Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CORE LITHIUM LTD Capital/Financing Update 2022

Aug 14, 2022

64737_rns_2022-08-14_ebaa9b96-7db4-4e28-aecc-d8a8d6d51aa9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX: CXO Announcement

15 August 2022

Core provides exploration activities update

Highlights

  • +40,000m RC drilling program underway

  • Pipeline of existing and new targets at Finniss to be tested

  • Two successful grants awarded under the Resourcing the NT Initiative

  • High grade lithium rock chip results received from AnningieBarrow Creek Project

Australia's next lithium producer, Core Lithium Ltd ( Core or Company ) (ASX: CXO ), is pleased to provide an update on its exploration activities in the Northern Territory.

Finniss Lithium Project

Diamond Drilling

As previously announced, diamond drilling is well underway at BP33, with a focus on exploring the depth and strike extensions of the main pegmatite intrusions.

Diamond drilling at BP33 will be followed up with extensional exploration and resource definition programs at Carlton, Hang Gong, Lees and Sandras. These programs are designed to further build on the Mineral Resource Estimates (CXO ASX Announcement 12 July 2022).

RC Drilling

Core has commenced a +40,000m RC drill program, which will be split between greenfields and brownfields target areas. A large RC rig has been mobilised to test some of the deeper targets.

The program will be focused on following up prospects where excellent exploration results were reported from 2021 drilling, including Bilatos, Penfolds, Centurion and Talmina West, as well as many new conceptual targets.

Results of both RC and diamond drilling programs will provide a continuous flow of new results during the year, with the possibility of new prospects and new mineral resources being defined.

==> picture [379 x 487] intentionally omitted <==

Figure 1. Location of main prospects

NT Co-Funding Grants

The Company is pleased to advise that Grants NT has approved two separate applications for co-funding in Round 15 of the Northern Territory Geophysics and Drilling Collaborations program.

The approved programs are:

  • Ambient Noise Tomography survey, which is now planned at the Shoobridge Lithium Project, EL31407, near Pine Creek NT. Seismic velocity data will be acquired to identify pegmatite drill targets. This work is planned to commence in September 2022 and the grant amounts to $100,000.

  • A single deep diamond drill hole targeting the down plunge extension to the currently defined Mineral Resource at the Sandras Lithium Deposit. The current total Mineral Resource at Sandras is 1.44Mt @ 1.01% Li2O (refer ASX Announcement 12 July 2022). Sandras has been modelled to a vertical depth of approximately 250m below surface. The planned hole has been designed to intersect the projected down plunge extension to the mineralisation at approximately 450m below surface, approximately 200m deeper than existing RC drilling. This grant also amounts to $100,000.

Anningie-Barrow Creek (ABC) Project

Since 2018, Core has assembled a strong lease position covering approximately 2,805km[2] in the Barrow Creek Pegmatite Field in the NT. The ABC Project is considered an early-stage lookalike to the Company’s high-grade discoveries at the Finniss Lithium Project, with a long history of tin and tantalum production around Barrow Creek and Anningie. The ABC Project is favourably situated alongside the railway that links to the Darwin Port.

Company geologists undertook a short familiarisation trip to the Bismark Prospect, located within the Anningie Tin Field, and assayed 13 rock samples. Six of these returned greater than 1% Li2O, with a maximum of 4.78% Li2O (Figures 2 and 3). Unlike the Finniss Lithium Project, spodumene occurs at the surface. These results confirm the results of previous explorers and highlight the latent potential of this project.

The Company is planning to recommence work on the ABC Project later this year.

==> picture [452 x 310] intentionally omitted <==

Figure 2: Bismark prospect mapping and sample locations

==> picture [326 x 245] intentionally omitted <==

Figure 3: Spodumene bearing pegmatite assaying 4.78% Li2O at Bismark

Finniss Gold Project Update

While Core is firmly focused on delivering Australia’s next lithium project, the Company has also undertaken exploration of existing gold mineralisation within the Finniss Lithium Project.

Gold-focused activities completed since the start of 2021 have included increasing the number of samples in the Finniss Project’s geochemical database by over 25,600 through the sampling of new sites together with assaying retained analytical pulps from historical lithium-focussed surface samples for gold.

Interpretation of the results suggest that the gold mineralisation at Finniss is of a style closely comparable with that seen at gold deposits in the Pine Creek Orogen (“PCO”), a gold district with past production and current reserves totalling in excess of 18 million ounces. The deposits in the PCO and at Finniss are turbidite-hosted epigenetic, fold-controlled deposits, with gold hosted in quartz lode structures and having associated arsenopyrite, pyrite, and bismuth-bearing minerals.

Core’s exploration has delineated more than 40 surficial gold geochemical anomalies on the Project tenements. Significant regions of the tenements remain to be geochemically sampled and the discovery of anomalies additional to those already delineated is a possibility.

Drilling programs have targeted five of the anomalies, with 429 RAB holes (7,703m), 21 RC (2,353m) holes and 3 diamond holes (722.7m) drilled. Strongly anomalous gold is present at shallow depths in all five of the targets drill tested, including at Golden Boulder where an auriferous, steeply east dipping quartz lode has been defined in drilling (Figure 4). A listing of drill intersections over 1g/t Au is shown in Table 1. Gold anomalous zones exhibit quartz veins and sulphides or their weathered equivalent, with arsenopyrite particularly prevalent.

Grid Co-ordinates Grid Co-ordinates SurveyData SurveyData SurveyData SurveyData Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Significant intercepts - Au grades have been determined by 50gm fire assay.
Intersections calculated using1g/t Au lower cutoff with no internal dilution.
Type Hole ID Prospect GDA94 Grid
East
GDA94 Grid
North
RL(m) Dip (°) Azimuth(°) Depth(m) From(m) To(m) Interval(m) Aug/t Sample Type
RC FRC281 Far East 697097 8595096 49.0 -60.5 129.2 102.0 87 88 1 2.0 Riffle split
RC FRC282 Far East 696933 8594751 45.0 -60.6 90.2 120.0 27 28 1 1.0 Riffle split
RC FRC282 Far East 696933 8594751 45.0 -60.6 90.2 120.0 30 31 1 12.3 Riffle split
RC FRC283 Far East 696946 8594465 38.0 -61.0 91.0 72.0 13 15 2 2.1 Riffle split
DD FEDD001 Far East 696912 8594719 33.2 -50.0 90.0 229.5 77.7 77.8 0.1 2.0 1/2 core
and 80.9 81.3 0.4 1.4 1/2 core
SLRC BRC014 Golden Boulder 693768 8594560 34.0 -60.0 270.0 90.0 53 54 1 1.2 Grab
SLRC BRC016 Golden Boulder 693762 8594501 27.5 -60.0 270.0 99.0 81 84 3 6.6 Grab
RAB RGG02-693740 Golden Boulder 693750 8594622 27.1 -60.0 270.0 19.0 0 1 1 1.4 Grab
RAB RGG03-693720 Golden Boulder 693719 8594562 27.4 -60.0 270.0 18.0 0 1 1 1.0 Grab
RAB RGG03-693730 Golden Boulder 693728 8594563 28.0 -60.0 270.0 25.0 0 2 2 6.9 Grab
RAB RGG03-693740 Golden Boulder 693739 8594564 28.4 -60.0 270.0 25.0 21 22 1 1.6 Grab
RC FRC269 Piper Nth 695224 8601305 19.0 -61.3 90.2 168.0 109 110 1 2.4 Riffle split
RAB RFT01-696760 Toolebuc 696759 8594352 25.0 -60.0 270.0 12.0 4 5 1 1.1 Grab
RAB CRB012 Covidicus West 695862 8576971 59.0 -60.0 320.0 37.0 28 30 2 2.6 Riffle split

Table 1: Downhole Drilling results from gold exploration at Finniss. Only holes with intersections >1 g/t Au are shown.

==> picture [452 x 264] intentionally omitted <==

Figure 4: Golden Boulder cross section 8594560mN showing Au contours, quartz vein boundary, and proposed RC hole

Core Chief Executive Officer Gareth Manderson commented:

“We have a full exploration schedule focused on growing our life of mine to support lithium production from northern Australia”

This announcement has been approved for release by the Core Lithium Board.

For further information please contact:

For further information please contact: For Media and Broker queries: Gareth Manderson Fraser Beattie Chief Executive Officer Account Manager Core Lithium Limited Cannings Purple +61 8 8317 1700 +61 421 505 557 [email protected] [email protected]

About Core

Core Lithium is building Australia’s newest and most advanced lithium project on the ASX, the Finniss Project in the Northern Territory. With first production on schedule for delivery by the end of 2022, the Finniss Project places Core Lithium at the front of the line of new global lithium production.

The Finniss Project has been awarded Major Project Status by the Australian Federal Government, is one of the most capital efficient lithium projects and has arguably the best logistics chain to markets of any Australian lithium project.

The Finniss Project boasts world-class, high-grade and high-quality lithium suitable for lithium batteries used to power electric vehicles and renewable energy storage.

Competent Persons Statement

The information in this report that relates to Exploration Results is based on information compiled by Andy Bennett (BSc(Hons)Geol), who is a full time employee of Core Lithium Ltd and who is a member of the Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s codes and recommended practices. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bennett consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Core confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the Mineral Resource, as cross referenced, continue to apply and have not materially changed.

JORC Code, 2012 Edition – Table 1 Report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary

  • Criteria JORC Code Explanation

  • Sampling • Nature and quality of sampling (e.g. cut channels, random chips, techniques or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

  • Rotary Air Blast (RAB), Reverse circulation (RC) and diamond core (DDH) drill techniques have been employed for the Core Lithium Ltd (“Core” or “CXO”) drilling.

  • RC drill spoils over all programs were collected into two sub-samples:

    • 1 metre split sample, homogenized and cone split at the cyclone into calico bags. Weighing 2-5 kg.
  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

    • A primary sample, was collected in green plastic bags and retained until assays had been returned and deemed reliable for reporting purposes.
  • RC sampling was done on a 1 metre basis.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • Drill core was collected directly into trays, marked up by metre marks and secured as the drilling progressed.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

  • DDH Core was transported to a local core preparation facility where geological logging and sample interval selection took place. Core was cut into half longitudinally along a consistent line generally between 0.3m and 1m in length, ensuring no bias in the cutting plane.

  • RAB drill spoils over the program were collected in green plastic bag for each metre and retained until assays had been returned and deemed reliable for reporting purposes.

  • RAB spoils were typically speared to collect a ub-sample into a calico bag for intervals ranging from single metre to 6m composites.

  • Where composite RAB samples returned anomalous results, 1m splits of the same size and in the same manner were collected for assay.

  • Rock chips samples were collected from in-situ outcrops using a hammer to

collect approximately 1kg of sample.

Drilling • Drill type (e.g. core, reverse circulation, open-hole hammer, • RC Drilling was carried out with 5 inch face-sampling bit.
techniques rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core • DDH drilling used triple tube PQ and HQ techniques. Core was oriented using a
diameter, triple or standard tube, depth of diamond tails, face- Reflex HQ core orientation tool.
sampling bit or other type, whether core is oriented and if so, • All diamond holes were cored from surface.
by what method, etc). • RAB drilling was carried out utilising a 4 inch hammer. Only on-board
compressed air was utilised.
Drill sample • Method of recording and assessing core and chip sample • RC and RAB drill recoveries were visually estimated from volume of sample
recovery recoveries and results assessed. recovered. The majority of sample recoveries reported were dry and above 90%
  • RC and RAB drill recoveries were visually estimated from volume of sample recovered. The majority of sample recoveries reported were dry and above 90% of expected.

  • Measures taken to maximise sample recovery and ensure representative nature of the samples.

  • RC and RAB samples were visually checked for recovery, moisture and contamination and notes made in the logs.

  • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

  • The RC rigs splitter was emptied between 1m samples. A gate mechanism on the cyclone was used to prevent inter-mingling between metre intervals. The cyclone and splitter were also regularly cleaned by opening the doors, visually checking, and if build-up of material was noted, the equipment cleaned with either compressed air or high-pressure water.

  • The RAB rigs cyclone was emptied between 1m samples by hammering the cyclone bin with a mallet. The cyclone was also regularly cleaned by opening the doors, visually checking, and if build-up of material was noted, the equipment cleaned with either compressed air or high-pressure water.

  • RC Drill collars are sealed to prevent sample loss and holes are normally drilled dry to prevent poor recoveries and contamination caused by water ingress. Wet intervals are noted in case of unusual results.

  • DDH core recoveries were measured using conventional procedures utilising the driller’s markers and estimates of core loss, followed by mark up and measuring of recovered core by the geologist or geotechnician.

  • DDH core recovery is >95% in the quartz vein zones and in fresh host-rock.

Logging Whether core and chip samples have been geologically and • Detailed geological logging was carried out on all RAB, RC and DDH drill holes.
geotechnically logged to a level of detail to support appropriate • Loggingrecorded lithology,mineralogy,mineralisation,weathering,colour,and
Logging Whether core and chip samples have been geologically and • Detailed geological logging was carried out on all RAB, RC and DDH drill holes.
geotechnically logged to a level of detail to support appropriate • Loggingrecorded lithology,mineralogy,mineralisation,weathering,colour,and

==> picture [87 x 82] intentionally omitted <==

  - Mineral Resource estimation, mining studies and metallurgical studies.
  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

  • • The total length and percentage of the relevant intersections logged.

  • Sub-sampling • If core, whether cut or sawn and whether quarter, half or all techniques and core taken. sample • If non-core, whether riffled, tube sampled, rotary split, etc and preparation whether sampled wet or dry.

  • For all sample types, the nature, quality and appropriateness of the sample preparation technique.

  • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

  • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the grain size of the material being sampled.

other sample features.

  • RC and RAB chips are stored in plastic chip trays.

  • DDH core is stored in plastic core trays.

  • • All holes were logged in full.

  • RC chip trays and DDH core trays are photographed and stored on the CXO server.

  • The majority of the mineralised samples were collected dry, as noted in the drill logs and database.

  • RC field sample preparation involved collection of samples from the cone splitter on the drill rig into a calico bag for dispatch to the laboratory.

  • The sample sizes are considered more than adequate to ensure that there are no particle size effects relating to the grain size of the mineralisation.

  • A field duplicate sample regime is used to monitor sampling methodology and homogeneity of RC and RAB drilling at Finniss. The typical procedure was to collect Duplicates via a spear of the green RC bag, having collected the Original in a calico bag.

  • The duplicates cover a wide range of values.

  • Results of duplicate analysis show an acceptable degree of correlation.

  • Sample preparation for RC samples occured at North Australian Laboratories (“NAL”), Pine Creek, NT.

  • A 1-2 kg riffle-split of RC Samples are prepared by pulverising to 95% passing - 100 um. RC samples do not require any crushing, as they are largely pulp already.

  • Half Drill Core sample intervals were constrained by geology, alteration or structural boundaries, intervals varied between a minimum of 0.3 metres to a maximum of 1 m. The core is cut along a regular Ori line to ensure no sampling bias.

  • Field and lab standards together with blanks were used routinely.

  • The purpose of the RAB sampling is to act only as an exploration guide or vector towards mineralisation, and as an open hole technique has lower sample integrity than the RC and diamond drilling. Nevertheless, the large

sample size is considered adequate to minimise particle size effects relating to the grain size of the mineralisation. Duplicates were collected into a calico bag via a spear of the primary green bag, having first collected the original from the same primary bag. No splitters were used for RAB.

  • Quality of assay • The nature, quality and appropriateness of the assaying and data and laboratory procedures used and whether the technique is laboratory tests considered partial or total.

  • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

  • Sample analysis for RAB, RC and routine DDH samples occurred at North Australian Laboratories, Pine Creek, NT.

  • Samples were dried then pulverised to 85% passing 75 microns or better using a Keegormill. This is believed to be the most appropriate method for nuggety gold samples

  • For the multi-element analysis, A sub-sample of the pulp is digested in a standard 4 acid mixture and analysed via ICP-MS and ICP-OES methods for the following elements: Li, Fe, K, P, S, Cu, Pb, Zn, Ag, Co, Ni, Mn, As, Mo, Se, Te, Sb, Bi, Sn, Ta, Nb, U, W and Th.

  • A 3000 ppm Li trigger was set to process that sample via a fusion method. The fusion method was - a 0.3 g sub-sample is fused with 1g of Sodium Peroxide Fusion flux and then digested in 10% hydrochloric acid. ICP-OES is used for the following elements: Li, P and Fe. The lower and upper detection range for Li by this method are 10 ppm and 20,000 ppm respectively.

  • Gold analysis has largely been carried out via Fire Assay AAS-finish for a 40-50g aliquot of the bulk RAB samples processed via the Keegormill route. This “ore grade” methodology has a detection limit of 10 ppb.

  • A barren flush is inserted between samples at the laboratory.

  • NAL has a regime of 1 in 8 control subsamples.

  • NAL utilise standard internal quality control measures including the use of Certified Lithium and Gold Standards and duplicates/repeats.

  • Approximate CXO-implemented quality control procedures include: o One in 20 certified Lithium or gold ore standards

    • One in 20 duplicates were used for the RC drilling program.

    • o One in 20 blanks were inserted for this drilling.

  • The duplicate analysis for gold shows that there is considerable variability between the gold grade of samples which likely relates to the nuggety nature of gold in some samples. No screen-fire assaying has been undertaken, but is

recommended for further work on gold targets.

Verification of • The verification of significant intersections by either
sampling and independent or alternative company personnel.
assaying • The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
  • Senior technical personnel have visually inspected and verified the significant drill intersections.

  • • All field data is entered into OCRIS logging system (supported by lookup/validation tables) at site and imported into the centralized CXO Access database.

  • Hard copies of survey and sampling data are stored in the local office and electronic data is stored on the CXO server.

  • Umpire samples were sent to an independent laboratory (Intertek in Perth), which resulted in excellent comparative results with NAL, providing a very high confidence in the assay quality.

Location of data • Accuracy and quality of surveys used to locate drill holes (collar • Differential GPS has been used to determine all RC and diamond collar locations,
points and down-hole surveys), trenches, mine workings and other including RL. Collar position audits are regularly undertaken, and no issues have
locations used in Mineral Resource estimation. arisen. RAB collars are determined by non-differential GPS with RLs adjusted to
• Specification of the grid system used. the DTM
• Quality and adequacy of topographic control. • The grid system is MGA_GDA94, zone 52 for easting, northing and RL.
• All of the CXO drilled RC and DD hole traces were surveyed by north seeking gyro
tool operated by the drillers and the collar is oriented by a line of sight compass
and a clinometer.
• RAB holes were short in length and so only set-up surveys were taken by
compass.
Data spacing and • Data spacing for reporting of Exploration Results. • Drill spacing for RAB was done on lines approximately 100-400m along strike
distribution • Whether the data spacing and distribution is sufficient to and variable across strike down to 10m. The RC ad DD holes were targeted at
establish the degree of geological and grade continuity geological and/or geochemical features at no regular spacing
appropriate for the Mineral Resource and Ore Reserve • All RC intervals are 1m. All DDH mineralised intervals reported are based on a
estimation procedure(s) and classifications applied. maximum of one metre sample interval, with local intervals down to 0.3m.
• Whether sample compositinghas been applied.
Orientation of • Whether the orientation of sampling achieves unbiased • Drilling is oriented approximately perpendicular to the interpreted strike of
data in relation to sampling of possible structures and the extent to which this is mineralisation (quartz vein and/or surface geochemical trend) as mapped.
known,consideringthe deposit type. Because of the dipof the hole,drill intersections are apparent thicknesses and
geological • If the relationship between the drilling orientation and the overall geological context is needed to estimate true thicknesses.
structure orientation of key mineralised structures is considered to have • No sampling bias is believed to have been introduced.
introduced a sampling bias, this should be assessed and
reported if material.
Sample security • The measures taken to ensure sample security. • Sample security was managed by the CXO. After preparation in the field or
CXO’s warehouse, samples were packed into polyweave bags and transported
by the Company directly to the assay laboratory. The assay laboratory audits
the samples on arrival and reports any discrepancies back to the Company. No
such discrepancies occurred.
Audits or reviews • The results of any audits or reviews of sampling techniques and • No audits or reviews of the data associated with this drilling have occurred.
data.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• Drilling by CXO took place on EL30012, EL30015 and EL29698, which are 100%
owned by CXO.
• The area being drilled comprises vacant or leased Crown land.
• Rock chips were taken from EL26848 which occurs on pastoral land, and has a
previous AAPA clearance certificate
• There are no registered heritage sites covering the areas being drilled.
• The tenements are in good standing with the NT DPIR Titles Division.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
FINNISS LITHIUM -
• The history of mining in the Bynoe area dates back to 1886 when tin was
discovered by Mr. C Clark.
• By 1890 the Leviathan Mine and the Annie Mine were discovered and worked
discontinuouslyuntil 1902.
Criteria JORC Code explanation Commentary
Criteria JORC Code explanation Commentary
• After purchase of the Liontown tenements in 2017, CXO drilled Lees, Booths,
Carlton and Hang Gong.
FINNISS GOLD -
• The history of gold mining in the broader Pine Creek Orogen dates back as far
as the 1880s. It has had a varied history since. In respect to the Finniss area,
there has been very minimal gold exploration or mining – it has been almost
exclusively a tin-tantalum province. The only exception appears to be Golden
Boulder, which was mined via shallow shafts and pits in the early 1990s
producing 18-22 kg of gold. No other historic production or exploration is
known. The earliest documented “modern” gold exploration within the Finniss
Project was in the mid-1990s by Greenbushes Ltd (drilling at Golden Boulder).
This was followed by surface exploration by Haddington Resources Ltd (mid
2000s), then Liontown Resources Ltd (2016-2017) and lastly Core Lithium Ltd
(2016 to present).
BARROW CREEK – ANNINGIE

• There have been multiple, sporadic but intensive periods of prospecting, exploration and small scale mining within the Barrow Creek -Anningie Project area since the 1940s. All known previous work has focused on tungsten, tin and tantalum with no systematic assaying for lithium. • All previous work has focussed on either alluvial/eluvial material or the upper, weathered portion of the bedrock which would be suitable for free digging. • The geological map provided in this report at Anningie was originally done by Todd River Resources, who reported on the Bismark prospect (ASX: TRT 21[st] December 2017) and confirmed the presence of spodumene as the main lithium bearing phase FINNISS -

Geology Deposit type, geological setting and style of mineralisation. FINNISS -
The tenements listed above cover the northern and centralportion of a
Criteria JORC Code explanation Commentary
Criteria JORC Code explanation Commentary
Drill hole • A summary of all information material to the understanding of Intervals over 1 g/t are tabulated within the body of this report. These are
Information the exploration results including a tabulation of the following from a total of 429 RAB holes (7,703m), 21 RC (2,353m) holes and 3 diamond
information for all Material drill holes: holes (722.7m) drilled.
o easting and northing of the drill hole collar A full listing of RC and DD holes is provided below
o elevation or RL (Reduced Level – elevation above sea level in The RAB holes are essentially a geochemical technique used to penetrate thin
metres) of the drill hole collar cover or laterite, and in many cases were not testing only for gold – the full
o dip and azimuth of the hole listing of these is not provided on the basis that the information is not
o down hole length and interception depth Material, they are not used for the purpose of resource estimation and their
o hole length. exclusion does not affect the conclusions or interpretations described in the
• If the exclusion of this information is justified on the basis that report.
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearlyexplain whythis is the case.
Criteria JORC Code explanation Commentary
Prospect
Name
Golden Boulder
Hole ID
BRC011
Easting
mga94z52
693785
Northing
mga94z52
8594683
RL
33
32
32
34
34
32
30
29
32
55
51
49
45
Dip
-60
Azimuth
(GN)
271

Total Depth
(m)
97
Drill
Method
SLRC
Golden Boulder BRC012 693718 8594623 -60 271 99 SLRC
Golden Boulder BRC013 693761 8594625 -60 271 99 SLRC
Golden Boulder BRC014 693768 8594560 -60 271 90 SLRC
Golden Boulder BRC015 693711 8594505 -60 271 99 SLRC
Golden Boulder BRC016 693762 8594501 -60 271 99 SLRC
Golden Boulder BRC017 693655 8594444 -60 270 99 SLRC
Golden Boulder BRC018 693702 8594435 -60 271 99 SLRC
Golden Boulder
Far East
BRC019
FRC279
693702
697221
8594382
8595782
-59
-61
272
093
102
84
SLRC
RC
Far East FRC280 697126 8595342 -61 096 90 RC
Far East FRC281 697097 8595096 -61 129 102 RC
Far East FRC282 696933 8594751 -61 090 120 RC
Far East FRC283 696946 8594465 38 -61 091 72 RC
Far East FEDD001 696912 8594719 33 -50 090 229.5 Diam
Far East FEDD002 697023 8595359 38 -50 100 288.6 Diam
Far East FEDD003 697126 8595859 39 -50 100 204.6 Diam
Piper Nth FRC265 695227 8600700 13 -61 087 102 RC
Piper Nth FRC267 695250 8600893 18 -61 092 120 RC
Piper Nth FRC268 695116 8600899 13 -61 092 156 RC
Piper Nth FRC266 695255 8600890 18 -61 274 156 RC
Piper Nth FRC269 695224 8601305 19 -61 090 168 RC
Piper Nth FRC270 695174 8601302 19 -61 091 150 RC
Piper Nth FRC271 695186 8601605 16 -61 092 150 RC
Drill method: RC - reverse circulation; SLRC -slimline reverse circulation; Diam - diamond core
Data aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high-
grade results and longer lengths of low-grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in
Criteria JORC Code explanation Commentary
detail.
• The assumptions used for any reporting of metal equivalent
values should be clearlystated.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in the reporting
of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reportingof Exploration Results.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
Further work
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Criteria JORC Code explanation Commentary
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commerciallysensitive.