogeology study has now been completed. The drill holes will be used to assess hydrogeological conditions prevailing in the project area. The information will be used to assess the current quality of the groundwater and to make the assessment of the potential projects impact on the ground water regime and quality in the area.

In addition, the data will be used to plan the pumping activities for the mine, and to provide information for the geotechnical engineering and geo-mechanics of the project. The program will improve the understanding of the project groundwater environment and is expected to mitigate the environmental risks attributable to the operation.

Environmental Survey Update

The autumn flora and fauna field survey has now been completed. The survey included:

  • Creating a vegetation inventory, including wetlands and species with special status;

  • Inventory of fish and fish habitat;

  • Inventories of wildlife species with special status; and


Page 8 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

• Assessment of surface water quality.

No major issues have been identified. Final environmental reports will be completed by the first quarter of 2018.

Mining Lease Application Process

The Company has now completed the project survey which is required for the Mining Lease approval process. The final four steps required to complete the Mining Lease application include, completion of Definitive Feasibility Study, public consultations, base line environmental work and rehabilitation plan. This is largely complete or in progress.

Stakeholder Engagement

The Company is actively progressing the local community and First Nations stakeholder engagement programs. The program aims to ensure all environmental, social and economic concerns raised by stakeholders are integrated into the project development. Early discussions with the local La Motte council have not flagged any major issues and the council is looking forward to new investment and job creation for the region.

________________ Page 9 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Western Australian Projects

Exploration tenure in Western Australia includes leases covering some 1780km[2] in the world class Pilgangoora lithium district. The 141km[2] Mallina project, E47/2983, has been the main focus of work during 2017 and three new zones of spodumene pegmatite have been identified, including the recent Area C prospect discovery. A potential for gold mineralisation has also been recognised at the Deep Well and Friendly Creek areas. Pilbara tenure is displayed in the figure below.

==> picture [401 x 267] intentionally omitted <==

Figure 4: Sayona Lithium Tenements in Western Australia

Mallina Project

Exploration at Mallina continued within a 6x3 kilometre zone where three groups of spodumene pegmatites have been identified to date. Work was focussed at the Area C prospect where spodumene pegmatites were first identified last quarter. Additional rock sampling has confirmed the presence of strong lithium mineralisation, with a maximum 4.27% Li2O returned in pegmatite with visual spodumene. Soil sampling (354 samples) returned a strong, coherent lithium anomaly as well as defining unexplained lithium anomalies in the more regional sampling. Results are displayed in the figure below.

________________ Page 10 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [452 x 344] intentionally omitted <==

Figure 5 Mallina Pegmatites and New Area C Prospect Geochemistry

Results are considered encouraging. The infill soil sampling at Area C returned up to 1399ppm Li2O, and using a 150ppm Li2O threshold (displayed by green hatch in the figure below), results define a coherent anomaly over 1200m in strike extent. This anomaly is centred over variably outcropping pegmatite up to 15m in surface width (true width not known).

Statutory requirements to allow drilling at the Area C prospect have been lodged and approved. Planning for drill testing the Area C prospect and other target areas within the Mallina tenement is well advanced.

Regional Lithium Projects

During the quarter, reconnaissance was made at the West Wodgina tenement, E45/4726. Twenty one rock samples were collected of granite and pegmatite to identify fractionation trends and help define the general prospectivity of the area. Results include elevated lithium and tin, indicating several areas for follow up sampling in the 2018 field season.

________________ Page 11 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

==> picture [305 x 396] intentionally omitted <==

Figure 6 Area C Prospect Soil Geochemistry and Selected Rock assay Results

Great Sandy Option

During the quarter, the Company made the first stage option payment to Great Sandy Pty Ltd (“Great Sandy”) to acquire a 694 km[2] package of 6 tenements in the world-class Pilgangoora lithium district of Western Australia (see Figure 4).

The Great Sandy purchase terms include an option to acquire an 80% interest in all the tenements by making staged payments in cash or shares at Great Sandy’s election of $300,000 (current payment) within 12 months and $300,000 within 24 months and free carrying Grant Sandy to Decision to Mine. At the Decision to Mine, Great Sandy can either elect to dilute or contribute to ongoing expenditure commitments or convert the 20% interest to a 2% gross smelter royalty.


Page 12 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Deep Well Project

The Deep Well tenement application covers 119km[2] of a poorly outcropping sequence of Mallina Formation sediments, intruded to the east by nested plutons of the Portree granite. Volcanic rocks of the Fortescue aged Mt Roe Basalt in the western tenement region are margined eastwards by poorly outcropping, highly weathered sediments with local pyrite and conglomerate textures (see figure below). The age or origin of these conglomerates is uncertain, and mapping has not been able to identify sedimentary units or horizons that can be traced along strike. The geological setting of the tenement however indicates a potential for conglomerate hosted gold mineralisation, which has recently been identified at several nearby areas.

==> picture [257 x 362] intentionally omitted <==

Figure 7 Deep Well Tenement, Fortescue Group and Nearby Gold Prospects

Work in the quarter included commencement of orientation geochemistry with 147 soil and 22 rock samples collected. Results for the first sample batch of coarse soil material (59 samples) returned subdued assay results up to 2.5ppb gold. Results from the finer sample fractions are pending.

Pyrite cubes are locally abundant in several areas of the bedrock sediments, providing encouragement that high energy sedimentary processes may have occurred during

________________ Page 13 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

deposition. To help identify potential heavy mineral assemblages (magnetite, uranium, and chromite etc), which may be associated with gold mineralisation, a small number of stream sediment and loam samples were collected. These were concentrated by panning to give a heavy mineral concentrate. Readings of magnetic susceptibility and radioactivity (scintillometer readings of counts per second) have also been collected along traverse and sample lines. Interpretation of these results is on-going.

Further work is planned, to expand the geochemical and geophysical programmes and carry out further geological mapping.

Other Project Areas

No exploration was carried out at either the Mt Edon Lithium project or the East Kimberley Graphite project during the quarter.

Corporate Activities

Capital Raising

During the quarter, the company completed a pro rata renounceable rights issue, comprising an offer on the basis of one (1) new share for every two (2) existing shares held at an issue price of 1 cent ($0.01) per share. Under the Rights Issue, 487,409,777 new shares were issued raising $4,874,097 before the costs of the offer. The Rights Issue is partially underwritten up to $2.0 million by Patersons Securities Limited, who also acting as the lead manager to the issue.

For more information, please contact:

Corey Nolan Chief Executive Officer Phone: +61 (7) 3369 7058 Email: [email protected]

Sayona Mining Limited is an Australian, ASX-listed (SYA) company focused on sourcing and developing the raw materials required to construct lithium-ion batteries for use in the rapidly growing new and green technology sectors. Please visit us as at www.sayonamining.com.au

Reference to Previous ASX Releases for Authier, Canada

This presentation refers to the following previous ASX releases:

  • Authier JORC Resource Expanded , 11 December 2017

  • Authier Maiden JORC Ore Reserve, 11 December 2017

  • Authier PFS, 11 December 2017

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and all material assumptions and technical parameters continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

________________ Page 14 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Competent Person Statement

The information in this report relating to projects on Western Australia is based on information compiled by Mr. Simon Attwell, a Competent Person, and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Attwell is an employee of Attgold Pty Ltd (“Attgold”) which provides geological services to Sayona.

Mr. Attwell has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Attwell consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Tenement Schedule

Australian Tenement Schedule Australian Tenement Schedule Australian Tenement Schedule Australian Tenement Schedule
Tenement Name Status Interest at Start of
Quarter
Interest at end of
Quarter
E59/2092 Mt Edon Granted 80%, with rights to 100%
of pegmatite minerals*
80%, with rights to 100%
of pegmatite minerals*
E59/2055 Mt Edon West Granted 100% (pegmatite
minerals)
100% (pegmatite
minerals)
E45/2364 Tabba Tabba Granted Rights to 100% of
pegmatite minerals*
Rights to 100% of
pegmatite minerals*
E45/4703 Tabba Tabba East Granted 100% 100%
E45/4716 Red Rock Granted 100% 100%
E45/4726 West Wodgina Granted 100% 100%
E45/4738 Cooglegong Granted 100% 100%
E45/4775 Carlindie Granted 100% 100%
E80/4511 Western Iron Granted 100% 100%
E80/4949 Corkwood Granted 100% 100%
ELA80/4968 Keller Application 100% 100%
ELA47/3802 Friendly Creek Application 100% 100%
ELA47/3829 Deep Well Application 100% 100%
Great Sandy Pty Ltd Option
E47/2983 Mallina Granted Option Rights to 80% Option Rights to 80%
E46/1103 Dorringtons Granted Option Rights to 80% Option Rights to 80%
E45/4687 White Springs Granted Option Rights to 80% Option Rights to 80%
E45/4721 Mt Edgar Granted Option Rights to 80% Option Rights to 80%
E45/4727 Mt Edgar Granted Option Rights to 80% Option Rights to 80%
E45/4700 Mt Edgar Granted Option Rights to 80% Option Rights to 80%

________________ Page 15 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Canadian Tenement Schedule Canadian Tenement Schedule Canadian Tenement Schedule
Claim Number Registered holder Registration Expiration Area
Date Date (hect)
2116146 Sayona Mining Limited 8/8/2007 7/8/2019 43.24
2116154 Sayona Mining Limited 8/8/2007 7/8/2019 42.88
2116155 Sayona Mining Limited 8/8/2007 7/8/2019 42.87
2116156 Sayona Mining Limited 8/8/2007 7/8/2019 42.86
2183454 Sayona Mining Limited 2/6/2009 1/6/2019 42.85
2183455 Sayona Mining Limited 2/6/2009 1/6/2019 42.84
2187651 Sayona Mining Limited 2/9/2009 1/9/2019 21.39
2187652 Sayona Mining Limited 39853 43474 21.29
2192470 Sayona Mining Limited 22/10/2009 21/10/2019 21.08
2192471 Sayona Mining Limited 22/10/2009 21/10/2019 21.39
2194819 Sayona Mining Limited 19/11/2009 18/11/2019 42.82
2195725 Sayona Mining Limited 27/11/2009 26/11/2019 29.03
2219206 Sayona Mining Limited 22/04/2010 21/04/2018 5.51
2219207 Sayona Mining Limited 22/04/2010 21/04/2018 17.06
2219208 Sayona Mining Limited 22/04/2010 21/04/2018 55.96
2219209 Sayona Mining Limited 22/04/2010 21/04/2018 42.71
2240226 Sayona Mining Limited 9/7/2010 8/7/2018 42.71
2240227 Sayona Mining Limited 40428 43319 42.71
2247100 Sayona Mining Limited 23/08/2010 22/08/2018 42.75
2247101 Sayona Mining Limited 23/08/2010 22/08/2018 53.77

JORC Code, 2012 edition – Table 1 (section 1; Sampling Techniques and Data)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling

Geochemical samples have been collected as a first
pass assessment and orientation of the project area.
The samples have an irregular spacing reflecting the
reconnaissance nature of the assessment.

Samples are grab samples.

The presence or absence of mineralisation was initially
determined visually by the field geologist.

The type of geochemical sampling is a standard
approach during the initial style reconnaissance that has
been carried out.

Page 16 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).

Not applicable, no drilling has been carried out
Drill
sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.

Not applicable, no drilling has been carried out
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.

Not applicable, no drilling has been carried out. This
information is of insufficient detail to support any Mineral
Resource Estimation.
Sub-sampling
techniques
and
sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.

Not applicable, no drilling has been carried out


No measures have been taken to ensure sampling is
statistically representative of the in situ sampled
material. The collection methodology is considered
appropriate for this early stage assessment of the
project.

The sample size is considered appropriate to the early
stage of exploration carried out.
Quality of assay
data
and
laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of bias)

Analysis was carried out by ALS, Brisbane which is a
certified laboratory in compliance with AS/NZS-
9001:2000. Analysis, of a 48 element suite, was
determined by mixed acid digest followed by ICP-MS61.
Six samples which reported high Li values by this
method were re-assayed by peroxide fusion, method
ME-ICP89, to give a high precision result. For samples
collected at the Deep Well project low level gold
determination by ST43 super trace aqua regia extraction
and ICPMS finish was carried out. This is considered a

________________ Page 17 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
and precision have been established. total digest appropriate to the samples submitted.

Not used

No additional quality control measures beyond that of the
Laboratory QA/QC were implemented.
Verification
of
sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.

The results are considered acceptable and have been
reviewed by multiple geologists. The company conducts
internal data verification protocols which have been
followed.

Li has been converted toLi20for the purposes of
reporting. The conversion used wasLi20= Li x 2.153.
No other adjustments to assay data has been
undertaken
Location of data
points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.

Samples were located during collection by handheld
GPS

The grid system used is Australian Geodetic MGA Zone
50 (GDA94).

The level of topographic control offered by the handheld
GPS is considered sufficient for the work undertaken
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.

There was no predetermined grid spacing to the rock
sampling program.

The data spacing and distribution is not sufficient to
establish the degree of geological and grade continuity
appropriate for Mineral Resource estimation procedures.

Samples have not been composited.
Orientation of data
in
relation
to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.

Sampling was carried out over small areas of the project
and it is not known if they are representative.

Not applicable, no drilling has been carried out
Sample security The measures taken to ensure sample security.
Industry standard sample collection and storage have
been reported by the vendor geologist.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.

No audits or reviews of the data have been conducted at
this stage

JORC Code, 2012 edition – Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.

The Mallina project, E47/2983 is part of a larger
tenement portfolio held under Option Agreement with
Great Sandy Pty Ltd. The Option terms and tenement
details have been previously reported, for example in 21st
December 2016 ASX release titled ‘Option to Acquire

Page 18 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
New Pilbara Spodumene Discovery’.

The Deep Well project is application E47/3829 which is
pending grant and which has no known reasons why this
should not proceed to grant.

There are no impediments that have been identified for
operating in the project areas
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other
parties.
 At Mallina past exploration has focused on the gold and
base metal potential of the area.
 Together with government data provided by GSWA past
information has allowed recognition of the projects potential.
Geology Deposit type, geological setting and style of mineralisation.  Lithium is being targeted within rare metal pegmatites which
represent the most fractionated and evolved pegmatite type.
Sayona’s main focus is in discovery of albite-spodumene
pegmatite types which host high grade lithium
mineralisation. Rare metal pegmatites are uncommon,
typically hosted in greenstone rocks near to granite
intrusion. The Deep Well project is being explored to
determine if gold mineralisation associated with heavy
minerals which accumulated during deposition in the late
Archaean is present.
Drill
hole
Information
A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
 Drilling has not been carried out.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should
be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
 No variation to laboratory reported assays has been made.
Relationship
between
mineralisation
These relationships are particularly important in the
reporting of Exploration Results.
 Exploration is at an early stage and information contains
insufficient data points to allow these relationships to be

Page 19 of 20

==> picture [595 x 52] intentionally omitted <==

==> picture [595 x 52] intentionally omitted <==

Criteria JORC Code explanation Commentary
widths
and
intercept lengths
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
reported
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
 Sample plans are attached
Balanced
reporting
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
 All relevant assay results are reported herein.
Other substantive
exploration data
Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
 The exploration reported herein is at a very early stage but
results are consistent with geological and other data
Further work The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-
out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
 Further mapping and follow up sampling is required to
define lithium targets and mineralisation for drill testing

________________ Page 20 of 20