AI assistant
CEC — Annual Report 2020
Apr 20, 2021
51857_rns_2021-04-20_21855027-1882-4116-bed0-9c05ab535c7f.pdf
Annual Report
Open in viewerOpens in your device viewer
==> picture [207 x 35] intentionally omitted <==
CHINA ECOTEK CORPORATION(1535) Investor Conference Start Time 14:30
==> picture [83 x 32] intentionally omitted <==
Coming soon
==> picture [720 x 67] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
==> picture [256 x 228] intentionally omitted <==
==> picture [83 x 32] intentionally omitted <==
==> picture [69 x 69] intentionally omitted <==
http://www.ecotek.com.tw/cec_csr/index.php 創造對環境友善、讓客戶信賴的全方位工程公司
==> picture [68 x 115] intentionally omitted <==
==> picture [84 x 157] intentionally omitted <==
2
==> picture [207 x 35] intentionally omitted <==
==> picture [390 x 40] intentionally omitted <==
The content provided in this presentation, including all prospective opinions will not update related information because of any latest news, future events, or under other conditions.
Ecotek is not responsible for updating or correcting the content of this presentation.
Neither can the content of this presentation expressly or impliedly guarantee its accuracy, completeness or reliability, nor can it represent the company’s full statement about the industry or the following critical development.
2021/4/20 © 2015 中宇環保工程股份有限公司 C.E.C. All Rights Reserved.
3
==> picture [207 x 35] intentionally omitted <==
CONTENT
1. Business Overview
2. Financial Highlight 3. Future Prospects
4 4
2021/4/20 © 2015 中宇環保工程股份有限公司 C.E.C. All Rights Reserved.
==> picture [207 x 35] intentionally omitted <==
1. Business Overview
5 5
2021/4/20 © 2015 中宇環保工程股份有限公司 C.E.C. All Rights Reserved.
Business Overview
==> picture [207 x 35] intentionally omitted <==
M&E Engineering
==> picture [188 x 181] intentionally omitted <==
Green Energy & Environmental Engineering
==> picture [190 x 177] intentionally omitted <==
Operation &Maintenance
==> picture [190 x 178] intentionally omitted <==
Refractory Engineering
==> picture [190 x 177] intentionally omitted <==
Biotech & Food Engineering
==> picture [192 x 179] intentionally omitted <==
6
==> picture [169 x 157] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
M&E Engineering
- **Upgrade M&E technical level. Strengthen strategic partnership. Cooperate with subcontractors and enlarge business scope. Extend the business range of M&E engineering.**
- **Start with the Group and expand outside the Group, we promote turnkey construction for M&E equipment so revenue and profit will increase.**
-
During 2021 Q1 : Major On-going Projects
-
CSC New-built Coal Mine Closed-type Building, Ph1-Conveyor Project
-
• CSC Retrofit Project of Conveying Coal/Iron Ore
-
CSC Betterment Work of Ph1&2 Crusher System Pollution Control
-
CSC Revamp Project of No. 1&2 Sinter Furnace Equipment
-
CSC Ph1&2 Mixing Line Doubling Track Project
-
CSC Revamp Project of M27, C1o, S6 Conveyor
-
CSC #1 Power Plant Cooling Tower (CT-6) Project
-
DSC Retrofit Project of Material Yard Conveyor
-
SinDa Marine Structure Co. Utility Facility Renovation Project
7
==> picture [207 x 35] intentionally omitted <==
M&E Engineering
==> picture [169 x 157] intentionally omitted <==
CSC #1 & #2 Sinter Plant Equipment Revamp
==> picture [133 x 198] intentionally omitted <==
CSC Coal Iron Ore Conveyor System
DSC Raw Material Yard
SinDa Marine Structure Co.
==> picture [259 x 199] intentionally omitted <==
==> picture [271 x 199] intentionally omitted <==
==> picture [102 x 159] intentionally omitted <==
----- Start of picture text -----
8
----- End of picture text -----
==> picture [169 x 156] intentionally omitted <==
Green Energy & Environmental Engineering
- **Upgrade air pollution technique of de-NOX, de-SOX and dust collection. Expand the operation area.**
- **PV System Engineering targets on the Group projects and extends outside the Group, CEC continuously pushes for site turnkey project.**
- **Continuously develop sewage and pure water treatment project.**
-
During 2020 Q1: Major On-going Projects
-
CSC Group PV Construction Project
-
CSC #1SP FGD EPC Project
-
CSC Additional Biological Filter for Effluent Water
-
CSC Additional COD Removal Tank for Coke Plant
-
DSC #1SP EP Equipment Project
-
DSC Additional Sludge Dryer for Water Treatment Plant
-
ShuLin Refuse Incineration Plant, ROT Project EP System EPC
-
(VN) FHS Coke Plant FGD Project
9
Green Energy & Environmental Engineering
==> picture [169 x 156] intentionally omitted <==
De-SOx
Electrostatic Precipitator
==> picture [153 x 198] intentionally omitted <==
De-NOx
==> picture [194 x 253] intentionally omitted <==
==> picture [25 x 14] intentionally omitted <==
----- Start of picture text -----
PV
----- End of picture text -----
==> picture [70 x 14] intentionally omitted <==
----- Start of picture text -----
De-Dust
----- End of picture text -----
==> picture [221 x 199] intentionally omitted <==
----- Start of picture text -----
10
----- End of picture text -----
==> picture [243 x 199] intentionally omitted <==
==> picture [168 x 157] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
Operation & Maintenance
- **On-site O&M work at CSC and DSC provides stabilized profit.**
- **Keep up O&M work at public construction for sewage and Advanced water treatment.**
-
During 2021 Q1: Major On-going Projects
-
CSC Group On-site Maintenance
-
CSC RMTP & Recycling Plant Operation
-
CSC Recycling Yard Operation
-
CSC Industrial Waste Water Treatment Plant O&M
-
DSC Waste Water Treatment Plant O&M
-
Cheng-Ching Lake Advanced Water Treatment Plant O&M
-
Kinmen county, Tai-hu Advanced Water Treatment Plant O&M
-
New Taipei City San-ying Water Resource Recycling Center O&M
-
Kaohsiung City, Kangshan Qiaotou Sewage Treatment Plant O&M
11
==> picture [168 x 157] intentionally omitted <==
Operation & Maintenance Cheng-ching Lake Advanced Gang-Shan Water Treatment Plant Sewage Treatment Plant
King-men Tai Lake
San-ying Water Resource Recycling Center
12
==> picture [168 x 157] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
Refractory Engineering
-
Strengthen the professional technique, searching for sources of global refractory materials and expanding business about refractory turnkey construction.
-
Develop & invest refractory formula. Train engineering team, and enhance value chain.
◆ During 2021 Q1: Major On-going Projects
-
CSC #21Hot-air Furnace Revamp Project
-
CSC #31Hot-air Furnace Revamp Project
-
CSC #33Hot-air Furnace Revamp Project
-
CSC Y41Reheating Furnace Revamp Project
-
CSC No.1 Sinter Plant Chimney Liner Restore Project
-
DSC #22Hot-air Furnace Refractory Restore Project
-
(VN) FHS Converter Furnace Refractory EPC Project
13
==> picture [168 x 157] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
Refractory Engineering
Furnace Liner Revamping
Air-heating Furnace
Reheating Furnace
Blast Furnace
14
==> picture [169 x 157] intentionally omitted <==
==> picture [207 x 35] intentionally omitted <==
Biotech & Food Engineering
Biotech construction of whole plant provides complete service for
(1) design
(2) commissioning
-
(3) liability test, etc.
-
During 2021 Q1: Major On-going Projects
==> picture [78 x 79] intentionally omitted <==
----- Start of picture text -----
Interior
Decor
----- End of picture text -----
-
Adimmune Corporation Cell Factory
-
Virbac Co. Process &
==> picture [78 x 78] intentionally omitted <==
----- Start of picture text -----
Pipeline
Cleaning
----- End of picture text -----
==> picture [79 x 78] intentionally omitted <==
----- Start of picture text -----
Air-con
Venting
----- End of picture text -----
-
Development Laboratory
-
Formosa Laboratories Co. Plant, M&E
==> picture [80 x 78] intentionally omitted <==
----- Start of picture text -----
Plant
Project
----- End of picture text -----
- TaiMed Biologics Co. Pharmaceutical Plant
==> picture [79 x 78] intentionally omitted <==
----- Start of picture text -----
Utility
----- End of picture text -----
==> picture [78 x 78] intentionally omitted <==
----- Start of picture text -----
Weak
Current
----- End of picture text -----
-
Caliway Co. Pilot Plant
-
CPDC Fine Chemical Plant
-
Toufen City
==> picture [78 x 78] intentionally omitted <==
----- Start of picture text -----
Fire-
fighting
----- End of picture text -----
==> picture [78 x 81] intentionally omitted <==
----- Start of picture text -----
Water
Supply
Drainage
----- End of picture text -----
15
==> picture [207 x 35] intentionally omitted <==
==> picture [169 x 157] intentionally omitted <==
Biotech & Food Engineering
Caliway Biopharmaceutical Co.
Formosa Laboratories, Inc.
==> picture [239 x 162] intentionally omitted <==
==> picture [220 x 149] intentionally omitted <==
Adimmune Co.
TaiMed Biologics
Virbac
==> picture [239 x 156] intentionally omitted <==
16
==> picture [207 x 35] intentionally omitted <==
2. Financial Highlight
17 17
2021/4/20 © 2015 中宇環保工程股份有限公司 C.E.C. All Rights Reserved.
Financial HighlightSales Distribution
Taiwan Oversea Unit: NT$, Thousand
==> picture [367 x 333] intentionally omitted <==
----- Start of picture text -----
10,813,583
9,315,910
8,836,360
96%
75%
76%
2018 2019 2020
----- End of picture text -----
==> picture [207 x 35] intentionally omitted <==
==> picture [316 x 421] intentionally omitted <==
----- Start of picture text -----
Vietnam
Country 4%
Taiwan
96%
Category Others
1% Environment Protection
Engineering
Operation and
21%
Maintenance
31%
M&E Engineering
47%
In-progress
Construction Overseas
1%
Domestic
99%
Construction contracts were signed but not yet
recorded on 31th,December,2020 is 8,702,963. 18
(NT$, Thousand)
----- End of picture text -----
Financial Highlight– Consolidated Income Statement
==> picture [207 x 35] intentionally omitted <==
Unit: NT$, Thousand
| 2020/01/01-12/31 | 2020/01/01-12/31 | 2019/01/01-12/31 | 2019/01/01-12/31 | YOY | |
|---|---|---|---|---|---|
| Sales Revenues | 8,836,360 | 100% | 9,315,910 | 100% | -5% |
| Operating costs | 8,318,011 | 94% | 8,784,938 | 95% | -5% |
| Gross Profit | 503,964 | 6% | 510,725 | 5% | -1% |
| Operating expenses | 439,240 | 5% | 478,245 | 5% | -8% |
| Operating Income | 64,724 | 1% | 32,480 | 0% | 99% |
| Total non-operating income | 174,736 | 2% | 131,092 | 2% | 33% |
| Profit before income tax | 239,460 | 3% | 163,572 | 2% | 46% |
| Income tax expense | 42,025 | 1% | 36,714 | 1% | 14% |
| Profit for the period | 197,435 | 2% | 126,858 | 1% | 56% |
| Total basic earnings per share | 1.60 | 1.03 |
19
Financial Highlight– Dividend Payout Ratio
==> picture [207 x 35] intentionally omitted <==
Unit: NT$
==> picture [676 x 328] intentionally omitted <==
----- Start of picture text -----
6.00 160%
5.51
5.06
4.90 4.84 139% 140%
5.00
4.44 4.50
120%
4.11 117%
3.89
4.00 3.71
3.50 3.50 100%
3.39
3.20
90%
3.00
3.00 2.70 80% 82% 83% 84% 80%
2.55
71% 73% 72% 71% 69% 73%
2.00
59% 2.00 60%
1.80 1.80
2.00
1.60
1.51
1.35
1.25 1.20 40%
1.10
1.03
1.00 0.79
20%
- 0%
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
EPS Cash DPS Cash Divided Payout Ratio
----- End of picture text -----
Remark:
Cash DPS by NT$1.35 in 2020. Approved by Board of Directors in Feb. 25[th] 2021, and will report to Shareholders for recognition in June 22th 2021. Besides, EPS by NT$ 1.60 is also reviewed & approved by accountant. 20
20
==> picture [207 x 35] intentionally omitted <==
3. Future Prospects
21 21
2021/4/20 © 2015 中宇環保工程股份有限公司 C.E.C. All Rights Reserved.
Future Prospects
==> picture [207 x 35] intentionally omitted <==
Future Prospect願景 To create an all-around engineering company 追求成長持續創新,提供全方位工程服務, that benefits the environment and wins 與客戶共創價值,成為客戶信賴的企業 customers’ trust.
策略主軸 Strategy Focus 發展「工程領域」、「操作維護」、「循環經濟」 Engineering, O&M, Circular Economy as “Power of Triple Balance” Strategy 三足鼎立的成長策略
Upgrade Engineering Management Efficiency
-
Strengthen execution
-
ability and decrease risks of construction
-
⚫ Improve the ability of engineering management. Bring in visualized analysis.
Business Expansion
-
Strive for business of
-
equipment revamping work within the Group.
-
⚫ Expand sales item and marketing area.
-
⚫ Explore business of circular economy, such as green energy and water treatment.
Enforce Technical Research & Development
-
Unite CSC R&D department
-
and improve the technology of energy-saving, water and air pollution control.
-
⚫ Join the integral design within the Group. Upgrade the ability of self-design.
~~22~~
Future Operation & Business Opportunities
01 M&E Engineering
02
Green Energy & Environmental Engineering
⚫ CSC Coke Plant Revamp Project
-
⚫ CSC Coke Yard & Convey System Revamp Project
-
⚫ CSC Coal Sample Preparation ⚫ CSC new-built CDQ Project
03
Operation & Maintenance
04
Refractory Engineering
-
⚫ CSC TG9
、TG10 Project ⚫ CSC PV Project ⚫ Waste Water Treatment Revamp -
⚫ Air Pollution Control FGD&SCR System and Dust Control Equipment Revamp Project
Public Works(Purified Water, Recycled Water, Seawater Desalination)
⚫
05
-
⚫ CSC On-site Maintenance
-
⚫ Recycling Yard O&M
-
⚫ RMTP O&M
-
⚫ Water Treatment Plant O&M (CSC, DSC, Cheng-ching Lake, Kinmen, San-ying, Gang-xiao)
-
⚫ CSC Coke & Furnace Plant
-
⚫ CSC Coke Plant & CDQ Revamp
-
⚫ Refractory Engineering for CSC, DSC Hot-air Furnace, Blast Furnace
-
⚫ National Biotechnology Research Park
-
⚫ Hsinchu Science and Industrial Park
-
⚫ Central Taiwan Science Park
⚫ South Smart Biotech Medical Cluster Ping-tung Agricultural 23 Biotechnology Park
==> picture [207 x 35] intentionally omitted <==
==> picture [83 x 32] intentionally omitted <==
==> picture [256 x 228] intentionally omitted <==
==> picture [248 x 140] intentionally omitted <==
==> picture [84 x 157] intentionally omitted <==
==> picture [68 x 115] intentionally omitted <==
24