Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ASARA RESOURCES LIMITED Capital/Financing Update 2021

Apr 21, 2021

64427_rns_2021-04-21_d9448dba-d1d7-4356-889e-ccf931f2a36d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

22 April 2021

GOLDEN RIM TO EXPLORE MAJOR PORPHYRY COPPER TARGET IN CHILE

Golden Rim Resources Ltd (ASX: GMR; Golden Rim or Company ) is pleased to announce it will recommence work on its Paguanta Copper and Silver-Lead-Zinc Project (Paguanta) in Chile following a review of historical data.

Highlights

  • Paguanta is at the northern extension of the West Fissure in Chile - the world’s largest concentration of major porphyry copper - molybdenum deposits.

  • Golden Rim will initially focus on the under-explored Loreto porphyry copper target where preliminary assessment has highlighted:

  • 3.5km x 3.5km leached cap (colour anomaly), interpreted as an alteration footprint of a large deeper porphyry system.

  • Remnants of copper oxide veins at surface and encouraging molybdenum in rock chip samples (porphyry pathfinder element) highlighting the centre of the porphyry cell.

  • Igneous breccia outcrops contain potassic-altered porphyry clasts with chalcopyrite (copper sulphide), suggesting a copper mineralised porphyry core at depth.

  • Multiphase porphyry dykes, with traces of chalcopyrite , dated as Late Oligocene – Early Eocene age , the same age as the major porphyry copper deposits in the belt.

  • Loreto porphyry target has not previously been explored.

  • Two of the world’s largest copper companies (BHP and Codelco) control the surrounding ground; Codelco has pegged over the top of Golden Rim’s Loreto mining permits.[1]

  • Loreto is one of five hydrothermal cells identified to date at Paguanta; all cells are prospective for copper mineralisation.

  • Extensive historical rock chip geochemical database ( 1,169 rock chip samples ); secondary target areas include Doris where high-grade secondary copper ( up to 4.1% copper) was obtained at surface and there is potential for a porphyry at depth.

  • Preparation of Loreto access agreements underway; exploration expected to commence in May.

Golden Rim’s Managing Director, Craig Mackay, said :

“While we are focussed on progressing our advanced gold projects in West Africa, the strengthening copper price and bullish price forecasts of US$15,000/ton[2] , has encouraged Golden Rim to evaluate a

1 . In Chile, companies are permitted to lodge permit applications over existing granted permits. Should the existing permit be relinquished the company that has over-pegged is first in line for the new permit.

2 www.businessinsider article 14 April 2021: Goldman Sachs forecast copper price for 2025, published 13 April 2021.

GOLDEN RIM RESOURCES ASX:GMR 1

22 April 2021

compelling and previously unexplored, porphyry copper target at Loreto, within our Paguanta Project, in Chile.

“Golden Rim believes that Loreto could well represent the last unexplored outcropping Eocene-Oligocene porphyry system in northern Chile and it has potential for the discovery of a Tier 1, world-class, Collahausi-type porphyry copper deposit. Not surprisingly, Loreto is surrounded and over-pegged by BHP and Codelco, two of the largest copper companies in the world.

“Golden Rim’s initial exploration to generate drill targets at Loreto can be conducted at little cost. Should a copper porphyry deposit be discovered, we could quickly generate significant value for our shareholders.”

==> picture [459 x 473] intentionally omitted <==

Figure 1. Loreto porphyry copper target area at Paguanta. The 3.5km x 3.5km alteration zone (colour anomaly) is within the green circle (parts of which have shallow recent alluvial cover). The interpreted porphyry centre is indicated by the blue outline and includes the area of anomalous molybdenum.

GOLDEN RIM RESOURCES ASX:GMR

2

22 April 2021

==> picture [276 x 375] intentionally omitted <==

Figure 2 .

Copper oxide vein (within green dashed lines) in the alteration zone (leached cap) at Loreto.

==> picture [440 x 252] intentionally omitted <==

Figure 3 . Secondary copper oxide mineralisation ( up to 4.1% copper ) in fractured volcanic rocks at Doris. Potential for a buried porphyry copper deposit beneath the volcanics.

GOLDEN RIM RESOURCES ASX:GMR 3

22 April 2021

Highly Prospective Porphyry Copper Setting

Paguanta is in northern Chile, in the northern extension of the West Fissure, which hosts the world’s largest known concentration of major porphyry copper and molybdenum deposits. The project is 30km north-east from BHP’s Cerro Colorado Mine (Measured and Indicated Mineral Resources: 519Mt at 0.55% copper[3] ) and 130km north from the Collahuasi (Anglo American and Glencore; Measured and Indicated Mineral Resources: 2,340 Mt at 0.66% copper[4] ) – Quebrada Blanca cluster (Teck; Measured and Indicated Mineral Resources: 1,494 Mt at 0.4% copper[5] ) (Figure 4).

Golden Rim’s Paguanta mining permits cover 5,500ha and are located within a fertile porphyry district around the Alantaya batholite, a source of several copper-molybdenum porphyry projects, including La Planada and Yabricoya (Codelco), situated just 37km and 25km respectively to the south, and Queen Elizabeth (Anglo American), 10km to the east.

==> picture [365 x 408] intentionally omitted <==

==> picture [81 x 157] intentionally omitted <==

----- Start of picture text -----

Figure 4 .
Location of
the Loreto
copper target
within the
Eocene –
Oligocene
Porphyry Belt
of northern
Chile.
----- End of picture text -----

3 BHP Annual Report 2020, p. 290.

4 - https://miningdataonline.com/property/1383/Collahuasi Mine.aspx#Reserves

5 https://miningdataonline.com/property/167/Quebrada-Blanca-Mine.aspx#Reserves; https://miningdataonline.com/property/4569/Quebrada-Blanca-Phase-2-(QB2)-Project.aspx#Reserves

GOLDEN RIM RESOURCES ASX:GMR 4

22 April 2021

Attributes of the Loreto Porphyry Copper Target

A recent review of historical data from Loreto shows encouraging evidence supporting a sizeable and fertile porphyry system, in an area that has been neglected because of difficult access and its distance from the silver-lead-zinc vein system at Patricia, the focus for all previous exploration and historical mining at Paguanta to date.

Findings from the limited previous field work at Loreto are summarised below:

  • 3.5km x 3.5km leached cap (colour anomaly) composed by clay – pyrite +/- sericite, surrounded by propylitic halo (chlorite – epidote – magnetite – pyrite) affecting the volcanic rocks from the Empexa Formation and granodiorite from the Alantaya Batholite. This is interpreted as the alteration footprint of a porphyry system (Figures 1 & 5).

  • Remnants of copper oxide veins at surface and encouraging molybdenum results in rock chip samples (as molybdenum is a geochemically immobile element, it is an excellent porphyry pathfinder) highlighting the centre of the porphyry cell (Figures 1, 2 & 7, Table 1).

  • Igneous Breccia outcrops , with a clay – silica – pyrite and dacitic matrix surrounding dacitic to dioritic porphyry clasts showing potassic alteration (biotite – pyrite – chalcopyrite), suggesting a potassic altered core at depth (porphyry copper target) (Figure 6).

  • Multiphase porphyry dykes , grading in composition from diorite to dacite. These dykes show silica – clay – sericite and chlorite – epidote – magnetite alteration, plus pyrite +/- chalcopyrite. Multievent intrusions are common in porphyry systems and play a key role in hydrothermal fluid exsolution and transport.

  • Porphyry dyke has been dated, confirming Late Oligocene – Early Eocene age; U-Pb zircon in dacitic biotite porphyry indicating 35.3 +/- 0.3 Ma. This is the same age as BHP’s Cerro Colorado and Anglo American/Glencore’s Collahausi copper deposits.

  • Hyperspectral analysis (Terra Spec) indicating muscovite and pyrophyllite in surface rock samples, suggesting a paleo-isotherm around 300°C, and potentially close to prospective classic phyllic – potassic porphyry alteration assemblages. This alteration is seen outcropping 10km to the east at Queen Elizabeth (Anglo American).

Whilst the Loreto porphyry target has not previously been explored, the area has been on the radar of the major companies which tightly hold the area surrounding Paguanta. These majors, which include BHP, Anglo American, Glencore, Vale and Freeport, are all looking for another Collahausistyle copper deposit in the northern extension of the Eocene – Oligocene Porphyry Belt. Not surprisingly, Paguanta’s mining rights, particularly the Loreto target, have been over-pegged by the majors.

GOLDEN RIM RESOURCES ASX:GMR 5

22 April 2021

==> picture [492 x 231] intentionally omitted <==

Figure 5. Photo of the Loreto hydrothermal alteration zone (colour anomaly).

==> picture [241 x 317] intentionally omitted <==

==> picture [242 x 317] intentionally omitted <==

Figure 6. Photos of outcrop in the Loreto alteration zone. Sulphide bearing igneous breccia showing potassic altered porphyry clasts with chalcopyrite (LHS) and limonite veins after sulphides in altered volcanics (RHS).

GOLDEN RIM RESOURCES ASX:GMR 6

22 April 2021

==> picture [372 x 281] intentionally omitted <==

Figure 7. Hand specimen from the Loreto alteration zone showing intense argillic alteration (clay – silica – sercite) and neotocite (black copper oxide).

Paguanta’s Copper Porphyry Exploration Upside

Loreto is positioning as the most promising copper porphyry target at present, but it is one of five hydrothermal cells Golden Rim has identified at Paguanta that are prospective for copper mineralisation (Figure 8). The prospectivity of the four other cells is discussed below.

  • Patricia/Patricia East : Previous exploration and historical mining has principally focused on the polymetallic epithermal – intermediate sulphidation mineralisation at Patricia, which hosts a Measured, Indicated and Inferred Mineral Resource of 2.4Mt at 5.0% zinc, 1.4% lead, 88g/t silver and 0.3g/t gold (10% zinc equivalent)[6] . There is potential for porphyry-style mineralisation to be discovered at depth and/or laterally to the existing mineralisation. A substantial IP chargeability anomaly to the east of Patricia (Patricia East) remains untested.

  • Cumbre : High-level hydrothermal cell to the south of Patricia. Possibly more prospective for epithermal silver-lead-zinc mineralisation, but it remains untested and a deeper porphyry system is also a target.

  • La Rosa: 3km x 1km colour anomaly to the north of Patricia, with intense argillic alteration, copper oxides, pyrite and strong limonite, suggesting leach capping over the pyrite shell of a porphyry system.

  • Doris: Exhibits encouraging copper oxide mineralisation ranging between 1 – 4% copper at surface in fractured volcanics (Figure 3 & Table 2). Whilst previously interpreted as a

6 ASX announcement: New Resource Estimation for Paguanta dated 30 May 2017 (Total Mineral Resource includes: Measured Mineral Resource of 0.41Mt at 5.5% zinc, 1.8% lead, 88g/t silver, 0.3g/t gold; Indicated Mineral Resource of 0.61Mt at 5.1% zinc, 1.8% lead, 120g/t silver, 0.3g/t gold; Inferred Mineral Resource of 1.3Mt at 4.8% zinc, 1.1% lead, 75g/t silver, 0.3g/t gold).

GOLDEN RIM RESOURCES ASX:GMR 7

22 April 2021

satellite exotic copper deposit, limited and shallow previous drilling (drilling intercepts include 3m at 1.3% copper and 160 g/t silver and 1.7m at 2.5% copper and 50 g/t silver[7] ) suggests Doris may correspond to a classic porphyry related peripheral coppersilver vein system like the ones seen in Collahuasi. As such, Golden Rim believes there is potential for a porphyry copper system to be discovered at depth below the volcanics.

==> picture [476 x 491] intentionally omitted <==

Figure 8. Location of the five hydrothermal cells (Loreto, Patricia, Cumbre, La Rosa and Doris) identified at Paguanta that are prospective for copper mineralisation. Rock chip sample results from 1,169 historical samples. Best copper results are summarised in Table 2. Surface copper results at Loreto interpreted to be lower because of sulphide interaction (pyrite – chalopyrite and others) with meteoric waters (weathering), causing acid leaching and remobilisation of the copper to potentially deeper in the porphyry system.

7 AIM Release: Herencia Resources plc - More Copper and Silver at Doris dated 15 June 2011.

GOLDEN RIM RESOURCES ASX:GMR 8

22 April 2021

There is an extensive historical geochemical database ( 1,169 rock chip samples ) at Paguanta. Apart from the anomalous copper results obtained from each of the identified hydrothermal cells, additional anomalous copper results, some associated with old mine workings, have been obtained from the northwest portion of the project area, near the Tarapacá River, and these areas required further investigation (Figure 8).

Exploration Model and Proposed Exploration at Loreto

Based on the field observations, Golden Rim believes that Loreto corresponds spatially to the upper portion of a porphyry system and that it corresponds in time to the most productive copper mineralising age in northern Chile (Late Oligocene – Early Eocene).

Moreover, Loreto shows good evidence to suggest a telescoped system (hydrothermal alteration overprinting), meaning that economic mineralisation might be in a range of hundreds of meters below surface, within the zone of phyllic and potassic porphyry alteration (Figure 9). Evidence for this deeper alteration includes the clasts with potassic altered porphyries plus sulphides from the igneous breccia and the pyrophyllite hyperspectral finding.

Also, the remanent copper oxides at surface, the chalcopyrite in the igneous breccia clasts and the traces of chalcopyrite in late multiphase porphyry dykes show evidence of the copper fertility at Loreto.

Golden Rim is preparing access agreements with landowners before commencing exploration at Loreto. The proposed initial work includes geological mapping (1: 5,000 scale), geochemical sampling, clay hyperspectral analysis, ground magnetics and 3D Induced Polarisation (IP)/Resistivity geophysical surveys, which it expects to commence in May.

It then plans to commence a short program of diamond drilling on priority targets identified in the earlier work.

GOLDEN RIM RESOURCES ASX:GMR 9

22 April 2021

==> picture [478 x 312] intentionally omitted <==

Figure 9. Loreto Exploration Model.[8]

-ENDS-

8 Original figure from University of Tasmania, Centre for Ore Deposit and Earth Sciences (Codes) presentation.

GOLDEN RIM RESOURCES ASX:GMR 10

22 April 2021

Table 1. Historical Rock Chip Assays from the Loreto Copper Target.

Table 1.Hi storical Roc k Chip Assay s from the Loreto C opper Tar get.
Sample
Number
Easting
(m)
Northing
(m)
Target Silver
(ppm)
Gold
(ppm)
Copper
(ppm)
Molybdenum
(ppm)
Lead
(ppm)
Zinc
(ppm)
822902 493,391 7,807,874 Loreto 1.13 0.067 131.5 7.3 15.6 13
81251 493,062 7,807,351 Loreto 0.07 0.011 21.8 4.19 13.2 61
81252 492,785 7,807,261 Loreto 0.05 0.006 14.3 1.8 24.2 68
81253 491,734 7,807,161 Loreto 0.04 0.01 47.6 13.8 17.9 27
81254 492,674 7,807,143 Loreto 0.06 <0.001 6 0.9 14 31
81255 492,633 7,806,944 Loreto 0.05 0.006 9.7 0.91 10.2 15
81256 492,527 7,807,018 Loreto 0.02 <0.001 20.1 0.33 12.7 63
81257 492,355 7,806,967 Loreto 0.12 0.013 7.4 4.36 15.3 3
81258 492,269 7,807,084 Loreto 0.06 0.002 14.6 6.02 30.2 11
81259 492,250 7,806,953 Loreto 0.08 0.004 15.4 3.81 15 40
81260 492,128 7,806,998 Loreto 0.04 0.001 15.9 2.46 13.1 63
81261 491,920 7,806,915 Loreto 0.05 0.031 19.7 26.5 31 44
81262 491,698 7,806,782 Loreto 0.04 <0.001 11.3 4.72 13.8 <2
81263 491,463 7,806,955 Loreto 0.08 0.001 29.2 1.52 14.1 67
81264 492,926 7,807,082 Loreto 0.06 0.002 34.4 1.97 16 9
81265 492,766 7,807,099 Loreto 0.1 0.002 9.7 0.98 24.1 21
81266 492,686 7,807,014 Loreto 0.04 0.002 15.2 2.27 6.2 46
81267 492,380 7,806,914 Loreto 0.17 0.015 33.3 7.55 19.1 13
81268 492,170 7,806,745 Loreto 0.02 <0.001 13 0.62 11.5 63
81269 491,801 7,806,996 Loreto 0.05 <0.001 21.1 2.33 13.7 22

Notes:

  • Geochemical analysis summary for 20 samples at Loreto.

  • Assays conducted by the ALS Global laboratory in Antofagasta.

  • The laboratory used digestion and analysis by High Grade Four Acid ICP-AES(ME-ICP61a) for 33 elements. Zn and Pb (20-100000ppm), Ag (1-200ppm). Over limit results for Zn, Pb, and Ag were analysed using AAS (method OG62) to provide ore grade results in the ranges of Zn and Pb (0.001-30%), Ag (1-1500ppm) (g/t).

  • 30g charge fire assays conducted for gold.

GOLDEN RIM RESOURCES ASX:GMR 11

22 April 2021

Table 2. Best Historical Copper Rock Chip Assays from Paguanta.

Table 2.Best Hi storical Cop per Rock Ch ip Assays fro m Paguanta .
Sample
Number
Easting
(m)
Northing
(m)
Target Copper
(%)
Gold
(ppm)
Silver
(ppm)
Lead
(ppm)
Zinc
(ppm)
822901 495,287 7,810,715 Doris 4.13 0.011 100 158 577
37877 495,206 7,810,635 Doris 3.92 NA 287 641 442
37879 495,288 7,810,636 Doris 2.84 NA 235 1220 369
37880 495,302 7,810,689 Doris 2.29 NA 99 929 1105
37943 495,484 7,810,419 Doris 1.53 NA 162 75 448
37944 495,514 7,810,400 Doris 1.42 NA 106 1.53% 347
37874 495,093 7,810,644 Doris 0.44 NA 13 14 186
37946 495,550 7,810,116 Doris 0.75 NA 8 64 253
813069 493,384 7,811,599 Doris 1.44 0.01 61 193 78
813070 495,511 7,810,398 Doris 1 <0.01 159 1.58% 403
813071 495,514 7,810,395 Doris 1.57 <0.01 151 1.65% 312
813072 495,517 7,810,396 Doris 0.88 <0.01 131 110 391
813073 495,567 7,810,124 Doris 1.8 0.02 88 53 245
813074 495,568 7,810,120 Doris 1.74 0.01 265 36 249
813075 495,484 7,810,444 Doris 2.18 0.01 290 16 299
813076 495,495 7,810,436 Doris 1.57 0.02 115 104 309
813077 495,520 7,810,453 Doris 2.65 0.01 617 2570 290
813078 495,526 7,810,439 Doris 3.35 0.01 379 83 206
813079 495,527 7,810,433 Doris 2.35 0.01 237 2390 350
43291 494,220 7,809,398 Patricia 0.13 0.97 280 21.2% 4300
43294 494,235 7,809,273 Patricia 0.12 1.09 800 4.44% 14.9%
43302 494,090 7,809,148 Patricia 0.11 0.43 309 11.4% 4900
49665 492,216 7,811,226 Patricia 0.1 2.16 100 17.3% 9620
37740 493,395 7,811,589 River shaft 0.92 0.02 45 164 110

Notes:

  • Best copper rock chip geochemical analysis summary from 1,169 samples from Paguanta.

  • Compilation of different historical sample batches and laboratories. Most of the samples analysed by ALS Global laboratory in Antofagasta.

  • The laboratories used digestion and analysis by ICP-MS (mass spectrometry) for 33 – 61 elements. Zn and Pb (20100000ppm), Ag (1-200ppm). Over limit results for Zn, Pb, and Ag were analysed using AAS (method OG62) to provide ore grade results in the ranges of Zn and Pb (0.001-30%), Ag (1-1500ppm) (g/t).

  • 30g charge fire assays conducted for gold.

  • NA – no assay.

GOLDEN RIM RESOURCES ASX:GMR 12

22 April 2021

Competent Persons Statements

The information in this report relating to previous exploration results and Mineral Resources are extracted from the announcements: New Resource Estimation for Paguanta dated 30 May 2017; Paguanta Zinc-Silver-Lead Project Update dated 20 January 2017; Golden Rim to Acquire Advanced Silver-Lead-Zinc-Copper Project in Chile dated 10 May 2016. These reports are available on the Company’s website (www.goldenrim.com.au). The Company confirms that it is not aware of any new information or data that materially affects the information included in these announcements and, in the case of the Mineral Resource estimate, that all material assumptions and technical parameters underpinning estimate continue to apply and have not materially changed.

The information in this report that relates to exploration results is based on information compiled by Craig Mackay, a Competent Person, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Mackay is a full-time employee of the Company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Mackay consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

Certain statements in this document are or maybe “forward-looking statements” and represent Golden Rim’s intentions, projections, expectations or beliefs concerning among other things, future exploration activities. The projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Golden Rim, and which may cause Golden Rim’s actual performance in future periods to differ materially from any express or implied estimates or projections. Nothing in this document is a promise or representation as to the future. Statements or assumptions in this document as to future matters may prove to be incorrect and differences may be material. Golden Rim does not make any representation or warranty as to the accuracy of such statements or assumptions.

Contact Information:

Golden Rim Resources Ltd

ABN 39 006 710 774

Craig Mackay Managing Director +61 3 8677 0829 [email protected]

This announcement was authorised for release by the Board of Golden Rim Resources Ltd.

GOLDEN RIM RESOURCES ASX:GMR 13

22 April 2021

ABOUT GOLDEN RIM RESOURCES

Golden Rim Resources Limited is an ASX listed exploration company with a portfolio of advanced minerals projects in Burkina Faso and Guinea, West Africa and in Chile, South America.

The Company discovered and has outlined an Indicated and Inferred Mineral Resource of 50Mt at 1.3g/t gold for 2Moz[1] at the Kouri Gold Project, located in north-east Burkina Faso. Kouri is currently Golden Rim’s flagship project and it covers 325km[2] of highly prospective Birimian greenstones. As exploration progresses, significant additional gold mineralisation, including a high-grade gold shoot, has been discovered and the gold inventory at Kouri is expected to grow.

The Company has recently secured the Kada Gold Project in eastern Guinea. Guinea remains one of the most under-explored countries in West Africa. Kada was previously explored by Newmont who completed 39km of drilling and defined a non-JORC gold resource. With infill drilling Golden Rim believes a maiden JORC Mineral Resource can be defined at Kada in the near-term. Most of the 300km[2] project area remains poorly explored and there is considerable upside for the discovery of additional gold mineralisation.

In northern Chile, Golden Rim has the Paguanta Copper and Silver-Lead-Zinc Project. Historically a silver mine, the Company has outlined a Measured, Indicated and Inferred Mineral Resource of 2.4Mt at 88g/t silver, 5.0% zinc and 1.4% lead for 6.8Moz silver, 265Mlb zinc and 74Mlb lead[2] at Paguanta. The Mineral Resource remains open. In addition, the project has several exceptional porphyry-copper targets that remain untested.

ASX:GMR

Market Capitalisation: A$30million

Shares on Issue: 2,670million

T + 61 3 8677 0829 | E [email protected] | goldenrim.com.au

  1. ASX announcement: Kouri Mineral Resource Increases by 43% Increase to 2 Million ounces Gold dated 26 October 2020 (Total Mineral Resource includes: Indicated Mineral Resource of 7Mt at 1.4g/t gold and Inferred Mineral Resource of 43Mt at 1.2g/t gold). 2. ASX announcement: New Resource Estimation for Paguanta dated 30 May 2017 (Total Mineral Resource includes: Measured Mineral Resource of 0.41Mt at 5.5% zinc, 1.8% lead, 88g/t silver, 0.3g/t gold; Indicated Mineral Resource of 0.61Mt at 5.1% zinc, 1.8% lead, 120g/t silver, 0.3g/t gold; Inferred Mineral Resource of 1.3Mt at 4.8% zinc, 1.1% lead, 75g/t silver, 0.3g/t gold).

GOLDEN RIM RESOURCES ASX:GMR 14

22 April 2021

Appendix 1: JORC Code (2012 Edition), Assessment and Reporting Criteria

Section 1: Sampling Techniques and Data

Criteria JORC Code Explanation Explanation
Sampling
Techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
All the sampling described in this report refers to 1,169
rock chip samples collected by Herencia and Golden
Rim Resources 2011 – 2019 (the Company’s).
Rock chip grab samples were collected (approx. 3 -
5kg), from which 1kg was pulverised to produce sample
for ICP analysis and a 30g charge for Au fire assay.
Location of each hole was recorded in WGS84 by hand
held GPS with positional accuracy of approximately +/-
3 metres.
Samples were submitted to ALS Laboratory Group,
Chile for preparation and analysis. Most of the sample
were analysed at the laboratory in Antofagasta.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Samples were all collected by qualified geologists or
under geological supervision.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
NA
Drilling
Techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc.).
Not applicable to rock chip sampling.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Not applicable to rock chip sampling.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Not applicable to rock chip sampling.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Not applicable to rock chip sampling.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological logging has been carried out on all samples,
recording lithology, weathering, structure, veining,
mineralisation, grainsize and colour.
The geological logging was done using a standardised
logging system. This information and the sample details
were compiled in a sample database.

GOLDEN RIM RESOURCES ASX:GMR 15

22 April 2021

Criteria JORC Code Explanation Explanation
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
Not applicable to rock chip sampling.
The total length and percentage of the
relevant intersections logged.
Not applicable to rock chip sampling.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Rock chip samples were collected by hand, using a
hammer/pick. All samples were dry.
The samples were transported by road to ALS Global
laboratory in Antofagasta in a truck.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
Not applicable to rock chip sampling.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample preparation for all samples follows industry
best practice.
At the laboratory all samples were weighed, dried and
crushed to -2mm in a jaw crusher. A 1kg split of the
crushed sample was subsequently pulverised in a ping
mill to achieve a nominal particle size of 85% passing
75um.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Not applicable to rock chip sampling.
Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Not applicable to rock chip sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The sample sizes are appropriate to correctly represent
the style of mineralisation, the thickness and
consistency of the intersections.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
The laboratories used digestion and analysis by ICP-MS
(mass spectrometry) for 33 – 61 elements. Zn and Pb
(20-100000ppm), Ag (1-200ppm). Over limit results for
Zn, Pb, and Ag were analysed using AAS (method
OG62) to provide ore grade results in the ranges of Zn
and Pb (0.001-30%), Ag (1-1500ppm) (g/t).
30g charge fire assays conducted for gold.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Not applicable to rock chip sampling.
Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
Sample preparation checks for fineness were carried
out bythe laboratoryaspart of their internal

GOLDEN RIM RESOURCES ASX:GMR 16

22 April 2021

Criteria JORC Code Explanation Explanation
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
procedures to ensure the grind size of 85% passing 75
microns.
Internal laboratory QAQC checks were reported by the
laboratory.
Review of the internal laboratory QAQC suggests the
laboratory is performing within acceptable limits.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Sample data was compiled and digitally captured by
the company’s geologists.
The compiled digital data is verified and validated by
the Company’s database geologist.
The use of twinned holes. Not applicable to rock chip sampling.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Reported results were compiled by the Company’s
Senior Geologists and the Managing Director.
Discuss any adjustment to assay data. There were no adjustments to the assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Location data was collected with a hand-held GPS
Specification of the grid system used. WGS84
Quality and adequacy of topographic control. Not applicable to rock chip sampling.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
The rock chip samples were irregularly spaced.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Rock chip sample data not used for Mineral Resource
estimation.
Whether sample compositing has been
applied.
There was no sample compositing in samples reported.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
No orientation based sampling bias has been identified
in the data at this point.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Not applicable to rock chip sampling.
Sample
security
The measures taken to ensure sample
security.
Samples are securely stored on site prior to road
transport by Company personnel or ALS Global
personnel to the laboratory in Antofagasta, Chile.

GOLDEN RIM RESOURCES ASX:GMR 17

22 April 2021

Criteria JORC Code Explanation Explanation
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
A review by Golder and Associates was undertaken as
part of the 2013 Feasibility Study completed by
Herencia..

Section 2: Reporting of Exploration Results

Criteria JORC Code explanation Explanation
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The rock chip results are from the Paguanta Project.
The Paguanta Project is comprised of 14 exploitation
concessions covering a total surface area of 3,900ha,
and 8 exploration concessions covering a total surface
area of 2,100ha.
Paguanta Resources (Chile) SA (PRC) is a wholly owned
subsidiary of Golden Rim. PRC holds 70% of the shares
in Compania Mineral Paguanta SA, which holds the
mineral concessions at the Paguanta Project.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Tenure is in good standing.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
The area that is presently covered by the Paguanta
Project has undergone some previous mineral
exploration.
Geology Deposit type, geological setting and style of
mineralisation.
Paguanta is located in the Tarapacá Region of northern
Chile, approximately 120km northeast of Iquique and
30km west of the Chile-Bolivia border. Paguanta is
situated approximately 40km northeast of BHP
Billiton’s Cerro Colorado Mine, which has a Mineral
Resource of 400Mt @ 0.62% copper for 5.5Blb of
copper and annual copper cathode production of
approximately 175Mlb.
The Patricia zinc-silver-lead deposit, located in the
south of the Project area, is the best explored area at
Paguanta.
The epithermal-style mineralisation is hosted in
andesite and rhyolite volcanic rocks and consists of
silver-lead-zinc sulphides in multiple mineralised vein
structures that are typically steep dipping, 3m to 15m
in width, and have an east/west orientation. The style
of mineralisation within the vein structures includes
massive to semi-massive sulphide replacement, breccia
zones and stockwork vein zones.
Porphyry copper-style mineralisation also exists at
Paguanta.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole
collar elevation or RL(Reduced Level –
Not applicable to rock chip sampling.

GOLDEN RIM RESOURCES ASX:GMR 18

22 April 2021

Criteria JORC Code explanation Explanation
elevation above sea level in metres) of the
drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Not applicable to rock chip sampling.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (eg cutting of
high-grades) and cut-off grades are usually
Material and should be stated.
Samples were taken at irregular intervals.
No weighting or high-grade cutting techniques have
been applied to the data reported.
Assay results are generally quoted rounded to 1
decimal place.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer
lengths of low-grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
Not applicable to rock chip sampling.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Metal equivalent values are not reported in this
announcement.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
Not applicable to rock chip sampling.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Not applicable to rock chip sampling.
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Maps are provided in the main text.
Balanced
reporting
Where
comprehensive
reporting
of
all
Exploration
Results
is
not
practicable,
representative reporting of both low and high-
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
All sample results containing significant assays are
reported the table in the main text.

GOLDEN RIM RESOURCES ASX:GMR 19

22 April 2021

Criteria JORC Code explanation Explanation
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical
survey
results;
geochemical
survey results; bulk samples – size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating substances.
There is no other exploration data which is considered
material to the results reported in the announcement.
Further work The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Not applicable.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Not applicable.

GOLDEN RIM RESOURCES ASX:GMR 20