ELEVRA LITHIUM LIMITED Capital/Financing Update 2021

Sep 12, 2021

64838_rns_2021-09-12_cc06d1a1-1c2c-4751-a06a-ac5ba887f8b5.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 67] intentionally omitted <==

==> picture [595 x 68] intentionally omitted <==

==> picture [595 x 68] intentionally omitted <==

==> picture [595 x 68] intentionally omitted <==

13 September 2021

SAYONA EYES POTENTIAL NAL RESOURCE INCREASE

Highlights

  • Project review shows potential to significantly increase lithium resource at newly acquired North American Lithium (NAL), supporting Sayona’s plans for world‐scale Abitibi lithium hub

  • Diamond drilling completed in 2019 being audited, with potential to fast‐track new expanded resource estimate and planning for resumption of operations

  • Consultants BBA commissioned to conduct updated NI 43‐101 and JORC study for resource estimate and subsequent feasibility study.

Emerging lithium producer Sayona Mining Limited (ASX:SYA; OTCQB:SYAXF) is planning a further boost to its Abitibi lithium hub, with the potential for a significant resource expansion at the newly acquired North American Lithium (NAL) mine in Québec, Canada.

Extensive diamond drilling completed in 2019 is being integrated with other previous drill results which are being audited, with the potential to fast‐track an increased resource estimate and the resumption of operations at NAL.

Consultants BBA Inc. have been engaged to produce an updated Canadian NI 43‐101 study of NAL’s resource base with subsequent conversion to Australia’s JORC standard by year‐end, as the basis of a scoping study for the production of spodumene (lithium) concentrate from 2023.

In 2017, NAL had a total foreign mineral resource estimate of 39.3 million tonnes @ 1.04% Li2O, up 18% from earlier studies (refer Table 1 for details and Cautionary Statement). Subsequent drilling has shown the potential for a resource expansion, including results for some 42 holes of around 12,000m which were completed during 2019 and which are being validated for inclusion into the drill database for the first time.

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

Sayona’s Managing Director, Brett Lynch commented: “ Based on the extra drilling conducted since 2017, we anticipate the potential for a significant upgrade to the NAL resource base, which we aim to deliver before year‐end.

“This only adds to the opportunity at NAL, which is the centre of our expanding Abitibi lithium hub supported by our Authier and Tansim Lithium Projects.

“Our Québec team is now on‐site at NAL and progressing the feasibility study to allow us to successfully resume operations. We look forward to quickly getting NAL back into production, becoming North America’s leading lithium operation and supporting its clean energy revolution.”

==> picture [475 x 31] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 31] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 31] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 31] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 31] intentionally omitted <==

==> picture [475 x 30] intentionally omitted <==

==> picture [475 x 31] intentionally omitted <==

Figure 1: NAL open pit and plant, looking south

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

NAL Resources and Reserves Estimates

In 2017, NAL completed a NI 43‐101 Technical Report with an effective date of 24 August 2017 (refer Tables 1 and 2 below).

Table 1: NAL 2017 Mineral Resources Estimate

NAL 2017 Mineral Resources Estimate (0.6% Li20 cut‐off grade)

Table 1: NAL 2017 Mineral Resources Estimate Table 1: NAL 2017 Mineral Resources Estimate Table 1: NAL 2017 Mineral Resources Estimate Table 1: NAL 2017 Mineral Resources Estimate
NAL 2017 Mineral Resources Estimate (0.6% Li20 cut‐off grade)
Category Million Tonnes **Grades Li20 ** **Contained Li20 **
Measured
Indicated
13.5
25.8
1.08%
1.02%
145,800
263,160
Total 39.3 1.04% 408,960
Inferred 18.4 1.06% 195,040
  • Tonnages have been rounded to the nearest 0.1 Mt to reflect their approximate nature.

  • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves.

  • The quantity and grade of reported Inferred resources in this Mineral Resource Estimate are uncertain in nature and there has been insufficient exploration to define these Inferred resources as Indicated or Measured, and it is uncertain if further exploration will result in upgrading them to these categories.

Table 2: NAL 2017 Reserves Estimate (0.6% Li20 cut‐off grade)

Category Million Tonnes **Grades Li20 ** **Contained Li20 **
Proven
Probable
11.7
8.8
0.94%
0.93%
109,980
81,840
Total 20.6 0.94% 193,640

Note: Based on a 95% recovery; 18% dilution. Estimates have been modified by subsequent mining.

Cautionary Note: National Instrument 43‐101 is a national instrument for the Standards of Disclosure for Mineral Projects within Canada. The Mineral Reserves stated are foreign estimates and are not reported in accordance with JORC Code. A competent person has not done sufficient work to classify the foreign estimates as Mineral Resources in accordance with the JORC Code. It is uncertain that following evaluation and/or further exploration work that the foreign estimates will be able to be reported as Mineral Resources in accordance with the JORC Code. Please see below for the ASX listing rule Chapter 5 disclosures.

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

Activities Post 2017 Foreign Resource Estimates

Between 2017 and February 2019, approximately 1,689,000 tonnes were extracted from the pit at an average grade of 1.11% Li2O. During the same period, 1,356,000 tonnes were milled at an average grade of 1.18% Li2O.

Up until 2019 when NAL was placed in receivership, the project dataset comprised a total of 251 holes for a total of 42,630m including 203 diamond drill holes, eight geotechnical holes and 18,584 blastholes for a total of 185,840 m; 19,723 assays, underground sampling and modelling of 41 geological domains covering the NAL deposit.

Based on an arrangement with the creditors, additional diamond drilling was carried out between May and July 2019 with 42 holes approximating 12,000 m completed. This information is being validated and is anticipated to aid interpretation of the mineralised zones and potentially expand the extent of an updated NI 43‐101 resource estimate study that Sayona has commissioned BBA Inc to complete.

Project Background

NAL comprises 19 contiguous claims covering 582.31 ha, situated in La Corne township in Quebec’s Abitibi‐Témiscamingue region. The project lies 60 km north of the city of Val d’Or, a major mining service centre, and is easily accessed by provincial highways and all weather secondary roads. The region has a long history of lithium mining.

==> picture [401 x 306] intentionally omitted <==

Figure 2: NAL deposit local geology map and mining property boundaries

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

==> picture [511 x 82] intentionally omitted <==

==> picture [511 x 81] intentionally omitted <==

==> picture [511 x 82] intentionally omitted <==

Figure 3: Representative section showing NAL 2017 Resource Classification with proposed 2017 optimised pit, looking north.

This announcement is authorised by Sayona’s Board of Directors.

‐END‐

For more information, please contact:

Brett Lynch

Managing Director Email: [email protected]

For media queries, please contact:

Anthony Fensom

Republic PR Ph: +61 (0)407 112 623 Email: [email protected]

About Sayona Mining

Sayona Mining Limited is an emerging lithium producer (ASX:SYA; OTCQB:SYAXF), with projects in Québec, Canada and Western Australia.

In Québec, Sayona’s assets comprise the Authier Lithium Project and its emerging Tansim Lithium Project, supported by a strategic partnership with American lithium developer Piedmont Lithium Inc. (Nasdaq:PLL; ASX:PLL). Sayona and Piedmont have also successfully undertaken the joint acquisition of North American Lithium, which hosts a former lithium mine and concentrator.

In Western Australia, the Company holds a large tenement portfolio in the Pilbara region prospective for gold and lithium. Sayona is exploring for Hemi‐style gold targets in the world‐class Pilbara region, while its lithium projects are subject to an earn‐in agreement with Altura Mining Limited.

For more information, please visit us at www.sayonamining.com.au

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

Reference to Previous ASX Releases

  • NAL Acquisition Finalised and Production Plans Advance – 30 August 2021

  • Quarterly Activities/Cash Flow Report – 30 July 2021

  • Sayona Obtains Court Approval for NAL Acquisition – 30 June 2021

COMPETENT PERSON STATEMENT

The information in this report that relates to Exploration Results is based on information compiled by Dr Gustavo Delendatti, a member of the Australian Institute of Geoscientists. Dr Delendatti is an independent consultant, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which it is undertaking to qualify as a Competent Person as defined in the JORC Code (2012 Edition) of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.‟ Dr Delendatti was responsible for the review of the exploration and drilling information, supervised the preparation of the technical information in this release and has relevant experience and competence of the subject matter. Dr Delendatti, as competent person for this announcement, has consented to the inclusion of the information in the form and context in which it appears herein.

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

Table 2 ‐ Australian Securities Exchange Listing Rules Chapter 5.12 ‐ Reporting Requirements for a Foreign and/or Historical Estimate – BBA Inc. 2017

Table 2 ‐ Australian Securities Exchange Listing Rules Chapter 5.12 ‐ Reporting Requirements for a
Foreign and/or Historical Estimate – BBA Inc. 2017
Table 2 ‐ Australian Securities Exchange Listing Rules Chapter 5.12 ‐ Reporting Requirements for a
Foreign and/or Historical Estimate – BBA Inc. 2017
Table 2 ‐ Australian Securities Exchange Listing Rules Chapter 5.12 ‐ Reporting Requirements for a
Foreign and/or Historical Estimate – BBA Inc. 2017
Listing
Rule
Criteria Comment
5.12.1 The source and date of the
historical estimates or foreign
estimates.
The La Corne NAL Mineral Resource foreign estimate was sourced from the
BBA Inc NI 43‐101 Technical Report, North American Lithium Project
Feasibility Study, effective date August 24, 2017 and signature date
September 7, 2017.
The Mineral Resource estimate was carried out by SGS Geostat (SGS) in
accordance with the regulations from the Canadian Institute of Mining and NI
43‐101 guidelines. The effective date of the resource is February 1, 2017.
The Mineral Reserves for the project have been estimated as defined by NI
43‐101 and are valid as of 1 May 2017.
The resource estimates have been subsequently modified due to mining
activities and new drill information so that they do not represent a current NI
43‐101 report.
5.12.2 Whether the historical
estimates of foreign estimates
use categories of mineralisation
other than those defined in
Appendix 5A (JORC Code) and if
so an explanation of the
differences.
The Mineral Resource and Reserve Estimates referred to in the report are all
consistent with those terms defined in Appendix 5A of the Joint Ore Reserve
Committee (“JORC”) 2012 Guidelines.
5.12.3 The relevance and materiality
of the historical estimates or
foreign estimates to the entity.
The foreign estimate is relevant and material to the entity as it pertains to a
project that could be economically viable for the entity.
5.12.4 The reliability of the historical
estimates or foreign estimates,
including by reference to any of
the criteria in Table 1 of
Appendix 5A (JORC CODE)
which are relevant to
understanding the reliability of
the historical estimates or
foreign estimates.
All criteria in Table 1 of Appendix 5A have been addressed in the foreign
estimate.
5.12.5 To the extent known, a
summary of the work programs
on which the historical
estimates or foreign estimates
are based and a summary of
the key assumptions, mining
and processing parameters and
methods used to prepare the
historical estimates or foreign
estimates.
The NAL 2017 foreign resource estimate was estimated using ordinary kriging
(OK) in two passes. The first pass required a minimum and a maximum of nine
and 15 composites, respectively. The maximum number of composites used
in the interpolation from individual drill holes was four; therefore, at least
three drill holes were required. The second pass required a minimum and
maximum of seven and 15 composites, respectively. The maximum number
of composites used in the interpolation from individual drill holes was four;
therefore, at least two drill holes were required. The estimation was
restricted by composites uniquely tagged by each dyke. SGS provided the
block model to BBA to generate an optimised pit shell at 0.6 % Li2O.
Geological and mineralisation domains were constructed using modern
industry accepted software. The modelled geological boundaries were used
to constrain grade estimations appropriately within each geological
boundary.
The NAL 2017 foreign resource included more than 42,600m in 203 diamond
holes NQ diameter, eight geotechnical holes and 40 Pseudo‐holes
(underground stope sampling) completed from 2009 to 2016, and 2,143 assay
samples (6,367 sample composites averaging 1m length). The project was
initially drilled by previous owners between 2008 and 2011 and then by NAL
in 2016 after open pit production from 2012 to 2014. Holes were typically
drilledperpendicular to the strike of the mineralisedpegmatite(Azimuth

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

045°) to provide high confidence in the grade, strike and vertical extensions of the mineralisation. During open pit operations (2012–2014), some 39,468 production blast holes were drilled and geo‐referenced. Some 7,720 of those blast holes, within or bordering on mineralisation, were sampled and analysed. This data was used primarily for grade control, mine planning and various reconciliations. The blast hole data was also used for broadly delineating mineralised bodies and ascertaining surface contacts, while refining the geological 3D model. The mineral resource model is defined by blocks 10m (east‐west) by 2.5m (north‐south) by 5m (elevation) in size (10x2.5x5m) in accordance with the drill spacing and pegmatite body geometry. The resource block model was created as a percent model for volumetric and tonnage calculations. The mineral resource estimate was undertaken using reported intercepts calculated using weighted averages, no top‐cut, and a 0.6% Li20 cut‐off grade. The mineral resource model is defined by blocks 10m (east‐west) by 2.5m (north‐south) by 5m (elevation) in size (10m × 2.5m × 5m) in accordance with the drill spacing and pegmatite body geometry. The resource block model was created as a percent model for volumetric and tonnage calculations. The mineral resource estimate was undertaken using reported intercepts calculated using weighted averages, no top‐cut, and a 0.6% Li2O cut‐off grade. The classification was based on drill spacing and chemical continuity, the variography study (75m ‐ 150m of grade continuity), exposure in the existing pit walls, and the lateral extents of the dykes outcropping at surface. The classification was completed using SGS’ in‐house software, GENESIS. The software uses an algorithm that is centred on the composites, as opposed to the blocks, so as to avoid classifying blocks between drill holes at a higher confidence level than blocks immediately surrounding drill holes. The drill grid spacing required to achieve measured and indicated resources is approximately 35m and 70m, respectively. The targeted drill grid for indicated resources from past exploration is around 50m. Inferred resources are classified where a single drill hole intersects a mineralised dyke, whose association with other drilling is supported by the geological interpretation. The deposit covers an area about 1,500m long in the northwest direction and 500m wide in the east‐northeast direction. The deposit is open to depth and is drill tested to 400m below surface. Individual dykes have an average thickness of 15m and range from a minimum of 2m to a maximum of 35m. Dykes dip at 70 degrees toward the southwest. An additional estimation was completed using the inverse distance squared (ID2) method to compare with the kriged (OK) block model estimation. The mean of the kriged estimation above 0.6% Li2O and with no reporting cut‐off is lower due to smoothing and the lesser impact of high‐grade composites, as well as declustering in areas of denser information, such as the high grade area around existing mining. The 2012‐2014 blasthole dataset was not used in grade interpolation on account of the different sampling media, compared to core drilling, yet it was noted that the blast hole data generally correlated well with the interpretation and resource block model. The NQ size diamond core was halved, typically 1.0m length sections were assayed for Li2O content at an ALS laboratory in Vancouver using Inductively Coupled Plasma Mass Spectrometry. Narrow pegmatite dykes were covered with samples less than 1.0m length. NAL and its predecessors had a rigorous “good industry practice” quality control process, including routine assaying of standards, duplicates and blanks

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au

==> picture [595 x 91] intentionally omitted <==

5.12.6 Any more recent estimates or
data relevant to the reported
mineralisation available to
entity.
No more recent NI 43‐101 compliant resources estimate have been
completed. Between 2017 and February 2019, approximately 1,689,000
tonnes were extracted from the pit at an average grade 1.11% Li2O. During
the same period, 1,356,000 tonnes were milled at an average grade of 1.18%
Li2O. Between May and July 2019 42 diamond drill holes approximating
12,000m were completed. This information is currently being accessed and
validated.
5.12.7 The evaluation and/or
exploration work that needs to
be completed to verify the
historical estimates or foreign
estimates as mineral resources
or ore reserves in accordance
with Appendix 5A(JORC Code).
Sayona plans to undertake geological modelling using all project data that is
available combined with mining activities subsequent to the 2017 Foreign
Estimate in order to complete an updated N43‐101 and JORC compliant
resource estimate.
5.12.8 The proposed timing of any
evaluation and/or exploration
work that the entity intends to
undertake and comment on
how the entity intends to fund
that work.
BBA Inc has been commissioned to complete a NI 43‐101 compliant resource
estimate which is anticipated to be completed by the end of 2021.
Funding for this work is by use of existing working capital.
5.12.9 A cautionary statement
proximate to, and with equal
prominence as, the reported
historical estimates or foreign
estimates.
See Table 3 above. Sayona cautions that the mineral resources for the project
are not reported in accordance with the JORC Code. A competent person has
not yet done sufficient work to classify the resources as mineral resources in
accordance with JORC code. It is uncertain that following evaluation or
further work that the foreign estimate will be able to be reported as mineral
resources in accordance with JORC Code.
5.12.10 A statement by a named
competent person or persons
that the information in the
market announcement
provided under rules 5.12.2 to
5.12.7 is an accurate
representation of the available
data and studies for the
material mining project. The
statement must include the
information referred to in rule
5.22(b) and (c)
I, Gustavo L. Delendatti, confirm that I authored the information described
under rules 5.12.2 to 5.12.7 and that the information is an accurate
representation of all information and data to my knowledge. I am not an
employee of Sayona nor do I hold any interest in any Sayona shares. I am an
independent consultant based in San Juan, Argentina. I am a member of the
Australian Institute of Geoscientist (MAIG 8009). I am a Competent Person
under JORC 2012 Code & Guidelines.
I have not visited North American Lithium project
I am responsible for the review of the exploration and drilling information,
supervised the preparation of the technical information in this release and
have relevant experience and competence of the subject matter. As
competent person for this announcement, I have consented to the inclusion
of the information in the form and context in which it appears herein.

SAYONA MINING LIMITED P +61 7 3369 7058 E [email protected] A Suite 68, 283 Given Tce, Paddington QLD

sayonamining.com.au