Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ASARA RESOURCES LIMITED Share Issue/Capital Change 2026

May 14, 2026

64427_rns_2026-05-14_24d6bde8-1578-41ac-9c5a-bba015a88077.pdf

Share Issue/Capital Change

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT
15 May 2026
ASARA RESOURCES

NOTICE UNDER SECTION 708(A)(5)(e) OF THE CORPORATIONS ACT 2001

This notice is given by Asara Resources Limited (ASX: AS1; Asara or Company) under section 708A(5)(e) of the Corporations Act 2001 (Cth)(Act).

The Company advises that it has issued 400,004,932 fully paid ordinary shares pursuant to the Placement announced on 8 May 2026. Refer to the Appendix 2A lodged today for further details.

For the purposes of section 708A(6) of the Act, the Company gives notice that:

  1. The Shares were issued without disclosure to the investors under Part 6D.2 of the Act.
  2. This Notice is being given under section 708A(5)(e) of the Act.
  3. As at the date of this Notice, the Company has complied with:

i. The provisions of Chapter 2M of the Act as they apply to the Company; and
ii. Section 674 and 674A of the Act; and

  1. As at the date of this Notice, there is no information that is 'excluded information' within the meaning of section 708A(7) and 708A(8) of the Act that is required to be set out in this Notice.

-ENDS-

This announcement was authorised for release by the Board of Directors.

Contact Information

Joanna Kiernan
Company Secretary
+61 8 6374 2654
[email protected]

ASARA RESOURCES LIMITED | ASX:AS1
Suite 1, 130 Hay Street
Subiaco WA 6008
T +61 8 6374 2654 | E [email protected] | asararesources.com


ASARA RESOURCES

About Asara Resources

Asara Resources Limited is an ASX listed exploration company with a portfolio of advanced minerals projects in Guinea, West Africa and in Chile, South America.

The Company's flagship project is the advanced Kada Gold Project in eastern Guinea. Guinea remains one of the most under-explored countries in West Africa. Asara owns 51% of the Kada project and, in April 2022, exercised its right to earn a further 24%, increasing its interest to 75%. To secure this additional interest, Asara must fund the preparation of a Definitive Feasibility Study for Kada. Asara has outlined an Indicated and Inferred Mineral Resource Estimate of 30.3Mt at 1.0g/t gold for 923Koz¹ the majority of which is shallow oxide-transitional gold mineralisation. Asara is focussed on growing the Mineral Resource Estimate. Most of the 150km² project area remains under explored and there is considerable upside for the discovery of additional oxide gold mineralisation.

Asara also holds the Paguanta Copper and Silver-Lead-Zinc Project in northern Chile and is pursuing divestment of this asset to focus on the Kada Gold Project.

At the adjacent Loreto Copper Project in Chile, Asara has signed a US$17m Option and Joint Venture agreement with Teck Resources Chile Limitada (Teck Chile) whereby Teck Chile can acquire up to a 75% interest in the project.

¹ ASX Announcement: Kada Mineral Resource Estimate Update improves confidence; more than 40% of oxide gold now indicated dated 10 October 2023.


ASARA RESOURCES

Table 1 – Kada Mineral Resource Estimate

Deposit Type Classification Tonnes (Mt) Grade (g/t Au) Metal (Oz Au)
Massan Oxide Indicated 4.6 1.07 158,000
Inferred 7.28 0.93 219,000
Total 11.88 0.99 377,000
Transition Indicated 1.07 0.88 30,000
Inferred 3.8 0.91 113,000
Total 4.94 0.9 143,000
Fresh Indicated 1.25 0.9 36,000
Inferred 11.65 0.93 350,000
Total 12.9 0.93 386,000
All Indicated 6.92 1.01 224,000
Inferred 22.8 0.93 682,000
Total 29.72 0.95 906,000
Bereko Oxide Inferred 0.48 0.92 14,000
Transition Inferred 0.06 1.05 2,000
Fresh Inferred 0.04 1.01 1,000
All Inferred 0.58 0.94 18,000
Total Kada Project Oxide Indicated 4.6 1.07 158,000
Inferred 7.76 0.93 233,000
Total 12.37 0.98 391,000
Transition Indicated 1.07 0.88 30,000
Inferred 3.92 0.91 115,000
Total 4.99 0.9 145,000
Fresh Indicated 1.25 0.9 36,000
Inferred 11.69 0.93 351,000
Total 12.94 0.93 387,000
All Indicated 6.92 1.01 224,000
Inferred 23.38 0.93 699,000
Total 30.3 0.95 923,000

Notes for Table 1:
1. Mineral Resources are reported on a dry in-situ basis at a 0.50g/t Au cut-off as selected by Asara, exceeding breakeven cut-off grades for economic extraction, and constrained to the limit of an optimised USD 1,800/oz gold price pit shell, based on a gravity/CIL processing route and typical West African open pit mining costs.
2. Mineral Resources have been compiled by Mr Frank Browning who is a full-time employee of Wardell Armstrong International and a Registered Member of the Australian Institute of Geoscientists. Mr Browning has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the JORC Code.
3. All Mineral Resource figures reported in the table above represent estimates on 1st October 2023. Mineral Resource estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape, and continuity of the occurrence and on the available sampling results. The totals contained in the above table have been rounded to reflect the relative uncertainty of the estimate. Numbers may not add due to rounding.
4. Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).

Mineral Resources have been reported at a 100% equity stake and not factored for ownership proportions. Ownership proportions are detailed elsewhere in this announcement. The Kada Mineral Resource Estimate referred to in this announcement was first reported by the Company on 10 October 2023. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Mineral Resource Estimate referred to in this report and it further confirms that all material assumptions and technical parameters underpinning the Mineral Resource Estimate continue to apply and have not materially changed.