Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CORE LITHIUM LTD Capital/Financing Update 2021

Feb 10, 2021

64737_rns_2021-02-10_276c2eab-ae00-4d02-ba89-2f2f07b8b685.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

11 February 2021

ASX: CXO Announcement

High-grade lithium assays from Grants to strengthen Finniss Resource

Highlights

  • Majority of the assays from Core’s 2020 resource diamond and RC drilling at the Grants Lithium Deposit have been received and compiled

  • Lithium assays and widths strengthen the current resource model and include:

  • 31m @ 1.65% Li2O from 197m, including 16m @ 2.02% Li2O from 207m (FRCD021); and

  • 36m @ 1.34% Li2O from 183m including 3m @ 3.38 % Li2O from 188m (FRCD020)

  • Assay results awaited for new drill intersection of 55m of pegmatite outside current resource (FRCD022)

  • This new drilling expected to deliver high conversion of Inferred Mineral Resource to Indicated Mineral Resource and add Reserves to Life of Mine (LOM)

  • Intersections in the Inferred-Indicated transition are of excellent width (+20m) and quality in line with surrounding drillholes and resource model

  • Further underground mining potential remains open below 300m at Grants

  • Geological and Geotechnical logging of drillcore almost complete with further drill assays to be received in late February ahead of a resource upgrade at Grants

Advanced Australian lithium developer Core Lithium Ltd ( Core or Company ) (ASX: CXO ) is pleased to announce new drill results from the Grants Deposit that are expected to strengthen the current Resource at the Company’s wholly owned Finniss Lithium Project in the Northern Territory.

The Grants Lithium Resource is the first spodumene pegmatite deposit Core plans to mine in the development schedule of the Finniss Lithium Project. Consequently, as a priority, over the last three months, Core has been undertaking a program of resource infill and expansion drilling at Grants.

These new drill results from Grants are expected to strengthen the current resource model in regard to size and reserves., with a high conversion of Inferred Resources to Indicated Resources and add Reserves to life of mine (LOM).

Core’s Managing Director, Stephen Biggins, said:

“Core’s targeted drilling at Grants is expected to be successful in adding more tonnes to the overall Finniss Project at a pretty decent lithium grade.

“Importantly, this drilling will enable Core to be able to convert a high proportion of the Inferred Resource at Grants to Indicated and Reserves, and add further Reserves to the life of mine.

“We are currently completing geological and geotechnical logging of the recently drilled core samples and should receive the remaining drill assays later this month.

“In due course, we expect to announce a new resource upgrade as a lead-in to the updated Definitive Feasibility Study, and we will also look to ramp up lithium exploration and resource growth drilling in the first half of 2021.”

Drilling

Inferred portions of the current resource model have been infilled to enable these parts of the orebody to be converted to the Indicated category (Figure 1). New Indicated Mineral Resources at Grants should then positively contribute to Ore Reserves and significantly increase the LOM in Core’s updated Definitive Feasibility Study in Q2 2021.

A large number of holes were also drilled outside the current resource (Figure 1) and results to date suggest they will likely result in an increase in the Mineral Resource Estimate for the project. The most significant results include:

  • 31m @ 1.65% Li2O from 197m, including 16m @ 2.02% Li2O from 207m (FRCD021)

  • 36m @ 1.34% Li2O from 183m including 3m @ 3.38 % Li2O from 188m (FRCD020)

  • 13m @ 1.68% Li2O from 263m, including 8m @ 2.04% Li2O from 263m, and 12m @ 1.60% Li2O from 280m (FRCD018)

  • 13m @ 0.62% Li2O from 309m (FMRD009)

  • 33m @ 1.49% Li2O from 181m (FRC219)

  • 17m @ 1.52% Li2O from 238m (FRC221)

Interestingly, there are some very high-grade intervals such as 3m @ 3.38% Li2O (FRCD020); 16m @ 2.02% Li2O (FRCD021) and 8m @ 2.04% Li2O (FRCD018).

In addition, recently completed drillhole FRCD022 intercepted a ~55m downhole interval of pegmatite, over half of which is strongly mineralised, and is located outside the current resource model.

Once the final assay results have been received in the coming weeks, Core will complete a new Mineral Resource Estimate expected to be finalised next month.

Core has had three drill rigs (1 RC and 2 diamond) operating over the past 3-months to intersect the Grants orebody to a maximum downhole depth of 375.8m (Table 1). Drilling utilised either a mud rotary or reverse circulation precollar down to a maximum of 160m and then collected HQ drill core. Drilling achieving excellent core recovery throughout with a majority of the planned targets intersected as planned (Figure 1).

Geotechnical diamond drilling at Grants and BP33 that will contribute to the DFS has now been completed and logging will be completed later this month.

==> picture [483 x 272] intentionally omitted <==

Figure 1 Current long section for Grants summarising drillhole assay results from the 2020 drill programs (recently completed in green; early 2020 program in blue)

About the Finniss Lithium Project

The Finniss Lithium Project is Australia’s most advanced new lithium project on the ASX and places Core Lithium at the front of the line of new global lithium production.

Finniss is also one of the most capital efficient lithium projects in Australia and has arguably the best logistics chain to markets of any Australian lithium project.

The Project lies within 25km of port, power station, gas, rail and one hour by sealed road to workforce accommodated in Darwin and importantly to Darwin Port - Australia’s nearest port to Asia.

Lithium is the core element in batteries used to power electric vehicles, and the Finniss Project boasts world-class, high-grade and high-quality lithium suitable for this use & other renewable energy sources.

==> picture [314 x 409] intentionally omitted <==

Figure 2 Lithium Resources and Prospects, Finniss Lithium Project, near Darwin NT.

This announcement has been approved for release by the Core Lithium Board.

For further information please contact:

For Media and Broker queries:

Stephen Biggins Fraser Beattie Managing Director Senior Consultant Core Lithium Ltd Cannings Purple +61 8 8317 1700 +61 421 505 557 [email protected] [email protected]

Competent Person Statement

The information in this report that relates to Exploration Results is based on information compiled by Dr David Rawlings (BSc(Hons)Geol, PhD) an employee of Core Lithium Ltd who is a member of the Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s codes and recommended practices. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Rawlings consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. This report includes results that have previously been released under JORC 2012 by Core as “Increased Ore Reserve Significantly Extends Finniss” on 30 June 2020. Core confirms that it is not aware of any new information or data that materially affects the previously released results included in this announcement.

Table 1 Drilling summary for Grants in the period November 2019 to present, including pegmatite intervals logged or estimated and significant lithium intercepts from assays at hand. Hole tagged with asterisk have only received a preliminary geological log and assay or pegmatite intervals are approximate only.

HoleID Grid Co-ordinates Grid Co-ordinates Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
Significant intercepts.(i) Mean grades have been calculated on a
0.4% Li2O lower cut-off grade with no upper cut-off grade applied,
and maximum length of consecutive internal waste of 3.0 metres.
East North Azi Dip Depth
(m)
From
(m)

To
(m)

Interval
(m)

Grade
(Li2O %)
Sample Type
FRCD018 693160 8598895 265.1 -63.9 330.0 263 276 13 1.68 1/2 core
including 263 271 8 2.06 1/2 core
and 280 292 12 1.60 1/2 core
including 289 290 1 3.58 1/2 core
FRCD019 693166 8599023 260.5 -64.62 339.4 277 278 1 0.56 1/2 core
FRCD020 692924 8598998 90.7 -63.4 246.3 183 219 36 1.34 1/2 core
including 188 191 3 3.38 1/2 core
including 211 216 5 1.97 1/2 core
FRCD021* 692942 8599064 88.3 -66.5 261.3 197.55 229 31.45 1.65 1/2 core
including 207 223 16 2.02 1/2 core
FRCD022 692869 8598935 87.6 -73 375.8 55mpegmatite - Awaitingassays 1/2 core
FMRD008 693148 8598863 276.0 -61.9 324.4 268.4 275 6.6 1.4 1/2 core
and 290 291 1 0.96 1/2 core
and 295 312 17 1.51 1/2 core
including 299 300 1 3.59 1/2 core
FMRD009 692869 8598829 88.0 -66.3 342.8 309 322 13 0.62 1/2 core
FMRD010* 692832 8598789 90.4 -66.11 356.0 20mpegmatite - Awaitingassays 1/2 core
FMRD011 692869 8598824 89.8 -61.96 312.4 No Significant Intercepts
FRC218 693162 8599039 268.29 -64.99 264.0 No Significant Intercepts
FRC219 693133 8598979 262.36 -65.38 234.0 181 214 33 1.49 RC Cyclone Split
and 173 177 4 1.58 RC Cyclone Split
FRC220 693154 8598965 263.11 -67.06 336.0 No Significant Intercepts
FRC221 692861 8598841 87.38 -67.02 276.0 238 255 17 1.52 RC Cyclone Split
FRC222 693156 8598895 271.47 -63.98 22.0 No Significant Intercepts
FRC223 693164 8599028 266.60 -64.24 29.0 No Significant Intercepts

JORC Code, 2012 Edition – Table 1 Report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary

  • Sampling • Nature and quality of sampling (e.g. cut channels, random chips, or techniques specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

  • Reverse circulation (RC) and diamond core (DDH) drill techniques have been employed by Core Lithium Ltd (“Core” or “CXO”) at Grants from October 2020 to January 2021. Four additional RC drillholes from November 2019 (FRC218 to 221) have also been included as they had not yet been published. A list of the hole IDs and positions can be found in the “Drill hole information” section below.

  • RC drill spoils over all programs were collected into two sub-samples:

  • 1 metre split sample, homogenized and cone split at the cyclone into 12x18 inch calico bags. Weighing 2-5 kg, or 15% of the original sample.

  • 20-40 kg primary sample, which for CXO’s drilling was collected in 600x900mm green plastic bags and retained until assays had been returned and deemed reliable for reporting purposes.

  • RC that was specifically implemented for precollars for diamond drilling (“tails”) and will not have intersected the primary pegmatite target. However, narrow secondary pegmatites were intersected.

  • Sampling of pegmatite for CXO’s assays was done on a 1 metre basis. 1m-sampling continued into the barren wall-zone of the pegmatite and then a 3m composite was collected from the immediately surrounding barren phyllite host rock.

  • Drill core was collected directly into trays, marked up by metre marks and secured as the drilling progressed. Geological logging and sample interval selection took place soon after.

  • DDH Core was transported to a local core preparation facility and cut firstly into half longitudinally along a consistent line between 0.3m and 1m in length, ensuring no bias in the cutting plane.

o DDH sampling of pegmatite for assays is done over the sub-1m

intervals described above. 1m-sampling continued into the barren phyllite host rock.

Drilling Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
• RC Drilling was carried out by WDA Drilling (Humpty Doo, NT; Hydco RC70 with 5.6-
techniques blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple inch (143mm) face-sampling bit). Air packs are on board 350/100 Elgi compressor
or standard tube, depth of diamond tails, face-sampling bit or other and support truck with Elgi 350/1100 CFM and 900/1800CFM booster.
type, whether core is oriented and if so, by what method, etc). • DDH drilling was carried out by: (i) WDA Drilling (Humpty Doo, NT; Exploration Drill
Master EDM1500HP track-mounted DDH with HQ core (100mm hole diameter) and
(ii) Wild Diamante (NSW; UDR650 wheel-mounted DDH with HQ core (100mm hole
diameter).
  • Drill sample • Method of recording and assessing core and chip sample recoveries recovery and results assessed.

  • Measures taken to maximise sample recovery and ensure representative nature of the samples.

  • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

  • RC drill recoveries were visually estimated from volume of sample recovered. The majority of sample recoveries reported were dry and above 90% of expected.

  • RC samples were visually checked for recovery, moisture and contamination and notes made in the logs.

  • The rigs splitter was emptied between 1m samples by hammering the cyclone bin with a mallet. The set-up of the cyclone varied between rigs, but a gate mechanism was used to prevent inter-mingling between metre intervals. The cyclone and splitter were also regularly cleaned by opening the doors, visually checking, and if build-up of material was noted, the equipment cleaned with either compressed air or high-pressure water. This process was in all cases undertaken when the drilling first penetrated the pegmatite mineralization, to ensure no host rock contamination took place.

  • Drill collars are sealed to prevent sample loss and holes are normally drilled dry to prevent poor recoveries and contamination caused by water ingress. Wet intervals are noted in case of unusual results.

  • DDH core recoveries were measured using conventional procedures utilising the driller’s markers and estimates of core loss, followed by mark up and measuring of recovered core by the geologist or geotechnician.

  • DDH core recovery is 100% in the pegmatite zones and in fresh host-rock, but in the top 50m is diminished to 80-90% by the weathered ground.

  • There has been no material bias recognised in drill core sampling to date. The assessment involves a detailed assessment of assay grade vs drill core geology, including visual spodumene concentration.

  • Logging • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

  • The total length and percentage of the relevant intersections logged.

    • Detailed geological logging has been carried out on all RC holes and most of the DDH drill holes (refer to Table 1 for this breakdown). These logs will be completed in the coming weeks.

    • Logging recorded lithology, mineralogy, mineralisation, weathering, colour, and other sample features.

    • RC chips are stored in plastic RC chip trays.

    • DDH core is stored in plastic core trays.

    • All holes were or will be logged in full. Many holes have been logged in part or in entirety for geotechnical data. Several holes have been probed using geophysical tools, including televiewer.

    • Pegmatite sections are also checked under a single-beam UV light for spodumene identification on an ad hoc basis. These only provide indicative qualitative information.

    • RC chip trays and DDH core trays are photographed and stored on the CXO server.

  • Sub-sampling • If core, whether cut or sawn and whether quarter, half or all core techniques and taken. sample • If non-core, whether riffled, tube sampled, rotary split, etc and preparation whether sampled wet or dry.

  • For all sample types, the nature, quality and appropriateness of the sample preparation technique.

  • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

  • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the grain size of the material being sampled.

RC Samples

  • The majority of the mineralised samples were collected dry, as noted in the drill logs and database.

  • The field sample preparation followed industry best practice.

  • This involved collection of RC samples from the cone splitter on the drill rig into a calico bag for dispatch to the laboratory.

  • The sample sizes are considered more than adequate to ensure that there are no particle size effects relating to the grain size of the mineralisation.

  • A field duplicate sample regime is used to monitor sampling methodology and homogeneity of RC drilling at Finniss. The typical procedure was to collect Duplicates via a spear of the green RC bag, having collected the Original in a calico bag. Trying to split the 2-3kg calico bag into an Original and a Duplicate has inherent dangers, least of all reducing the sample mass. However, comparing cone split sample with a spear sample also has some element of incompatibility. The expectation would be a high degree of variability in the spear sample, because of the heterogenous and stratified RC bag, but overall it should statistically match the split original sample.

  • Assessment of QAQC indicates no issues.

  • Sample preparation for RC samples occurs at North Australian Laboratories (“NAL”), Pine Creek, NT.

  • A 1-2 kg riffle-split of RC Samples are then prepared by pulverising to 95% passing -100 um. RC samples do not require any crushing, as they are largely pulp already.

DDH Samples

  - Half Drill Core sample intervals were constrained by geology, alteration or structural boundaries, intervals varied between a minimum of 0.3 metres to a maximum of 1 m. The core is cut along a regular Ori line to ensure no sampling bias. It is not advisable to create duplicates of the DDH core given the grainsize (heterogeneity) and limited amount of material available.

  - DDH samples were prepared at North Australian Laboratories (“NAL”), Pine Creek, NT.

  - Half core was crushed to a nominal size of -6.3mm and riffle split to obtain a portion to be pulverized in LM5 mill to 80% passing 75um.
  • Quality of • The nature, quality and appropriateness of the assaying and assay data and laboratory procedures used and whether the technique is considered laboratory partial or total. tests • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

  • Sample analysis for RC and DDH samples occurs at North Australian Laboratories, Pine Creek, NT.

  • A 0.3 g sub-sample of the pulp is digested in a standard 4 acid mixture and analysed via ICP-MS and ICP-OES methods for the following elements: Li, Cs, Rb, Sr, Nb, Sn, Ta, U, As, K, P, S and Fe. The lower and upper detection range for Li by this method are 1 ppm and 5000 ppm respectively.

  • During the drilling program a 3000 ppm Li trigger was set to process that sample via a fusion method. The fusion method was - a 0.3 g sub-sample is fused with 1g of Sodium Peroxide Fusion flux and then digested in 10% hydrochloric acid. ICPOES is used for the following elements: Li, P and Fe. The lower and upper detection range for Li by this method are 10 ppm and 20,000 ppm respectively.

  • A barren flush is inserted between samples at the laboratory.

  • The laboratory has a regime of 1 in 8 control subsamples.

  • NAL utilise standard internal quality control measures including the use of Certified Lithium Standards (approx. 1 in 4) and duplicates/repeats (approx 1 in 6).

  • Approximate CXO-implemented quality control procedures include: o One in 20 certified Lithium ore standards were used for this drilling.

==> picture [384 x 140] intentionally omitted <==

  • Verification of • The verification of significant intersections by either independent or sampling and alternative company personnel. assaying • The use of twinned holes.

  • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

  • Discuss any adjustment to assay data.

o One in 20 blanks were inserted for this drilling. QAQC of Drilling data

  • CXO used 4 standards roughly between 4,500 ppm and 30,000 ppm Li, covering the range of expected Li values in the mineralized pegmatite and in concentrate.

  • The standards reported back with an excellent correlation.

  • The data from the blanks pulverised and assayed at NAL indicate that the Li content is low (<50 ppm).

  • Field duplicates were discussed above.

  • There were no significant issues identified with any of this data.

  • Umpire samples from the current RC and DDH drillholes will be sent to an independent laboratory for analysis in the next few months.

  • Senior technical personnel have visually inspected and verified the significant drill intersections.

  • All field data is entered into OCRIS logging system or logging-specific Excel spreadsheet (supported by look-up/validation tables) at site and imported into the centralized CXO Access database.

  • Hard copies of survey and sampling data are stored in the local office and electronic data is stored on the CXO server.

  • Metallic Lithium percent was multiplied by a conversion factor of 2.15283/10000 to report Li ppm as Li2O%.

Location of • Accuracy and quality of surveys used to locate drill holes (collar and • All data have valid location information, including easting/northing, grid datum,
data points down-hole surveys), trenches, mine workings and other locations location method (e.g. GPS).
used in Mineral Resource estimation. • The grid system used by Core is MGA_GDA94, zone 52 for easting, northing and
• Specification of the grid system used. RL.
• Quality and adequacy of topographic control. • Drill hole collars will be collected more accurately via DGPS for use in resource
estimations.
• All of the hole traces were surveyed by north seeking azimuth aligner and gyro tool
(Devicon) operated by CXO.
Data spacing • Data spacing for reporting of Exploration Results. • Drill spacing are approximately 40m along strike and 30-80m vertical, as illustrated
and • Whether the data spacing and distribution is sufficient to establish in the figures in the report.
distribution the degree of geological and grade continuity appropriate for the • The mineralisation and geology show good continuity from hole to hole and will
Mineral Resource and Ore Reserve estimation procedure(s) and be sufficient to support the definition of a Mineral Resource and the classifications
classifications applied. contained in the JORC Code (2012 Edition).
• Whether sample compositing has been applied. • All RC intervals are 1m. All DDH mineralised intervals reported are based on a
maximum of one metre sample interval, with local intervals down to 0.3m.
Orientation of • Whether the orientation of sampling achieves unbiased sampling of • Drilling is oriented approximately perpendicular to the interpreted strike of
data in relation
possible structures and the extent to which this is known, considering

mineralization (pegmatite body) as mapped. Because of the dip of the hole, drill
to geological the deposit type. intersections are apparent thicknesses and overall geological context is needed to
structure • If the relationship between the drilling orientation and the estimate true thicknesses.
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported if
• No sampling bias is believed to have been introduced.
material.
Sample • The measures taken to ensure sample security. • Core has a modern Chain of Custody in place during sample submission.
security • Sample security was managed by the CXO. After preparation in the field or CXO’s
warehouse, samples were packed into polyweave bags and transported by the
Company directly to the assay laboratory. The assay laboratory audits the samples
on arrival and reports any discrepancies back to the Company. No such
discrepancies occurred.
Audits or • The results of any audits or reviews of sampling techniques and data. • No external audits or reviews of the data associated with these drillholes or
reviews samples.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

  • Criteria JORC Code explanation Mineral tenement and • Type, reference name/number, location and ownership land tenure status including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

Commentary

  - Drilling by CXO took place on EL29698, which is 100% owned by CXO.

  - The area being drilled comprises Vacant Crown land.

  - There are no registered heritage sites covering the areas being drilled.

  - The tenements are in good standing with the NT DETT Titles Division.
  • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

  • Exploration done by • Acknowledgment and appraisal of exploration by other other parties parties.

  • The history of mining in the Bynoe area dates back to 1886 when tin was discovered by Mr. C Clark.

  • By 1890 the Leviathan Mine and the Annie Mine were discovered and worked discontinuously until 1902.

  • In 1903, Hang Gong Wheel of Fortune was found, and 109 tons of tin concentrates were produced in 1905. In 1906, the mine produced 80 tons of concentrates.

  • By 1909 activity was limited to Leviathan and Bells Mona mines in the area with little activity in the period 1907 to 1909.

  • The records of production for many mines are not complete, and in numerous cases changes have been made to the names of the mines and prospects which tend to confuse the records still further. In many cases the published names of mines cannot be linked to field occurrences.

  • In the early 1980s the Bynoe Pegmatite field was reactivated during a period of high tantalum prices by Greenbushes Tin which owned and operated the Greenbushes Tin and Tantalite (and later spodumene) Mine in WA. Greenbushes Tin Ltd entered into a JV named the Bynoe Joint Venture with Barbara Mining Corporation, a subsidiary of Bayer AG of Germany.

  • Greenex (the exploration arm of Greenbushes Ltd) explored the Bynoe pegmatite field between 1980 and 1990 and produced tin and tantalite from its Observation

Criteria JORC Code explanation Commentary
Geology
• Deposit type, geological setting and style of mineralisation.
Criteria JORC Code explanation Commentary
Drill hole Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
**Hole No. ** Type GDA94 Grid
East
GDA94 Grid
**North **
RL
(m)

Azimuth
(°)
Dip
(°)

Depth
(m)
FRCD018 DDH 693160 8598895 17 265.1 -63.9 330.0
FRCD019 DDH 693166 8599023 18 260.5 -64.62 339.4
FRCD020 DDH 692924 8598998 23 90.7 -63.4 246.3
FRCD021* DDH 692942 8599064 22 88.3 -66.5 261.3
FRCD022 DDH 692869 8598935 22 87.6 -73 375.8
FMRD008 DDH 693148 8598863 16 276.0 -61.9 324.4
FMRD009 DDH 692869 8598829 24 88.0 -66.3 342.8
FMRD010* DDH 692832 8598789 22 90.4 -66.11 356.0
Criteria JORC Code explanation Commentary
FMRD011 DDH 692869 8598824 23 89.8 -61.96 312.4
FRC218 RC 693162.19 8599039.3 18.42 268.29 -64.99 264.0
FRC219 RC 693132.7 8598978.5 19.38 262.36 -65.38 234.0
FRC220 RC 693153.96 8598964.5 18.75 263.11 -67.06 336.0
FRC221 RC 692861.02 8598841.2 22.92 87.38 -67.02 276.0
FRC222 RC 693156 8598895 17 271.47 -63.98 22.0
FRC223 RC **693164 ** 8599028 18 266.60 -64.24 29.0
Data aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Relationship between
mineralisation widths
and intercept lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(e.g. ‘down hole length, true width not known’).
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discoverybeingreported These should include,
Criteria JORC Code explanation Commentary
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
Balanced reporting
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleadingreportingof Exploration Results.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminatingsubstances.
Further work
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-
out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.